HomeMy WebLinkAbout000656 Amendment 000656 04 PORT `< City of Port Angeles t x - Public Works Department 321 East 5th Street/ Port Angeles, WA 98362 �SyIN s� Contract No.&Title CONTRACT ORDER 06-01 PHASE 1 CSO, RAYONIER OUTFALL DIFFUSER REPAIR/MODIFCATION PROJECT Project Manager: Michael SZatlocky DateChange 3 Prime: Richard Phillips Marine, Inc Prepared 7-14-2014 Order No. Change Title: Unanticipated Material Encountered Around Outfall Pipe Change Scope/Justification: Bid Item No. 6a - Unanticipated Material Encountered Around Outfall Pipe The City of Port Angeles issued change order number 1 in the amount of$50,000 to compensate the Contractor for additional work related to excavating around the Outfall Risers. This work was not included within the original contract documents and therefore was extra work added to the contract. It was estimated that an additional unanticipated work would be required resulting in a second increased cost of$50,000 for a total cost of unanticipated work of$100,000 (See Council memo dated December 17, 2013). All work was completed in January, 2014. The total cost of unanticipated work was $90,000. City of Port Angeles phase 01 CSO Rayonier Outfall Diffuser Repair/Modification Project 1 Change Order No.3 • s � CONTRACT AMOUNT SCHEDULE Original Contract $383,000.00 Original Substantial Completion 11/5/2013 Previous Change Orders $50,000.00 Previous Time Extension by 6 Change Order(days)* 56 days This Change Order (Extended Amount $40,000.00 Suspension of Work(days) Substantial Completion date to 12/31/2013 6 days Change Order#1 Time (Extends Extension(days) Substantial Completion Date New Contract Amount $473,000.00 to 1/6/2014 3 days Change Order#2 Time (Extends Extension(days) Substantial Completion Date to 1/9/2014 Substantial Completion 1/8/2014 Change Order#3 No Change CONTRACTOR: Richard Phillips Marine, Inc CITY OF PORT ANGELES Signature Signature Name&Yitle Name&Title Dan McKeen City Manager Date: Date: 8 / (v I I This Change Proposal shall represent full and complete compensation and final settlement of all Claims for all(1)time;(2) direct,indirect,and overhead costs;(3)profit;and(4)costs or damages associated with delay,inconvenience,disruption of schedule,impact,ripple effect,loss of efficiency or productivity,acceleration of work,lost profits,and/or any other costs or damages related to any work either covered or affected by the Change Proposal,or related to the events giving rise to the Change Proposal. City of Port Angeles Phase 01 C50 Rayonier Outfall Diffuser Repair/Modification Project 2 Change Order No.3