Loading...
HomeMy WebLinkAbout001166 Original Contract City of Port Angeles Record#001166 NET ENERGY METERING CONNECTION AGREEMENT for CUSTOMER FUEL CELL, SOLAR, WIND, or HYDROPOWER ELECTRIC GENERATING FACILITIES of 100 KILOWATTS or LESS This Net Energy Metering Connection Agreement is executed in duplicate this 14th day of December, 2016 between Carol J Philpott (hereinafter referred to as"Custoiner"),and the City of Port Angeles Department of Public Works and Utilities, (hereinafter referred to as the City), Both parties, who may be herein further referred to collectively as "Parties"and individually as "Party",agree-as follows: I CUSTOMER ELECTRIC GENERATING I'Aciu'ry 1.1 Customer has elected,in accordance with PCW (10.60 et seq., to operate either a net energy metering fuel cell,solar,wind or hydropower electric generating facility,with a generating capacity of not more than one hundred kilowatts,in parallel with the City's transmission and distribution facilities. This generating facility is intended to offset either part or all of the Customer's electrical requirements. 1.2 Customer's Application for Net Metered Electrical Generation, including the location of tile electrical generating installation and details on the electrical generating unit(s)is hereby incorporated into this agreement as Appendix A. 1.3 The installation is identified by the City with the following designators: Transformer No. 65AS06 onfeeder/phase WA 1203/13 Customer Utility Location No. 105930 1.4 A separate agreement shall be entered into for each Customer's electrical service location(s). L5 The electrical generating system used by the Customer shall be located on the Customer's premises. It shall include all equipment necessary to meet applicable safety, power quality, and connection requirements established by the National Electrical Code(Articles 690 and 705),National Electrical Safety Code, the Institute of Electrical and Electronics Engineers, Underwriters Laboratories, and the City's Connection Standards, as set forth in Appendix B, which is attached hereto. 1.6 The City shall have the sole authority to determine which connection requirements set forth herein are applicable to Customer's proposed installation. 2. PAYMEN'f FOR Nt"TENERGY 2.1 The City shall measure the net electricity produced or consumed by the Customer during each billing period, in accordance with normal metering practices. 3/28/01 PW1201-01 Net Metering Agreement, DOC 1 of 6 2,2 If the electricity supplied by the City exceeds the electricity generated by the Customer and fed back to the City during the billing period,or any portion therc-of,then the Customer shall be billed for the net electricity supplied by the City together with the appropriate customer charge paid by other customers of the City in the sarne rate class, 2.3 If the electricity generated by the Customer and distributed back to the City during the billing period, or any portion thereof,exceeds the electricity supplied by the City,then the Customer shall be- (a) billed for the appropriate customer service charge as other customers of tile City in the same rate class; and (b) credited for the net excess kilowatt-hours generated during the billing period,with this kilowatt-hour credit appearing on Customer's bill for the following billing period, 2.4 At the beginning of each calendar year,any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year shall be granted to the City without any compensation to the Customer. 2.5 Customer shall pay any amount owing for electric service provided by the City in accordance with applicable rates and policies. Nothing in this Section 2 shall limit City's rights under applicable Rate Schedules,Customer Service Policies, and General Provisions. 3. INTERRUPTION OR REDUCTION OF DELIVERIES 3.1 The City may require Customer to interrupt or reduce deliveries as follows: (a) when necessary in order to construct,install,maintain,repair,replace, remove, investigate,or inspect any of its equipment or part of its system; or (b) if'it determines that curtailment, interruption,or reduction is necessary because of emergencies, force or compliance with prudent electrical practices. 3.2 Whenever possible,the City shall give Customer reasonable notice of the possibility that interruption or reduction of deliveries may be required. 3.3 Notwithstanding any other provision of this Agreement,if at any time the City determines that either: (a) the facility may endanger City personnel,or (b) the continued operation of Customer's facility may endanger the integrity of the City's electric system, The City shall have the right to disconnect Customer's facility from the City's electric system. Custorner's facility shall remain disconnected until Such time as the City is satisfied that the condition(s)referenced in(a)or(b)of this section 3.3 have been corrected. 4. CONNECTION 4.1 Customer shall deliver the excess energy to the City at the City's meter. 3/28/01 PW1201-01 Net Metering Agreement,DOC 2 of 6 4.2 Customer shall pay for designing, installing, inspecting,operating, and maintaining the electric generating facility in accordance with all applicable laws and regulations and shall comply with the City's Contiection Standards set forth in Appendix B,which is attached hereto. 43 Customer shall pay for the City's standard watt-hour meter electrical hook-up, if not already present. 4.4 Customer shall not commence parallel operation of the generating facility until written approval of the connection facilities has been given by the City. Such approval shall not be unreasonably withheld. The City shall have the right to have representatives present at the initial testing of Customer's protective apparatus. 5. MAINTENANCE AND PERMITS 5.1 Customer shall: (a) maintain the electric generating facility and connection facilities in a safe and prudent manner and in conformance with all applicable laws and regulations including, but not limited to, the City's Connection Standards, Appendix B,and (b) obtain any governmental authorizations and permits required for the construction and operation of the electric generating facility and connection facilities, including electrical permit(s). 5.2 Customer shall reimburse the City for any and all losses,damages,claims, penalties,or liability it incurs as a result of'Customer's failure to obtain or maintain any governmental authorizations and permits required for construction and operation of Customer's generating facility or failure to maintain Customer's facility as required in (a)of this Section 5. 6ACCESS TO PREMISES 6.1 The City may enter C'ustomer's premises or property to: (a) inspect,with prior notice,at all reasonable hours,Customer's protective devices; (b) read meter; and c) disconnect at the City's meter or transformer,without notice, the connection facilities if,in the City's opinion, a hazardous condition exists and such immediate action is necessary to protect persons,or the City's, facilities, or property of others from damage or interference caused by Customer's electric generating facilities,or lack of properly operating protective devices or inability to inspect the same. 7. INDEMNITY AND LIABILITY 7.1 The Customer assumes the risk of all damages,loss, cost and expense and agrees to indemnify the City, its successors and assigns,and its respective directors-, officers, employees and agents, from and against any and all claims,losses, costs,liabilities, 3/28/01 PW1201-01 Net Metering Agreement.DOC 3 of 6 damages and expenses including,but not limited to,reasonable attorney fees,resulting from or in connection with performance of the agreement or which may occur or be sustained by the City on account of any claim or action brought against the City for any reason including but riot limited to loss to the electrical system ofthe Customer,caused by or arising out of air electrical disturbance. 7.2 Such indemnity,protection, and hold harmless includes any demand,claim,suit or .judgement for damages,death or bodily injury jury to all persons, including officers, employees or agents,and subcontractors of either Party hereto including payment made under or in connection with any Worker's Compensation Law or under any plan for employees' disability and death benefits or property loss which may be caused or contributed to by the connection,rnaintenance,operation, use,presence,or removal of Customer's equipment. The only exception will be liability occasioned by the sole negligence or willful misconduct of the City or its ernployees acting within the scope of their ernployrnent and liability occasioned by a partial negligence of the City or its employees acting within the scope of their employment to the extent that such partial liability is fixed by a court of competent jurisdiction. 7.3 The provisions of Section 7 shall riot be construed to relieve any insurer of its obligations to pay any insurance claims in accordance with the provisions of any insurance policy. 7.4 The City shall have no liability, ownership interest,control or responsibility for the Customer's Flectric Generating Facility or its connection with the City's electric system,regardless of what the City knows or should know about the Customer's Electric Generating Facility or its connection. 7.5 Customer recognizes that it is waiving immunity under Washington Industrial Insurance law,Title 51 RCW,and further agrees that this indemnification clause has, been mutually negotiated- This indemnification shall extend to and include attorney's fees and the costs of establishing the right of indemnification hereunder in favor of the City. 8. INSURANCE 8.1 Customer shall maintain, during the term of this Agreement,Comprehensive Personal Liability Insurance with a combined single limit in air amount equivalent to the industry standard for this type of insurance. 8.2 Stich insurance shall,by endorsement to the policy or policies,provide for thirty(30) calendar days written notice to the City prior to cancellation, termination,attention,or material change of such insurance. 8.3 The City shall have the right to inspect or obtain a copy of the original policy or policies of insurance, 9. INDEPENDENTCONTRAcTORS, 9.1 The Parties hereto are independent contractors and shall not be deemed to be partners, joint venturers, employees,franchisees or franchisers,servants or agents of each other fur any purpose whatsoever under or in connection with this Agreement. 3/28/01 PW1201-01 Net Metering Agreement.DOC 4 of 6 10. 60VERNING LAW' 100 This Agi-ClefflCrIt shall be interpreted,governed,and constructed under the laws of the State of Washington as if executed and to he performed wholly within the State of Washington. Venue of any action arising hereunder or related to this agreement shall lie in Ciallam County, Washington. 11. AMENDMENTS, MODIFICATIONS OR WAIVER 11.1 Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at any time or times to require performance of any provision hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any Party of the breach of any term or covenant contained in this Agreement, whether by conduct or otherwise,shall be deemed to be construed as a further or continuing waiver of any such breach or waiver of the breach of any other term or covenant unless such waiver is in writing, 12. APPENDICFS The Agreement includes the following appendices attached and incorporated by reference: Appendix A: (I ustomer's Application for Net Metered Electrical Generation to City of Port Angeles, Appendix B: City's Connection Standards for Customer Electric Generating Facilities of 100 Kilowatts or Less. 11 NOTICES All written notices shall be directed as follows: City of Port Angeles: Electrical Engineering Manager 321 East 5"' Street R4444w44-50 Port Angeles, WA 98362 Customer: Carol J Philpott Name 1822 E Lauridsen Blvd. Address Port Angeles,WA 98362 CitN,state&/ip 3/28/01 PW1201-01 Net Metering Agreement.DOC 5 of 6 Customer notices to the City,pursuant to this Section 13,shall refer to the Service Address set forth in Appendix A. 14. TERM 01�. AGREEMENT This Ageement shall be in effect when signed by the Customer and tile City and shall remain in effect thereafter month to month unless terminated by either Party on thirty (30)days'prior written notice in accordance with Section 13. 15, SIGNATURES IN WITNESS WHERE01',the Parties hereto have caused two originals of this Agreement to be executed by their duly authorized representatives. This Agreement is effective as of the last date set forth below: CUSTOMFR: CITY OF PORT ANGELES: /It 1 1;11'101 Sgnalurc signature L,r d'W I _ LilParr SHAILESH SI- ERE Print name Print name Assistant Director of Power Systems l'ide I ifle 12/14/2016 Date Date 3/28/01 PW1201-01 Net Metering Agreement.DOC 6 of 6 APPENDIX A Application for Net Metered Electrical Generation Thank you for your interest in establishing a renewable energy or fuel cell connection with City of Port Angeles, Electric Utility. Please note generation systems must meet certain requirements to be considered. The project must be not more than 100 kilo%xatts(kW)in site.. • Generation must be fueled by solar,wind, hydropower,or be a fuel cell. 0 Owner provides power conditioning,connection,and safety equipment, 0 Projects will be considered on a first come first served basis. Please complete Customer and Installer Information and the appropriate section fbr the type of generation proposed to be installed. In addition,include a one-line diagram and description of protection equipment. Please allow at least ten working days for processing your application. Questions may be directed to Electrical Engineering Manager,at telephone number(360)417-4702. Custonter Info nation Owner Name: Carol J Philpott ........... Mailing Address: 1822 E Lauridsen Blvd. _-------------------__-- ........ City, State&Zip: Portangeles, WA 98362...... Ernail Address: bncphilpott@tfon.com Service Address: (If different than Mailing Address). ........ Daytime Telephone- (360) 457-7426 Electric Utility Account No.: 51313-105930 f:"xpectedSystein0peratiojiallate: 12/15/2016 ............... Installer Information(it' lifferent from Customer Information Installer Name- Smart Energy Today -------........ Mailing Address: 1001 Cooper Point Rd SW, STE 140-290 City, State&Zip: Olympia, WA 98502 . Email Address: ..A........n.drew.E@SmartEnergyToday....n....e....t.. ......... --------­-­ .......... Daytime Telephone: 360-339-6660 ............____...... ....... PW1201, 02[Revised 01/20161 1 of 2 Photovoltaic Solar System Information PV'Module Manufacturer: iTEKEn�ergy PV"Module Model Number: IT280-HE Number of Modules: 16 ............ PV Power Rating per Module: 280 DC Watts Total Output: 4480 DC Watts Inverter Manufacturer: EtWe Frog Solar -..—.......... Inverter Model Number: YC50OA-MIW .......... Inverter's Power Rating(kW)- 0,50...... ........... (AC continuous) Describe the protection equipment to be used and the physical location of tile installation: Residential Rooftop Solar PN installation all micro-inverters equipped with rapid shutdown and full system disconnect .................... ............ ................. ...... Installation Cost Information Estimated cost of installation: 16000 Drawin2s Attached: one line manufacturers literature ✓ design drawings K LMJ PW120102[Remised 01/20161 2 of*2 PHOTOVOLTAIC NOTES 4 46 rcw ac;PV Svsl°E.M �wm MarA�a ma SOLAR ROOF PROJECT � CAROL.PHIL.POr'r „ 1822 E.LAURIDSEN BLVD " w '�,. FOR rANGEL ES68;361 wx, �.� :360-457.7426 ... A, Scope of Work n e n m'+�r w;nm as as ,rerr rru a rrmun�? wa.w. �k.—I� P�"P'�POPaOSFI)*W 4 48 KW(P3G'7{ROOF MOUNT H) PHO IOVOd T'AlC(PV)S STFM WITRi 1'G,XLOWING a COUIY MF„NI`: 11 1111k— ° (i Bf IrEK WNE4tr7Y iTJRO-fiF SOLARMODULE u Xu K asaauv, (8p BLUE FROG SOLAR Y0500A-MIW'MICRO VVFITI i P yl nl ¢nmN � ia.n. anw m.,uav:w�n',, ue nwow ma a ov4 +ri uur acm ni�iov � d'3T+IP'!FHIRAX N.i6,A(:;K WIDOW RACKING SYS'1'4'&M u, ur rani+w roa�vir.ry } p1a A .f5 ,RaY VJt a bf:id Nth Gf4:'d v�6Vtvi nC' Naa uW;rvY@4 W :a�. g U p an n COOT„AU I'HONI➢'Y. a a 2015 WASHING I`ON STATE MPLOINGti Q;;OOC 12015 ” - 2015 WASHINGVON Sb"ATE ESE CODE GOO,II-.C(;) raw i<<.c.e Ararx i avti; R mrar vr"r v�mr Nn�,,m ur.w.aw,ux oiuF e�unarvvnG�z. au E.u�. Mn iaw� � rruc, iraon� ud015 WASHINGTON J'rAT E RESIOENT`IAI GORE(111,1 r as Fau x INIE`RNA'I`IONAL RLSIDEN I IA6 CODE WASHING ION aP AMFFNDMEiNT'S 2014 WAC51 G1-2300 SECT`ION M2304) w 204 WAG 296 468(2014 NEC) m Vl(INYIY V�I,,._ ....., ..,.....___..,.,,..,.,.._..._...».. .......... ........ „,.,�,,.„....� .,�„�.�„ .... ...._._..._,......._.._____ ,w.......................,,,,.. 20SWASHINGGONSIATEMFCHAMCAI COOFLAASUMC! ..._. AN VIC fPJQ Y P%LAN 7011!6 WASHING ION S1 ATF PLUMBING C FRE€20115 Ur''C} ' 20 5 WASHING,ION a'rA"I F FIRE COrW(2016WC) C P a S ...,.......__._... ......... .................. ._.�........,..,. ...,m...... .... ... .. Q q' SHTFETINDEX: A 1 GENERAL NOTES,SLIF.E'T'INDEX,MAH,OING DA'T'A, T6 e6 A PROJECT OA'TA,SffE P6.AN G3 .. A-2P'V V.AY(14d'i'PLAN •,....... A 3PV ARRAY AND RACIONG CONNECTIONN �*' 8-j EiIN4',1R E UNE OIAG1&'PAM ' T a F-2 WARNING NOTE$ F 2al.MAI PLAC AHO La IF a 8--3EG]UI%ENTS 1:'VMO1UTE:SPd.CIFIC7AIIONSHEF.T E 4 FO APMFNTSr.INVFRIi _R SPAE(N: ICAT'ON S8ip.,E G' " m..... .......... SIFUt)IEMFN I .RA(KYNC,SY TEEM A- '1 ?t"CIt.lI4'MENT SS.:RA{KING SYST'1=.M C,:FRTIFICAI'E 3 COUIRMENIS.RAC)KINI SY 1F..MATIACHMF."Nt DL,,I'Alt. v1 ................................... .................... .......... ............................................................................................. ........... PV ARRAY 10 HF, L INSI ALL WI IH I HE F01 LOWNG MUMUM I BACKS PER WASHING ION SFA rE FIRE(.',O[)E whop S" .36 INCHES FROM Ak B.RIDGES m 36 INCHES FROM A RAKCS INCHES FROM ALL,HIPS&VALLEYS Au CAU RIDSEN ST 19 V� lu CIO N ----------------- SOLAR AC 1)K-.'K30NNE','C'r& WFUN F'RC DUC,1110N ME FEF?, LOC r PV ARRAY NE'r METER LOCATION ................... ............ PV Panel Total: 11 Pieces X280 =4,481WDC Solar Panel: iTek Energy iT280 HE (See Sheet E-3) Inverter: Blue Frog Solar APS YC500A- MIW Micro Inverter(See Sheet E-4) I 2 Racking: SpiderRAX Black Widow(See Sheet S-1) - ................... .............----------- ................................ ............ ............ ................... > 0 0 0 m ==:r,> mmrn < w Lu 0 0 0 m SKr r - >>>'Z, > T (1) T C.D W r, mmom > 0 < U) > C:: m X) 0 r7 0 z 7.1 > rn z z --1 71 Z rri m Xl X T m > z 0 z > m ca 0 X c 0 z c ;4 0 0 4 CD 2— > @ m M 0 C 0 Dramng Date Customer&nfc Projed Detads Energy Consukant I - , ------—----........... ...... PV ARRAY I R E 11111 1 DAVORRMERTS AND RACKIN. tarmarr AURIOSENROM 448KWR00RIOPPV' sryw"t CONNECNON PORI ANGER S 981,62 SYSTEM energy today __ .. ....._.._ ___ ...__......_., ____.._........ ____............... _____ .___-_.___ --.. _.. ._ ........._.... ._...w........................... V4'CONDUIT :3F44 CONOIJIT' V CONGUI I' ('0)10 AWG I'IHN(811 Red Wt IU) (.Il)iU AWG TWIN(13I.,,k,MW WhA f3!10 AWG9 THI°IN(81,Uk,IYW AT10) aw 0)8 1 HHYR dC nuau I( krkv9) (1)3 THHN BnIIW r1 t (61=1 {b) 4X THIN R4.dC..aw., 9OAWI.t RAI P 90C. 40A 1 AWG RA YE 40'C—40A 90 AWG RA'UE9 %I 40A I M PFRATURE Ob HATING 4V 174°F U.01 PY.MF^FRAILINE DE RATING Ob 104'r=0.91 TMMI SNAI URE III RATING 0 104`6 0.911 AMI'R.C14fAxf,3x 92,1f,µ211.fiA AMF'R208A a 4'rc 1x9°h t(7 AA AMf�'° AAx 4x7 LSh'TO 4A v ' 40A x 0.�4'd1 3N7 AA'.„20 8A 40A x Yl U1`.3H.4A'+10.4A 40A x 0 01 w:10 .IA',1,IT)4A � OK TOT TALC 10 AWG IHHN 11K 111 IN!x1 AI.L'10 AW(')I'I^IHN CA 10INSTAI.L 10 AWG'I`H14N -W A ._......... INSTAI L.NEW 2E iQA SC71.AR[!BLAKE,R�ATuF END C1f LVll�a. ........ . ......���„ ...,....�.� ...... ........... .......".__._............... ..,........,........_. ,� S C1A(t€N 300A MAIN SERVICE I ANL"l. u M(Ill E01 Aid 4.fdMFii NIt vvinTr n .^N^C Mr T.F..B -I_ ..•• C.PCf._M.,7JUI„d8 / Wi(l, n (I x+iSA WTAtR ✓ ME fKd f N SOLAR FTC[1„TIfN ..._...4 syu� ._1 ... , ... _.. 5 .. f ........... .. .....�......�. ......... .,,.,... ”Y" A ........... ... <AE.AB MC717UEES 200ARwiA iHRVOC,F NUI ^ �.......... SOI USED AT', DISCONNECT ivriinv+x wr..i1. •` 30A ........._._................._____.....,.... _ ------ ...,_. ..................... _....... .....,. ..........,.. .... ......_.......... M.d"Ieo Info-aflr✓u Vnvoltlar F2arIfirlS MdOulr I''rnncr0 Rating C7ui{rW v'u0w Iwt or ". __.. ....,,.._._.. ..... _. ......___ _.._._.,. .�..._„ ._....., ..._,.. _......___...._.........................._...__. ......_. ...... .....,........_..... ....._._...._.... EB"I.EMf'1JI21tiAl,C'lAIA PER f'ANf(1'NFl MAX.171:1Nrtlr vPllTArtC 'v 'I'OEXISTINC3 _ .. .. _ ...::.......... 'EK NNLIi(1V 1 MI<.PoI;>INVI Ykif bl 0411E HOG SOLAR All YC 00A MIW It 14.Aid UIVYCtAIT CONNECTED l)IN =:!.i3 iC iS Y�II.M MAX DC OUTPUT b(.5T(:(. EL I(, fICOMKNOILD VV MlD(A I. .�.Itl04W. °-YL d96i CxAKLIC T'G Y3N4F NalAl.lYi.EIA AT t!"w'Q,1A 2diftWxllC'x A.ANKW u, W NCYMINAd MAX POWER 2k1t1WV PO EH NAN Y!'I'C, 310VI S ENO 6 V SYSI EM MAX AC CALCULATION(.ULATION USIN CSI PIC PYA,X. MAX POWER VOLI AGE E'Vrrr),ypr ';f"k�3V Mt*SINCE ,�aaV 455 OF RU S BAHT CMAX A IY MCrIY4146=25r MV �"47 MAX POWE.;R CURRENT(I pp) 'N,_6A f11^f.fu A'PIN¢RANGE ,gf.V'36V 2S7 BW x 9H x 4 02 KW t� �"0"y 0PEN CIRC LIT VOLTAGE,(Voce) r.;,N2V "X INNIT11CIJURRENT ,I1Axx 4.12 KW 95 5%, �N.93 KW C'1 SHORT CIRCUIT'CURRENT(Is") 93A RA t C 1'10k,17 l U r POWER •aaw SUPPLY POWER 30A«200A-130A s 201AAx 1.2.240A ...-�.................. POWER OFNSI Y +1/9 owh RATA)OUIHIIY CURIIC.NT F208A0 A40Vxi,: C:PERATINr fk:MF AO'c +HO,C„' N4bMINAL901 Il Rr ACeEICGRAF' ^W4 ri/S11 4.05 E—1 MAtlIPhAd..6 H6 CilIENk'r/NANOvE All Y1/°✓Y}qui CI5 7tt1A OK MAXT II1VIERIC Xi LIRA 15NAPJtl.kl C,19it IIY V% Al INVEN T4'.R C'P1101ENf1V .... ...................... ................--.......... .................. In I I RECIT)BY PPIY NfC %) 6 ,17 RFQ'D BY APPLY NK 690C),fl PGL(3) 3- RE(FOBY N ,13 On 4 RECCO BY:NEC 705,17(D(o 5 0 REDO BY NEC MS @mQtN(3) A "0: r APPLY W EC 690APPI Y TO: APPLY'I`41 DISCONNEC IS LOEXP OSED RACEWAYS, AC DISCONNE US MAIN S'ERVIEE PANEL PV SYsrEM 11FICAKIER P V LOAD UNIERS CABLE IRAYS&01H FEYW IRING DS COMBINER BOXES METHO (2)(OVER SOR ENUC)SURES OF PO1 I BOXES WNCTION BOX FS (nCONDUI1 BODY W/DIEMNf UNUSto V 9 1. 0 MM G PLOT)BY:NEC 690 54 7 -NEFYI)BY N APPLY TO AND NEC 1090 12 yI AC DISCONNEC? W " APPLY PRODUCTION MFR Ac I)IsCONNEF r PV SYSTEM BREAKELL .............. ....... Notes: ......................... .. ............. .............. ......................................... ....... 5 L The marking shall be placed adjacent to the main service disconnect clearly visible for the location where the lever is operated. 2.Marking format:white hatter on a red background,Minimum of 3/8 inches letter height.All letters shall be capitalized,aerial or similar ford,norLbold. 3,Material:Reflective,weather resistant material Suitable for the environment Use UL969 as standard for the weather rating.Durable adhesive metal materials Meet this requirement Z 0 ............ -2 ............. ................................................. ................ � « 3 # . # . .� p. � \ � ® * � ! Dfawin .! ( f & , � 6� :\ : �7.1.0:- 2 a %,er ^ . smart . / m, P ES / ~ .. ey. .re� mD R��D " .7.-- , . . }n¥r\y \/day _ems> . � . .....�.._..w ......,,_...._. ..._._...._... ................ .,. ...a... ..� ............_... ...... ..., .......... ! !dread. ._.,.._.... d �r f i f „ d ! ,d f/ 1 e � MJ j .m..,............. .. ,....,..w..... ......., m.m...m..,.,�...........____.,. .,...,.... ....�...., ...._.....___.._ ..._.,..........._......., ........ ...,....»...........,,,,.�. ,......... '...W...._, ............... ................. CZ 7. j µ � L � �b f a M I _. ... ssl OFp Pry d Det ds Erwgy Consuftant DAM ROBERTS EQUPMEWS CPREta 1^&kaA r v MOWLE. 1IM616 aero E LMMOSEN BLVD a 48 KW r1 µ tDees rt�r SPE tiFKAT7rON PORT�.F GE1 F`.3 98362 SYST"A em ,....,... I�"'$ �„Smart gy today E r W-4571476 ­� DANIEL HUNT „. I (f( L f A0 I cr I i w lot J 17, �' ipflMWfb@U IIIW�i��' f IIIWI i I AM p f J h f wt V�'. r Mi 2 .... No, W T IV F8 A ., i p Tk d �. d ..r w w �N —9 q.lF fwd Xk ra ' rr ? ^� ,�„ t'rr ° ,acv +,�i ✓ rr a g "i n '> z x ..,. � M ��. P,L'L 81, rr " r0 _ cws � 8i ',, Drawwarug D, C *w Wo 6Bkaft . ..a ETem30 4:¢wnsaaNraC PkuWYVNCY ROBERTS ' !! ECYIDBB�M1'tleE�iTS: CAaBM.ak w w�ra..Pcar0' 1414Y$J'E6 X.822 E L''LNAEC,SFS BLVD r0.48 KW Bd,Sd '�0P PV INVERTER &Mzf � "!PORT ANGE1 Es STM22T Des aroa 6 SPECWCA energy today bWa'fkWB dX'.IE r. ....................... ... ... ...,.... _... __.................__.. .. ..... ......___-_.e._..w.......___n__.__................. ..........................................w . _.w....... ........ .. ...... ..... .........................._._.. ............ ,.._.,__..I.GE CLAMS RAIL ...............BOTTOM CLAMP INTEGRATED ILSCO GROUND LUG- COMPA'f IB1..E WITH#4,#6, S1 RAN IDC AND u SI"F�ANCJE�LI COPPER WIRE �.��......... uF _._BASE:PLATE �a SPIDER-RAX BLACK WIDOW COMPOSITE RACKING SYSTEM DETAIL (NTS) f :> 5" JJ , Aw f!F I � w � "= ��u� h �� '„��,�*+ �+` � ��,„ � ,, moi• nva ^ m c ate', � �,T^� '� ��• �J . � 1 i l I :a mm 1 4 F ^c x n �w � � I t Drawgrug Carte Custnarr w trate Project tetwls wons,Att t v. EOUE MENT Cs.vum�cru?aPEFat�z crsP r mMw�mara RACKING laVELALPROSENIUND 4,48 PKK ROCFTCF PV smart, fids rcd C�BSA neer SYSTEM P ars EmEs s 2 SYSTEM T"EM _�.' ..... eirvergy toiday 1110 CEEtIIFMCATE rsuu-.asr-74.26 auANUEm awmuNt , f„GM PLT CTS C� "wD �Y IraV J CY 'MI c 0 4 ? CaP Wy` c ro D A„W �Cpp'P,"l PTI. wJ ILT ro� PTI Cdb I I 0 Z M ba ^� M R '�II I*v 0 C) 0 c zI .> z CP 0 $Yr M I s p > M °T1 C 1>1 > I� U) �b 0 CAY 0 AFT EkPeek Dra wmn Pate .Lusk er Info �"moject Debs qw Ep lez�y baa* cPRk�r k /��1 k�Y4YRPMErwVT �aaa�r D erc BER Ts nergy today 1w�/r/ k�Ac�wtpm G CAROL P este Pyre T Smart SYSTEM 4'6P&16 o4W,?2 E uAURIeSEN E6R,VD A A7&tlG'^a"r'P'�'�T74bd�'PY,'�tl�°4 w ��k"9ke�P'1 C%Bi4o PVH'SN' i B ORT ANGU ES 4dI0 6L' w'NtS'f'k .. ..... 'TI"" �� 10 APPENDIX B CONNECTION STANDARDS ir for CUSTOMER ELECTRIC GENERATING FACILITIES of not more than 100 KILOWATTS A. General This Appendix sets forth the requirements and conditions for interconnected non-utility- owned electric generation where such generation may be connected for parallel operation with the service of City of Port Angeles Electric Utility(the "City"). For purposes of this Appendix, the interconnecting entity shall be designated "Customer". B. Connection Requirements 1. Customer shall conform to all applicable National Electric Code (NEC) requirements [NEC Articles 690 and 705] and building codes, and shall obtain electrical permit(s)for the equipment installation. 2, Customer shall have a dedicated lockable disconnect device between sources of alternating-current, (i.e. between inverter(s) or other power conditioning unit(s))and the City's distribution system. The lockable disconnect must be accessible to the City at all times and only the City's lock may be used on it. 3. Customer's over current device at the service panel shall be marked to indicate power source and connection to the City's distribution system. 4. Customer's power production control system shall comply with NEC Articles 690 and 705, Underwriters Laboratories (UL)Standard 1741, Second Edition, and the Institute of Electrical and Electronics Engineers (IEEE) Standard 1547 minimum specifications, and standards for parallel operation with the City. In particular, the;. a. Power output control system shall automatically disconnect from the City's source upon loss of the City's voltage and not reconnect until the City's voltage has been restored by the City. b, Power output control system shall automatically disconnect from the City's source if Customer's voltage fluctuates beyond plus or minus 10 percent, per UL 1741 c. Power output control system shall automatically disconnect from the City's if Customer's and the City's frequency fluctuates plus or minus 2 cycles per second (Hertz). d, Inverter output distortion shall meet IEEE Standard 519. C. Safety All safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA)Standard 29, CFR 1910.269, the NEC, WAC rules, the Washington Industrial Safety and Health Administration (WISHA) Standard, the City Service Requirements, and equipment manufacturer's safety and operating manuals. Net Metering-Apndx B.doc(2/19/13)