Loading...
HomeMy WebLinkAbout000092 Amendment (6)F"11111' AMENDMENT NO. 6 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND STUDIO CASCADE, INC PROJECT WTIP THIS AMENDMENT NO. 6 is made and entered into this 4"' day of _June_ 2014, by and between the City of Port Angeles, a non -charter code city of the State of Washington, (hereinafter called the "CITY") and Studio, Cascade Inc., a Washington Corporation (hereinafter called the "CONSULTANT"). WHEREAS, this amendment to the AGREEMENT satisfies the criteria of Port Angeles Municipal Code 3.05.110; NOW, THEREFORE, in consideration of the representations and, the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows: SECTION 1 The CITY entered into an AGREEMENT with the CONSULTANT on May 5, 2011 (the AGREEMENT) and amended the AGREEMENT on July 12, 2012, October 1, 2012, November 20, 2012, March 12, 2013, and March 4, 2014. SECTION 2 I. TIME OF PERFORMANCE Section IV of the original Agreement is amended to read as follows: The CONSULTANT may begin work upon the execution of this Agreement by both parties and the duration of the Agreement shall extend. through July 31, 2015. II. SCOPE OF SERVICES Section I of the Agreement is amended to include all work described in the attached Exhibit A — Port Angeles West End Park Extra Design Services — Addendum 6. III. MAXIMUM COMPENSATION Section VI of the Agreement is amended as follows: The not to exceed amount is increased by $146,600 from $1,561,172 to $1,707,772. IV. REVISED EXHIBITS EXHIBIT "C" is of the original Agreement is amended, increasing the budget for Task 6 by $146,600 from $132,935 to $279,535. SECTION 3 RATIFICATION As modified herein, the AGREEMENT is confirmed and ratified. In WITNESS WHEREOF, the parties hereto have executed this Amendment No. 6 to the Agreement as of the date and year first written above. CITY OF PORT ANGELES By: City Manager ATTEST: Janess urd, City Clerk APPROf/VED AS TO FORM: William lEr. Bloor, City Attorney STUDIO CASCADE, INC Exhibit A — Port Angeles West End Park Extra Design Services — Addendum 6 The West End Park design process is essentially complete, except for a final set of revisions to respond to agency comments requiring separate bid packages for elements of the park that are funded by a dedicated grant and necessitate an independent, free-standing bid package. This necessitates limited redesign of the park's electrical system and landscaping to ensure project construction in independent phases is compatible and consistent with the park's overall design intent. This Addendum 6 includes an allowance for design team fees to make those revisions to the design and bid specifications. It also includes an allowance for design team support during the construction phase to address design -related issues as they arise. Addendum 6 includes these additional services, resulting in a contract value increase of $146,600. Task Description SCI Zenovic HBB CGS Sazan Total Work to separate the beaches Beaches portion of the project into a 1,000 9,000 0 7,500 0 17,500 separate, free-standing construction -ready bid set. Work to separate the waterfront Trail trail portion of the project into a 1,500 7,500 3,500 0 5,000 17,500 separate, free-standing construction -ready bid set. Work to separate the balance of Park the park into a separate, free- 1,500 9,600 6,000 0 5,300 22,400 standing construction -ready bid set. Constructio Work to assist the contractor and n design construction management team to 6,400 45,300 19,500 18,000 0 89,200 support resolve design details during construction. This includes regular attendance at construction meetings and limited processing of requests for information (RFIs) for design -related issues. Total extra services 10,400 71,400 29,00 25,500 10,300 146,600 0 Studio Cascade Community Planning & Design Notes: Hi Janesssa, !!. Jul 1 6 2014 ?I I Enclosed is a signed, original copy of the agreement between the City of Port Angeles and Studio Cascade, Inc. Please let me know if you need anything further. Thank you. 429 E. Sprague Avenue, Spokane WA 99202 voice 509.835.3770 fax 509.835.3763 To: Janessa Hurd, City Clerk Facsimile X From: Angela Shope Postal Service F] Date: July 14, 2014 Hand Delivery F] FAX No.: (509) 835-3763 Please Respond ❑ Pages:4 Urgent (Including cover sheet) Notes: Hi Janesssa, !!. Jul 1 6 2014 ?I I Enclosed is a signed, original copy of the agreement between the City of Port Angeles and Studio Cascade, Inc. Please let me know if you need anything further. Thank you. 429 E. Sprague Avenue, Spokane WA 99202 voice 509.835.3770 fax 509.835.3763