HomeMy WebLinkAbout000345 Amendment (3) City of Port Angeles Record #000345 AMENDMENT NO. 4 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND LINDBERG & SMITH ARCHITECTS PROJECT PD01-2011 THIS AMENDMENT NO. 4 is made and entered into this t-7 day of Aril , 2015, by and between the City of Port Angeles, a non-charter code city of the State of Washington, (hereinafter called the "CITY") and LINDBERG & SMITH ARCHITECTS, INC., (hereinafter called the "CONSULTANT"). NOW, THEREFORE, in consideration of the representations and the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows: SECTION 1 The CITY entered into the existing AGREEMENT with the CONSULTANT on April 24, 2012, (the AGREEMENT). The CITY and the CONSULTANT amended the AGREEMENT on September 18, 2012, August 20, 2013, and May 6, 2014 (the AMENDMENTS). SECTION 2 I AMENDED SCOPE OF SERVICES A. The scope of the professional services is amended to include work as described in the attached Exhibit A to Amendment 4. II TIME OF PERFORMANCE The Added Services Scope of Work in Exhibit A of Amendment 4 shall be completed by December 31, 2015. PDO1-2011 Amendment 4,Page 1 3/11/2015 III MAXIMUM COMPENSATION The CONSULTANT'S total compensation and reimbursement are stated in the attached Exhibit A to Amendment No. 4. The maximum compensation is increased by$17,400.00 to $118,746.00. The budget for Amendment No. 4 may be further adjusted by mutual agreement without an amendment to the Agreement, as long as the maximum compensation of$118,746.00 is not exceeded. SECTION 3 RATIFICATION Except as modified herein, the original AGREEMENT and AMENDMENTS are confirmed and ratified. In WITNESS WHEREOF, the parties hereto have executed this Amendment No. 4 to the Agreement as of the date and year first written above. CITY OF PORT ANGELES LIND 1 WI& SMITH ARCHITECTS s By: By: Dan McKeen, City Manager Title: I ATTEST: TeAnifer Veneklasen, City Clerk APPROVED AS TO FORM: William E. Bloor, City Attorney PDO1-2011 Amendment 4,Page 2 3/11/2015 Amendment No. 4 Exhibit A—Added Services Scope of Work and Budget The following items are to be revised in the design drawings and specifications: 1. Existing equipment has changed. The Fujitsu AC unit in the City Hall Data Center has been removed and two AC units have been relocated to be in the Data Center. These changes effect placement of new equipment, changes to phasing and revisions to our drawings. 2. Existing ductwork serving the City Hall Data Center has been demolished. This ductwork was to be re-used and will now need to be designed new. An existing AC unit will need to be relocated and the area this is to be located in will need to be investigated and designed. 3. HVAC controls design changes will be needed to accommodate the existing equipment changes. 4. Revise the phasing plan for changes made to the HVAC equipment and the electrical on- line diagram. 5. Coordination for access control in the Police Department attic area. The City wants the Uninterrupted Power Supply (UPS) system fenced off for security. 6. Revise the drawings to move the data outlet boxes off the floor. The boxes will need to have details designed. 7. The City has provided additional direction concerning the electrical power system requiring changes to be made to the electrical one-line diagrams. Sub - Total Cost: $9,000.00 8. Gen-Set-2 is to be reconnected for 208Y/120 volt operation at the generator, eliminating need for a transformer. This work to be accomplished by City of Port Angeles before contract work begins and will be shown as existing on Hunt Engineering drawings as of 04-02-2015 scope change. 9. Panel X4 remains. The feeder to it is to be replaced with 225A. Hunt scope: Call for new feeder. Part of current scope. 10. Existing transformer XMR2 is to remain where it is and continue feeding existing panel XC,to be renamed"OC". Hunt Scope: Part of current scope. 11. Generator No. 1 circuit breaker replacement,feeders to ATS's, and new ATS's design is to be per September 26, 2014 design drawings. 12. Generator No. 2 ATS is to be replaced. 13. Revise phasing plan for changes in scope of work and for having Phone and Radio Room UPS operational by June 30,2015. PDO1-2011 Amendment 4,Page 3 3/11/2015 14. Assist Owner with Pre-Ordering UPS and any other equipment necessary to have Phone and Radio Room UPS operational by June 30, 2015. 15. Revise Specifications for equipment Pre-Ordering. 16. Revise Cost Estimate into categories: City to provide guidance for categories by April 8, 2015 in order to separate City work from Pencom work, and grant supported work from non-grant supported work. Sub -Total Cost: $8,400 Total Amendment Amount$17,400.00 PDOI-2011 Amendment 4,Page 4 3/11/2015