Loading...
HomeMy WebLinkAbout5.788 Amendment (17).788 AMENDMENT NO. 17 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND BROWN AND CALDWELL PROJECT 06 -01 THIS AMENDMENT NO. 17 is made and entered into this 17t" day of Se tee mber, 2013, by and between the City of Port Angeles, a non - charter code city of the State of Washington, (hereinafter called the "CITY ") and BROWN AND CALDWELL, INC a California Corporation authorized to do business in the State of Washington (hereinafter called the "CONSULTANT "); The CITY entered into the existing AGREEMENT with the CONSULTANT on July 5, 2006, (the AGREEMENT); and WHEREAS, the CITY and CONSULTANT amended the AGREEMENT on February 21, 2007, May 9, 2007, March 20, 2008, September 15, 2009, November 30, 2009, March 9, 2010, July 27, 2010, November 16, 2011, December 21, 2010, January 4, 2011, September 20, 2011, January 9, 2012, February 24, 2012, February 21, 2012, February 26, 2013, August 20, 2013 (Amendment 16), and has proposed Amendment 17 (the AMENDMENTS); and WHEREAS, the CITY desires to amend the AGREEMENT again to amend the Scope of Work and Budget: NOW, THEREFORE, in consideration of the representations and the terms, conditions, covenants and agreements set forth in this AMENDMENT, the Agreement and the Amendments are hereby amended as follows: 1 REVISED SCOPE OF WORK The Scope of professional services to be performed and the results to be achieved by the CONSULTANT are hereby amended by adding the tasks identified in the attached Exhibit A to Amendment 17. The CONSULTANT shall provide. and furnish all services and material necessary to accomplish the additional work identified in Exhibit A. III MAXIMUM COMPENSATION Section VI of the Agreement, is amended from $7,299,684 in Amendment 16 to $7,325,895, in Amendment 17, an increase of $26,211. The budget for any Task may be further adjusted by mutual agreement without an amendment to the Agreement, as long as the maximum compensation amount of $7,325,895 is not exceeded. IV RATIFICATION Amendment 1, Page 1 As amended herein, the Agreement and the Amendments are ratified and confirmed. In WITNESS THEREOF, the parties hereto have executed this Amendment No. 17 to the Agreement as of the date and year first written above CITY OF PORT ANGELES By: Dan McKeen, City Manager ATTEST: 5*4(0-4� Ja e sa Hurd, City Clerk APPROVED AS TO FORM: William E. Bloor, City Attorney 7 y: AND CALDWELL P,� Title: SW -10�- Amendment 1, Page 2 EXHIBIT A To Amendment 17 SCOPE OF SERVICES RELATED TO CSO PHASE I TASK 18 ENGINEERING SERVICES DURING CONSTRUCTION Amendment 17 provides additional budget to accomplish the original scope of services in Task 18, Engineering Services During Construction. Under construction engineering services in Task 18, 1, several elements of work critical to the construction and completion of the CSO Phase 1 project have been performed that resulted in an increase to Brown and Caldwell's level of effort. These unanticipated elements of work include: • Design for Pipeline Inspection Gauge (PIG) Launching Station at CSO outfall number 10 • Design upgrades to the CSO tank flush column to prevent over - pressurization • Design modifications to the CSO tank vortex drop box • Addressing additional requirements identified by Ecology to reconcile tribal issues concerning the Industrial Outfall rehabilitation. At this time, construction is over 80% complete on an earned value basis, and it is clear that additional funds are required in order to finish all tasks in the original scope. EXHIBIT B To Amendment 17 PROFESSIONAL SERVICES AGREEMENT NO 06 -01 BUDGET TASK DESCRIPTION Amendment 17 Total Contract CSO PHASE I (Amendment 1 through 14, and Amendment 17.E�. „a 1 through 11 Design $3,663,237 12 Septage Receiving Station Design $8,400 13 Headworks Screens Design $56,000 14 Integrated CSO Monitoring Design $26,000 15 WWTP Project Integration & Monitoring $34,900 16 First St Stormwater Separation $418,074 17 Industrial Outfall Repair and Cleaning $47,000 18 Engineering Services during Construction for CSO Ph 1 $26,211 $512,191 Subtotal CSO Phase I $4,765,802 19 CSO PHASE II Amendment 15 and 17 ' 19.1 Architectural Services $85;000 19.2 Geotechnical En ineering Services $73,718 19.3 Surveying and Base Mapping Services $28,402 19.4 Permitting and Environmental Support $29,855 19.5 Acoustic Evaluation Services $23,500 19.6 Quality Control $23,998 19.7 Facility Design and Preparation of Construction Contract Documents: Civil Design; Preliminary Civil Design; Detailed Process Mechanical Design Surge Analysis Building Mechanical Design Structural Design Electrical Design Instrumentation and Control Design $1,946,562 19.8 Preparation of Cost Estimate $33,712 19.9 Project Management $199,863 20 Peabody Creels Culvert Condition Assessment $115,483 Subtotal CSO Phase H $2,560,093 CONTRACT TOTAL j $7,325,895