Loading...
HomeMy WebLinkAbout000751 Amendment 1 00075'1 AMENDMENT NO. 1 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND Vanir Construction Management, Inc. Combined Sewer Overflow (CSO) Phase II, Project No. 06-02 RELATING TO: CSO Phase II Construction Management Services THIS AMENDMENT NO. 1 is made and entered into by and between the City of Port Angeles, a non-charter code city of the State of Washington, (hereinafter called the "CITY") and Vanir Construction Management, Inc., located at 10900 NE 8th Street, Suite 1486, Bellevue, Washington 98004 authorized to do business in the state of Washington (hereinafter called the "CONSULTANT"); The CITY entered into the existing AGREEMENT with the CONSULTANT on May 14, 2014, (the AGREEMENT). WHEREAS, the PARTIES mutually desire to amend the AGREEMENT, and NOW, THEREFORE, in consideration of the representations and the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows: I. SCOPE OF WORK No change. II. TIME OF PERFORMANCE Article IV Time of Performance is amended, the second sentence to read: The duration of the Agreement shall extend through December 31, 2016. III MAXIMUM COMPENSATION Article VI Maximum Compensation is amended to include the CONSULTANT'S compensation and reimbursement of$360,099 to compensate the consultant for the additional time and construction management services required to complete the project. The maximum compensation amount shall not exceed $1,923,825. x Amendment 1, Page 1 In WITNESS THEREOF, the parties hereto have executed this Amendment No. 1 to the Agreement as of the date and year of the last signature below. CITY OF PORT ANGELES VANIR CONSTRUCTION MANAGEMENT, INC. Dan McKeen, City Manager Joseph A. Mehula Date: al A d TITLE: President ATTEST: Date: J fifer Veneklasen, City Clerk AP OVED AS TQ RM: William E. Blo , y t y i Amendment 1, Page 2