Loading...
HomeMy WebLinkAbout001148 Original ContractCity of Port Angeles Record #001148 NET ENERGY METERING CONNECTION AGREEMENT for CUSTOMER FUEL CELL, SOLAR, WIND, or HYDROPOWER ELECTRIC GENERATING FACILITIES of 100 KILOWATTS or LESS This Net Energy Metering Connection Agre€ment is executed in duplicate this 1oh day of October 20 t6 between James A- Ude and Marianne J- lJde (hereinafter re fened to as "Customer"), and the City ofPort Angeles Department ofPublic Works and Utilities (hereinafter referred to as the City). Both parties, who may be herein further referred to collectively as "Parties" and individually as "Party", agree as follows: I. CUSTOMER ELECTRIC GENERATING FACILITY 1.1 Customer has elected, in accordance with RCW 80.60 et seq., to operate either a net energy metering fuel cell, solar, wind or hydropower electric generating facility, with a generating capacity ofnot more than one hundred kilowatts, in parallel with the City's transmission and distribution facilities. This generating facility is intended to offset either part or all of the Customer's electrical requirements. 1.2 Customer's Application for Net Metered Electrical Generation, including the location of the electrical generating installation and details on the electrical generating unit(s) is hereby incorporated into this agreement as Appendix A. 1.3 The installation is identified by the City with the following designators: Transformer No. 57-FO-05 on feederip hn5s 1A1203/A Customer Utility Location No. 103504 1.4 A separate agreement shall be entered into for each Customer's electrical service location(s). 1.5 The electrical generating system used by the Customer shall be located on the Customer's premises. It shall include all equipment necessary to meet applicable safety, power quality, and connection requirements established by the National Electrical Code (Alicles 690 and 705), National Electrical Safety Code, the Institute of Electrical and Electronics Engineers, Under*riters Laboratories, and the City's Connection Standards, as set forth in Appendix B, which is attached hereto. I .6 The City shall have the sole authority to detennine which connection requirements set forth herein are applicable to Customer's proposed installation. 2. PAYMENT FOR NET ENERGY 2.1 The City shall measure the net electricity produced or consumed by the Customer during each billing period, in accordance with normal metering practices. PWl201-01 Net Metering Agrcement.Doc I of 6 3/28101 2.2 If the electricity supplied by the City exceeds the electricity generated by the Customer and fed back to the City during the billing period, or any portion thereo! then the Customer shall be billed for the net electriciry supplied by the City together with the appropriate customer charge paid by other customers ofthe City in the same rate class. 2.3 lfthe electricity generated by the Customer and distributed back to the City during the billing period, or any portion thereof, exceeds the electricity supplied by the City, then the Customer shall be: (a) billed for the appropriate customer service charge as other customers ofthe City in the same rate class; and (b) credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on Customer's bill for the following billing period. 2.4 At the beginning ofeach calendar year, any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year shall be granted to the City without any compensation to the Customer. 2.5 Customer shall pay any amount owing for electric sewice provided by the City in accordance with applicable rates and policies. Nothing in this Section 2 shall limit City's rights under applicable Rate Schedules, Customer Service policies, and General Provisions. 3. INTERRUPTION OR REDUCTION OF DELIVERIES 3.1 The City may require Customer to intemrpt or reduce deliveries as follows: (a) when necessary in order to construct, install, maintain, repair, replace, remove, investigate, or inspect any of its equipment or part of its system; or (b) if it determines that curtaiknent, intemrption, or reduction is necessary because of emergencies, force or compliance with prudent electrical practices. 3.2 Whenever possible, the City shall give Customer reasonable notice ofthe possibility that intemrption or reduction ofdeliveries may be required. 3.3 Notwithstanding any other provision of this Agreement, if at any time the City determines that either: (a) the facility may endanger City personnel, or (b) the continued operation ofCustomer's facility may endanger the integrity of the City's electric system, The City shall have the right to disconnect Customer's facility from the City's electric system. Customer's facility shall remain disconnected until such time as the City is satisfied that the condition(s) referenced in (a) or (b) of this section 3.3 have been corrected. 4. CONNECTION 4.1 Customer shall deliver the excess energy to the City at the City's meter Pwt2ol-01 Net Metering Ageement.DOC 2of 6 3t28t0t 4.2 Customer shall pay for designing, installing, inspecting, operating, and maintaining the electric generating facility in accordance with all applicable laws and regulations and shall compty with the City's Connection Standards set forth in Appendix B, which is attached hereto. 4.3 Customer shall pay for the City's standard watt-hour meter electrical hook-up, if not already present. 4.4 Customer shall not commence parallel operation of the generating facility until written approval of the connection facilities has been given by the City. Such approval shall not be unreasonably withheld. The City shall have the right to have representatives present at the initial testing of Customer's protective apparatus. 5. MAINTENANCE AND PERMITS 5.1 Customer shall: (a) maintain the electric generating facility and connection facilities in a safe and prudent manner and in conformance with all applicable laws and regulations including, but not limited to, the City's Connection Standards, Appendix B, and (b) obtain any govemmental authorizations and permis required for the construction and operation of the electric generating facility and connection facilities, including electrical permit(s). 5.2 Customer shall reimburse the City for any and all losses, damages, claims, penalties, or liability it incurs as a result of Customer's failure to obtain or maintain any govemmental authorizations and permits required for construction and operation of Customer's generating facility or failure to maintain Customet's facility as required in (a) of this Section 5. 6. ACCESS TO PREMISES 6.1 The City may enter Custome/s premises or property to: (a) inspect, with prior notice, at all reasonable hours, Customer's protective devices; (b) read meter; and (c) disconnect at the City's meter or transformer, without notice, the connection facilities if, in the City's opinion, a hazardous condition exists and such immediate action is necessary to protect persons, or the City's facilities, or property of others from damage or interference caused by Custome/s electric generating facilities, or lack ofproperly operating protective devices or inability to inspect the same. 7. INDEMNITY AND LIABILITY 7.1 The Customer assumes the risk ofall damages, loss, cost and expense and agrees to indemnifu the City, its successors and assigns, and its respective directors, officers, employees and agents, from and against any and all claims, losses, costs, liabilities, PW120l-01 Net Metering Agreement.Doc 3 of 6 3t28l0t damages and expenses including, but not limited to, reasonable attorney fees, resulting fiom or in connection with performance ofthe agreement or which may occur or be sustained by the City on account ofany claim or action brought against the City for any reason including but not limited to loss to the electrical system of the Customeq caused by or arising out ofan electrical disturbance. 7.2 Such indemnity, protection, and hold harmless includes any demand, claim, suit or judgement for damages, death or bodily injury to all persons, including officers, ernployees or agents, and subcontractors ofeither Party hereto including payment made under or in connection with any Worker's Compensation Law or under any plan for ernployees' disability and death benefits or property loss which may be caused or contributed to by the connection. maintenance, operation, use, presence, or removal of Customer's equipment. The only exception will be liability occasioned by the sole negligence or willful misconduct of the City or its employees acting within the scope of their employment and liability occasioned by a partial negligence of the City or its employees acting within the scope of their employment to the extent that such partial liability is fixed by a court ofcompetent jurisdiction. 7.3 The provisions ofSection 7 shall not be construd to relieve any insurer of its obligations to pay any insurance claims in accordance with the provisions ofany insurance policy. 7.4 The City shall have no liability, ownership interest, control or responsibility for the Customer's Electric Generating Facility or its connection with the City's electric system, regardless ofwhat the City knows or should know about the Customer's Electric Generating Facility or its connection. 7.5 Customer recognizes that it is waiving immunity under Washington Industrial Insurance law, Title 5l RCW, and further agrees that this indemnification clause has been mutually negotiated. This indemnification shall extend to and include attorney's fees and the costs ofestablishing the right of indemnification hereunder in favor ofthe City. 8. INSURANCE 8.1 Customer shall maintain, during the term ofthis Agreement, Comprehensive Personal Liability Insurance with a combined single limit in an amount equivalent to the industry standard for this type of insurance. 8.2 Such insurance shall, by endorsement to the policy or policies, provide for thirty (30) calendar days written notice to the City prior to cancellation, termination, attention, or material change ofsuch insurance. 8.3 The City shall have the right to inspect or obtain a copy of the original policy or policies of insurance. 9. INDEPENDENT CONTRACTORS 9.1 The Parties hereto are independent contractors and shall not be deemed to be partners, joint venturers, employees, franchisees or franchisers, servants or agents of each other for any purpose whatsoever under or in connection with this Agreement. PWl20l-01 Net Metering Agreement.DOc 4 of 6 3l28tOt IO. GOVERNING LAW l0.l This Agreement shall be interpreted, governed, and constructed under the laws of the State of Washington as if executed and to be performed wholly within the State of Washington. Venue ofany action arising hereunder or related to this agreement shall lie in Clallam County, Washington. I2. APPENDICES The Agreement includes the following appendices attached and incorporated by reference: Appendix A: Customer's Application for Net Metered Electrical Generation to City of Port Angeles. Appendix B: City's Connection Standards for Customer Electric Generating Facilities of 100 Kilowatts or Less. I3. NOTICES All written notices shall be directed as follows: City of Port Angeles: Electrical Engineering Manager 321 East 5s Street P.O. Box I150 Port Angeles, WA 98362 Name 221 West Fogarty Ave. AddrEss Port Angeles, WA 98362 City, State & Zip 3/28101 I I. AMENDMENTS, MODIFICATIONS OR WAIVER I l.l Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at any time or times to require performance of any provision hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any Party of the breach of any term or covenant contained in this Agreement, whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver ofany such breach or waiver of the breach ofany other term or covenant unless such waiver is in writing. Customer: James A. Ude and Marianne J- Ude PWl20l-01 Net Metering Agreement.DOc 5 of 6 Customer notices to the City, pursuant to this Section 13, shall refer to the Service Address set forth in Appendix A. 14. TERM OF AGREEMENT This Agreement shall be in effect when signed by the Customer and the City and shall remain in effect thereafter month to month unless terminated by either Party on thirty (30) days'prior written notice in accordance with Section 13. I5, SIGNATURES IN WITNESS WHEREOF, the Parties hereto have caused two originals of this Agreement to be executed by their duly authorized representatives. This Agreernent is effective as ofthe last date set forth below: CUSTOMER:CIry OF PORT ANGELES A?4- Vlqu-., ) /d, llantoa"n,n*-^ fitt" o lb Signature Shailesh Shere Prinl name Asst. Director of Power Systems Title 1011012016 Date PWl20l-01 Net Meteriog Agre€ment.DOc 6 of 6 3/28/01 4k Signature t^lf fl,(4e- tlar;""". Uth Print name APPENDIX A Application for Net Metered Electrical Generation Thank you for your interest in establishing a renewable energy or fuel cell connection with City of Port Angeles, Electric Utility. Please note generation systems must meet certain requirements to be considered. o The projecl must be not more ftan 100 kilowatts (kW) in size. o Generation must be fueled by solar, wind, hydropower, or be a fuel cell. r Owner provides power conditioning, connection, and safety equipment. . Projects will be considered on a first come first served basis. Please complete Customer and Installer Information and the appropriate section for the type of generation proposed to be installed. In addition, include a one-line diagram and description of protection equipment. Please allow at least ten working days for processing your application' Questions may be directed to Electrical Engineering Manager, at telephone number (360) 4174702. Customer Information owner Name: James A. Ude and Marianne J. Ude Mailing Address: City, State & Zip 221 West Fogarty Ave. . Port Angeles, WA 98362 EmailAddress: jude@olympus.net Serv'ice Address: Dayime Telephone:(360) 452-3932 38487-103504 Expected System Operational Date:third week of October, 2016 Installer Information ( If from Customer lnformation) Insraller Name: Power Trip Energy Corp Mailing Address: City, State & Zip: Email Address: 83 Denny Avenue Port Townsend, WA 98368 bobbie@powertripenergy.com Dayime Telephone . (360) 643-3080 (lfdifferent than Mailins Address) PW1201 02 lRevised 01/2016]1 of2 ,PE\r., Electric Utility Account No.: Photovoltaic Solar Svstem Information PV Module Manufacturer. SunPower PV Module Model Number: SPR-E20-327-C-AC Number of Modules: 28 PV Power Rating per Module: 327 DC Watts Total Output: InveTter Manufacfuret. SunPow€r Solar Module{nteg6ted Micro-lnverters (qry 28) 9156 DC Watts Inverter Model Number: Inverter's Power Rating (kW)' .320 ea / Lg6 total Describe the protection equipment to be used and the physical location of the installation: (AC continuous) AC disconnect located orl ttle south wall of house adiacent to p3to entrance. Arays to be localed on the south roof ot house and on the west loof of garage. Installation Cost Information Estimated cost of installation: s27.s00 Drawinss Attached:r'one line manufacturers literature design drawings AiV1201 02 [Revised 01/2016]2of? Pv lnstall Checklist Solar Agent:Client Name: Jim & Marianne Ude Power Trip Energy Corp 83 Denny Ave Port Townsend, WA 98368 (360) eB-3080 www.powertripenergy.com Lic # POWERTE9 JN Proiect: Ude residence Client: Jim & Marianne Ude Phone: (360) 452-3932 Address: 221 W Fogarty Ave, Port Angeles, WA 9836 System Description: Grid Tied Pv on house and garage toof Line Drawing: Solar Modules Branch circuit B- 2.94kw array on Wes roofofgarage. Nine 32?W Sunpower modules. model SPR-E20-327-C- AC Solar Modules Branch circuit C- 2.94kw array on Wes roofofgarage. Nine 327W Sunpower modules, model SPR-E20-327-C- AC Solar Modules Branch circuit A- 3.27kw array oD South roofofhouse. Ten 327W Sunpower modules, model SPR-820-327-C- AC AC System Disconnect Circuit C Open & Lockable (Line) Located on South wall of house adjacent to patio entrance ombiner City of Port Angeles Utility Crid AC System Disconnecl - Visibly Open & Lockable (Line) Located on South wall ofhouse adjacent to patio entrance. City of PA Net Meter Located remole on the right side ofdriveway by street. Meter #: Main Service Panel (Load) 200 Amps located on East wall ofbasement closet. Production Meter Located on South wall of house adjacent to patio sntratrce. ljlg-l t!!9: !93{l te4d-l September 27, 2016 Page 3 of 6 APPENDIX B CONNECTION STANDARDS for CUSTOMER ELECTRIC GENERATING FACILITIES of not more than 100 KILOWATTS A. General This Appendix sets forth the requirements and conditions for interconnected non-utility- owned electric generation where such generation may be connected for parallel operation with the service of City of Port Angeles Electric Utility (the 'City"). For purposes of this Appendix, the interconnecting entity shall be designated "Customed. B. ConneclionRequirements 1. Customer shall conform to all applicable National Electric Code (NEC) requirements [NEC Articles 690 and 705] and building codes, and shall obtain electrical permit(s) for the equipment installation. 2. Cuslomer shall have a dedicated lockable disconnect device between sources of alternating-cunent, (i.e. between inverte(s) or other power conditioning unit(s)) and the City's distribution system. The lockable disconnect must be accessible to the City at all times and only the City's lock may be used on it. 3. Custome/s over cunent device at the service panel shall be marked to indicate power source and connection to the City's distribution system. 4. Custome/s power production control system shall comply with NEC Articles 690 and 705, Underwriters Laboratories (UL) Standard 1741, Second Edition, and the lnstitute of Electrical and Electronics Engineers (IEEE) Standard 1547 minimum specifications, and standards for parallel operation with the City. ln particular, the: a. Power output control system shall automatically disconnect from the City's source upon loss of the City's voltage and not reconnect until the City's voltage has been restored by the City. b. Power output control system shall automatically disconnect from the City's source if Customer's voltage fluctuates beyond plus or minus 10 percent, per UL 1741. c. Power output control system shall automatically disconnect from the City's if Custome/s and the City's frequency fluctuates plus or minus 2 cycles per second (Hertz). d. lnverter output distortion shall meet IEEE Standard 519. Safety All safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA) Standard 29, CFR 1910.269, the NEC, WAC rules, the Washington lndustrial Safety and Health Administration (WISHA) Standard, the City Service Requirements, and equipment manufacture/s safety and operating manuals. Net Metering-Apndx B.doc {2/19/13 }