Loading...
HomeMy WebLinkAbout001154 Original Contract City of Port Angeles Record#001154 �a s* rm ✓a NE'T' ENEJRGY METERING CONNECTION AGREEMENT for CUSTOMER FUEL CELL, SOLAR, WIND, or HYDROPOWER ELECTRIC GENERATING FACILITIES of 100 KILOWATTS or LESS This Net Energy Metering Connection Agreement is executed in duplicate this 1st day of November , 20 16 between Barbara Deese (hereinafter referred to as "Customer"), and the City of Port Angeles Department of Public Works and Utilities (hereinafter referred to as the City). Both parties, who may be herein further referred to collectively as "Parties" and individually as "Party", agree as follows: 1. CUSTOMER ELECTRIC GENERATING FACILITY LI Customer has elected, in accordance with RCW 80.60 et seq., to operate either a net energy metering fuel cell, solar, wind or hydropower electric generating facility, with a generating capacity of not more than one hundred kilowatts, in parallel with the City's transmission and distribution facilities. This generating facility is intended to offset either part or all of the Customer's electrical requirements. 1.2 Customer's Application for Net Metered Electrical Generation, including the location of the electrical generating installation and details on the electrical generating unit(s) is hereby incorporated into this agreement as Appendix A. 1.3 The installation is identified by the City with the following designators Transformer No. 28-AS-e3 , on feeder/phase A12021A, Customer Utility Location No. 90498 1.4 A separate agreement shall be entered into for each Customer's electrical service location(s). 1.5 The electrical generating system used by the Customer shall be located on the Customer's premises. It shall include all equipment necessary to meet applicable safety, power quality, and connection requirements established by the National Electrical Code (Articles 690 and 705),National Electrical Safety Code,the Institute of Electrical and Electronics Engineers, Underwriters Laboratories, and the City's Connection Standards, as set forth in Appendix I3, which is attached hereto. 1.6 The City shall have the sole authority to determine which connection requirements set forth herein are applicable to Customer's proposed installation. 2. PAYMENT FOR NET ENERGY 2.1 The City shall measure the net electricity produced or consumed by the Customer during each billing period, in accordance with normal metering practices. PW 1201-01 Net MeteringAgreement,,DOC 0 of 3/28/01 2.2 If the electricity supplied by the City exceeds the electricity generated by the Customer and fed back to, the City during the billing period, or any portion thereof, then the Customer shall be billed for the net electricity supplied by the City together with the appropriate customer charge paid by other custorners of the City in the same rate class, 2.3 If the electricity generated by the Customer and distributed back to the City during the billing period, or any portion thereof, exceeds the electricity supplied by the City, then the Customer shall be: (a) billed for the appropriate customer service charge as other customers of the City in the same rate class; and (b) credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on Customer's bill for the following billing period. 2.4 At the beginning of each calendar year, any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year shall be granted to the City without any compensation to the Customer. 2.5 Customer shall pay any amount owing for electric service provided by the City in accordance with applicable rates and policies. Nothing in this Section 2 shall limit City's rights under applicable Rate Schedules,, Customer ' ervice Policies. and General Provisions. 3. INTERRUPTION OR REDUCTION OF DELIVERIES 3.1 The City may require Customer to interrupt or reduce deliveries as follows: (a) when necessary in order to construct, install, maintain, repair, replace, remove, investigate, or inspect any of its equipment or part of its system.- or (b) if it determines that curtailment, interruption, or reduction is necessary because of emergencies, force or compliance with prudent electrical practices. 12 Whenever possible, the City shall give Customer reasonable notice of the possibility that interruption or reduction of deliveries may be required. 33 Notwithstanding any other provision of this Agreement, if at any time the City determines that either: (a) the facility may endanger City personnel, or (b) the continued operation of Customer's facility may endanger the integrity of the City's electric system, The City shall have the right to disconnect Customer's facility from the City's electric system. Customer's facility shall remain disconnected until such time as the City is satisfied that the condition(s) referenced in (a) or(b) of this section 3.3 have been corrected, 4. CONNECTION 4.1 Customer shall deliver the excess energy, to the City at the City's meter, PW 1201-01 Net Metering Agreernent.DOC 2 of 6 3/28/01 4.2 Customer shall pay for designing, installing, inspecting, operating, and maintaining the electric generating facility in accordance with all applicable laws and regulations and shall comply with the City's Connection Standards set forth in Appendix B. which is attached hereto. 4.3 Customer shall pay for the City's standard watt-hour meter electrical hook-up, if not already present. 4.4 Customer shall not commence parallel operation of the generating facility until written approval of the connection facilities has been given by the City. Such approval shall not be unreasonably wxithhc1d. The City shall have the right to have representatives present at the initial testing of Customer's protective apparatus. 5, MAINTF'.NANCE AND PERMITS 5,1 Customer shall: (a) maintain the electric generating 'facility and connection facilities in a safe and prudent manner and in conformance with all applicable laws and regulations including, but not limited to, the City's Connection Standards, Appendix B., and (b) obtain any, governmental authorizations and permits required for the construction and operation of the electric generating facility and connection facilities, including electrical permit('s,). 5.2 Customer shall reimburse the City for any and all losses, damages., claims, penalties, or liabillity it incurs as a result ofCustorner's failure to obtain or maintain any governmental authorizations and permits required for construction and operation of Customer's generating facility or failure to maintain Customer's facility as required in (a) of this Section 5. 6, ACCESSTO PREMISES 6.1 The City may enter Customer's premises or property to: (a) inspect, with prior notice, at all reasonable hours, Customer's protective devices; (b) read meter; and (c) disconnect at the City's meter or transformer, without notice, the connection facilities if, in the City's opinion, a hazardous condition exists and such immediate action is necessary to protect persons, or the City's facilities, or property of'others from damage or interference caused by Customer's electric generating facilities, or lack of properly operating protective devices or inability to inspect the same, 7. INDEMNITY AND LIABILITY 7.1 The Customer assumes the risk of all damages, loss, cost and expense and agrees to indemnify the City, Its Successors and assigns, and its respective directors, officers, employees and agents, from and against any and all claims, losses, costs, liabilities, P,W 1201-01 Net Metering Agreement.DOC 3 of 6 3/28/01 10/8z/� 9jo t JOGWILL1,10JOV '13UP3131N ON 10-10ZL'Ad 'jwnuaa)AV siql ql!m UOII',)IULIO,-) Ul jo npun JIAO()slP4m asodind uu icj ntlio qovajo slug jo siut'.,Nj.-)s `sensor ,-)m?j .1 to siasiqiuPjj 'soa� ojdLlla 'sninI1,10A 11110f `smijud ,)q 01 PZ)WZ);)p ',,)q JOU 11eqs pup sjolowluol ju,,)puodopui -3JP 01,11,114 s3ll-lud 3141 1.6 SldOl,)VMJ,NOJ '6 )uujnsui jo soi,,)i lod .to n-)qod IvutSijo )qi.,:Io „ado, v utulqo jo loodsm 011421-1 iql OAU4 IMS I!J iq.t, f-g 'x)uvjnsui Unsjo a'Sueqi Irpilew jo uoilu3ilb, uoilruiu.inj luot)PlIntan (,)I joyd iql of oDijou Uall!IM SXL'P irpullul ((l0 /.it!tji jo,i �)p!,%ojd Isoi.-mlod lo XmIod atll of luouimioptio, Xq 'IPP amunism q,,)nS Z-8 ,,),)uL,jnsut jo a&(I siql loj ptrpums ktisnput itli of juilininbi. junoum, UR u1ILUIl ilBuis poutqwoo v qjim i-mminsul X:uj!qurj InoSX)d lAt,,uaqojdwo,) ljtjo==',?V sitlijo wnj otil 2u1jnp I•utmutrui llBqs 1;)wolsnD I.8 I'MNASNI '8 3111 JOAj ut j,)punoJ',)LI UOIIP.I!J!uw,.)puiijo iq5tj ,)tll luiqsjjqjs.ijo sism oqi pup saoj S.�(aulojjp -.)Pnjaui pun of pualv) lieqs uoiiv,,)U!uumpuj s14l -poirtio',bu njjunjnuj uioq spq osnuli uotva3!j!uu,mpui siql jvqj s,,),,)j2p 1,)qljnj puL, I ollij, '.4Aq iziuvinsul jumsnpul uoiSualspM lopun �JlUnLULIH 5MAIVAN si it luqi siziu0mij jamoisnD, 9°L 'UOIIOOULIO.) Sit JO &IIJUIUo() )IJjIOj'j s,j,,)wolsn,-,) 041 Inoqr,, MOLIJ pinOLJS AO SMOUI Xj!') -)ql jeqm,jo sSajpjv,&m 'twom(s 31-113,110 041 qiim UOfl3lUUO:) Sj! AO Itutlujoux oppal] sjmojsnD 3tll joj �jjpq!suodsoj jo 10.111.103 'ISOlolut. dtqsioumo �Iipqpij OU lArq jjtqs �4!,) 0gd t7 -,,�-,)qod -),,)uvinsui ,,�UIIJO SUOISIAojd )LIJ ql!M 03Ut'P.100,-)U Ul SU,Htlj') 33LIvinsm �uv Mrd o.1 suoorOjjqo sit to JIJ11SUJ WV 1A.-MIN 01 P,)IlJlsuoo z)q iou HPI-IS L U011,13S JO SUOISIA()J(J 141 CL 'uOtPlpsynf iuijidLUO;)JO iino;)v �q pixy, si Kiq!qvq jup.ied qons iry woIx.) )lqi oi ivaui�ojduj�,:) j43q1,jo odo.)s oqi u!qj!m Ouivr si,) ojdw sit 30 ^l!,,) xjj.jooz)u..),lctjS.)u juili-ed v Xq p,)uotsr,),,,)o �vj!qutj pue juz)w,%ojdwi itoLp jo 3doos 3141 uitlitm Jiupor so-aXo1dum sit io Xii D z)ql jo 1,)npuoz)SI Ul jRffl!M 10 0zou.)21 10au Z) I n otos 041 �q pauotsuoolo �:qpqeij ;)q Ip m uoildiov.) �11-10 I 41 °ju wdinbi S,J, LUO S 'D jo jv,,kowj jo -xxtosajd °asn -uotlLlj;)do axwU3jUIPW -1.1011,331.11.103 OLIJ /�q oi, p.)inq!jiuo.1 lo pmnui iq Xuut qoiqm ssol �jjidojd,lo SIL4011laq LITUOp PUR Kjipqusap s.)IXoldwz) jqj uuld Cur jopun jO 8k]3`1 UOIJUSIlodaw.) s.1oljoM AW 41!AA uo,11.10U1IO') Ul A)Japtin ,)Pl,'Ul 11.13LUXedRuipniout 010JOLI �vlad nqI!,ojo slol,)Ljltjo,)qns pun 'slui5r jo saaxoldw,) *Slal1jjo 5uipnlOLII -suosiod lip oi Kinfui Xppoq J�O LIJIN)p 'Sl'RVU,[,ep JOJ JW-)LU,)5pnf jo iins 'uurjz) 'puruc.)p (tjp sapnput ss,.)juijuq PlOLJ PLIV wip-moid 'Xj!UU,PpUI tImS Z�L -inuynisip Ienaalaolo uv jo Ino 5ugs1jt,jo Xq pmnvo �.toujoisnj iqijo tumXs juzyix)lo lqi of Ssof cal poliwil lou vlq 'Sulpnjoui tiosew ,due joj Xlt,_) )ql isumfiv iq5nojq uotj�-,)r it) tutej,,) due jo junoom uo Xu,-) mp Xq pautuisns: aq lo jnO')O APLu q,)tq)w jo iu,3wi3j'5v iqijo xommioJnd qI!,m 11011-0,11.11103 tit 30 LUOIJ 5utillisli Xiujolie algwosni "ol polmul jou inq 'Ituiptillul S',)Suadxo put? sa�muup Ill. GOVERNING LAW I O,I This Agreement shall be interpreted, governed. and constructed under the laws of the State of Washington as if executed and to be performed wholl.),, within the State of Washington. Venue of any action arising hereunder or related to this agreement shall lie in Clallarn County, Washington. 11 AMENDMENTS, MODIFICATIONS OR WAIVER 11.1 Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at an), time or times to require performance of any provision hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any Party of the breach of any, term or covenant contained in this Agreement, whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver of any such breach or waiver of the, breach of any other term or covenant unless such waiver is in writing, 12. APPENDICES 1"he Agreement includes the following,appendices attached and incorporated by reference: Appendix A: Customer's Application for Net Metered Electrical Generation to City of Port Angeles, Appendix B: C'Ity*s Connection Standards for Customer Electric Generating Facilities of 100 Kilowatts or Less. 13. NOTICES .All written, notices shall lie directed as follows: City of Port Angeles: Electrical Engineering Manager 3 2 1 East 5th Street P,C , Box 1150 Port Angeles, WA 98,362, Customer: Barbara Deese Name 808 W 4th St ............. Address Port Angeles,WA 98363 Cily.State&Zip PWI201-01 Net Metering Agreement,E)OC 5 of 6 3/28 01 Custorner notices to the City, pursuant to this Section 13, shall refer to the Service Addres,s set forth in Appendix A. 14. TERM OF AGRHIMENT 'I"his Agreement shall be in effect whensigned by the Customer and the City and shall rernain, in effiecl thereafter month to month unless terminated by either Party on thirty, (30) days' prior written notice in accordance with Sectilon 13. 15, SIGNATURES IN WITSS WI-ff�'REOF, the Parties hereto have caused two originalss, of this Agreement to be executed by their duly authorized representatives. This Agreement is, effective as ot"the last date set forth below CUSTOMER: CITY OF [IORT ANGELES: Sign un� SignalLrFkT r6a Shaillesh Shere Print name print nalne 0 Woe Asst. Director of Polwer Systems . ............... tit e 11/01/2016 Date D�ate IM 1201-01 Net Metering Agrami ent.DOC 6 of'6 3/28/01 fiMt APPENDIX A Application for Net Metered Electrical Generation Thank you for Your interest in establishing a renewable energy or fuel cell connection with C"ity of Port Angeles, Electric Utility' Please notegeneration systems must meet certain requirements to be considered. The prQject must be not more than 100 kilowatts(kW) in size. • Generation must be fueled by solar, wind, hydropower, or be a fuel cell. • Owner provides power conditioning, ccninection, and salty eqUipment. 0 Projects will be considered on a first come first served basis. Please complete Customer and Installer Information and the appropriate section for the type of generation proposed to be installed. In addition, include a one-line diagram and description of protection equipment. Please allow at ]east ten working days for processing your application, Questions may he directed to Electrical Engineering Manager, at telephone number(360)4117-4701 Customer Information Owner Name: Barbara Deese M I ailing Address: ..8108 W 4th St, ........................... City, State&Zip: Port Angeles, WA 98,363 Email address: oceainblue4441@yahoo.com . .......................... Service Address: 808, W. 4th St., Port Angeles ............... (I i'different than Mailing address)--tj (7, Daytime Telephone: _(360) 452-5029 ................ Electric Utility Account No.-: ___JjZ�5ikl- _----- � � Expected System Operational Date: 11/15/16 Installer Information(if different from Customer Information) Installer Name: Smart, Eniergy Today . ................. Mailing address. 1001 Cooper P6int Rd, SW s 14,0-290 City, State & Zip: Olympia WA 918502 Ernail Address: Andrewwr.E@srnertenergytedlayr.net Daytime "telephone: 360-3391-6'660 PW'1201_021 IRev�sed 0112016] 1 of 2 Photovoltaic Solar System Information PV Module Manufacturer: Iftek Energy PV Module Model Number: IT280-HE Number ol:'Modules: 12 PV Power Rating per Module: 2'80 DC Watts 'r,otal Output:! '3300DC Watts ................ Inverter Manufacturer: BiueFrogSo�ar ...................... Inverter Model Number: YC50OA-MIW -- -- --------........ .................. Inverter's,Power Rating(IkW): 050--.- .............. (AC contifILIOLIS) Describe the protection equipment to be used and the physical location of the installation: Milcro-Inverters coy stain aulornatic Raipd shutdown ......................... .................... —---------- ......................... ................. ............. ................. Installation Cost Information Estimated cost of installation: $14025 010 Drawings Attached: z one line manufacturers literature design drawings P"' 1201 lReOsed 01/20161 2 of 2 PHIQTOVOLT'MIC NOTES 3.6 KW DC PV SYSTEM �Il� SOLAR ROOF PROJECT w BARBARADEESE � a 808 w 4"fN sT REE"r' �InI�awe F'C7RT ANGELE S WA 98363ZIILIIIZ,71,11,1,111�11,",I mW pe ` (360)452-5029 0 — ........ Scope of Work ine aa.;� ImF—11111,wcn. n ou a,�c mn arm.., v,mmn, waw cix I�Y4(:YN(�1SIGNr�W,7�.„#FiKW(15d�'�91�t!'J(�YI-MCAVdM11P:r') � PHd:MIOVOLrMG,(1'W'),SYS TFM W111.1 FOLLOWING EOUIPMa.No r ,w.u,m reuru nnco au�nw ar.xru'u rco- (} HE LN (Q),MK ri rll�'Y6'SM hILHC4 Fn(:41..Y1Wr WIC„MIMlJ4.G', r ansNI, nwno cuew,e � � B� ( n�nu�r« w.a Arrra ,�mi:� w.0 ti r ur rn. uu e R§fl1..0:dE FY2CpCa 5Q')LAAN YC�Ut}M.MIW MIC;Vif7VNWRk"t"1 kHF1 12 'll." �rvmu e� min,.. A111-11 11 ll I _ ami. ma �.11 m wh rr x w.wnry r iww e rv.n i„oum m "SWI67&R-I'4M'%U%L,0.(:",K VM II:){,7W L"6JMF'C.?:11P1'}'r�ld/�(7KIN('J 9'YSYI''PNI f e � v AIIIi u, w nuuwiso- � '11,.1.1,w ,u �axw , ,enmx . . . .......... .._ ___..._.._._.................._ .. .....____......_.__ .. ... u >I COM AkJYF1(JI{(TY'. ,70115 WA,rF1INd ION ITAI'L BUILDING GOOF ISM IF1CM 2015 WA,91 I INGII ON S I A,F F NF R Y(,d;rS(20 15 Ilf(;1;) F yi ( IU15 WA.;il[NC I(3N.IA'rE R SIIDEIN'1`IM IN .Ci71G11 tl7N}11 ' •W v' cr.am i ui w.vnm rou,vr sw�a s> rvlw n. o�c ax rr n�.... .WArHINGU1(.)N M' .wne nu a a.un v ry n mcii u,To ri�.a+rc .row naarem an �a ,wr.a�.awn n,o-. ra r. 1fF I�rNA'CH;�YNr1d!EF'"dll("fC`N"f116 r7GI: AMCNII 2014 WA(,.Yti 1 7500?SEMION W302I 2014 WAG 7.96-468(2014 NEC) ...._,., ....... .__.........__..._.......e..._._____._..__.._._......____.__ ... .............................._...._._., ... 11111-A�.i.HINCI(DN IAIE,MF(NANIM.(, .Ep(m) UMC) __ ............. I I fV V>!AN 1P11 WASH NGTON,'I A ki p4 WlNCaIN4J G:C5C1L(WC) 2015 WAI:SFIINC YON t11 ArN FIRE P{7UCs{ZlJ1!s IF'u7) ver LF"Irl/ it nYr Ix I 1 f r E,I�Arr INDEX,BU1 w<DATA,OJCNOTES,SITE P AW re n lr � A1FW hYOUIPLAN .. ., 1 a WARNING NrS.l w MCaE I SINGLE 11 INC l7 ol t1LE SI 1 c.I+ICAruaN dIF:Er a A a 1 v n,IrNnv AND RACKING d oNNI€c I ION � Sd P(':Itllf MAINrm,RAC65wG SYSTCM c P�R1'C L SNi,C rGA1 hoN fNLJn°tl' n 9 C,i RIII ICAIE � fi ............... ------------ ........... .................................... ................................----------------------- PV ARRAY 10 HE INSTAH�1)WI rM I HIE,f DU OWING MINIMUM SI'113ACKS WASHING ON STAFE FIRE GORE. 36 INCHES r ROM At,RIMES 36 XNGHFS r ROM&L RAKI"-S •18 NNCJJES V-ROM AI'L 111PS 8 VAI,I FYS 0 N�E'T ME�:TIE F,' 1-CKA"101114 200A MOMILIE SEFMCE PACK ...............- SOL AIIR AC DIISU)NP 4 F CT & 1!!1R0DUCMf'4 ME"I EN � OCAT0114 CO F"V ARRAY CO W .......................................... ............ PV Panel Total: 12 Pieces X 28OW 3.36 kW DC '41 Solar Panel: iTek Energy iT280 HE (See Sheet E-3) Inverter: Blue Frog Solar APS YC5,0,Oa- M1W Micro Inverter(See Sheet E-4) --.......................--- Racking: SpiderRAX Black Widow Composite (See Sheet S-1) UII�A-2 .......................... ..._.v_. ..................I-.,- | uj ^ ^ ............... .. --------- ......._._.... ..... _._.................. __ _..._..._... _ _ _ ....m_.....--_..._.._. 7f4"CONDUI f rq (a)WAWC tIIWN 2(IiL ak Ba Whllq (1)Af 1HWN2 B. 1C Id 1 (6 araJ IUSMVI 1fi AWCB RATE 401 f 40A YLMP(`NAIUNF DF RATIN(g3!104'ff x041 AME TWA kr Q!,%-15 AA � 40A w f9-91 364A 1 b,6A +.M enKTnINS!ml1 v©Awaalo-lWVN.! 0sur (ND, Ni INSTAL L Nrw 21'+'20A SOLAR BRrAKrR At FNID C11'+{BUSS RAR IN(E)20(tA MC71711.E","LRVl(T PACK NET METER ` 4C)CKEI ME FER FOR .. w U SLAB PRODUCT WIN 1 w3C7LAfT R`ANFInE'i VONA MOB Ill-&tC RVICF (.,,'-.1 l,:�n �T—•m�� __ ._.........,. PACK N OI AR P'USED AC; 171 SC ONNI'CT 20A l5 n� iE .............................................. MrxiulP Ir forrnmDiorr IrlvcDrl¢rr RKtlnfl Ma rY F WnaCl RdIYf yi Co t( 11 mic i Ilnr ri ( PW E CI VMODrRCW Ii"1Ltt149E MIIW IINVIF.Et ILA lALLAbwa)1 M),LAR APS"AMA MAX UC IRA"VtSl IAOC .55v .7CFLm%t liCllll(;C7NNl 4;19.171NIfA %(IMIIN4i bNSIFM M,A,%.Sc 1)LIYPUI' dY(.,al('J ,4.. EL.ECTRIC„'At.DATA PER PANEL.(SIC). W RI-COMMI hBa'DL IIIV MODIA.11. �.YFlApNN.3�11IWY A'Y"Y.YSA SM HIIf:SERVICE PACK 4MITI1 NEW 2E1fiMN 1A :136KW y uCE Pk TCY ISY.,kWMPAq 9 J AT I'�V V rklM MAX AC(;AI.L�9D4./i fi4)N{J:wlNG N�tG PMAX: ^i Ill NOMINAL MAX i>474MkR 2UC7w MNT+Y KANGI 2—M END(If:9D)S$BAN RMA%PER MODUI F 267 SW U MAX POSSES PFuC'F(VrnprP) .9I3V taFI.RAIINIQ"NGL =1C!w sa,w ^7.Aw 12 10)KW cr U)� MAX PCIWII CURRE NTfiuwlNDl �+8AA IMAx 9NI7IAU U("d,INiWY4:IWT =2Axx 309 KMBu.d,:i.5%;+2.I 45 KW CJ CYT"NN C.IR(UIT VoLIAGE(Vm) 092V RAILA)o AMA VUNNA .15P(DW ^.n4APPLV POWER 2,)A+200A%'22.JA��,2CN7Aa t 2=240A _. --____.---...... .$L401I CURC:411 I(;I)RRENT px4) 93A -1 c 15 and 1Fn1lljkkf NI a08 PA 21IV. POWER DENSITY 'YF91q 0whm' Wf9MIHAI IHI C01 GYMN !4(tiV 1111W tif1QY' E �y� W(IMIMAI LfMI CJYIt N(:VNH Ni L U10 91 f W 46(I Ca 'Y2flA OK "I OPERA TFMLv a44p^C' �4t7"'CS Mnx wNlY t::PI IS YaA¢n4nWl.In mlr,�dlr r U5 4�I AM,INV(N11 fA[I�(ICIUMI:,Y 'M ii"i. -------------- .. ................................ ..._..........................._....._____............_._....... ---_.............................-------- .........--..._._.-.._....__._......_..._. ------------- ................ _..............-.._..-.._... .-...,_.._..._..........._.------- __.._..______....................... _-----------.._..._............. ...__.. re I I IVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVIIVVVVm0V0VIIV0VVVIIVVVV ��IC'acM ��IY ami. f 50 u � 1._HEO'1BY NET 6901Y y._.REEL D BY NIP(r�a ii l(,ffn 9 -RF(' ABY NFC). (i B NEC 7 'al 5 MC.Y'.CrD BY Nr(A a12l l(AIN3M AIfIIY TO APIP Ya0 ACA BYNFCNr4,h4Y7.1'i a A Pdl(.YN UY'TV /CIS tl(aaii, APPLY rra. [)ISCUNN1,C1" ILKAP05P RACEWAYS, RC DI',CDNNFCTS MAIN MI:R'NIILE PANEL WV SYS'GFM TIRE'.AMI:R ry tCIAL7 L&N11:Nk'i LA12 TRAY'S&OTHIiW WIRING C oNeINFIY BOXES MEIITDS(:)C171/kla'.,CS41 rN(I051"US Of+1ILL(0",& Yn Nc...N Ir.'s (1)COINULot 8ODYW/UI"M.NIN6 UNUSED yu B REeaOa}Y Ntcase(,ss r Rcn°Uwv:NecFA(1,ya,(r:N APPLY ED AN I)NrC 690 lr Z AC'UCIIONN CCT APPCN N I'Yr1laClUCfIK7N METG.it AC I)r6{:C7MNCC;Pc (N ......_,_......... .n.................wm....... ......_..... .. _.. ...._..... ..,..�.w.._.........., ._._....-.....------- ------------------------------------- .--- .._._._ Note!„: L The marking shall be placed adjacent tothe main service disconnect clearly visible for the location where the lever Is operated. -wa;••• ._ 2.Marking format:white letter on fa read background,Minimum of 3/8 im�uhes letter height.All letters shall be capitalized,aerial or similar fom.,non-bold. 3.Material:Reflective,Weather resistant material suitable for the environment.Use UL969 as standard for the We'a'ther rating.Durable adhesive metal e materials meat this requirement uireament v ' k i 4 G I M w a r w IN ................ ...., ................._IS. _.............'__..w_w, j& I I I �l ldf F w"Y Joh r l W MY M lz r °r on uk k 14 1! flr Y Pri. I 7. l �> Sheet Drawing Date Customer Ind P,ojec4 Delaills y C'onsi atant EQU ...�� ......,. .._ EVAN MASON N'W MODULE 11GI V 16 1,08W 477 STREE9 I� 336 KW ROOFTOP P" V yS��RIP7 Designer �)�� °"ECIIJWZPa�'ou POF'dF`�ANIGELES W"a"R4'ES.Aftl"'.J SYSTEM ,�?!µvN �" today SaaEEc P;�V+a5?SECA"P ^' M WmC-tiTMAN f *61uefroqsoVar 111PU I DANN- d itrn i a. A>�ifavrv,�n.t.,I'fP} IMIr nIOW � R7d +I,,.x,�n��mi N l V±Itm;Ya a,y V 4qk IYA M "" (111Yf LQI (dyl PV ) V �pq� M. i.rn Uu lf. 14... "OV t� i!t}N W I i t V it y fld 1 I!C V Y�1W/iP/kl AV' / ft Fu bill' a } a .3 1011"r N I t 114 m M �u rcu !"r Ux Ar cli .I i do/, Pio" 1,Dill l- ul VA a V MIP 1 I (p tl(BIC p >W Yi'tW 1q CHANKJA to 1A s"u n" is ,n f1 Yl W f'P I tl C IY hf Y6 fVi16 MIW Vriel' t ti re P dr ftl It (IY9Y3 Y( (f L+.«f,)y 5N ?,.�.n1 Vid r xruU l(+r will nY¢II'P; i wo N'YP .i nel <I�"uk''nVY v it,xl'",r �A fN- fll'NF r*I�d1 d("f.Yo*(l`_, o rt 'iP+,+yxt w��o-IfiuvcincN'' tFfr+r(�4ii5((N.iYf irdC rr,k..,v do fY Xrn i:ilf 40 p10 1W, 401' R.a+.N'C: Il gP y I W.'Y1 I 1 d P AlInhVI,th YG NA (W M I) MY4 f 11 i fW 1(I)1 r'r rty a4 „ II p t911W I I I Y;bd 4a1a1 I ,7Jf Ik'N in x1£11r V.I f I AJW A(I 4 I Ii' 1"il I k ( tl! WI H fI t rt A 11¢I I, 4 1 urb M++t� I Ni Pah AM t� r-d-nrni and I f I Ile ntlr vn t ry(eiNlJCvnw+�.Tc.a I CPAR 1IY /h I(r OA)03 c ( " 11 f'A llit111,1Y10 , 111,k ?11 y7z ...... blflA1&? 1,fl„l ._... ICd 11 IIt SP A 't.. IY, 1 L'1 —1 Ati ,,1 t1 `14" 41 fl' il.t�8r t:,�T E k�sl4ar��fiw�ra�,�;,r�t,r'wf uN�,r�Lic1'u rms�� .ownr ( 5 t 10, < rv,11uw�r , o� k ltu„I=Pd W�" —d I,- ............. - -----_.-....._ --TOP CLAMP iii um�mi� RAIL �!�;, , �re MiuL'�iuwl>I'�ram ;rr, r w�L(flw —....-------C3CJTT'4M CLAMP �rm�ur tl� W INTEGRATED ILSCO A } GROUND 6..UG- COMPATIBLE WITI11#G,#B, 48&#10 BARE AND � STRANDED COPPER WIRE SHOOK 'ro Rs ——BASE PLATE r; 4 'X SPIDER-RAX BLACK IDOW COMPOSITE RACKING SYSTEM DETAIL (NTS) a wr �, " ta c ti pORT A,V APPENDIX B a2li` CONNECTION STANDARDS for CUSTOMER ELECTRIC GENERATING FACILITIES of not more than 100 KILOWATTS A. General This Appendix sets forth the requirements and conditions for interconnected non-utility- owned electric generation where such generation may be connected for parallel operation with the service of City of Port Angeles Electric Utility (the "'City"). For purposes of this Appendix, the interconnecting entity shall be designated "Customer"'. B. Connection Requirements 1. Customer shall conform,to all applicable National Electric Code (NEC) requirements [NEC Articles 590,and 7'05] and building codes, and shall) obtain electrical permit(s) for the equipment 'installation. 2. Customer shall have a dedicated lockable disconnect device between sources of alternating-current, (i.e. between inverter(s) or other power conditioning unit(s)) and the City's distribution system. The lockable disconnect must be accessible to the City at all times and only the City's lock may be used on it. . Customer's over current device at the service panel shall be marked to indicate power source and connection to the City'"s distribution system. 4. Customer's power production control system shall comply with NEC Articles 599 and 715, Underwriters, Laboratories (UL), Standard 1741, Second Edition, and the Institute of Electrical and Electronics Engineers (IEEE) Standard 1547 minimum specifications, and standards for parallel operation with the City. In particular, the: a. Power output control system shall automatically disconnect from the City's source upon loss of the City's voltage and not reconnect until i the City's voltage has been restored by the City. b. Power output control system shall automatically disconnect from the City's source if Customer's voltage fluctuates beyond plus or minus 101 (percent, per UL 1741. c. Power output control system shall automatically disconnect from the City's if Customer's and the City's frequency fluctuates plus or minus 2 cycles per second (Hertz).. d. Inverter output distortion shall meet IEEE Standard 519. C. Safety All safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA) Standard 29, CFR 11919.259, the NEC, WAC rules, the Washington Industrial Safety and Health Administration (WVISHA) Standard, the City Service Requirements, and equipment manufacturer's safety and operating manuals. Net Metering-Apndx B.doe{2/1.9/13;