Loading...
HomeMy WebLinkAbout000791 Amendment 000791 U [n ORDER FOR MINOR CHANGES No.1 Date:1/15/2015 Owner: City of Port Angeles Contract Title: 4th Street Stormwater Improvements, DR03-2009 Contractor: Jordan Excavating Subject: Rain Garden Scupper Settling Block Project Manager: Jonathan Boehme Bid Item No: A-1 ®Ordered by Contracting Agency ❑Changed proposed by the Contractor E]Change in scope Change Description: Stormwater carrying sediments enter the rain gardens through scupper inlets. A concrete block will be placed at each inlet and be surrounded by quarry spalls to dissipate the energy of the water and allow the sediments to settle out on a flat surface that can be easily cleaned. Blocks will be installed in up to 202 inlets at a cost of $11.00 each. All Work,materials and measurements to be in accordance with the provisions of the original contract and/or the standards specifications and special provisions for the type of construction involved.The payments and/or additional time specified and agreed to in this order include every claim by the Contractor for extra payment or extension of time with respect to the work described herein,including delays to the overall project. Original Bid Item Amount Current Bid Item Amount Cost this Change Est.Remaining Bid Item Amount $40,000 $40,000 $2222.00 $37,778.00 CONTRACTOR: CITY OF PORT ANGELES Signature Signature Name&Title Name eTitle Date: , _ � �� Date: ( I 4"Street Stormwater Improvements 1 Minor Change Order No._i_