Loading...
HomeMy WebLinkAbout000751 Amendment 2 000751 AMENDMENT NO. 2 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND Vanir Construction Management,Inc. Combined Sewer Overflow (CSO) Phase 11, Project No. 06-02 RELATING TO: CSO Phase 11 Construction Management Services TI-IIS AMENDMENT NO. 2 is made and entered into as of the date of the last signature affixed below, by and between the City of P'ort Angeles, a non-charter code city of the State of Washington, (hereinafter called the "CI'"['Y") and Vanir Construction Management, Inc., located at 10900 NE 8" Street, Suite 1486, Bellevue, Washington 98004 authorized to do business in the state ofWashington (hereinafter called the -CONSL)LTANT"), NOW, THEREFORE, in consideration of the representations and the terms, conditions,covenants and agreements set forth in the original AGREEMENT and this AMENDMENT,the parties hereto agree as follows: SECTION 1 The CITY entered into the existing AGREEMENT with the CONSULTANT on May 14, 2014, (the AGREEMENT). The CITY and the CONSULTANT amended the AGREEMENT on February 1, 2016 (the AMENDMENTS). SECTION 2 1 AMENDED SCOPE OF SERVICES No change. 11 TIME OF PERFORMANCE Article IV Time of Performance is amended, the second sentence to read: The duration of the AGREEMENTis extended to June 30, 2017 111. PAYMENT No change. IV. MAXIMUM COMPENSATION Article VI Maximum Compensation is amended to include the CONSULTANT'S compensation and reimbursement of$156,000 to compensate the consultant for the additional time and construction management services required to complete the project. The maximum compensation amount shall not exceed $2,079,825. CSO Phase If CM Services Amendment No, 2 Page I V. EXHIBITS No change. SECTION 3 RATIFICATION Except as modified herein, the original AGREEMENT and AMENDMENTS are confirmed and ratified. In WITNESS WHEREOF,the parties hereto have executed this Amendment No. 2 to the Agreement as of the date of the last signature affixed below. CITY OF PORT ANGELES VANIR CONSTRUCTION MANAGEMENT,INC. By: 241'�,00lo/ By:_ Dan McKeen, City Manager Joseph. A. ehula Title: President Date: Date: ATTEST: nnife Veneklasen, City Clerk APF ED AS TO FORM: William E. loon, City Attorney CSO Phase It CM Services Amendment No, 2 Page 2