Loading...
HomeMy WebLinkAbout000832 Original Contract City of Port Angeles 0�V ORT. ce,, ; City f Port Angeles Record # 000832 Public Works &Utilities Dept. Engineering E.Angeles,WA 98362 stmt Po rt Ang LIMITED PUBLIC WORKS PROCESS Po "i:ORKS0' Tel: 360-417-4541 Fax: 360-417-4709 ❑ Request for Quotation ❑ Contract Contract Title: Civic Field Light Pole Repair Project Number: PK-14-029 THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES, WASHINGTON ("CITY") AND Andy Schwartz Construction ("CONTRACTOR"). 1. WORK BY CONTRACTOR The Contractor shall perform the work as described in Attachment"A"(Attachment°A"may include Contractor's Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents) which is attached hereto and by this reference is incorporated herein. 2. TERM OF CONTRACT All work under this Contract is to be completed as indicated (check one): ❑ All work under this Contract is to be completed by this date: ❑ All work under this Contract is to be completed 10 days from the Notice to Proceed. No work is to be performed prior to written Notice to Proceed by the City. ® The performance period under this Contract commences seven (Z)calendar days after notice to proceed and ends thirty_(30) calendar days thereafter. 3. PAYMENT A. The City shall pay the Contractor for the work performed under this contract (check one): ❑ Force Account -Time and material, not to exceed: $ ❑ Force Account-Time and actual expenses incurred, not to exceed: $ ❑ Force Account- Unit prices set forth in the Contractor's bid or quote, not to exceed: $ ® Firm Fixed Price set forth in Contractor bid or quote in the amount of: $7,720.12 The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance with and as described in Attachment "A". The Contractor shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof; except as are mentioned in the specifications to be furnished by the City of Port Angeles. B. The Contractor shall maintain time and expense records, which may be requested by the City. The contractor shall submit invoices to the City for payment for work performed. All invoices must reference the City's contract number. Invoices shall be in a format acceptable to the City. C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt of a properly completed invoice. D. All records and accounts pertaining to this Contract are to be kept available for inspections by representatives of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon request. Project PK-14-029 Page 1 Rev. 8/30/2011 E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the Contract, the Contractor shall correct or modify the required work to comply with the requirements of this Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the Contract Documents. 4. RESPONSIBILITY OF CONTRACTOR A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and local regulations, ordinances and codes. Contractor shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public and shall post danger signs warning against known or unusual hazards. B. Correction of Defects. Contractor shall be responsible for correcting all defects in workmanship and/or materials discovered within one year after acceptance of this work. When corrections of defects are made, Contractor shall be responsible for correcting all defects in workmanship and/or materials in the corrected work for one year after acceptance of the corrections by the City. The Contractor shall start work to remedy such defects within seven (7) days of mailing notice of discovery thereof by City and shall complete such work within a reasonable time. In emergencies where damage may result from delay or where loss of service may result, such corrections may be made by the City, in which case the cost shall be borne by the Contractor. In the event the Contractor does not accomplish corrections at the time specified, the work will be otherwise accomplished and the cost of same shall be paid by the Contractor. C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages including consequential damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost of materials and labor expended by the City in making emergency repairs and cost of engineering, inspection and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made against the City as a result of any defective work and the Contractor shall defend any such claims at its own expense. Where materials or procedures are not specified in the Contract Document, the City will rely on the professional judgment of the Contractor to make appropriate selections. D. Nondiscrimination/Affirmative Action. Contractor agrees not to discriminate against any employee or applicant for employment or any other persons in the performance of this Contract because of race, creed, color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local law or ordinance, except for a bona fide occupational qualification. Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by Contractor setting forth the provisions of the nondiscrimination clause. E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or services required by the Contractor under this Contract, shall be considered employees of the Contractor only and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of said employees, while so engaged, and all claims made by a third party as consequence of any negligent act or omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or rendered herein, shall not be the obligation of the City. S. COMPLIANCE WITH LAWS The Contractor shall comply with all federal, state and local laws and regulations applicable to the work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of a material provision of this Contract and shall be grounds for cancellation, termination or suspension of the Contract by the City, in whole or in part, and may result in ineligibility for further work for the City. 6. TERMINATION OF CONTRACT A.This Contract shall terminate upon satisfactory completion of the work described in Attachment "A" and final payment by the City. B. The City may terminate the Contract and take possession of the premises and all materials thereon and finish the work by whatever methods it may deem expedient, by giving 10 days written notice to the Project PK-14-029 Page 2 Rev. 8/30/2011 Contractor, upon the occurrence of any one or more of the events hereafter specified. 1. The Contractor makes a general assignment for the benefit of its creditors. 2. A receiver is appointed as a result of the insolvency of the Contractor. 3. The Contractor persistently or repeatedly refuses or fails to complete the work required herein. 4. Contractor fails to make prompt payment to subcontractors for material or labor. 5. Contractor persistently disregards federal, state or local regulations and ordinances. 6. Contractor persistently disregards instructions of the Contract Administrator, or otherwise substantially violates the terms of this Contract. 7. The City determines that sufficient operating funds are not available to fund completion of the work contracted for. C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any further amounts due under this Contract until the work specified in Attachment "A" is satisfactorily completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under this Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or which may be sustained by reason of such refusal, neglect, failure or discontinuance of employment, such excess shall be paid by the City to the Contractor. If the City's expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City. Such expense and damages shall include all legal costs incurred by the City to protect the rights and interests of the City under the Contract, provided such legal costs shall be reasonable. 7. OWNERSHIP OF DOCUMENTS A. On payment to the Contractor by the City of all compensation due under this Contract, all finished or unfinished documents and material prepared by the Contractor with funds paid by the City under this Contract shall become the property of the City and shall be forwarded to the City upon its request. B. Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City or by court order. B. CLAIMS Any claim against the City for damages, expenses, costs or extras arising out of the performance of this Contract must be made in writing to the City within thirty days after the discovery of such damage, expense or loss, and in no event later than the time of approval by the City for final payment. Contractor, upon making application for final payment, shall be deemed to have waived its right to claim for any other damages for which application has not been made, unless such claim for final payment includes notice of additional claim and fully describes such claim. 9. GENERAL ADMINISTRATION AND MANAGEMENT The Director of the Public Works and Utilities Department or his/her designee shall have primary responsibility for the City under this Contract and shall oversee and approve all work to be performed, coordinate communications, and review and approve all invoices, under this Contract. 10. INDEMINIFICATION / HOLD HARMLESS A. The Contractor shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with the performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. B. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This Project PK-14-029 Page 3 Rev. 8/30/2011 waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 11. INSURANCE The Contractor shall maintain insurance as set forth in Attachment B. 12. PREVAILING WAGE This Contract is subject to the requirements of Chapter 39.12 RCW, and as it may be amended, relating to prevailing wages. On Public Works projects, funded in part or in whole with Federal funds, Federal wages laws and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED IN THE PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF WAGE as determined by the Industrial Statistician of the Department of Labor and Industries for the State of Washington. The schedule of prevailing wage rates for this Contract is made a part of this contract as though fully set forth herein. Prior to making any payment under this Contract, the City must receive an approved copy of the "Statement of Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industries. It is the Contractor's responsibility to obtain and file the "Statement of Intent to pay Prevailing Wage". The Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that prevailing wages have been paid by the Contractor and all subcontractors. Following the final acceptance of services rendered, Contractor shall submit an "Affidavit of Wages Paid". For a contract award or an on-call contract work order under $2,500, and in accordance with RCW 39.12.040(2), the contractor or subcontractor is authorized to submit a combined Statement Of Intent To Pay Prevailing Wages &Affidavit Of Wages directly to the City of Port Angeles at final invoicing. Submission shall be made on the form developed by the Washington State Department of Labor and Industries and available from the City of Port Angeles Public Works and Utilities Department. In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or occupation and such dispute cannot be adjusted by the parties in interest, including labor and management representatives, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his decision shall be final, conclusive, and binding on all parties involved in the dispute. 13. INTERPRETATION AND VENUE This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. 14. BRANDS OR EQUAL When a special "brand or equal" is named it shall be construed solely for the purpose of indicating the standards of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered, provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid containing a brand which is not of equal quality, performance, or use specified must be represented as an alternate and not as an equal, and failure to do so shall be sufficient reason to disregard the bid. 15. INSPECTION AND REJECTION All goods, services, work, or materials purchased herein are subject to inspection and to approval by the City. Any rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications of this order, whether held by the City or returned, will be at Contractor's risk and expense. 16. SUBLETTING OR ASSIGNING OF CONTRACTS Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from this Contract without the express prior written consent of the other. 17. INDEPENDENT CONTRACTOR Project PK-14-029 Page 4 Rev.8/30/2011 i The Contractor is and shall be at all times during the term of this Contract an independent contractor and not an employee of the City. 18. EXTENT OF CONTRACT/MODIFICATION This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written or oral. This contract may be amended, modified or added to only by written instrument properly signed by both parties hereto. 19. SUBCONTRACTOR RESPONSIBILITY A. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include substantially the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to all subcontractors regardless of tier. B. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: - At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW; - Have a current state unified business identifier number; - If applicable, have: • Industrial insurance coverage for the subcontractor's employees working in Washington as required in Title 51 RCW; • An employment security department number as required in Tile 50 RCW; and • A state excise tax registration number as required in Tile 82 RCW; • An electrical contractor license, if required by Chapter 19.28 RCW; • An elevator contract license, if required by Chapter 70.87 RCW. - Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Project PK-14-029 Page 5 Rev. 8/30/2011 IN WITNESS WHEREOF, the parties have executed this Contract as of 1 .', 2014. ANDY SCHWARTZ CONSTRUCTION CITY OF PORT ANGELES By w Printed Name: t- 'f - Printed Name: f._ Title: (0 Title: C c_'N c r Address: Cc City: +! P-1 � Tax ID #: &6 J Phone Number: Purchase Order #: JL8. v 0 1 Project PK-14-029 Page 6 Rev. 8/30/2011 City of Port Angeles ATTACHMENT "A" Engineering Office WORK BY CONTRACTOR Public Works and Utilities Department 360-417-4541 The contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the project described below. Unless otherwise provided for in the Statement of Work, the Contractor will be responsible for obtaining and paying for any and all permits required for this work. General Scope: Install repair band on light pole No. 7 in accordance with the project plan and specifications. Location: Civic Field, 307 South Race Street, Port Angeles, WA Site Point of Contact: Eric Walrath at 360-417-4806. Work Hours and Schedule: The contractor will be allowed to work from 8:00 AM to 5:00 PM, Monday through Friday, non-holidays. Work outside of these days and/or hours may be requested from and is at the discretion of the City Engineer. Permits: None Work Requirements: Ability to access pole repair locations approximately 40 and 55 +/- feet above adjacent grade. 1.0 Project Description Repair Area 1: Remove loose concrete and rust from upper connecting ring, exposed reinforcing strands and reinforcing anchors, remove pole steps as necessary to install steel sleeve as detailed in the plans, fill annular space between steel sleeve and pole surface with Type 2 grout. Repair Area 2: Remove loose concrete and rust from reinforcing steel in concrete rock pocket located above steel sleeve installation location and install Type 3 mortar to fill void to flush with pole surface. 2.0 Standard Specifications This contract incorporates the Washington State Department of Transportation's 2014 Standard Specifications for Road, Bridge and Municipal Construction referred to herein as the Standard Specifications and the City of Port Angeles Urban Services Standards and Guidelines(current edition). 2.1 Special Provisions 1-01.3 Definitions (September 12, 2008 APWA GSP) This Section is supplemented with the following: All references in the Standard Specifications to the terms "State", "Department of Transportation", Washington State Transportation Commission", "Commission", Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall be revised to read "Contracting Agency". All references to "State Materials Laboratory" shall be revised to read "Contracting Agency designated location". Project PK-14-029 Page 7 Rev.8/30/2011 The venue of all causes of action arising from the advertisement, award, execution, and performance of the contract shall be in the Superior Court of the County where the Contracting Agency's headquarters are located. Additive A supplemental unit of work or group of bid items, identified separately in the proposal, which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. Alternate One of two or more units of work or groups of bid items, identified separately in the proposal, from which the Contracting Agency may make a choice between different methods or material of construction for performing the same work. Contract Documents See definition for"Contract". Contract Time The period of time established by the terms and conditions of the contract within which the work must be physically completed. Dates Bid Opening Date The date on which the Contracting Agency publicly opens and reads the bids. Award Date The date of the formal decision of the Contracting Agency to accept the lowest responsible and responsive bidder for the work. Contract Execution Date The date the Contracting Agency officially binds the agency to the contract. Notice to Proceed Date The date stated in the Notice to Proceed on which the contract time begins. Substantial Completion Date The day the Engineer determines the Contracting Agency has full and unrestricted use and benefit of the facilities, both from the operational and safety standpoint, and only minor incidental work, replacement of temporary substitute facilities, or correction or repair remains for the physical completion of the total contract. Physical Completion Date The day all of the work is physically completed on the project. All documentation required by the contract and required by law does not necessarily need to be furnished by the Contractor by this date. Completion Date The day all the work specified in the contract is completed and all the obligations of the Contractor under the contract are fulfilled by the Contractor. All documentation required by the contract and required by law must be furnished by the Contractor before establishment of this date. Final Acceptance Date The date on which the Contracting Agency accepts the work as complete. Notice of Award The written notice from the Contracting Agency to the successful bidder signifying the Contracting Agency's acceptance of the bid. Project PK-14-029 Page 8 Rev.8/30/2011 Notice to Proceed The written notice from the Contracting Agency or Engineer to the Contractor authorizing and directing the Contractor to proceed with the work and establishing the date on which the contract time begins. Traffic Both vehicular and non-vehicular traffic, such as pedestrians,bicyclists,wheelchairs, and equestrian traffic. Bid Items Not Included in the Proposal Section 1-04.1(2)is replaced with the following: "When the contract specifies Work that has no Bid item, and the Work is not specified as being included with or incidental to other Bid items, payment for the Work shall be included in an appropriate unit price or lump sum bid item in the Bid Form." 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda Revise the second paragraph to read: Any inconsistency in the parts of the contract shall be resolved by following this order of precedence(e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 1. Addenda, 2. Proposal Form, 3. Special Provisions, including APWA General Special Provisions if they are included, 4. Contract Plans, 5. Amendments to the Standard Specifications, 6. Current edition of the City of Port Angeles Urban Services Standards and Guidelines, 7. WSDOT Standard Specifications for Road Bridge and Municipal Construction, and 8. WSDOT Standard Plans for Road Bridge, and Municipal Construction. 1-04.4 Changes in Work Section 1-04.4, Changes, of the Standard Specifications shall be supplemented with the following: All revisions, clarifications, field requests and field authorizations for construction contracts shall be documented using the 'REQUEST FOR INFORMATION (RFI)"form. A construction contract change order may be initiated by the Contractor, City Inspector, or Engineer by using the RFI form contained in Contract documents. 1-05.7 Removal of Defective and Unauthorized Work (October 1, 2005 APWA GSP) Supplement this section with the following: If the Contractor fails to remedy defective or unauthorized work within the time specified in a written notice from the Engineer, or fails to perform any part of the work required by the Contract Documents, the Engineer may correct and remedy such work as may be identified in the written notice, with Contracting Agency forces or by such other means as the Contracting Agency may deem necessary. If the Contractor fails to comply with a written order to remedy what the Engineer determines to be an emergency situation, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have work the Contractor refuses to perform completed by using Contracting Agency or other forces. An emergency situation is any situation when, in the opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or damage to the public. Project PK-14-029 Page 9 Rev. 8/30/2011 Direct or indirect costs incurred by the Contracting Agency attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from monies due, or to become due, the Contractor. Such direct and indirect costs shall include in particular, but without limitation, compensation for additional professional services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. No adjustment in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the Contracting Agency's rights provided by this Section. The rights exercised under the provisions of this section shall not diminish the Contracting Agency's right to pursue any other avenue for additional remedy or damages with respect to the Contractor's failure to perform the work as required. 1-05.10 Guarantees Section 1-05.10 is supplemented with the following: The Contractor shall guarantee all materials and equipment furnished and work performed for a period of one (1) year from the date of substantial completion. The Contractor shall warrant and guarantee for a period of one (1) year from the date of substantial completion of the system that the completed system is free from all defects due to faulty materials or workmanship, and the Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of any damage to other parts of the system resulting from such defects. The City will give notice of observed defects with reasonable promptness. In the event that the Contractor should fail to make such repairs, adjustments, or other work that may be made necessary by such defects, the City may do so and charge the Contractor the cost thereby incurred. Measurement and Payment All costs associated with this item shall be incidental to the contract prices for the various bid items. 1-05.11 Final Inspection Delete this section and replace it with the following: 1-05.11 Final Inspections and Operational Testing (October 1, 2005 APWA GSP) 1-05.11(1) Substantial Completion Date When the Contractor considers the work to be substantially complete, the Contractor shall so notify the Engineer and request the Engineer establish the Substantial Completion Date. The Contractor's request shall list the specific items of work that remain to be completed in order to reach physical completion. The Engineer will schedule an inspection of the work with the Contractor to determine the status of completion. The Engineer may also establish the Substantial Completion Date unilaterally. If, after this inspection, the Engineer concurs with the Contractor that the work is substantially complete and ready for its intended use, the Engineer, by written notice to the Contractor, will set the Substantial Completion Date. If, after this inspection, the Engineer does not consider the work substantially complete and ready for its intended use, the Engineer will, by written notice, so notify the Contractor giving the reasons therefore. Upon receipt of written notice concurring in or denying substantial completion, whichever is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized interruption, the work necessary to reach Substantial and Physical Completion. The Contractor shall provide the Engineer with a revised schedule indicating when the Contractor expects to reach substantial and physical completion of the work. Project PK-14-029 Page 10 Rev. 8/30/2011 The above process shall be repeated until the Engineer establishes the Substantial Completion Date and the Contractor considers the work physically complete and ready for final inspection. 1-05.11(2) Final Inspection and Physical Completion Date When the Contractor considers the work physically complete and ready for final inspection, the Contractor by written notice, shall request the Engineer to schedule a final inspection. The Engineer will set a date for final inspection. The Engineer and the Contractor will then make a final inspection and the Engineer will notify the Contractor in writing of all particulars in which the final inspection reveals the work incomplete or unacceptable. The Contractor shall immediately take such corrective measures as are necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption until physical completion of the listed deficiencies. This process will continue until the Engineer is satisfied the listed deficiencies have been corrected. If action to correct the listed deficiencies is not initiated within 7 days after receipt of the written notice listing the deficiencies, the Engineer may, upon written notice to the Contractor, take whatever steps are necessary to correct those deficiencies pursuant to Section 1-05.7. The Contractor will not be allowed an extension of contract time because of a delay in the performance of the work attributable to the exercise of the Engineer's right hereunder. Upon correction of all deficiencies, the Engineer will notify the Contractor and the Contracting Agency, in writing, of the date upon which the work was considered physically complete. That date shall constitute the Physical Completion Date of the contract, but shall not imply acceptance of the work or that all the obligations of the Contractor under the contract have been fulfilled. 1-05.13 Superintendents, Labor and Equipment of Contractor (March 25, 2009 APWA GSP) Revise the seventh paragraph to read: Whenever the Contracting Agency evaluates the Contractor's qualifications pursuant to Section 1-02.14, it will take these performance reports into account. 1-05.15 Method of Serving Notices (March 25, 2009 APWA GSP) Revise the second paragraph to read: All correspondence from the Contractor shall be directed to the Project Engineer. All correspondence from the Contractor constituting any notification notice of protest, notice of dispute, or other correspondence_ constituting notification required to be furnished under the Contract, must be in paper format, hand delivered or sent via mail delivery service to the Project Engineer's office. Electronic copies such as a-mails or electronically delivered copies of correspondence will not constitute such notice and will not comply with the requirements of the Contract. 1-05.16 Water and Power (October 1, 2005 APWA GSP) The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the contract includes power and water as a pay item. 1-05.17 Oral Agreements (October 1, 2005 AWPA GSP) No oral agreement or conversation with any officer, agent, or employee of the Contracting Agency, either before or after execution of the contract, shall affect or modify any of the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered as Project PK-14-029 Page 11 Rev. 8/30/2011 unofficial information and in no way binding upon the Contracting Agency, unless subsequently put in writing and signed by the Contracting Agency. 1-07.1 Laws to be Observed (October 1, 2005 APWA GSP) Supplement this section with the following: In cases of conflict between different safety regulations, the more stringent regulation shall apply. The Washington State Department of Labor and Industries shall be the sole and paramount administrative agency responsible for the administration of the provisions of the Washington Industrial Safety and Health Act of 1973 (WISHA). The Contractor shall maintain at the project site office, or other well known place at the project site, all articles necessary for providing first aid to the injured. The Contractor shall establish, publish, and make known to all employees, procedures for ensuring immediate removal to a hospital, or doctor's care, persons, including employees, who may have been injured on the project site. Employees should not be permitted to work on the project site before the Contractor has established and made known procedures for removal of injured persons to a hospital or a doctor's care. The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the Contractor's plant, appliances, and methods, and for any damage or injury resulting from their failure, or improper maintenance, use, or operation. The Contractor shall be solely and completely responsible for the conditions of the project site, including safety for all persons and property in the performance of the work. This requirement shall apply continuously, and not be limited to normal working hours. The required or implied duty of the Engineer to conduct construction review of the Contractor's performance does not, and shall not, be intended to include review and adequacy of the Contractor's safety measures in, on, or near the project site. 6-20 Pole Repair 6-20.1 Description Removal and disposal of loose concrete and rust from upper connecting ring, exposed reinforcing strands and reinforcing anchors, removal of pole steps as necessary to install steel sleeve as detailed in the plans, and filling of annular space between steel sleeve and pole surface with grout. Removal and disposal of loose concrete and rust from reinforcing steel in concrete rock pocket located above steel sleeve installation location and installation of new cement concrete to fill void to flush with pole surface. 6-20.2 Materials All materials shall be new and in accordance with the plans and specifications. 6-20.3 Construction Requirements All workmanship shall be complete and in accordance with the latest accepted industry standards. 6-20.4 Measurement "Pole Repair" will be measured by Lump Sum. 6-20.5 Payment The Lump Sum Contract price for"Pole Repair" shall be full compensation for all costs incurred to carry out the requirements of the contract, including, but not limited to, labor, materials, and equipment required to make the pole repairs as detailed in the plans and specifications. 3.0 Drawings: The following listed drawings are part of this contract: "Civic Field Light Pole #7 Repair" prepared by Sargent Engineers, Inc. Project PK-14-029 Page 12 Rev.8/30/2011 City of Port Angeles ATTACHMENT "B" Engineering Office Public Works and Utilities Department Project Plan 360-417-4541 Project PK-14-029 Page 13 Rev.8/30/2011 jqd}a}Sp a 2014–9-M "k \\S9MRI\files\14%i\A14152.01 Pad Mpl.Pd Repay\Pole Repvi.6°9 4..t N.—Laywtt wefs: AM 3 F _______________________________�–_.r._-------------------------------------- _ I 1 I ______________________________________ ____ v � 1 n r I I s i ---- ------ ------ --------------------------------------- I A --------- --i------------------------------------ g ------------------------ n� o�b �3b o v, b C £n ntK r, E�l Q �J H� m � d Z a p _ ov' °wi 030 °°n oa M �3 o - V aQ m tti b -V 54t D 21 'O 43'j N C) m _ m ___ Z � 1v O A Z oa m xb m O o° m o D SD °o O ZD co �cl Sq. b a $ n ° b ' •� a^3° ow 5�.°� _ h dfsb ° m °o j p' x •.� O m Z V o a_ City of Port Angeles ATTACHMENT "C" Engineering Office INSURANCE Public Works and Utilities Department 360-417-4541 INSURANCE REQUIREMENTS FOR CONSTRUCTION AND SERVICE CONTRACTS Includes construction and remodeling,janitorial service, tree maintenance, road maintenance,painting, electrical work,plumbing, movers, and on site maintenance agreements. Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. No Limitation Contractor's maintenance of insurance, its scope of coverage and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products- completed operations, stop gap liability, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85 or an equivalent endorsement. There shall be no endorsement or modification of the Commercial General Liability Insurance for liability arising from explosion, collapse or underground property damage. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: Project PK-14-029 Page 15 Rev. 8/30/2011 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of$1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and $2,000,000 products-completed operations aggregate limit. Other Insurance Provision The Contractor's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A: VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors The Contractor shall have sole responsibility for determining the insurance coverage and limits required, if any, to be obtained by subcontractors, which determination shall be made in accordance with reasonable and prudent business practices. G. Notice of Cancellation The Contractor shall provide the City and all Additional Insureds for this work with written notice of any policy cancellation, within two business days of their receipt of such notice. H. Failure to Maintain Insurance Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract,upon which the City may, after giving five business days notice to the Contractor to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Contractor from the City. Project PK-14-029 Page 16 Rev.8/30/2011 City of Port Angeles ATTACHMENT "D" Engineering Office PREVAILING WAGE RATES Public Works and Utilities Department 360-417-4541 See attached listing: 1. Washington State Prevailing Wage Rates For Public Works Contracts—Journey Level and Apprentices, Clallam County, effective October 141h 2014. 2.To access applicable prevailing rate(s) of wages rates for the describe work by trade,use the following Labor and Industries website link: http/hvw�a lni wa aov/TradesLicensing/PrevWac/WageRateSldefault.asp 3. A copy of the applicable prevailing wage rates can be obtain by contacting Lucy Hanley at 360-417-4541 or by email, contracts@cityofpa.us. A hard copy is available for viewing in person at 321 E. 5t"Street,Port Angeles, WA. 98362. Project PK-14-029 Page 17 Rev.8/30/2011 City of Port Angeles ATTACHMENT "E" Engineering Office Public Works and Utilities Department Repair Area Photos 360-417-4541 Project PK-14-029 Page 18 Rev.8/30/2011 x �i �ter✓� �.'*° �x. �f^y�ss z"��� �y �< .. �� r��� v e � U�`� s 5 � std t 1 k. W � p : a 30 j Weler main 77d„Ppr:-1bu *dfa I'vr4.—.rpn-. WWalermaln approxtmeu ordy TopogmpMdAfap froeunl me+-J jeer o/xrud locmtonc fib N ro N 6Walef main spd—dhy the yofPa AWA foria--.dpurpx !'nrrcel rktum W.1'.Il'ti U � Aiy NA-wr add.-ydu»ag..ti.H-16a rhr xpa Nllly JM.cry Eledricaldisidbutlon rttawleraa#® A Nor(ramil Daarm=HAD 8391 Area Map :747- v \s s � ; r � z c \ � z r i r t r y s - .: iR AREA '�� .; � �,.� .� � 'y '�,e1�r�'yz� ,;x �✓ax�r�'€�'-sK�� 'sat j� AIR ARE Ah i 4, v t } f � yams z � W � s r� y a`w�x Ns, W r a e ma, a My t 3' h c fr � , y b t re' b City of Port Angeles ATTACHMENT "F" Engineering Office Public Works and Utilities Department Quotation Form Received 360-417-4541 Andy Schwartz Constructions'Quotation Form attached: Project PK-14-029 Page 22 Rev. 8/30/2011 QUOTATION FORM Project Title: Civic Field Light Pole Repair Project Number: PK-14-029 The bidder hereby bids the following amounts for all work(including labor, equipment, time and materials) required to perform the work in the Statement of Work and this package. 1. Pole Repair, Lump Sum $ '/ /� 1 2. Sales Tax(8.4%) $ 3. Total Bid $ e 5.The bidder hereby acknowledges that it has received Addenda No(s). (Enter"N/A" if none were issued)to this Request for Quotation package. 6. The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent, are listed below. Any written notices required by the terms of an awarded contract shall be served or mailed to the following address: Contractor Information: SICYIJPWZ�m 1. Company Name: i)1/ GJ�V&VMVI 2. Address: ,r &4-)AY 3. City, State, Zip Code: L YM O i WiC l 4. Phone Number: 5. Contractor Registration Number: , Ato by 3 C *°l q 5 6. UBI Number: 0 7. WA State Industrial Insurance Account Number: „ 5 Y 8. WA State Employment Security Dept Number: °4 r - ' d- 9. State Excise Tax Registration Number: The bidder represents that it is qualified and possesses sufficient skills and the necessary capabilities to perform the services forth in this Co Signed by voef Title Printed Name: �J Date /042,7 _ _ Project: PK-14-029 Page 3 Rev 8/30/2011