Loading...
HomeMy WebLinkAbout000104 AmendmentSERVICE ORDER 1 TO THE CONTRACT FOR SANITARY SEWER SYSTEM CLEANING VIDEOING QETWEEN THE THE CITY OF PORT ANGELES AND PACIFIC CONCRETE SERVICES WW -11 -036 RELATING TO: CONTRACT FOR SANITARY SEWER SYSTEM CLEANING VIDEOING, WW -11 -036 This Service Order No. 1 is made and entered into this l 7 Tit day of ffB 2012, by and between THE CITY OF PORT ANGELES, a non charter code city of the State of Washington, (hereinafter called the "CITY and Pacific Concrete Services, a Washington Corporation (hereinafter called the "CONSULTANT The Service Order is being entered pursuant to the Contract titled "Sanitary Sewer System Cleaning Videoing" WW -11 -036, which was entered into on January 24, 2012. Service Order No.1 contains the first work phase requirements. I SCOPE OF SERVICES The scope of professional services to be performed and the results to be achieved by the CONNTRACTOR for the task identified in the attached Exhibit Al. The CONTRACTOR shall provide and furnish all services and material necessary to accomplish the Task identified in Exhibit Al. II TIME OF PERFORMANCE Service Order No. 1 shall be completed by March 16, 2012. III MAXIMUM COMPENSATION The maximum compensation, including tax, is $15,000 for this Service Order. IV EXHIBITS This Task Order, including its exhibits, constitutes the entire Task Order, supersedes all prior written or oral understandings, and may only be changed by a written agreement by both parties. The following exhibits are hereby made a part of this Task Order: Exhibit Al Scope of Services No. 1 Exhibit 81 Maps of Inspection Locations (12 Sheets) Exhibit C1 Price Sheet WW -11 -036 Task Order 1, Page 1 2/8/2012 V SIGNING In WITNESS THEREOF, the parties hereto have executed this Service Order to the Contract as of the day and year first written above. CITY OF PORT ANGELES: CITY MANAG CONTRACTOR: Div i9�L iii0/t//f TITLE: APPROVED AS TO FORM: CITY ATTORNEY ATTEST: WW- 11-036 Task Order 1, Page 2 2/8/2012 EXHIBIT Al Scope of Services Tasks Contractor shall provide the following services related to Contract for Sanitary Sewer System cleaning Videoing, WW -11 -036: 1. The Contractor shall perform video inspection of the sanitary sewer system in the order provided in Exhibit C1. 2. Video inspection will be performed without prior cleaning of the sanitary sewer system unless it is determined by the contractor that the sewer system condition requires prior cleaning. 3. Sewer system line lengths shown on Exhibit C1 are approximate. Line lengths will be adjusted to reflect measured distances from manhole center to manhole center, or manhole center to cleanout, whichever is appropriate as determined by Contractor or the Project Manager. 4. Sewer system line materials shown on Exhibit C1 shall be corrected if differing material is shown on the videos by the Contractor or by the Project Manager. 5. The Project Manager may change the order of work or location of work for the benefit of the City. 6. The maximum compensation, including tax, for Task 1 is $15,000. A working copy of the Exhibit C1 spreadsheet will be updated daily by the Project Manager. Inspection shall cease when the cost of work (cleaning and inspection) reaches the $15,000 limit. This Service Order does not alter the provisions of the Original Contract dated January 24, 2012. Exhibit B1 Maps of Inspection Locations (12 Sheets) CSII egl V° CO I'.I 4.RO.Z1..19iO4,09' .101 7::. 7, I f) -r- )s'eseto 0 -<1 c.?? lt c_-) ..c- 1 4 Ty, 1 .c. 111 ti 1 ..0 1 t, CO 0) 1 U P (I) co SCC!' N 1 1.41'1 i 0,4 "''1111 jahlr. r "R 1 —1 0 4 N•fri. u ,=„Ti to c, c3) ,,t__ S .r 'r! ci K2 I 1 ,1 1 Fr V ILO. I') 0 i,, CM 'Cr :J 3 ,t JJ 6 5 s ,Y,14:17C101:1179, .11V871706)79 i .1 0 I r i N Cn —0 !I CU r 1 i o AMMO. asolli m•P Exhibit C1 Price Sheet SANITARY SEWER SYSTEM CLEANING AND VIDEOING, TASK ORDER 1 EXHIBIT Cl PRICE SHEET No Street /Alley 1 Georgiana /Front Alley 2 Caroline /Georgiana Alley 2 Caroline Georgiana Alley 3 Caroline Georgiana Alley 4 Georgiana /Front Alley 5 Georgiana /Front Alley 6 Front /First Alley 7 First /Second Alley 8 Second/Third Alley 9 Third /Fourth Alley 10 Fourth /Fifty Alley 11 Fifth /Sixth Alley 12 Sixth /Seventh Alley 13 Seventh /Eighth Alley 14 Eights /Ninth Alley 15 Ninth/Tenth Alley 15 Ninth/Tenth Alley 16 Francis St 16 Francis St 17 Francis 5t 18 Francis St 19 First /Second Alley 20 Second St 21 Second/Third Alley 22 Third /Fourth Alley 23 Second/Third Alley 24 Third /Fourth Alley 25 Fourth /Fifty Alley 26 Fifth St 27 Dolan Ave 28 Hancock Ave 29 Orcas St 30 Orcas St 31 Thirteenth /Fourteenth Alley 32 Fourteenth /Fifteenth Alley 33 Fifteenth /Sixteenth Alley 34 Pine St 35 Sixteenth Street 36 Fifth /Sixth Alley 37 Sixth /Seventh Alley 38 Railroad Ave 38 Railroad Ave 39 Oak St 39 Oak St 40 Eighth /Ninth Alley 41 Eighth /Ninth Alley 42 Eighth /Ninth Alley From Race St Francis St 50' East of Francis St Race St Washington St Chambers 5t Chambers St Jones St Jones St Jones St Jones St Washington St Washington St Race St Race St Race St 80' West of Washington St Second/Third Alley First /Second Alley First /Second Alley Front /First Alley Ennis St Ennis St Ennis St Ennis St Wolcott St Wolcott St Wolcott St Wolcott St Oak St Oak St laurel St 100' West of Lincoln St Cedar St Cedar 5t Cedar St Fourteenth /Fifteenth Alley Cedar St D St D St Oak St Mid -block Front St 40' N of Front St Laurel St Lincoln St Chase St To Washington St 50' East of Francis St Race St Washington St Chambers St Jones St Jones St Liberty St. Liberty St Liberty St Liberty St Chambers St Chambers St Washington St Washington St 80' West of Washington St Washington St First /Second Alley First /Second Alley Front /First Alley Georgiana /Front Alley Alder St Alder St Alder St Alder St Penn St Penn St Penn St Penn St Laurel St Laurel St 100' West of Lincoln St 270' West of Orcas St Pine St Pine St Pine St Fifteenth /Sixteenth Alley Pine St C St C St Mid -block Laurel St 40' N of Front St Railroad Ave Lincoln St Chase St Peabody St NOTE 1 Pipe lengths are approximate Payment will be based on measured distance from maanhole centerlines 2 Contractor to verify pipeline materials 3 Cleaning Cost and CCTV Cost includes Tax of 8 4% From Through Pipe Manhole Line To Manhole Material Pipe Length Cleaning CCTO Price Cleaning Cost Asset ID Asset ID Asset ID Pipe Dia (in) (2) (ft) (1) Price /If) /If) (3) CCTV Cost (3) 1030 1475 987 15 Conc 580 0 60 0 55 377 23 345 80 1139 452 1090 12 Conc 52 0 60 0 55 33 82 31 00 1090 1473 1091 12 Conc 425 0 60 0 55 276 42 253 39 1091 2312 1031 10 Conc 530 0 60 0 55 344 71 315 99 987 1303 2131 8 Conc 475 0 60 0 55 308 94 283 20 2131 1585 2102 8 Conc 530 0 60 0 55 344 71 315 99 2101 662 2062 6 Conc 490 0 60 0 55 318 70 292 14 1998 2297 1999 6 Conc 520 0 60 0 55 338 21 310 02 1997 2615 1961 6 Conc 520 0 60 0 55 338 21 310 02 1960 297 2170 6 Conc 520 0 60 0 55 338 21 310 02 2169 697 915 6 Conc 520 0 60 0 55 338 21 310 02 2165 414 2166 6 Conc 540 0 60 0 55 351 22 321 95 2164 2774 910 6 Conc 540 0 60 0 55 351 22 321 95 907 182 909 6 Conc 455 0 60 0 55 295 93 271 27 903 1201 1621 6 Conc 470 0 60 0 55 305 69 280 21 1619 224 842 6 Conc 440 0 60 0 55 286 18 262 33 842 618 843 6 Conc 81 0 60 0 55 52 68 48 29 2126 2766 983 24 Conc 350 0 60 0 55 227 64 208 67 983 885 984 30 0 60 0 55 19 51 17 89 984 2772 1027 24 Conc 350 0 60 0 55 227 64 208 67 1027 1634 1864 30 Conc 370 0 60 0 55 240 65 220 59 1962 2621 2174 6 Conc 440 0 60 0 55 286 18 262 33 2172 1581 918 6 Conc 440 0 60 0 55 286 18 262 33 2171 1582 917 6 Conc 565 0 60 0 55 367 48 336 85 916 1573 252 6 Conc 400 0 60 0 55 260 16 238 48 1636 2653 856 8 Conc 400 0 60 0 55 260 16 238 48 853 2654 855 8 Conc 400 0 60 0 55 260 16 238 48 1931 724 1934 8 Conc 400 0 60 0 55 260 16 238 48 1932 166 624 8 Conc 450 0 60 0 55 292 68 268 29 1654 1165 1655 8 Conc 540 0 60 0 55 351 22 321 95 865 1382 867 8 540 0 60 0 55 351 22 321 95 870 1151 873 6 350 0 60 0 55 227 64 208 67 873 2281 875 6 7 400 0 60 0 55 260 16 238 48 898 2326 2021 6 Conc 520 0 60 0 55 338 21 310 02 1551 1550 2022 6 Conc 520 0 60 0 55 338 21 310 02 2039 1543 2040 6 Conc 520 0 60 0 55 338 21 310 02 2022 2328 2040 8 Conc 380 0 60 0 55 247 15 226 56 276 2078 1976 6 Conc 440 0 60 0 55 286 18 262 33 1074 1401 1663 6 Conc 490 0 60 0 55 318 70 292 14 1661 667 1662 6 Conc 480 0 60 0 55 312 19 286 18 1434 1227 1504 18 Conc 295 0 60 0 55 191 87 175 88 1504 1002 1505 18 Conc 310 0 60 0 55 201 62 184 82 1501 3215 12976 18 Conc 40 0 60 0 55 26 02 23 85 12976 262 1434 18 Conc 330 0 60 0 55 214 63 196 75 2166 1741 2030 24 Conc 525 0 60 0 55 341 46 313 01 2030 993 2084 24 530 0 60 0 55 344 71 315 99 2084 900 2049 12 Conc 475 0 60 0 55 308 94 283 20 19388