Loading...
HomeMy WebLinkAbout000953 Original Contract City of Port Angeles Record # 000953 2015-1323789 Page 1 of 2 Agreement Port Angeles City Of Clallam County Washington 07/30/2015 12:05:50 Pfd ®III W"rol'i Iw,I v IOC RETURN ADDRESS City of Port Angeles Department of Public Works and Utilities PO Box 1150 Port Angeles,WA 98362 AGREEMENT TO REMOVE ENCROACHMENT within PUBLIC RIGHT-OF-WAY WHEREAS: I, ` °({ ti ( the undersigned owner in fee simple of the following described property: Lots 11 and 12 of the Norman R. Smith's Subdivision of the Townsite of Port Angeles Parcel Number: 0630005121600000 Address: 601 East First Street, Port Angeles, Washington 98362 do hereby acknowledge that ground water monitoring wells have been and will be constructed by me within the adjoining public street or roadway. NOW, THEREFORE: For adequate consideration, I agree that said ground water monitoring wells and any associated appurtenances shall be expeditiously demolished, removed, modified, rebuilt or restored at my expense within sixty(60) days of receipt of written notice from the Director of Public Works and Utilities Department (Director) with work to be done in accordance with the requirements and conditions deemed necessary by the Director or his designee at such time as the City finds that it is necessary to modify the right-of-way. If the required work is not done in a timely fashion and/or if the work does not meet the requirements and conditions set forth, the City is authorized to have the work done and the cost thereof including reasonable overhead and attorney's fees shall become a civil debt of the property owner and shall be a lien against the property. We do also hereby agree that the Director may, without notice, remove the private improvements as necessary to repair utilities or other public facilities and that the City has no obligation to reconstruct or replace such private improvements. The property owner agrees to indemnify,hold hannless, and defend the City, its employees, agents and assigns from and against all claims or lawsuits as alleging injury or damage to persons or property as a result of the construction and location of the private improvements as provided herein. It is understood that this agreement shall run with the land and shall be binding on the undersigned owner, his heirs, devisees, successors and assigns and all owners now or hereafter of the land described above. Property Owner(s) Date STATE OF WASHINGTON ) ss. COUNTY OF CLALLAM ) On this date, before me the undersigned Notary Public in and for the State of Washington, personally appeared Syb ��J eA( ,to me known to be the individual who executed the foregoing Agreement to Remove Encroachment within Public Right-of-Way and acknowledged to me that they signed the same for the uses and contents therein mentioned. DATED this 2-3 day of c c- — , 20 1 :Septefftw Public NOTARY PUBLIC for Washin on, of ' chingtar� residing at f M `'OW�R My commission expires: MY bt!i lC?N EXi 9,201 7 HTE #7 goer °�" ECEIVED PORT ANN04T OF WAY CONSTRUCTION PERMIT ® �LIC WORKS APPLICATION mc�F 1 AY 15 AM 11: 05 NAME OF APPLICANT/CONTRACTOR Antea Group DATE 04/21/15 CONTRACTOR ID. NO. (if work is over$3500) Cascade Drilling - CASCADL91508 MAILING ADDRESS 4006 148TH Ave NE, Redmond WA 98052 PHONE NUMBER (425) 498-7722 STREET ADDRESS OF PROPOSED WORK 601 East First Street (Chevron Station) DESCRIPTION OF WORK(include drawings required for clarity): [If street closure is requested, please state the name of the street and limits of closure, together with the duration of closure.] One well is to be installed in the alley behind the service station. The proposed location is shown on the attached Figure 2. Traffic Control will be utilized in the street and the alley. The work is expected to be completed in one day and will likely be 4 hours in the alley. We will return quarterly to sample all wells on site. Well sampling takes_ about 0.5 hours per well and will not require traffic control. WHAT IS THE ESTIMATED COST OF THE PROJECT? $15,000 WHAT IS THE ESTIMATED DURATION OF THE PROJECT? 1-day with quarterly follow-up sampling WHAT ARE THE HOURS OF WORK? 8-5 LIST THE CONTRACTOR(S)THAT WILL BE DOING THE WORK: Cascade Drilling;Altus Traffic Control, Antea Group (Environmental Consultant) HOLD HARMLESS and INDEMNIFICATION AGREEMENT In compliance with the Port Angeles Municipal Code,and in consideration of the issuance by the City of Port Angeles of a Right Of Way Use Permit to the undersigned allowing the placement of the above described street use or obstruction,the undersigned for himself and for his successors in interest,hereby agrees to indemnify,hold harmless, and defend the City of Port Angelej1l gy'{�st any claims or lawsuits for personal injury or property damage arising out of, or in any way connected with,tft4��?a� � n'4 6'6, e use or obstruction on the City street,sidewalk,planting strip,or right f way �`Q ,,, ��j`/�i�r D TED this 14.th day of Ma/� _._,2015 t° OOTARk = Applicant UBOC NOTARY P IC or Was ington, residing at �P WASH\ My commission expires: (This permit,if approved,maybe terminated by the City of Port Angeles without cause and at any tf e) [OF'F'ICE USE ONLY) Se(-- Date application received �-1 — `� Fee paid $/56) Receipt# Date Certificate of Insurance per PAMC 11.08.110 received -S, Temporary Traffic Control Plan Approve -eat lw N/A Performance Bond Received on 141A ✓ Application r wiewpd and recommendation by City Engineer Date is to deny r rove d with the folio//Wfu1g c ditions: /sfel r7 �'S o�rS/dam r /a ovr e-6 r 1 &,,v o c / r L' e r o,— ,4, S r �..1OA/T T /T S" L-; T ObeagTiotis / ISl o N s x Y -7 Y73 Approved copies lo; Applicant/Fire O Police O Street O Other—O Addressfile,o" RCP# NIPWKSIENGINEER/ROW Constructionl2010 ROW Construction Permit Application.doc