Loading...
HomeMy WebLinkAboutUAC Agenda Packet 02/09/2016N:\UAC\MEETINGS\UAC2016\UAC02916\020916 Agenda.docx Utility Advisory Committee Jack Pittis Conference Room Port Angeles, WA 98362 February 9, 2016 AGENDA I. Call To Order II. Roll Call III. Approval Of Minutes For December 15, 2015 IV. Late Items V. Discussion Items: A. Department of Ecology Stormwater Grant Acceptances B. Herrera Environmental Professional Services Agreement Amendment No 2, Elwha River Hydraulic Analysis and Remediation VI. Information Only Items: A. “Improve the Odds” Ductless Heat Pump Workshop (verbal report) B. Commercial Lighting Rebates Update (verbal report) VII. Next Meeting Date: March 8, 2016 VIII. Adjournment Utility Advisory Committee Jack Pittis Conference Rooms Port Angeles, WA 98362 December 8, 2015 3:00 p.m. I. Call To Order Lynn Bedford called the meeting to order at 3:01 p.m. II. Roll Call UAC Assigned Councilmembers Present: Lee Whetham, Dan Gase, Sissi Bruch (3:12) Other Councilmembers Absent: Dan DiGuilio, Patrick Downie, Brad Collins, Cherie Kidd UAC Members Present: Betsey Wharton, Lynn Bedford, Rob Feller UAC Members Absent: None Staff Present: Craig Fulton, Gregg King, William Bloor, Mike Puntenney, James Burke, Tom McCabe, Jeff Bender, Michelle Hale Others Present: Two Citizens Burt Clothier - Robinson-Noble Michael Krautkramer - Robinson-Noble III. Approval Of Minutes Vice Chairman Lee Whetham requested a motion to approve the minutes of November 10, 2015. Betsey Wharton seconded the motion, which carried unanimously. IV. Late Items: None V. Discussion Items: A. 2015 Hydrogeologic Services Feasibility Study Craig Fulton provided an introduction to the City of Port Angeles’ preliminary exploration for the development of new ground water sources to supplement the current surface water sources from the Elwha River. The City contracted with Robinson-Noble to provide a groundwater source feasibility assessment to research the potential of producing groundwater from one or more wells within or in proximity to the City limits (Phase 1). Burt Clothier and Michael Krautkramer of Robinson-Noble presented a PowerPoint briefing of the results of the Phase 1 analysis. The study involved the acquisition and review of information available from published reports and agency files that was used as the basis for describing the hydrogeologic settings of the study area and identifying specific groundwater regimes within the greater Port Angeles area. If one or more areas are identified with a reasonable expectation of success in developing a new source well, the second phase (2), would be to perform a preliminary assessment of the water right situation to identify possible complicating aspects in the proposed groundwater withdrawal. The third phase (3) would be to secure drilling agreements and to drill test wells. It is anticipated that three test wells would be required. The fourth and final phase (4) would be to secure water right permit(s), construct product wells, transmission mains, and pumping facilities. Craig Fulton discussed the phases and spoke of bringing in the future, a request to the UAC to move forward with phase 2, subject to available funds. A lengthy discussion followed. B. Interagency Agreement with Department of Ecology for Local Source Control Program James Burke explained the grant funding being offered to the City to support the temporary full time, 24-month term employment position dedicated to small business education and technical assistance for applying best management practices in handling hazardous and dangerous wastes, stormwater, solid waste and spill prevention. The Department of Ecology is providing the City a grant for the Local Source Control Program in an amount of $218,890. No City matching funds are required. Discussion followed. Dan Gase moved to recommend City Council to approve and authorize the City Manager to sign an agreement accepting a grant in the amount of $218,890 from the Washington State Department of Ecology, and to make minor modifications to the contract, if necessary. Sissi Bruch seconded the motion, which carried unanimously. C. Department of Ecology Coordinated Prevention Grant Acceptance James Burke reviewed the City’s application for a two year Coordinated Prevention Grant (CPG) for July 2015-June 2017 that has been approved by Department of Ecology (DOE). The grant is for the moderate risk waste collection (collection/operations/disposal) and the waste reduction and recycling program. The Department of Ecology is providing the City the Coordinated Prevention Grant for a total eligible amount of $159,000. The grant is based on a 75/25 match. The City’s share is $39,750, with the balance being funded by DOE in the amount of $119,250. The total eligible costs are broken into two categories: residential moderate risk waste operations ($138,000) and waste reduction and recycling education and outreach ($21,000). The City has participated in this program for more than 15 years. Discussion followed. Sissi Bruch moved to recommend City Council to authorize the Director of Public Works to sign the Department of Ecology Coordinated Prevention Grant W2RCPG-1517 PoAnPW-00024 and any future amendments or agreements. Dan Gase seconded the motion, which carried unanimously. D. Landfill Bluff Stabilization Construction Management Agreement Amendment No. 2 Mike Puntenney reviewed the construction management services of the Port Angeles Landfill Stabilization Project. Due to the discovery of large amounts of asbestos and the resulting claim from the construction contractor, Anchor QEA has provided a substantial amount of additional support to prepare the City to equitably resolve the asbestos claim. Schedule impacts due to the asbestos and other issues have extended the completion date from November 2015 to the end of January 2016, requiring Anchor QEA to be onsite longer. The construction contract has a liquidated damages clause in the amount of $5,000 per calendar day for delays beyond the scheduled completion date. Pending final settlement of the asbestos claim, some liquidated damages may result which could offset part or all of the cost of the additional time Anchor QEA will be needed to support this project. Anchor QEA has analyzed a budget increase of $80,000 as the amount they projected to be needed as per Amendment No. 2. The professional services agreement is an hourly contract, so the City will only be charged for the actual effort that the construction management firm uses. Discussion followed. Lee Whetham asked when a report would be issued regarding the apprenticeship utilization program passed by City Council. Craig Fulton stated he would provide a report on this program and the project costs when construction has wrapped up and all data has come in. Sissi Bruch moved to recommend City Council to authorize the City Manager to sign Amendment No. 2 to the Professional Services Agreement with Anchor QEA increasing the value by $80,000 for a revised maximum not-to-exceed amount of $1,728,927. Lee Whetham seconded the motion, which carried unanimously. E. Combined Sewer Overflow Phase 2 Construction Management Services Amendment No. 1 Mike Puntenney discussed the contract with Vanir Construction Management to provide construction management services for the Combined Sewer Overflow (CSO) Phase II, Project WW1008. This project is the final phase of the City’s CSO Reduction Program approved by the Department of Ecology. The project reduces CSOs to the Port Angeles Harbor in compliance with terms of Agreed Order 3853. Amendment No. 1 provides additional compensation for construction management professional services to compensate for time impacts. Discussion followed. Sissi Bruch moved to recommend City Council to authorize the City Manager to sign Amendment No. 1 to the Professional Services Agreement with Vanir Construction Management, Inc. increasing the value by $360,099 for a revised maximum not-to-exceed amount of $1,923,825. Lee Whetham seconded the motion, which carried unanimously. VI. Information Only Item None VII. Next Meeting Date: January 12, 2016 – CANCELLED February 9, 2016 VIII. Adjournment: 4:31 p.m. ___________________________ __________________________________ Patrick Downie, Mayor Michelle Hale, Administrative Specialist II N:\PWKS\Stormwater\00 grants and loans\2016 Stormwater Facility Grants DATE: February 9, 2016 TO: UTILITY ADVISORY COMMITTEE FROM: Jonathan Boehme, Stormwater Engineer SUBJECT: Department of Ecology Stormwater Grant Acceptances Summary: The Department of Ecology (DOE) has offered the City three water quality stormwater grants: 1) A $50,000 Stormwater Capacity grant with no local match to implement and manage the City’s Western Washington Phase II Municipal Stormwater NPDES Permit; 2) A $474,300 Water Quality Combined Financial Assistance grant with a 15% local match to design and construct a Decant Facility at the Port Angeles Regional Transfer Station; 3) A $461,250 Water Quality Combined Financial Assistance grant with a 25% local match to construct two Green Low Impact Development Alley’s with permeable pavement. Funding: The Municipal Stormwater Capacity Grant has no City match requirement. The Decant Facility grant requires a minimum $83,700 (15%) match from the City; $119,500 has been included in the 2016 Solid Waste Utility CFP budget for this match and other non-grant work. The Green LID Alley grant requires a minimum $153,750 (25%) match from the City. $155,000 has been included in the 2016 Street CFP budget for this match. Recommendation: 1) Authorize the City Manager to sign the grant agreement with the Department of Ecology under the Municipal Stormwater Capacity Grant Program in the amount of $50,000, and to make minor modifications to the Agreement, if necessary. 2) Authorize the City Manager to sign the grant agreement with the Department of Ecology for the City of Port Angeles Decant Facility Project in the amount of $474,300, and to make minor modifications to the Agreement, if necessary. 3) Authorize the City Manager to sign the grant agreement with the Department of Ecology for the Port Angeles Green Low Impact Development Alley Project in the amount of $461,250, and to make minor modifications to the Agreement, if necessary. Utility Advisory Committee Memo N:\PWKS\Stormwater\00 grants and loans\2016 Stormwater Facility Grants Background/Analysis: The Department of Ecology (DOE) has offered the City three water quality grants. Grant 1: A Municipal Stormwater Capacity Grant of $50,000 is to implement the City’s Western Washington Phase II Municipal Stormwater NPDES Permit. City Staff intends to use the capacity grant to continue Phase II permit requirements including the illicit discharge detection and elimination (IDDE) program, public education and outreach, and support programs to control runoff from new development, redevelopment, and construction sites. Grant 2: A Water Quality Combined Financial Assistance Agreement of $474,300 is to design and construct a Decant Facility at the Port Angeles Regional Transfer Station. This project which is in the approved CFP under SW0112 will construct a facility to provide for the proper handling, treatment, and disposal of vactor and street sweeping waste. The City of Port Angeles has issued a request for qualifications seeking professional services to design a replacement facility based on recommendations from a 2014 pre-design report. The grant eligible costs for the decant project are summarized below: Tasks – Decant Project Total Eligible Cost 1. Project Admin/Management $20,000 2. Design Plans and Specs, Environmental Review $90,000 3. Construction Management $40,000 4. Construction $408,000 Total $558,000 Grant 3: A Water Quality Combined Financial Assistance Agreement of $461,250 is to construct the Port Angeles Green Low Impact Development (LID) Alley Project. This project is in the approved CFP under DR0113 and aims to improve water quality in Port Angeles harbor through installation of permeable pavement in two alleys in the Francis Street drainage basin. The two alleys selected for the permeable pavement based on geotechnical investigation and other design factors are the Front/Georgiana Alley between Albert St and Eunice St, and the 4th/5th Alley between Washington St and Chambers St. This project will provide treatment for Total Suspended Solids (TSS), Dissolved Copper, Total Phosphorus, and infiltrate stormwater that was previously draining to the City’s combined sewer system. This project was previously designed and is ready to be advertised for construction in spring of 2016. The grant eligible costs for the Green LID Alley Project are summarized below: Tasks - Green LID Alley Project Total Eligible Cost 1. Project Admin/Management $20,000 2. Design Plans and Specs, Environmental Review $0 3. Construction Management $75,000 4. Construction $520,000 Total $615,000 N:\PWKS\Stormwater\00 grants and loans\2016 Stormwater Facility Grants It is recommended that the Utility Advisory Committee forward a favorable recommendation to the City Council to authorize the City Manager to: 1) Sign the grant agreement with DOE under the Municipal Stormwater Capacity Grant Program in the amount of $50,000, and to make minor modifications to the Agreement, if necessary; 2) Sign the grant agreement with DOE for the City of Port Angeles Decant Facility Project in the amount of $474,300, and to make minor modifications to the Agreement, if necessary; 3) Sign the grant agreement with DOE for the Green Low Impact Development Alley Project in the amount of $461,250, and to make minor modifications to the Agreement, if necessary. N:\UAC\MEETINGS\UAC2016\UAC02916\2016-2-09 UAC Amend 2 HEC Elwha Analysis and Remediation.docx DATE: February 9, 2016 TO: Utility Advisory Committee FROM: KATHRYN NEAL, P.E., ENGINEERING MANAGER SUBJECT: Herrera Environmental Professional Services Agreement Amendment No 2, Elwha River Hydraulic Analysis and Remediation Summary: Working cooperatively, the City and Lower Elwha Klallam Tribe (LEKT) are in discussion with the National Park Service (NPS) over the final disposition and transfer of the Elwha Water Treatment Facilities (EWTP) and impacts to the municipal and industrial water supplies resulting from dam removal on the Elwha River. The City previously hired Herrera Environmental to provide select expert services to the City in river hydrology/hydraulics as part of its due diligence work in preparation for the discussions and for drought related alterations at the intake structure. This amendment provides funding to support additional investigative work related to the ongoing due diligence. Included are assessments of the suitability of the existing infrastructure, investigation and design support for corrective actions to preserve flow to the Ranney Well, risk assessments, and continuation of support to the City during the ongoing negotiations with NPS. Funding: Funds are available from the 2016 Water Utility Operating budget from proceeds from the original funding provided from NPS during the PAWTP transfer of facilities. The City will request reimbursement of this as part of the ongoing discussions with the NPS. Recommendation: Forward a favorable recommendation to City Council, to authorize the City Manager to sign Amendment No. 2 to the Professional Services Agreement with Herrera Environmental in an amount of $78,000, increasing the total contract amount to $111,000, and to make minor modifications to the Agreement, if necessary. Background/Analysis: In August 2015 the City entered into an Agreement with Herrera Environmental Consultants to analyze Elwha River hydraulics in support of assessing impacts to the existing well supply and surface water intake, in support of the City’s discussions with NPS and LEKT regarding the final disposition and transfer of the Elwha Water Treatment Facilities. The original budget was $33,000 and the scope included assessing background information and existing conditions, field investigations, preparation of a Technical Memorandum, and additional support as Utility Advisory Committee Memo needed. The additional support task was envisioned to potentially include scientific/engineering analyses, economic analysis, operations and maintenance analysis, risk assessment, negotiation support with the National Park Service, or assessing/providing engineered remedies for the City’s water supply on the Elwha River. Almost immediately, Herrera was asked to evaluate the impending impairment of the surface water intake by drought-related low water levels in the Elwha. Herrera engineered a solution that elevates the pool at the intake structure by narrowing a weir opening without impeding fish passage. Herrera provided graphics and engineering calculations that enabled the City to apply for emergency permits to keep the intake operable. Amendment 1 was issued to reallocate money to the unexpected low flow analysis task without increasing the contract amount. Additional budget is provided in Amendment 2 (Task 4.2) to follow up with regulatory agencies and obtain long-term permits that will enable the City to respond to future drought emergencies without invoking emergency permits. Negotiations with NPS are ongoing, and Herrera’s analysis and presentations have proved valuable. Additional tasks have been identified that support additional investigative work related to the ongoing due diligence, document results and recommendations of engineering analyses, and enable the discussions to move forward. The current and proposed tasks and task budgets are shown on the table below: Task Description Original Contract Amount Revised (Amendment No. 1) Amendment No. 2 Budget Total Contract Amount 1 Background and Existing Conditions Assessment $9,400 $8,000 $8,000 2 Field Investigation and Support $9,900 $7,000 $7,000 3 Reporting $9,700 $2,000 $8,000 $10,000 4 Additional Support $4,000 $2,000 $10,000 $12,000 4.1 Drought Low Flow Analysis and Design $9,500 $9,500 4.2 Drought Hydraulic Analysis Technical Memo & Permitting $4,500 $5,000 $9,500 4.3 Negotiation support with NPS $10,000 $10,000 4.4 Design review and recommendations $15,000 $15,000 5 Intake Infrastructure Inspection $30,000 $30,000 TOTAL BUDGET $33,000 $33,000 $78,000 $111,000 N:\UAC\MEETINGS\UAC2016\UAC02916\2016-2-09 UAC Amend 2 HEC Elwha Analysis and Remediation.docx Additional work in Task 3 provides for the completion of technical memos that summarize the geomorphic analysis that describes changes have taken place in the side channel near the Ranney well. The preliminary results of the geomorphic analysis were summarized at a meeting with NPS in January 2016. Additional subtasks are added to Task 4 to support negotiations with NPS, and to review designs that may be proposed by others to reengage the side channel. Additional budget is added to Task 4 for unspecified needs that may emerge as work continues. For all tasks, the budgets are estimates that are not to be exceeded. Costs will be incurred only for actual work that is authorized and completed. Task 5 is added, to provide for inspection of the Elwha Surface Water Intake, the Temporary Diversion Pumping Facility, the new fish screen installed by NPS and the pipe lines connecting these to pre-existing City facilities. The inspection will determine the facilities’ current functional condition and risks to future performance associated with natural variability in water and sediment in the Elwha. l Northwest Public Power Association June 2614 IULLET, .IN, Volume fib, Number 6 Demanding mOre: PortAa�'_' el.O$ builds on its Legacy of der and ?*de,� anagement L Ott ` % Iv r• . M Wi F y ; r' •' � _ 1 K ,. - s e V . COVER STORY by Bob Kajfasz, CEM, DSM Demanding more: Port Angeles builds on its legacy of demand-side management hile it's not quite the same as a TV game show,par- purchase costs low and help maintain the health of the radial ticipating in a demand response market and provid- feed." ing a load reduction is similar. It comes down to this But DSM isn't anything new for Port Angeles. The value proposition: if"the price is right." Coming out ahead municipal utility has a long history of DSM which dates back depends on having the best knowledge of the cost of what's to a robust energy conservation program beginning in the late behind Door Number One (a capacity payment for a 15- 70s. Over the years that followed,the utility has successfully megawatt load reduction) and Door Number Two (90 min- kept customers engaged in energy conservation through edu- utes of industrial production at the current electric rate). cation,rate adjustments, and rebates for energy efficiency In 2012,the City of Port Angeles partnered with Nippon measures.During the past decade, Port Angeles has been on Paper Industries,USA (NPNSA) and the Bonneville Power the forefront for demand response in the Northwest,conduct- Administration (BPA) in the first market demonstration pro- ing DR pilots in all three customer sectors:residential, com- ject for demand response (DR) in the region.Now in its sec- mercial, and industrial. and year,the project is helping determine the value proposi- Working closely with a handful of customers,Port tion for fast DR—a load reduction within a 10-minute Angeles has implemented load reductions ranging from resi- period.BPA calls upon NPIUSA to reduce load (cut back its dential thermostat set-backs to turning off large process loads energy use) in exchange for monthly capacity payments from in industrial facilities. "We have confidence that a button can BPA. be pushed or a lever thrown and that a load reduction can The current market demonstration project is the latest of occur when we need it," said Lusk. "However,we don't know a sequence of DR pilot projects that Port Angeles,NPNSA, what will motivate our customers to participate and continue and BPA have explored. The goal is to determine if the in a DR program. So to continue our success in demand-side resource can commercially meet BPA's needs for supplying management,we want to determine an appropriate market within-hour imbalance capacity—where both availability value for demand response assets." and reliability will be key measures of success.Included in this effort are determining a market value for a DR asset and developing a con- tracting mechanism to be used for any potential future transactions between A the parties. Port Angeles, a municipal utility { , located in western Washington state on the Olympic Peninsula,is examining DR to keep costs low and to help ensure distribution system reliability. 4. Since its founding in 1893 with a 20- t kilowatt biomass generator,the utility 1 has enjoyed a mixed power supply which includes two hydro projects on - the Elwha River,a small hydro project �` r r• on nearby Morse Creek, and powers purchases from wholesale power sup- } pliers. II # Today the utility now receives all of its power from BPA,which is deliv- ered by a radial feed transmission line originating in Olympia,Wash. PhilFr,• �.. JP + �� Lusk,deputy director of Power and x Telecommunications Systems,points k_ out that while "now completely depen- PAW s dent on that line,Port Angeles has a . vested interest in using demand-side A look inside the first Port Angeles power house(circa 1893).Photo provided by the City of management to keep wholesale power Port Angeles. 28 www.nwppa.org BULLETIN/June 2014 - 3 All 4 Steve Johnson,vice president and power manager at the NPIUSA pulp and paper mill,bas been a champion of demand response,providing mill resources and bis time to develop it as an additional asset. Photo by Keith Thorpe of the Peninsula Daily News. Finding a market value for a DR asset will help the utility eration capacity.As a result of the co-gen project,NPIUSA determine whether to integrate DR into the rate structure or has gained increased knowledge of regional energy issues of use incentives to encourage customer participation in DR pro- constricted transmission and load shaping, and views DR as a grams. potential new revenue stream for the mill. Lusk proposed this project to BPA under the Technology Previously,the group tested the concept of using Innovation Program with the intent to leverage and aggregate NPIUSXs large thermal mechanical pulping process for bal- existing DR assets from the prior pilots.While those other ancing load at BPA.This process consists of two major pulp assets offered a mix of load size and operate on either an lines and several ancillary lines,totaling 45 megawatts of hour-or day-ahead notice, for this project BPA was seeking available power.Large pulp storage tanks located between the fast DR assets with loads of 10 megawatts or larger. So the pulp plant and the paper machines allow for some variability city turned to one of its largest customers,NPIUSA,which in line operations. had load that fit both requirements. "It is ideal for this project The tests demonstrated NPLUSXs ability to both shed because NPIUSA has a variety of load centers that can be load and increase load with a 10-minute notice from BPA. directly compared as a fungible resource to a conventional Although not actually used by BPA to balance load during the natural gas-fired peaking generator in terms of dispatchabil- pilots,the plant demonstrated they could add or shed ity," said Lusk. megawatts within the required time frame. While the mill The NPIUSA pulp and paper mill,located on the incurred the cost of deferred pulp production and hours of Olympic Peninsula,is the largest electric load for Port staff time,participating in the project provided a better under- Angeles. The mill has been in continuous operation for over standing of mill costs during a DR event. 90 years. Mill management has a sophisticated understanding Steve Johnson,vice president and power manager at the of plant operations,electric rate structures, and how to mini- mill,has been a champion of DR, providing mill resources mize its electric bill. NPIUSA is also improving viability with a and his time to develop it as an additional asset.Johnson new$70 million biomass fuel boiler with 20-megawatt cogen- noted that NPIUSA is pleased to be working with the City of Continued on page 30 BULLETIN/June 2014 www.nwppa.org 29 wmnw� COVER STORY All the project partners have committed enormous amounts of time and effort to this project which continues through the end of August 2014. Power, and Transmission groups to address key issues such as potential effects on billing and power purchasing contracts. BPA's cross-agency team developed a dispatch group matrix and an operating agreement—two key components of the project that define the attributes of a DR asset such as load reduction; size;duration; days and hours of availability; and recharge period.The parameters also include ramp time— the maximum number of minutes allowed before the target reduction is achieved. During any event,if the load reduction The City of Port Angeles is located on the Strait of Juan de Fuca in does not occur within the ramp rate or the target reduction is western Washington state on the Olympic Peninsula.Photo provided not maintained for the duration of the event,the event is con- by the City of Port Angeles. sidered unsuccessful. If a load is unavailable,provisions in the agreement allow for the temporary removal of a DR asset Port Angeles and BPA to explore the subject of demand from the dispatch group due to maintenance or repair. response. The payment for the DR asset is in the form of a monthly "We believe it has the potential of reducing costs for both capacity price based on DR load size and the hours it is avail- the mill and the City of Port Angeles, better balancing electri- able during the month.The operating agreement states that cal load in the BPA service area as well as the Olympic the monthly capacity payment may be reduced by a predeter- Peninsula and allowing additional integration of renewable mined amount for any unsuccessful event and any days that electricity such as wind and solar power," said Johnson. an asset is declared as unavailable load. "Plus, the project provides an understanding of both how the John Wellschlager and Ryan Redmond from BPA's Bulk- mill operates and how true is the flexibility of their particular hub group drew upon their experience with BPA operations DR asset." and commercial capacity acquisitions to assign a dollar value In the current project,BPA is only requesting load reduc- to the DR assets in this project when they developed the con- tions from the mill. While this simplifies the decision process tract.They were able to reduce the information from the dis- for NPLUSA and Port Angeles,the rate structure for it is patch matrix to a dollar/megawatt value by comparing the somewhat complex. For example, depending on what time of resource to a 24/7 generation source.The dollar/megawatt day a DR event is called,pulp production could be shifted value is applied throughout the matrix to derive the monthly from a light-load-hours period to a high-load-hours period, capacity payment and any reduction due to actual perfor- resulting in a higher electric rate for pulp production that nor- mance of the asset during the month.At this time, BPA is not mally would have occurred in a period with a lower opera- actually using the load reductions in this project to help bal- tional cost. If there are multiple events during a cold weather ance regional power loads. Instead,the BPA team prepares a month, Port Angeles and NPLUSA could incur increased weekly schedule of DR events in advance.The schedule is not demand charges if the deferred pulp production coincides shared with Port Angeles or NPLUSA until the week after the with the utility's peak energy use period.As a result,Port event. Reliability permitting, the team's goal is to transition Angeles staff learned to be diligent to assure that other city into actually using the resource to help manage within hour customers incur no adverse effects from this project or future load/resource issues before the pilot ends. DR market transactions. All the project partners have committed enormous For BPA this project is a complement to a larger demand amounts of time and effort to this project which continues response initiative,providing an option of integrating existing through the end of August 2014. Several check-ins are sched- assets to balance the regional load. uled during the remaining months to review progress and "This project is an example of how partnerships with our explore options for refining asset definitions and performance, customers can be very productive," said BPA Smart Grid and and communications protocol. But,for the time being we are Demand Response Manager Lee Hall. "In this pilot,industrial getting closer to an understanding of what is behind Door demand response has shown strong promise in meeting BPA Number One. nwppe and regional needs,including the potential for balancing vari- able generation." Bob Kaj fasz, CEM, DSM is the commercial energy analyst for Tom Brim manages the project for BPA and has drawn the City of Port Angeles in Washington state. He can be con- on expertise and resources in the agency's Energy Efficiency, tacted at either(360) 417-4718 or rkajfasz @cityofpa.us. 30 www.nwppa.org BULLETIN/June 2014 Elwha River Hydraulic Analysis Herrera Amendment 2 City of Port Angeles Utility Advisory Committee February 9, 2016 I� .fi seesi� `,n,e,nvs awn sexe�sn,cwK 'I�maixtwnnr c' ®� LM IriY.e d d 3 D g i x� v i► v 4 Elwhe Rk— a � r x. w... ... a ,. �' • `P` ��, �� *. F `kMFh,