Loading...
HomeMy WebLinkAboutUAC Agenda Packet 06/14/2016 Utility Advisory Committee Jack Pittis Conference Room Port Angeles, WA 98362 June 14, 2016 3:00 p.m. AGENDA L Call To Order II. Roll Call III. Approval Of Minutes for May 10, 2016 IV. Late Items V. Discussion Items: A. Professional Services Agreement with Kennedy/Jenks Consultants, for WWTP Biosolids Dewatering,Project WW0205 VI. Information Only Items: A. Verbal update on discount customers B. UAC site visits VII. Next Meeting Date: July 12, 2016 VIII. Adjournment N:AUAC\MEETINGS\UAC2016\UAC061416\061416 Agenda.docx Utility Advisory Committee Jack Pittis Conference Rooms Port Angeles, WA 98362 May 10, 2016 3:00 p.m. L Call To Order Vice Chair Lee Whetham called the meeting to order at 3:02 p.m. II. Roll Call UAC Assigned Councilmembers Present: Sissi Bruch, Cherie Kidd and Vice Chair Lee Whetham Other Councilmembers Absent: Brad Collins, Mayor Patrick Downie, Dan Gase, and Michael Merideth UAC Members Present: Rob Feller UAC Members Absent: Chair Lynn Bedford and Betsy Wharton Staff Present: Craig Fulton, Gregg King, Bill Bloor, Kathryn Neal, and Michelle Hale Others Present: None III. Approval Of Minutes Sissi Bruch requested a motion to approve the minutes of April 12, 2016. Cherie Kidd seconded the motion, which carried unanimously. IV. Late Items: One item to be discussed by Gregg King in VI Information Only Item C. V. Discussion Items: A. Professional Services Agreement with Kennedy/Jenks Consultants, for WWTP Biosolids Dewatering, Project WW0205 Kathryn Neal, P. E, Engineering Manager provided background information and a review of the Wastewater Treatment Plant Biosolids Dewatering project of replacing the aging belt press at the plant with a new screw press, and upgrading the ancillary equipment to include the polymer feed system. Kathryn stated Kennedy/Jenks Consultants have been selected to provide design services and construction support, based on the firm's qualifications. Lengthy Discussion followed. Sissi Bruch moved to recommend to City Council to authorize the City Manager to sign the Professional Services Agreement with Kennedy/Jenks Consultants for a maximum amount not-to-exceed$268,040. Cherie Kidd seconded the motion. Rob Feller voted no. Discussion followed the motion. The Committee requested additional information from staff. Craig Fulton, Director,Public Works &Utilities will add additional information on the belt press for the UAC members to consider in response to their good questions. B. 2015 Hydrogeologic Services Feasibility Study, Phase 2 Craig Fulton, Director,Public Works &Utilities brought forward a request for Phase 2 of the hydrogeologic services feasibility study. This follows Phase 1, the preliminary exploration for the development of new ground water sources to supplement the current surface water sources from the Elwha River. Craig briefed UAC members on how Phase 2 involves an assessment of water rights in the vicinity of potential test wells. Discussion followed. Sissi Bruch moved to recommend to City Council to authorize the City Manager to sign Amendment 2 to the Professional Services Agreement with Robinson Noble in an amount not to exceed $20,694, for a total contract amount of$48,004. Cherie Kidd seconded the motion,which carried unanimously. C. ADS Environmental Services Contract Amendment 1 for Combined Sewer Overflow Flow Monitoring Kathryn Neal, P. E, Engineering Manager reviewed the Wastewater Treatment Plant National Pollutant Discharge Elimination System (NPDES)permit requiring the City to monitor all Combined Sewer Overflows (CSO) events. Kathryn reported the City had entered into an agreement with ADS Environmental Services in July 2014 to provide technical service support to the City in order to meet its State NPDES Permit requirements to monitor and report the frequency and volume of CSO's. As modifications to the CSO structures are made, ADS flow monitoring field services will be phased out. The contract expires in July 2016 and the amendment request is to extend the CSO Flow Monitoring contract with ADS Environmental Services for the remainder of 2016. Discussion followed. Sissi Bruch moved to recommend to City Council to authorize the City Manager to sign Amendment 1 to the Professional Services Agreement with ADS Environmental Services, LLC for a bid amount of$26,870.96, for a new total agreement amount of$154,092.21, and to make minor modifications to the agreement, if necessary. Rob Feller seconded the motion,which carried unanimously. VI. Information Only Item A. UAC Site Visits—Landfill Bluff Project and Morse Creek(verbal report) Gregg King reported on the site visits he is scheduling as requested for UAC and Council members. Visits will scheduled over the course of the summer months to the Landfill, Morse Creek,the Wastewater Treatment Plant and the Water Treatment Plant. Gregg will send invitations to UAC and Council members with a few dates and times. B. CFP Presentation—Council and UAC meeting 5:00 PM Tuesday, 17 May 2016 (verbal report) Gregg King mentioned the May 17th, 2016 joint Council and UAC meeting and work session. Finance will discuss the next five years capital finance plan. Requested the UAC to participate in this work session. A packet will be put together for UAC members. C. Energy Efficiency Project(verbal report) Gregg King reported on upcoming energy efficiency LED rebate projects in the City. The City of Port Angeles Civic field lighting will save 145,474 kWh hours (equivalent of 10 homes saved), and will receive $28,553 rebate from Bonneville Power Administration -BPA funds. ACTI is also doing a lighting project with a projected 93,000 kWh savings receiving a rebate of$33,965 from BPA. Fairmont Grocery, Hotel and Restaurant is planning on a project to save 50,000 kWh with a$12,438 rebate from BPA. All these incentives are through the City of Port Angeles Ordinance 3.25 with the Bonneville Power Administration energy efficiency. D. Heat Pump Water Heater (verbal report) Gregg King mentioned the May 25th "Improve the Odds" energy efficiency talk at the Vern Burton Center. The topic will be on the heat pump water heater rebate program. The City of Port Angeles, Clallam and Jefferson PUD will be onsite to provide information on the heat pump water heaters and the rebate program. VIL Next Meeting Date: June 14, 2016 VIII. Adjournment: 4:10 p.m. Chair Lynn Bedford Michelle Hale, Administrative Specialist 11 El Discounts Summaries - IBM Cognos Viewer Page I ofl Electric Discounts Between Jan 1, 2015 and May 31 ,2015 I n"tu ct"r. Description i rransaa¡oJr Amounf |Jo oilcoul! | Transagllon Amount I Discount Amt Given 1.. I customer.'......,. i Count I '.'.,.i 150 lD5 -25% D6 - 35% .,256,687.80, $166,847.07 : 14,428'4.8 89,840.73 104,269.21 l I ¡ 566 716 Jun 6, 2016 El Discounts Summaries - IBM Cognos Viewer Overall - Total Between Jan 1,2016 and May 31,2016 314,401.71 $210,132.50 1 4:10:16 PM Page I ofl Electric Discounts Rate Class Desctiption Transaction Amount No Discount Transaction Amount Discount Amt Given Customer Count Ð5 - 25o/o ,.l_ D6-35%. $16,574.88 $57,440.05 5,524.96 ?0,??:126 36,454.22 79, 276 ì. ¡Overall - Total 1 $74,014.93 I t 'f l ì 355 Jun 6, 2016 4:08:11PM f),r - 1VJtu ßr,a à'.:( *tunt* 4-" w*/w</1 þ C*^¿l ^' îJ"- El Discounts Summaries - IBM Cognos Viewer Page I of 1 Electric Discounts Between Jan 1,2015 and MaY 31,2015 Rate Class DescriPtion Transaction Amount No Discount I'.'..',...-..1 Transaction Amount: I i 57,713.91. Discount Amt Given 14,428.48 89,840.73 ñ4,269.21 I Customer Countt....i 150$43285.4: , $166,847.07 i Overall - Total Jun 6, 2016 El Discounts Summaries - IBM Cognos Viewer D5 - 25o/o D6 - 35% Between Jan 1,2016 and May 31,2016 256,687.80 314,401.71 $2f 0,r32.50 1 ¡ 566 716 1 4:10:16 PM Page I ofl Electric Discounts Rate Class Description Transaction Amount No Discount D5 D6 35% 22,099.84 Transaction Amount Discount Amt Given Customer Count 25o/o 88,369.31 $16,574.88 $57,440.05 5,524.96 30,929.26 i *,tst.zz 79ì 276 355 I-,*.-..----. -*.JOverall - Total I I 11 $74,014.93 Jun 6,2016 4:08:11PM El Discounts Summaries - IBM Cognos Viewer Page I ofl Electric Discounts Between Jan 1,2015 and May 31,2015 Rate Class DescriPtion Transaction Amount No Discount Transaction Amount Discount Amt Given ù5 - 25o/o :57,713.91 , $43,285.43 14,428.48 Customer Count 150 I 1 I D6 - 35%.. ...$166r8a1-ol $21 0,1 32.50 89,840.73 566 Overall - Total 104,269.2'l 716 Jun 6, 2016 El Discounts Summaries - IBM Cognos Viewer 1 4:10:16 PM Page I ofl Electric Discounts Between Jan 1, 2016 and May 31 ,2016 Rate Class Description Transaction Amount No Díscount D5 -25%22,099.U D6 - 35% Overall - Total Transact¡on Amount Discount Amt Given Customer Count $16,574.88 5,524.96 79. $57,440 . 30'e11.26 36,454.22 .05 : l I I !ì I 11'_J Jun 6, 2016 1 4:08:11 PM • tel'RT ,ANGES , "W"W"W"W"W"W"W"W "W WAS HINGTON, U. S. A. Utility Advisory Committee Memo Date: June 14, 2016 To: Utility Advisory Committee FROM: KATHRYN NEAL,P.E.,ENGINEERING MANAGER SUBJECT: Professional Services Agreement with Kennedy/Jenks Consultants, for Wastewater Treatment Plant Biosolids Dewatering, Project WW0205 Summary: The Wastewater Treatment Plant(WWTP) Biosolids Dewatering project will replace the aging belt press at the plant with a new screw press, and upgrade ancillary equipment including the polymer feed system. Replacement of this system is critical to the continued functioning of the wastewater treatment plant. Kennedy/Jenks Consultants have been selected to provide design services and construction support, based on the firm's qualifications. A contract price has been negotiated, in an amount not to exceed $268,040. Funding: Funds are available in the 2016 budget, as part of the Biosolids Dewatering project, WW0205. The project is included in the Capital Facilities Plan, and construction is scheduled for 2017, with a planned total project cost of$1,350,000. If technical assistance is needed for other Wastewater Utility issues, the funds will come from the wastewater operations budget, where funds are available in an amount up to $20,000. Recommendation: Approve and forward a favorable recommendation to City Council to authorize the City Manager to sign the Professional Services Agreement with Kennedy/Jenks Consultants for a maximum amount not-to-exceed $268,040. Background/Analysis: The dewatering press and polymer feeding system at the wastewater treatment plant(WWTP)were installed as part of the 1993 plant expansion project. Both the dewatering press and polymer feed system are 23 years old and at the end of their service life. The manufacturers of both pieces of equipment are no longer in business and replacement parts are unavailable. WWTP personnel have reported frequent breakdowns and have had parts manufactured at a local machine shop in order to keep the systems operating. The dewatering press is a critical system at the WWTP which, if taken out of service, would necessitate the transport of biosolids to a remote processing facility. Page 2 After researching available dewaterng presses, it has been decided to select a screw press manufactured by FKC as the most desirable press. This decision was based on a number of considerations including: a)reliability, b) cost, c) low energy use, and, d) maintenance support. FKC is located in Port Angeles, and can work closely with the engineering team during design and construction, and is readily available to service the equipment. The proposed capital project will completely rehabilitate the dewatering system. Components will include: a)replacement of the dewatering press, b)replacement of the polymer feed system, c) replacement of the press feed pumps and motor controls, d)integrating the press and polymer feed system into the newly rebuilt plant SCADA control system, e)replacement of process piping as required, f)revision to the odor control systems required, and provisions for a temporary dewatering press to maintain solids processing during construction of the new dewatering press. A RFQ for design services was issued on December 29, 2015. Response was made by four firms: A selection board reviewed the submitted proposals, contacted the consultant references and selected Kennedy/Jenks Consultants as the best qualified consultant. The design contract authorizes the preparation of plans, specifications, and estimates for the construction of the necessary improvements, bid support, and design support during construction. The following table summarizes the budget for each task, based on the estimated level of effort. The City will be invoiced only for actual work performed. Task 6 is a provision of$20,000 for unanticipated issues that may arise within the Wastewater Utility, and will be funded by the appropriate project or operations budget item. Design Task 1 —Project Management $24,730 Task 2—Preliminary Design $63,480 Task 3 —Final Design $82,180 Task 4—Bid Services $7,650 Task 5 —Construction Services $70,000 Task 6—Directed Services $20,000 Total contract amount $268,040 In response to questions raised at the May 2016 Utility Advisory Committee meeting, a detailed cost analysis is attached. The primary reason for pursuing the replacement of the biosolids dewatering system at the WWTP at this time is the risk of downtime on a system that has no redundancy. Aside from the cost of repairs and hauling biosolids out-of-area for disposal, the operational savings that the City will gain as a result of the equipment replacement are $86,600 per year on average, or $1,732,000 over the nominal 20-year life of the project. The net savings anticipated over the life of the project are $560,000. It is recommended that the Utilities Advisory Committee forward a favorable recommendation to City Council to authorize the City Manager to sign the Professional Services Agreement with Kennedy/Jenks Consultants for design services in an amount not to exceed $268,040. WW 02-05 Biosolids Dewatering Project Cost Analysis M. Szatlocky, PE May 26, 2016 PROJECT COMPONENTS Project WW 02-05 will replace the existing Klein belt press with a new screw press; replace the progressive cavity filter feed pump with a small progressive cavity feed pump that better matches the press feed rate; replace the polymer injection system with a new system that optimizes the polymer utilization; adds a conveyor system that allows for automatic feeding the pressed sludge into the drop box; and, automates the dewatering process by integrating it into the existing plant SCADA control system, and updates the HVAC/odor control system. The project will eliminate the compressed air system used to regulate polymer feed to the existing belt press, reduce the amount of recycled water used to clean and operate the press by 70,000 gallons per day, reduce energy costs, and greatly reduce the cost of labor and handling. The component changes are discussed below. Dewatering Press The existing belt press was installed in 1993. While rated at 300 gallons per minute (gpm), the press is being operated at 75 gpm, its point of maximum efficiency. The belt press manufacturer is no longer in business. The once automated control system has failed and parts are not available. The belt press is operated in manual mode. The press has had numerous breakdowns. Components such as bearings and pneumatic cylinder actuators have been replaced as needed. The drive shafts have experienced three failures which have been repaired by welding. Since press operation is manual, press operations can occur only during the daytime during normal operating hours. The proposed screw press has an optimal production rate of 40 gpm and an upper production rate of 80 gpm. The screw press operation FKC unit is automated and can be operating for a longer time interval without operator assistance. The automation feature results in significantly lower operating labor and maintenance costs. The screw press produces a pressed sludge with a lower water content resulting in lower handling and disposal costs. Pilot tests have demonstrated an increase in press sludge solids content from 20%for the existing belt feed press to 35%for the screw press—a 75% increase in cake density. The screw press has fewer working parts. The new press comes with replacement bearings and a transmission. The screw press is manufactured in Port Angeles and the manufacturer can provide immediate assistance in case of a press breakdown. Page 1 Feed Pump The current progressive cavity feed pump is a 20 HP pump that has a maximum rating of 300 gpm. It is currently operating at 75 gpm to keep pace with the belt dewatering press. The replacement feed pump is also a 20 HP progressive cavity pump with a maximum rating of 80 gpm. It will be run at 40 gpm to keep pace with the new screw press. The pump has capacity to increase the feed rate to match the screw press feed rate. Polymer Feed The existing dry polymer system is functionally obsolete. The manufacturer is no longer in production. The proposed system uses liquid polymer which has the advantage of using more complex polymers that provide better dewatering of the digester sludge. The liquid polymer system also requires less operation and maintenance time as the polymer is premixed and delivered in large containers which eliminate the cost of daily loading and mixing dry polymer. The proposed system will reuse the aging and storage tanks that are already in use. Conveyor System Current operations require the press operator to move the drop box during press operations to keep the drop box uniformly filled. The proposed screw conveyor system will allow the drop box to be automatically uniformly filled. This will result in labor savings. Compressed Air The compressed air system currently provides compressed air to the pneumatic adjusters in the Klein press, and to the polymer mixing valve in the digester sludge feed line to the press. The FKC press uses no compressed air making the compressor obsolete. The compressor has two 3 HP motors. Elimination of the compressor will provide a minor energy savings. Telemetry The existing belt press control system was constructed as a standalone system. It no longer works in automatic mode and requires manual adjustment during the press cycle. The proposed screw press has a built in programing unit manufactured by TSI that integrates with the plant SCADA control system. TSI is the contractor that is currently working with the City to reprogram the wastewater treatment plant. Automation of the press and polymer feed system will reduce the labor requirements for running the press system. HVAC/ODOR CONTROL HVAC requirements will be lower for the new screw press system. The screw press and the external contact tank are enclosed. They will need connection to the HVAC odor control system to provide a slightly negative air pressure inside the screw press in order to contain moisture and 1-12S emissions. The existing press shroud will be removed as it will be unnecessary. The new system will greatly reduce the humidity and odors in the press room. Page 1 2 Wash Down System The existing belt press uses a great amount of water during operation and post-operation maintenance. Wash down water is added to the press to clean the belts during operation. It takes two to three gallons of wash down water to treat one gallon of digester sludge. This generates approximately 100,000 gallons per day of post-processing liquid that is fed back to the plant headwords, increasing the plant liquid handling cost for pumping and treatment. Post- pressing maintenance requires 15 minutes of exterior washing the press and another 30 minutes of belt cleaning. The screw press uses a programmed, sequential, internal wash down during pressing using small quantities of wash down water. The press is designed to be turned off while under load leaving digester sludge in the press. No post-pressing wash down is required. There is a 3-inch wash down water line feeding the press room. This will be reutilized to provide wash down water to the screw press and hose bibs. LABOR RATES The following table shows the breakdown of operations personnel. The rates are taken from the 2015 ASFCME schedule. The current operating staff(WWTP II) are all at maximum range. It is assumed that over the 20 year planning period that the personnel will likely average mid- range due to personnel turnover. Table 1: Labor Rates Salary Average Hourly Position Range Salary w/Overheads WWTP Operator III A23 $40 WWTP Operator II A19 $35 WWTP Operator I &OIT A16 $32 Utility Worker I A14 $31 OPERATION COSTS Daily press operation is done by a licensed wastewater treatment plant operator level II. The operator is responsible for the polymer system operation, press operation, delivery of press biosolids to the City compost facility, and routine maintenance including equipment and press cleaning. The existing belt press is functionally obsolete. The automatic control features do not work, and replacement parts are unavailable. The press must be run in manual mode which requires monitoring and frequent adjustment by the operator as the water content of the digester sludge changes during each filter run. Typically the morning run has a thicker sludge that the afternoon sludge. The quantity of digester sludge and septic hauler volume has remained relatively stable for the period from 2010 through 2015. Press statistics are shown in the following table: Page 13 Table 2: Press Statistics Year Processed Septic Press Processed Truck Trips to Digester Hauler Days Wet Tons Compost Sludge (gal) Volume (gal) Facility 2010 3,194,865 2,255,600 128 1917 287 2011 3,307,993 2,198,180 124 1757 256 2012 3,197,600 2,295,100 118 1690 234 2013 3,849,430 2,333,600 136 1698 247 2014 3,813,040 2,187,100 157 1664 242 2015 4,414,380 2,687,340 166 1807 263 Average 3,629,551 2,326,153 138 1755 255 The typical daily time breakdown for the WWTP operator is as follows: Press operation 5.35 hr Truck Trips A@ 2 per day 1.9 hr Press maintenance .75 hr Total Time 8 hr The 20 year manpower cost of belt press operation for a Level II operator including overheads for 138 press days per year is$773,920 excluding inflation. The screw press system has several cost cutting features including: 1) a liquid polymer system that requires changing every 2 months; 2) SCADA controlled press operation that requires occasional monitoring which can be done at any of the remote terminals in the treatment plan; 3) increased biosolids solids content which reduces the truck trips to 1 per press day, and 4) automatic wash down procedures that eliminates the 45 minute daily cleaning maintenance cost. Additional features include the ability to automate the press cycle that allows the operation of the press when unattended in the evenings or the weekend when there is no staff on site. The typical daily time breakdown for the new system is as follows: Polymer Makeup 1 min Press operation 30 min Truck Trips @ 1/day 1 hr Wash down 2 min Total Time 1 hr 33 min The 20 year manpower cost of screw press operation for a Level II operator including overheads for an equivalent 138 press days per year is$157,686 excluding inflation. This results in a savings of$616,234 in operator costs. Page 14 Sludge Hauling Cost Sludge hauled to the compost facility has 2 costs—tipping fees at the transfer station ($50.85/wet ton) and vehicle transport cost of$10/mile for a 14 mile round trip between the wastewater treatment plant and the compost facility. The cost per mile includes vehicle depreciation, fuel, maintenance, overheads, tire replacement, and field repairs. The average wet tons of sludge hauled for the 2010-2015 time period was 1,755 wet tons of 20% solids pressed sludge. The average number of truck trips for the same period was 255 per year. The cost of transporting and disposing wet belt feed sludge for a 20 year period computes as follows: Tipping fees: $1,772,954 Equipment transfer: $714,000 Total 20 year cost = $2,486,954 The screw press will produce a 35% solids pressed sludge. This will reduce the sludge hauling cost for the 20 year period to $1,421,117 - a savings of$1,065,837. Maintenance Costs The existing belt press is functionally obsolete. Replacement parts for the mechanical and electrical components are not available from the manufacturer. Moving components such as bearings and drive shafts are worn or subject to fatigue fracturing. Of particular concern are the drive shafts which have failed and been repaired 3 times in recent history. The filter belts lose porosity and need to be replaced every other year. Other components such as safety switches and pneumatic cylinders that adjust belt tension have failed. The principal problem is that, since spares are not obtainable from the press manufacturer, staff have had to obtain new sources for parts which delays repairs. The belt drive shaft has broken 3 times and was repaired in place. Should either drive shaft fail, a replacement drive shaft will need to be fabricated. This will require partial disassembly of the belt press to remove the failed shaft, taking measurements of the shaft to provide a plan for machining a new drive shaft, obtaining appropriate feed stock for shaft manufacture, machining a replacement drive shaft, and reassembly of the screw press. It is estimated that this repair could take up to two weeks. While this is occurring, the accumulated digester sludge will need to be trucked to a receiving facility, the nearest on being in Bremerton. Belt replacement: The press requires a belt change of both the upper and lower belts every two years. Belt replacement takes an average of 3 days for a 5 person crew consisting of 3 WWTP II's, 1 WWTP Page 15 I, and 1 Utility Worker I for a daily cost of$1,570. The following table itemizes the cost of belt replacement for a 3 day event. Belt Cost $4,000 Labor 4710 Total Cost per event $8,710 The manpower cost of belt replacement based on replacement on a two year cycle for a 20 year time period is$87,100 excluding inflation. The screw press uses a stainless steel screen. The installed presses have operated up to 25 years in wastewater systems have not required screen changes. Savings of$87,100 are anticipated for the 20 year design life. Broken Drive Shaft: The belt press drive shafts have failed a number of times (3) due to metal fatigue. The location of the shaft fractures was outside of the press body and repairs were made in place rather than disassembling the entire press. This is a 2 day activity requiring two operators, and the services of a specialty welding company. The last breakdown was in 2013. The cost of repair is as follows: Welding contractor $2,750 WWTP Operator Cost $1,120($35/operator hr x 2 operators x 16 hr) Total Cost $3,870 The cost of 4 anticipated repairs in the 20 year design life is$15,480. The total anticipated costs of maintaining the existing belt feed press for the 20 year design period is$102,580. Repairs to the new screw press are limited to either bearing or gearbox replacement. Replacement for both of these components will be provided at the time of purchase. The manufacturer states that either component can be replaced by two workers in one day. Assuming one repair will be needed in the 20 year period, the cost of repair will be$560. The cost of maintaining the new screw press will be$102,020 lower than the cost of maintaining the current belt press. . ENERGY COSTS There are two basic energy costs—the cost of consumption and the will serve cost. Consumption costs, the cost of running equipment,for industrial users are 5.13 cents per kilowatt hour. Direct costs include the cost of running the dewatering press system and the cost of recirculating process water to the plant headworks and the trickling filters. Will serve costs are a monthly fee based on a user's highest energy use in kilowatts. The following tables compare the energy costs for a 20 year period for the Klein filter press and the proposed screw Pagel 6 filter press, Table 3: Belt Press Direct Energy Costs Belt Dewatering Press Component HP Hours per Presses per 20 year press 20 years direct cost Press Belt Drive 5 6 2,764 $43,284 Press Screw Conveyor 2 6 $17,303 Press Hydraulic Pump 1.5 6 $12,991 Press Compressed Air Pump 6 6 $51,396 Wash Water Booster Pump 7.5 6 $89,332 Press Feed Pump 20 6 $173,137 Tank Drain Pump 3 8.33 $36,043 Trickling Pump 75 .83 $89,802 Total Direct Energy Cost $513,828 Table 4: Belt Press Will Serve Energy Costs Component HP Kw Press Belt Drive 5 3.73 Press Screw Conveyor 2 1.49 Press Hydraulic Pump 1.5 1.12 Press Compressed Air Pump 6 4.48 Wash Water Booster Pump 7.5 5.60 Press Feed Pump 20 14.92 Tank Drain Pump 3 2.24 Trickling Pump 75 55.95 Tota 1 120 89.5 The monthly will serve cost per Kw is$0.0438. The total will serve cost for the belt press for a 20 year period is$942. The total energy cost for the belt feed press for a 20 year period is $514,770. The screw press has a lower power demand and, therefore, a lower 20 year cost as shown in Table 5 below. Page 17 Table 5: Screw Press Direct Energy Cost FKC Dewatering Press Component HP Hours per Presses per 20 Year press 20 years Direct Cost Screw Press Drive 2 11.25 2,764 $50.433 FKC Sludge Conveyor 1 11.25 $25,222 Wash Water Booster Pump 7.5 .5 $89,332 Press Feed Pump 20 11.25 $173,137 Tank Drain Pump 3 2.5 $36,043 Trickling Pump 75 .24 $89,802 Total Energy Cost $463,979 Table 6: Screw Press Will Serve Energy Costs Component HP Kw Screw Press Drive 2 1.49 Press Sludge Conveyor 1 0.74 Wash Water Booster Pump 7.5 5.60 Press Feed Pump 20 14.92 Tank Drain Pump 3 2.23 Trickling Pump 75 55.95 Tota 1 108.5 80.94 The monthly will serve cost per Kw is$0.0438. The total will serve cost for the screw press for a 20 year period is$851. The total energy cost for the screw press for a 20 year period is $464,830. Energy cost savings for the screw press for a 20 year period are$49,940. CONTINGENCY COST OF BREAKDOWN In the event of breakdown of a critical press component such as a drive shaft inside the belt press, the press would require disassembly, machining of a new shaft, and press reassembly causing a long time delay. Because it is not possible to shut down the plant incoming flow,the only feasible solution to digester sludge disposal is to truck the sludge to a receiving facility. This would require costs for 6 to 8 daily tanker truckloads to be hauled off site and the cost of processing 30,000 gallons of sludge at the remote site. The closest identified disposal site is in Bremerton. Assuming a one week breakdown, the cost of hauling 120,000 gallons of liquid sludge is estimated at$13,540, and the cost of treatment of 120,000 gallons of liquid sludge is $41,800. The total cost for trucking and disposal would be$60,304. In addition, a major breakdown would require press disassembly to remove the broken drive shaft, and reassembly which includes a belt replacement after installing the new drive shaft. This would amount to a direct labor cost of$6,300. Machining and shipping costs for the drive shaft manufacturer is estimated at$10,000. Although it is desirable to manufacture replacement parts such as main drive shafts ahead of time, this is not possible because there are no available plans that provide part Page 18 dimensions. The only way to pre-manufacture these parts would be to cease production and disassemble the press. The disassembly and machining is estimated at total $16,300 making the total cost for a major equipment breakdown $76,040. Of necessity, this estimated cost is not definitive—the risk of much higher costs exists, including a breakdown that cannot be feasibly repaired.These risks are not quantified in this analysis. COST COMPARISON Cost comparisons are based on a number of simplifications: 1. There has been no factoring for inflation 2. Labor rates are based on the 2015 AFSCME contract and are not up to date. 3. Energy statistics are based on a 2010 study and may not reflect current usage. 4. Repairs are based on current past history with the belt press. No breakdown costs have been applied to the screw press. 5. Transfer station tipping fees at$50.50 per wet ton reflect current contract conditions with Waste Management. These rates may be subject to change. 6. System demand is based on a 6 year study. It is not been determined whether the 2014 and 2015 quantity of digester sludge and process wet tons indicates an increasing growth trend that will cause increased production costs. The 2016 septic hauler volume at the end of April 2016 was 40% higher than anticipated. If solids volumes are increasing, than the cost savings of upgrading the Biosolids dewatering system will be more than stated below. Table 7: Cost Comparison Summary—20 Year Period Existing Belt Press Proposed Screw Press Operation & Maintenance $773,920 $157,686 $616,234 Sludge Handling $2,486,954 $1,421,117 $1,065,837 Energy Costs $514,770 $464,830 $49,940 Subtotal, Operations $3,775,644 $2,043,633 $1,732,011 Repairs $102,580 $560 $102,020 Contingency Cost of Breakdown (one week) $76,040 $0 $76,040 Subtotal, Repairs $178,620 $560 $178,060 Total Cost $3,954,264 $2,044,193 $1,910,071 Estimated Project Cost (design and construction) $1,350,000 Savings 560,071 The cost comparisons show a clear financial advantage in favor of replacing the existing biosolids dewatering system (belt press). Current construction costs are estimated at$1,350,000. The reasons Page 19 for replacing the existing biosolids dewatering system are even more compelling given that the cost comparison does not quantify all significant risks. It is possible that a complete failure of the existing press could occur, requiring complete replacement of the press and long term hauling of sludge.That would cause significant system disruption as well as high costs. The dewatering press is old, components are failing, and the dewatering press is the critical component in the solids treatment portion of the wastewater treatment plant. It is the only component in the wastewater treatment plant process that has no redundancy(no parallel back-up system). Should the press experience a major failure, processing biosolids will stop. In the initial project scoping, an alternative of installing two presses in order to provide redundancy was explored, but discarded after it became clear that the cost of a second gear box and bearings can be included in the project cost.This option allowed the City to reduce the estimated project cost significantly because it minimizes equipment costs and structural alterations to the press buildings while providing a highly desirable increase in system reliability. Page 1 10