Loading...
HomeMy WebLinkAbout5.970 Original Contract (2)AMENDMENT No. 4 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND EES CONSULTING, INC. RELATING TO: SMART GRID INVESTMENT GRANT APPLICATION THIS AGREEMENT is made and entered into this o�� s day of (a.A.C_ 2011, by and between THE CITY OF PORT ANGELES, a non charter code city of the State of Washington, (hereinafter called the "CITY") and EES Consulting, Inc., a Washington Corporation authorized to do business in the state of Washington (hereinafter called the "CONSULTANT WHEREAS, the CITY desires professional services related to a Commercial and Industrial Demand Response Economic Evaluation for its electric utility; and WHEREAS, the CITY desires to engage the professional services and assistance of a qualified consulting firm to perform the scope of work as detailed in Exhibit A, and WHEREAS, the CONSULTANT represents that it is in full compliance with the statutes of the State of Washington for professional registration and /or other applicable requirements, and WHEREAS, the CONSULTANT represents that it has the background, experience, and ability to perform the required work in accordance with the standards of the profession, and WHEREAS, the CONSULTANT represents that it will provide qualified personnel and appropriate facilities necessary to accomplish the work; NOW, THEREFORE, in consideration of the above representations and the terms, conditions, covenants, and agreements set forth below, the parties hereto agree as follows: I REVISED SCOPE OF WORK The scope of professional services to be performed and the results to be achieved by the CONSULTANT shall be as detailed in the attached Exhibit A and shall include all services and material necessary to accomplish the work. The CITY may review the CONSULTANT'S work product, and if it is not satisfactory, the CONSULTANT shall make such changes as may be required by the CITY. Such changes shall not constitute "Extra Work" as related in Section XII of this Agreement. The CONSULTANT agrees that all services performed under this Agreement shall be in accordance with the standards of the profession and in compliance with applicable federal, state and local laws. The Scope of Work may be amended upon written approval of both parties. Page 1 of 2 II MAXIMUM COMPENSATION The additional work authorized by the Amendment is in the total of $20,000.00, including all items contained on Page 1 of Exhibit A. III TIME OF PERFORMANCE The work for each task shall be completed according to the schedule in the attached Scope of Work, and must be completed on or before July 31, 2013. IV SIGNATURES Except as modified herein, the original AGREEMENT as amended shall remain in effect. In WITNESS WHEREOF, the parties hereto have executed Amendment No. 4 to the Agreement as of the date and year first written above. CITY OF PORT ANGELES RENT NIYER$I MANAGER CON S.I T ANT Page 2of2 it TITLE: Y n \aV\Ck APPROVED AS TO FORM: WILLIAM E. BLOOR, CITY ATTORNEY ATTEST: JAN SA HURD, CITY CLERK EXHIBIT A: Statement of Work The primary tasks involved in assisting the City are: Task A Economic Evaluation of the C &I Demand Response Pilot Projects with BPA Objective: To assist the City in Task 4: Economic Evaluation of the Commercial and Industrial (C &I) Demand Response (DR) Pilot Project with BPA. 1. Project Management and Review: Attend by phone at most, two (2) project review meetings with all project participants. Consult with the City's project manager on an as needed basis. 2. Data Review and Manipulation: Obtain 12 to 15 months of 15- minute meter data from eight (8) sites in the City of Port Angeles. This data will be provided in a form that is sortable by date and time. Spend minimal time reviewing and /or manipulating the metering data. 3. Template Development Modeling: Develop an economic analysis template. The economic analysis will use the 15- minute meter data to develop a baseline energy use, compare the power cost associated to the baseline customer with the power cost to that customer after several demand response events. Develop a cost/benefit analysis for both the customer and the City. BPA to supply costs associated with avoided transmission and generation upgrades. It is anticipated the economic analysis template will serve as a tool to assist utilities in evaluating demand response throughout the region. 4. Analysis: Populate the economic analysis template with two or three (2 -3) of the eight (8) Integrated Load Management projects using Open ADR identified under Task 3.1 of the City's project with BPA, with a focus on different load types. It is anticipated the City or individuals customers will be able to complete the remaining analyses. 5. Reporting: Prepare a memo summary report of the results, including a description of the economic template. Deliverables A draft summary memo and economic analysis template containing two to three of the Integrated Load Management projects using Open ADR will be provided. Once the City has reviewed the draft summary memo, EES Consulting will incorporate any comments or suggestions into a final memo and economic analysis template. Once the project is completed, EES Consulting will provide the City with a copy of the model. 1 Basic Fee Estimates EXHIBIT B: Budget Costs for Each Task EES Consulting charges the following hourly billing rates. The fee estimates for this project have been developed on the basis of the following billing rates: President $185 Managing Director 165 Manager /Consultant 160 Project Manager 150 Senior Analyst 145 Analyst 140 Administrative 120 Based upon the above hourly billing rates, the following labor fee budget is estimated for the scope of services presented for the electric rate study. If the scope of services is modified, EES Consulting will discuss any required changes to the budget prior to proceeding with additional work. Task A Economic Evaluation Total Labor Cost $20.000 $20,000 In addition, any presentations or meetings requested by the City are billed at the hourly rates listed above. Out -of- pocket and travel expenses will be billed separately at their actual cost. The above quoted fees will remain in effect until December 31, 2011. 2 Time Schedule EXHIBIT C: Schedule for the Work EES Consulting has staff available to begin work upon Agreement execution. EES Consulting will develop the template prior to receipt of the 15- minute meter data. Once the meter data is available, it is anticipated that initial results of the model can be available within 4 weeks. 3