Loading...
HomeMy WebLinkAbout000869 Original Contract 0 City of Port Angeles Record # 000869 NET ENERGY METERING CONNECTION AGREEMENT for CUSTOMER FUEL CELL, SOLAR, WIND, or HYDROPOWER ELECTRIC GENERATING FACILITIES of 100 KILOWATTS or LESS This Net Energy Metering Connection Agreement is executed in duplicate this 14th day of December, 2016 between Robert Carter (hereinafter referred to as"Customer"),and the City of Port Angeles Department of Public Works and Utilities (hereinafter referred to as the City). Both parties,who may be herein further referred to collectively as"Parties" and individually as "Party",agree as follows: I CUSTOMER ELEC,rRIC GENERATING FACILITY IJ Customer has elected, in accordance with RCW 80.60 et seq.,to operate either a net energy metering fuel cell, solar, wind or hydropower electric generating facility,with a generating capacity of not more than one hundred kilowatts,in parallel with the City's transmission and distribution facilities, This generating facility is intended to offset either part or all of the Customer's electrical requirements. 1.2 Customer's Application for Net Metered Electrical Generation, including the location of the electrical generating installation and details on the electrical generating unit(s) is hereby incorporated into this agreement as Appendix A. 1.3 The installation is identified by the City with the following designators: Transformer No. 59DQ05 on feeder/pliase VA1205/C Customer Utility Location No. 104720 1.4 A separate agreement shall be entered into for each Customer's electrical service location(s). 1.5 The electrical generating system used by the Customer shall be located on the Customer's premises. It shall include all equipment necessary to meet applicable safety,power quality,and connection requirements established by the National Electrical Code(Articles 690 and 705), National Electrical Safety Code,the Institute of Electrical and Electronics Engineers, Underwriters Laboratories,and the City's Connection Standards, as set forth in Appendix B,which is attached hereto. 1.6 The City shall have the sole authority to determine which connection requirements set forth herein are applicable to Customer's proposed installation, 1 PAYMENT FOR NET FNERGY 2.1 The City shall measure the net electricity produced or consumed by the Customer during each billing period,in accordance with nonnal metering practices. 3/28/01 PW1201-01 Net Metering Agreement.DOC 1 of 6 2.2 If the electricity Supplied by the City exceeds the electiicity generated by the Customer and f'ed back to the City during the billing period, or any portion thereof, then the Customer shall be billed for the net electricity supplied by,the City together with the appropriate customer charge paid by other customers of the City in the same rate class. 2.3 If the electricity generated by the Customer and distributed back to the City during the billing period,or any portion thereof,exceeds the electricity supplied by the City,then the Customer shall be: (a) billed for the appropriate customer service charge as other customers of the City in the same rate class; and (b) credited for the net excess kilowatt-hours generated during the billing period,with this kilowatt-hour credit appearing on Customer's bill for the following billing period. 2.4 At the beginning of each calendar year, any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year shall be granted to the City without any compensation to the Customer. 2.5 Customer shall pay any amount owing for electric service provided by the City in accordance with applicable rates and policies.Nothing in this Section 2 shall limit City's rights under applicable Rate Schedules,Customer Service Policies, and General Provisions. 3. INTERRUPTION OR REDUCTION OF DELIVERIES 3.1 Pie City may require Customer to interrupt or reduce deliveries as follows: (a) when necessary in order to construct,install,maintain,repair,replace, remove,investigate,or inspect any of its equipment or part of its system;or (b) if it determines that curtailment,interruption,or reduction is necessary because of emergencies,force or compliance with prudent electrical practices. 3.2 Whenever possible, the City shall give Customer reasonable notice of the possibility that interruption or reduction of deliveries may be required. 3.3 Notwithstanding any other provision of this Agreement,if at any time the City determines that either: (a) the facility may endanger City personnel,or (b) the continued operation of Customer's facility may endanger the integrity of' the City's electric system, 'rhe City shall have the right to disconnectCustomer's facility from the City's electric system. Customer's facility shall re rain disconnected until such time as the City is satisfied that the condition(s)referenced in (a)or(b)of this section 3.3 have been corrected. 4, CONNECflON 4.1 Customer shall deliver the excess energy to the City at the City's meter. 3/28/01 PW1201-01 Net Metering Agreement.DOC 2 of 6 4.2 Customer shall pay for designing,installing, inspecting, operating,and maintaining the electric generating facility in accordance with all applicable laws and regulations and shall comply with the City's Connection Standards set forth in Appendix B, which is attached hereto. 4.3 Customer shall pay for the City's standard watt-hour meter electrical hook-up, if not already present. 4.4 Customer shall not commence parallel operation of the generating facility until written approval of the connection facilities has been given by the City. Such approval shall not be unreasonably withheld. The City shall have the right to have representatives present at the initial testing of Customer's protective apparatus. 5. MAINTENANCE AND PERMITS 5.1 Customer shall: (a) maintain the electric generating facility and connection facilities in a safe and prudent manner and in conformance with all applicable laws and regulations including,but not limited to,the City's Connection Standards, Appendix B,and (b) obtain any governmental authorizations and permits required for the construction and operation of the electric generating facility and connection facilities,including electrical pennit(s), 5.2 Customer shall reimburse the City for any and all losses, damages,claims,penalties,or liability it incurs as a result Of Customer's failure to obtain or maintain any governmental authorizations and its required for construction and operation of Customer's generating facility or failure to maintain Customer's facility as required in (a)of this Section 5. 6. ACCESS TO PREMISES 61 The City may enter Customer's premises or property to: (a) inspect, with prior notice,at all reasonable flours,Customer's protective devices; (b) read meter; and c) disconnect at the City's meter or transformer,without notice,the connection facilities if, in the City's opinion,a hazardous condition exists and such immediate action is necessary to protect persons,or the City's facilities,or property of others from damage or interference caused by Customer's electric generating facilities,or lack of properly operating protective devices or inability to inspect the same. 7. INDEMNITY AND LIABILITY 7.1 The Customer assumes the risk of all damages,loss,cost and expense and agrees to indemnify the City, its successors and assigns,and its respective directors,officers, employees and agents, from and against any and all claims, losses,costs,liabilities, 3/28/01 PW1201-01 Net Metering Agreement.DOC 3 of 6 i damages and expenses including,but not limited to,reasonable attorney fees,resulting from or in connection with performance of the agreement or which may occur or be sustained by tlae City on account of any claim or action brought against the City for any reason including but not limited to loss to the electrical system of the Customer,caused by or arising out of an electrical disturbance. 7.2 Such indemnity,protection, and hold harmless includes any demand,claim,suit or judgement for damages,death or bodily injury to all persons, including officers, employees or agents,and subcontractors of either Party hereto including payment made under or in connection with any Worker's Compensation Law or under any plan for employees' disability and death benefits or property loss which may be caused or contributed to by the connection,maintenance,operation,use,presence,or removal of Customer's equipment. "Che only exception will be liability occasioned by the sole negligence or willful misconduct of the City or its employees acting within tine scope of their employment and liability occasioned by a partial negligence of the City or its employees acting within the scope of their employment to the extent that such partial liability is fixed by a court of competent jurisdiction. 7.3 The provisions of Section 7 shall not be construed to relieve any insurer of its obligations to pay any insurance claims in accordance with the provisions of any insurance policy. 7.4 The City shall have no liability,ownership interest,control or responsibility for the Customer's Electric Generating Facility or its connection with the City"s electric system,regardless of what that,City knows or should know about the Customer's Electric Generating Facility or its connection. 7.5 Customer recognizes that it is waiving immunity under Washington Industrial Insurance law,Title 51 RCW,and further agrees that this indemnification clause has been mutually negotiated.This indeamnification shall extend to and include attorney's fees and the costs of establishing tlae right of indemnification hereunder in favor of the City. g. INSURANC;"Ia fl.l Customer shall maintain,during the term of this ,agreement,Comprehensive Personal Liability Insurance with a combined single limit in an amount equivalent to the industry standard for this type of insurance. .2 Such insurance shall,by endorsement to the policy or policies,provide for thirty(30) calendar days written notice to the City prior to cancellation,tennination,attention,or material change of such insurance. .3 Tile City shall have the light to inspect;or obtain as copy of the original policy or policies of insurance. q. INDEPENDEN`I°CONTRAC`ORS 9.1 The,Parties hereto are independent contractors and shall not be deemed to be partners, joint venturers,employees, franchisees or franchisers,servants or agents of each other for any purpose whatsoever under or in connection with this Agreement. 3/28/01 PW1201-01 Net Metering Agreement.DOC: 4 of 6 10. GOVERNING LAW MI This Agreement shall be interpreted,governed,and constructed under the laws of the State of Washington as if executed and to be per-fion-ned wholly within the State of Washington. Venue of any action arising hereunder or related to this agreement shall he in Clallam County,Washington. 11. AMENDMENTS, MODIFICATIONS OR WAIVER 11.1 Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at any time or times to require performance of any provision hereof shall in TIO manner affect the right at a later time to enforce the sarne. No waiver by any Party of the breach of`any term or covenant contained in this Agreement,whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver of any such breach or waiver of the breach of any other term or covenant unless such waiver is in writing, 12. APPENDICES The Agreement include-, the fiollo"4ng appendices attached and incorporated by reference: Appendix A: Customer's Application for Net Metered Electrical Generation to City of Port Angeles, Appendix B: City's Connection Standards for Customer Electric Generating Facilities of 100 Kilowatts or Less. 13. NOTICES All written notices shall he directed as follows- City of Port Angeles: Electrical Engineering Manager 321 East 5'h Street P-.0r-B,&x--44-50 Port Angeles, WA 98362 Customer: Robert Carter Name 626 sen Blvd Fe J?k ina� '/address Port Angeles,WA 98362 City,State&/ip 3/28/01 PW1201-01 Net Metering Agreement,DOC 5 of 6 Customer notices to the City,pursuant to this Section 13,„shall refer to the Service Address set forth in Appendix A. t 14. TERM OF AGREEMENT This Agreement shah be in effect when signed by the Customer and the City and shall remain in effect thereafter month to month unless terminated by either Party can thirty (3 )days'prior written notice in accordance with Section 13. 15. SIGNATURES IN WITNESS WIJEREOF, the Parties hereto have caused two originals of this Agreement to be executed by their duly authorized representatives. Tb is Agreement is effective as of'the last date set forth below: CUSTOMER: CITY OF PORT ANGELES: u n tsara Snaaaaatu re " Print name 116fa name Assistant Director of Power Systems Tifle to� Date 3/29/01 PW1201-01 Net Metering Agreernent.DOC 6 at 6 APPENDIX A Application for Net Metered Electrical Generation Thank you for your interest in establishing a renewable energy or fuel cell connection with City of Port Angeles,Electric Utility. Please note generation systems must meet certain requirements to be considered. • The prqject must be not more than 100 kilowatts (kW) in size. • Generation must be fueled by solar,wind,hydropower,or be a fuel cell. • Owner provides power conditioning,connection,and safety equipment. 0 Projects will be considered on a first come first served basis. Please complete Customer and Installer Information and the appropriate section for the type of generation proposed to be installed. In addition, include a one-line diagram and description of protection equipment. Please allow at least ten working days for processing your application. Questions may be directed to Electrical Engineering Manager,at telephone number(360)4174702. Customer Information Owner Name: Robert Carter Mailing Address: _ ----------- City, State&Zip: Port Angeles, WA 98362 Email Address: bnkcarter@msn.com -------................ .......... Service Address: 467- 1_444klh &W ....................-—- (If different than Mailing Address) Daytime Telephone: G " " ,... 1V2_ ... ...... Electric Utility Account No.: 87041-104720 ........................ F"xpected System Operational Date: 12/1/2016 Installer Information ilf different from Customer Informationj Installer Name: -Smart Energy Today ......_­ Mailing Address- 1001 Cooper Point Rd. V1N ........... City, State& Zip: Olympia, WA 98502 .......................... Email Address: Andrew,E@smartenergytoday.net ..................... Daytime Telephone- 360-339-6660 PW 120102[Revised 01/20161 1 of 2 Photovoltaic Solar System Information PV Module Manufacturer: Itek Energy PV Module Model Number, IT280-HE Number of Modules: 10 .......... PV Power Rating per Module: 280 DC Watts 'Total Output: 2800 DC Warts Inverter Man ufiacturer: BUeFrog Solar Inverter Model Number- YC50OA-MIW ............... Inverter's Power Rating(kW): 050 ........... continuous) Describe the protection equipment to be used and the physical location of the installation: ResidentW Rooftop Solan PN instalLation all micro-Overters equipped wdh rapid shutdown and full system disrannect ............. ............. .............. ........ ------------ ---------- Installation Cost Information Estimated cost of installation- $1000000 Drawin2s Attached: 1;11 one line manufacturers literature FvIdesigndrawings PW1201_02[Revised 01/20161 2oF2 PHOTOVOLTAIC NOTES 2,8 KW DC PV SYSTEM � �N SOLAR ROOF PROJECTT4 1111 III-nti M P. Pr�IrM�"w S �u�P i �iP���.. a� ROf3PRTC,ART'ER r,rze � 626 E LAURIUSEN BIND aero uV FOR ANGELES,WA 98362 � 360,417-9785 � n unu a�wcP P PMtiN R"w. ,«c"w�r c« 11 1- a Sl,a(7e of Werk 011--r-111010MCIIIIII 'I, (� I Pli('i�TC1VOYPI ANCW"N`K KW fUG"l FIGCAIIMM UUW LOWING OF 1'��IIN VIII 1 All r<ou� 4'}SY%IEM WITH 1O1 IU G .. QUiPMEN I . I'll IXOI�I'll jj .ma s u e 1 Q Ol l K k 1R0 200 k.aU4. O X e 8 M � (bIPIOI:41t4A%BLACK WIL"�I(W ItAI K NICCI'4OIMVkfYU'ER c P w r.},e a,xau i(n.. uer. w.�. rnw na." tl)vn ex rMu SYSTEM T w P. AllGtW1 EfJ F C 1,. r,., Y;.MI �Utlu ' I-1-1111j d Gf VW�15 w'MM1�fiYAPo YtY HM X':b;lM sn ,run."aa UnA 1vft1-1 n.a w. w<%I&wrcr. ........................... ..................... ..,_........_.............. V ..:.Y10 C'OOF A17P1171'411"Y: g e e4 rc a ¢ � - I j 011 WA,iMiNC I()N 51"471 t3UIl,l71NG CODE(.7()tti lCfC) f. rc 1-111-f IC-1111111 AI wr 7013 WAS NO ON$1A'Yr ENERGY CODE(2015 IEC1C3 1 �? rerue a ur vu.¢rw r r�,e ra v„o s a rrw<uPK 20rc5WA..1P11N4 TONSI`AI&NPSIUFN'IIALCOT'➢F(2015 "^ au>a a a ¢ v, �n rrn w. TNT F,RNA I LONA RESIDE N1 IAL CODF WA H(NGI ON u nva v ma "c+ur r o r, w a wu rrn M�M a�a v a"o "r u.P AMENOME'N'I S 2014 WAGS 1 a1 2300 SECTION M2302) 21114 WAC,296A613(2014 NEC) ...�„ ....„.,__,__...._.............__ `G20I WAit°IINION STAT!ME HANICAY ODE(2015 UMC 1 PAA12YSHISIIitUMRNGODIF(2015 UPC) 05WAxNGTUN AF P : E(201rfL .....' rvunry , ...................- ............................ ._......................... ....._,......,........,.........._._.........,.. SHEET INDEX ”. A-i GEMFVtAl NOTES,&tikE't'INSbFk.YIUII,DPN(a DATA, rS IF PP2CUFC1 DATA,SITE PLAN ", ... A-2 PV t.AYOU1'PIAN A,0 FV ARRAY AMG FtA(:;KING ClSNNf,:CTION w' E I SINGLE I INE DIAGRAM " �.�C n E4 WARNING NOTES F-3 E:OU0 MEN ISS&''V MOD E SSPECIPrcIGA GIKIM SSHEFT L k:-A C'.Y1Y14"Mh.NTR:INVB R1 P P"i SPECIFICATION SHEET S I EQUIPMENT&RACKING SYSTEM r. A.............." 9 Y EQUIPMk I T9::TAC KING SYSTEM GEI'31`IF'ICATF wrw h"4 t°r:QUl4"MF N P S:P'�kACKiFdln.,VJ I NSM A r I'AGr{HENT 117E1"APC, ug ._-__._ .... _._ ............ _._............._ ___.. ......_ _..._..._...... ____._.__w.w_._......__...._ ........�................................__.._......... ..._......._..._.._...w. PV ARRAY 10 BE INS YALLIED WITH THE FOLLOWING MWIMIIM SET BACKS F"CR WASHINGI ON$I At E FURL=,CODE -36 INGHF!";FROM AIL1 FOIDGES .36 fN01ILSv 4 ROM ALL RAKES 13 CNC HFS F140M AILL RIPS&VALLEYS .. _.... _. .w..__..._.._v..._a_.. ...n __....._n___ ..._�_._ ._J �.. E LAURIDSEN BLVD loll 0.4 _............._...._....................�__ . .....--.................... --._--------_ mw , m Cn N C01 AR AC° DSCs.wNP,1Ec r PV AFFRAY . _,..... PV Panel Total: 10 Pikes X 280W = 2.8 kW DC Solar Panel: iTek Energy iT280 HE (See Sheet E-3) a 6. Inverter: Blue Frog Solar APS YC500A- MIW Micro Inverter See Sheet E-4 . Packing: SpiderRAX Black Widow(See Sheet S-1) ) A-2 RSR m m 0 0e >> ----- m --� m . � 0 w 0 c { m 0 I � 0 } 1S 0 z r m 0 f �1 M f Y r a� i f I > F > z :. f J c. rl "V < arc 171 Z n 0 CD E 0 as � 9 K�7, ~ ..� " z --4 „ > p11 71 0 vb Z r :r ma 0 crs fb 0 Sheet Drawing Date y.stomRReR IInfo F°RR�kt Detads E,rreexgy ConsRu9Cant ituanN BARK. PV F4AdIFtAY ._.... � �tr41atd4tr a� M cT ixr-4xTR ER C�k6E4AUR �4RVO .,...�.,�.�..„ Rarcrc11. 19 11 smad n d t caGLLEu Rl SIVSFEM rttuernrNS�:Wakenrq ,a aver , energy GAP4RIYFh,Hk,XM4"f ..................... ..__.. .___...._. Al 0/4¢QNCAIAT (9)1(7 AWG'P llf 1N(8t.k,RI d who) � (Y)%1`III-IN CI(r I I C 11,,O(o,(G,rrgml t(bAWG HATE 90°C:+40A �R 'IEMPENAI'URE DF RA 104"E"+0.91 AMEE,' LIRA.x I,x'12R'A,�U�A 40A x 0.1)136,4A:13A I ON P)INSAt t 10 AWG THIAN EG aA In f lZIP INSTALL NEW VIM SOLAR BREAKER AT END OF BUSS RAR IN'70A SUR PANEL. .n A � I k NET METER 'w o ,.. , SOLAR CTL R FOR 71,YV1C TIUN ^roC+LA62 Mk(',Dt1tILC:' 41,L 70A fSUR F+ANEI C.... ......_..... NCN e�m SOLAR FUSED AC, al r•'" DISCONNECT 16A w Mu(JUItC Irofrlrmalinn Invortnr Rati,19 M¢irr Panel Rati,, f)utp(C P'alcutntic rl e, ..... ......... .,.... ............_... ....,...._....... MtlNIX,,.NVCN1Lk fYtlkC fN()C;vl)I.AIt AIS_. ....... ...... .....�......._. .....,..,,.,,. e....._._.._.__.. .,,.,. ..._...... ,...,,.._.. ._._ ......._ .......,...... Y k.ECIR CAI,.DATA RER PA ... PV MODUI I-I'I"FIX FNLRGY 11 MAIL I Y3 Y(,iGf7A..MlW S O(,AR CIRCUIT C';C)NNC CI 1111N 10 EXI51 ING1 .�..._......� PANEL,s1 C; MAXMAK Gre,ulaNul vtH Int"C'. ::1x9V D) k 10 Ad MAX I1L:Cllltp4tE(f74 n1C). � - ( �) lCkA"aUR C'ANI",t.Wkl'bd MCW J4'tiCeA f1t AN ?P1fIW 1C1".2.W KW y W NC(,IYMM 4Aw YJ0 V Mftrll,ILA 44CXMVNAC MAX POWER l,It7W FtaWf,&t kANfri I."tlt.t =5wr)wV:9141w SPEAKER TO RE INSTALLED At I'��.NI)(AI BUSS I'�V Y IEM MAXACCAL(nIIT.AII(7N USING PTO:E'MAX: MAX VQWE�P V()I IA(,rl'.(Vn,pP) -32.3V MPPI IAAN(C =eeV 0 BAH f MAX F HR MC7DULE 257.AW z'"�"4"J MAX POWER CURRE-NT(InC45p) r00A bPLNA INC,NANGr v1ov"+I, � 2518W to 257KW CS 4 ,rtl NCE42£;;6,DI7VOLIAGFOv_) =392V MAX iNpi rDC GURFICNI 12A W? ?,A KW 46 EI, ,02.46 KW f.J SHORT(ARCUII`CURRENT P.I ) 9 3A NA51:Y,Y04am)f owER .00 f4YE�1�4.'N POWER�ISA-70A..:85A x 70A x 1.25=V I:'uA -----..........,,...,. I'af;7WER MdCN31EY y�111OOV N)MINCL VOLIAOC/HNCA nr TIV 49 dV 264 � � OPERATING TEMP AWC '90"C NOMINAL t O*ACNCYlHA =e 0111,)vv 8YV4v I N(A41NAG,V S PEK i(I O ANK C ,.AVG/,W J.fi(i."'' 85A P)6( aa„„ MAX IrNrIM S V'9:H}t1A PidYApyY.b/t'lP4C`t IIY =N WY 0"BI.Ak 4Nvc tY t'4.H CP4"s,: Ncy 95.5`11,. _..e.._._............__...._ _..._._..._....__ _ . .............. ..................._.__... .. C L.....NESfdu BY NUC690,17 'z-- Rrifl Y4XV(APPLY ACE WAY!'iEC 690,11 �I) 9,..-14lAC LCAAIPC NINEG9tl t!i JB) RECEV By MC 70S,12 MABNSI'.IKYVICI IPANI'.111�1iidl 9 �R41lD BY NEC fV 4PAPPL jus d:f fl>IIY�GII't) AIN�6 Y 7C1 ANEI Y TO: D(SCONNV C B5 Y 711 IV PW LOAD C N 6 ERS CAW TRAYS N OTHER WMNC�i IIIRfAMI:R COMBINER BOXES MTHOD R)Cowrisois c.. ENCLOSURES Or PUI,L BOXES N JUNCTION BOXES q�P 1:90C:47Nt>WliRf7nV W/rJptiNiNGi UNUSFU E w W IT WI APplr rca AND Rv:NEC r�n�s ss Qc',y ...__._ h- Rr4tn 0Y N,"fi?iE7,°i4 7 Al.or7 7 NEC 6Nfr 17 AC UISCUNNECT APPLY TO PR(7LILIC.TIUN Mti't l'i AC 1715{;G)NNECI PV SYSTEM BREAKER °.a A Notes S, 1.'1"he marking Shall be placed adjacent to the main service disconnect clearly visible for the location where the lever is operated. .....,�_—..----... 2.Marking format:white letter'on a red background,Minimum of 3/8 inches letter height.All letters shall be capitalized,aerial or similar font,non-bold. ;7 3.Material:Reflective,weather resistant',material suitable.for the environment.Use LJL969 as standard for the weather rating.Durable adhesive metal ,n materials meet this requirement G e E-2 l � � �# \ ■ � . . � 2 I . � »g/. Customer . JOHN MAP ,t' , �OW' L� ae\�»e � /\ \ � \ ? \< PLACARD m,e« E < \\® ^ ` \/\ ^ y � ` _rte: 2 +nergyto\}\ � �. . . . . . . .uuu.. ......... .............__. ......... .... ......... _...... ..............._.........______...._.. a rr P s, r r T Y 1 r > 71 Y n f fr ,1 I i irJ C,w m a a v a rn mar c^„ . . 1 3 ; , v� w r2, rr a ,f h, TI P C wl' k Irak` 11 kl ah t Dry Date Customer paves P CkOWS Eun � esul 0E'a: O FAkXTre , r�'YkNV%*Mtllff,bWTS rrG'T�w 'G'71k�'6 PV gar E I III&ti 6 626 E LAURMW ra e1 wrra 6.6 KW also TOP P SPECIFIC,aTKYN AWAL t�WA QCKa SYS rau 5y' erre esu�mr z Smart SHEET 360417,9766 " r� �" today Dam6irs.RUNT t m 1 w I mawN mmaawxv¢ cr rc .,. A } N5 a " �` 7 ,p2 R ,w:�.:«w .mwG.�.��.w zx �> wr. � ;'�•;^" u^a. "r� r v nJ n r�. u t . ry fir" vrv�: x r; X ui } 'an k i ,r•i '; 'a. r y. e" nr .a a t -% 3 -� g tl'� au � xaf rw f t i Wy y a" Re ��: ,w^ r M � ^arc..,� a r, U'�• � n rb ,,. ae n cl c M rwy �r c' In y ti ?2 •i �. r. toSk"r > "I #1� a Fk r as r„ �„ iD 1: z0 .._ N c: 4A r K vv. f hrorzel br Nrug Pate Custorner Wo Prgeet Dem^ads Energy Corsugara rwrmv E4 Cld'"If twbWfi` ROBERT CARTER .NOH N BAXTERsmart INVERTER 11k16J16l 626 Ei A A4kMtOSEN BLVD a+8 KW ROOFTOP PV �SyaterrN mas gnee £CdF9CA1 ICN PORT wr Es.WA aaea WSTEXd _. _ 1 5energy today aTavr.ares .............. TOP CLAMP .or RAIL BOTTOM CLAMP ........INTEGRATED ILSCO GROUND LUG, COMPATIBLE WITH#4,#6, #8&#10 BARE AND STRANDED COPPER WIRE S HOOK BASE PLATE SPIDER—RAX BLACK WIDOW COMPOSITE RACKING SYSTEM DETAIL (NTS) Id, fel '.0 "I ............. Ifffffffff ...................... ................ ................... r- g �'l 'n Ci 14 ft Ilk, es TZ R Y .. rs r i 41. I ... ......... i J 4•W Po� T wa I I ' i w n�' P a�11� t N _.....,, ..._ ..._.....__ ..,,.,.w. ..... ..,.. _.._._.... .......... µ_w. ....._. _.. ..... aruq _ .,..NrarkCa Projed DEWSkar, �... CUY.JIfahN:AJ"GS .... JOHN BAXTER f) slmzft RACKING 111161$6$6 ME G.oaaROSEN BLVD 2-E KW ROOFTOP PAS �r�tl��rrn C7a��m tea` SYSTEM PORT ANGELES WA 08362 EYSTEU ..�..�. energy .......... m > 0 x cn 0 C, K 0 C Cry �i> > Z' m I ..........-- ............ m m x "IX 10 C) i�: 0 C: Z z < 0 0 > c rl m Iv 'v F-n > to > z m 'n 0 0 x I>D m > m cn 0 L .0 0 --4 >r, c a 0 (n 0 m MA Drawn I Drawng Date CWO"16-r InIO ProjeO Doliff r y EOUPMENTS ROBERT CARTER JOHN BAX I E R S(Inart' RACKWG 11/1616 626 LAURI)SEN BLVD 2 8 KW ROOFI OP PV -- SYSTEM p rE Aam Des� nor OR ANGE E&WA98362 SYSTEM Sys ATIACHMENT 360,4117,9785 e n e r gi y t ol d a y DETAWL DAWEL HUNT T APPENDIX B CONNECTION STANDARDS for CUSTOMER ELECTRIC GENERATING FACILITIES of not more than 100 KILOWATTS A. General This Appendix sets forth the requirements and conditions for interconnected non-utility- owned electric generation where such generation may be connected for parallel operation with the service of City of Port Angeles Electric Utility(the"'City"). For purposes of this Appendix, the interconnecting entity shall be designated "Customer". B. Connection Requirements 1. Customer shall conform to all applicable National Electric Code (NEC) requirements [NEC Articles 690 and 705] and building codes, and shall obtain electrical permit(s)for the equipment installation. 2. Customer shall have a dedicated lockable disconnect device between sources of alternating-current, (i.e. between inverter(s) or other power conditioning unit(s))and the City's distribution system. The lockable disconnect must be accessible to the City at all times and only the City's lock may be used on it. 3. Customer's over current device at the service panel shall be marked to indicate power source and connection to the City's distribution system. 4. Customer's power production control system shall comply with NEC Articles 690 and 705, Underwriters Laboratories (UL) Standard 1741, Second Edition, and the Institute of Electrical and Electronics Engineers (IEEE)Standard 1547 minimum specifications, and standards for parallel operation with the City. In particular, the: a, Power output control system shall automatically disconnect from the City's source upon loss of the City's voltage and not reconnect until the City's voltage has been restored by the City. lb. Power output control system shall automatically disconnect from the City's source if Customer's voltage fluctuates beyond plus or minus 10 percent, per UL 1741. c. Power output control system shall automatically disconnect from the City's if Customer's and the City's frequency fluctuates plus or minus 2 cycles per second (Hertz). d, Inverter output distortion shall meet IEEE Standard 519. C. Safety All safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA) Standard 29, CFR 1910.269, the NEC, WAC rules, the Washington Industrial Safety and Health Administration (WISHA) Standard, the City Service Requirements, and equipment manufacturer's safety and operating manuals. Net Metering-Apndx B.doc{2/19/131