Loading...
HomeMy WebLinkAbout001159 Original ContractCity of Port An8eles Record #0011S9 NET ENERGY METERING CONNECTION AGREEMENT for CUSTOMER FUEL CELL, SOI-AR, WIND, or HYDROPOWER ELECTRIC GENERATING FACILITIES of 100 KILOWATTS or LESS This Net Energy Metering Connection Agreement is executed in duplicate this -7th day of Decernber, 201 6 between Kimberly Sager- Fro4Lttr (hereinafter referred to as "Customer"), and the City of Port Angeles Department of Public Works and Utilities (hereinafter referred to as the City). Both parties, who may be herein further referred to collectively as "Parties" and individually as "Party", agree as follows: 1.1 Customer has elected, in accordance with RCW 80.60 et seq., to operate either a nel energy metering fuel cell, solar, wind or hydropower electric generating facility, with a generathg capacity ofnot more than one hundred kilowatts, in parallel with the City's transmission and distribution facilities. This generating facility is intended to offset either part or all of the Customer's electrical requirernents. 1.2 Customer's Application for Net Metered Electrical Generation, including the location of the electrical generating installation and details on the electrical generating unit(s) is hereby incorporated into this agreement as Appendix A. 1.3 The installation is identified by the City with the following designators: Transformer No. 30GS07 on feeder/phase VA1205iB Customer Utility Location No. 95970 1.4 A separate ageement shall be entered into for each Customer's electrical service location(s). 1.5 The electrical generating systern used by the Customer shall be located on the Customer's premises. It shall include all equipment necessary to meet applicable safety, power quality, and connection requirements established by the National Elecfical Code (Articles 690 and 705), National Electical Safety Code, the krstitute of Electrical and Electronics Engineers, Under$Titers Laboratories, and the City's Connection Standards, as set forth in Appendix B, which is attached hereto. 1.6 The City shall have the sole authority to deternine which connection requirements set forth herein are ap'plicable to Customer's proposed installation. 2. PAYMENT FORNET ENERGY PW1201-01 Net Metering Agreement.DOC 1of6 3/28/Ot 1. CUSTOMER ELECTRIC GENERATING FACILITY 2.1 The City shall measure the net electricity produced or consumed by the Customsr during each billing period, in accordance with normal metering practices. 2.2 If the electricity supplied by the City exceeds the electricity generated by the Customer and fed back to the City during the billing period, or any portion thereof, then the Customer shall be billed for the net electricity supplied by the City together with the appropriate customer charge paid by other customers ofthe City in the same rate class. 2.3 Ifthe electricity generated by the Customer and distributed back to the City during the billing period, or any portion thereof, exceeds the electricity supplied by the City, then the Customer shall be: (a) billed for the appropriate customer service charge as other customers of the City in the same rate class; and (b) credited for the net excess kilowatt-hours generaled during the billing period, with this kilowatt-hour credit appearing on Customer's bill for the following billing period. 2-4 At the beginning of each calandar year, any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year shall be granted to the City without any compensation to the Customer. 2.5 Customer shall pay any amount owing for electric service provided by the City in accordance with applicable rates and policies. Nothing in this Section 2 shall limit City's rights under applicable Rate Schedules, Customer Service Policies, and General Provisions. 3. INTERRUPTION OR REDUCTION OF DELIVEzuES 3.1 The City may require Customer to interrupt or reduce deliveries as follows: (a) when necessary in order to conskuct, install, maintain, repair, replace, remove, investigate, or inspect any of its equipment or part of its system; or (b) if it determines that curtaiknent, interruption, or reduction is necessary because of ernergencies, force or compliance with prudent electrical practices. 3.2 Whenever possible, the City shall give Customer reasonable notice ofthe possibility that intemrption or reduction of deliveries may be required. 3.3 Notwithstanding any other provision ofthis Agreernent, if at any time the City determines that either: (a) the facility may endanger City personnel, or (b) the continued operation of Customer's facility may endanger the integrity of the City's electric system, The City shall have the right to disconnect Custoner's facility &om the City's electric systern. Customeds facility shall remain disconnected until such time as the City is satisfied that the condition(s) referenced in (a) or (b) ofthis section 3.3 have been corrected. 4. CONNECTION 4. 1 Customer shall deliver the excess energy to the City at the City's meter Pw1201-01 Net Metering Agreement.DOC 2of6 3/28/Ot 4.2 Customer shall pay for designing, installing, inspecting, operating, and maintainhg the electric generating facility in accordance with all applicable laws and regulations and shall comply with the City's Connection Standards set forth in Appendix B, which is attached hereto. 4.3 Customer shall pay for the City's standard watt-hour meter electrical hook-up, ifnot already present. 4.4 Customer shall not commence parallel operation of the generating facility until written approval ofthe connection facilities has been given by &e City. Such approval shall not be unreasonably withheld. The City shall have the right to have representatives present at the initial testing of Customels protective apparatus. 5. MAINTENANCE AND PERMTTS 5-l Cu-stomer shall: (a) maintain the electric generating facility and connection facilities in a safe and prudort manner and in conformance with all applicable laws and regulations including, but not limited to, the City's Connection Standards, Appendix B, and (b) obtain any govemmental authorizations and permits required for the consffuction and operation ofthe electric generating facility and connection facilities, including electrical permit(s). 5.2 Customer shall reimburse the City for any and all losses, damages, claims, penalties, or liability it incurs as a result ofcustomels failure to obtain or maintain any governmental authorizations and permits required for construction and operation of Customefs gererating facility or failure to maintain Customels facility as required in (a) of this Section 5. 7. INDEMNITY AND LIABILITY 7.1 Th€ Customer assumes the risk ofall damages, loss, cost and expense and agrees to indermiff the City, its successors and assigns, and its respective directors, officers, anployees and agents, fiom and against any and all claims, losses, costs, liabilities, PW1201-01 Net Metering Agreement.DOC 3of6 3/28107 6. ACCESS TO PREMISES 6.1 The City may enter Customer's premises or property to: (a) inspect, with prior notice, at all reasonable hours, Customels protective devices; (b) read meter; and ( c) disconnect at the City's meter or transformer, without notice, the connection facilities if, in the City's opinion, a hazardous condition exists and such immediate action is necessary to protecl persons, or the City's facilities, or property ofothers from damage or interference caused by Customels electric generating facilities, or lack of properly operating protective devices or inability to inspect the same- damages and expenses includiag, but not limited to, reasonable attomey fees, resulting from or in connection with performance ofthe agreernent or which may occur or be sustained by the City on account ofany claim or action brought against the City for any rcason including but not limited to loss to the electrical system ofthe Customer, caused by or arising out ofan electrical disturbance. 7.2 Such indernnity, protection, and hold harmless includes any demand, claim, suit or judgernent for damages, death or bodily injury to all persons, including oflicers, employees or agents, and subcontractors ofeither Party hereto including palment made under or in connection with any Worker's Compensation [,aw or under any plan for employees' disability and death benefits or property loss which may be caused or contributed to by the connection, maintenance, operation, use, presence, or rernoval of Customer's equipment. The only exception will be liability occasioned by the sole negligence or willful misconduct of the City or its employees acting within the scope of their employment and liability occasioned by a partial negligence of the City or its ernployees acting within the scope oftheir employment to the extent that such partial liability is fixed by a court of competent jurisdiction- 7.3 The provisions of Seclion 7 shall not be construed to relieve any insurer ofits obligations to pay any insurance claims in accordance with the provisions ofany insurance policy. 7.4 The City shall have no liability, o*nership interest, control or responsibility for the Customer's Electric Generating Facility or its connection with the City's electric system, regardless ofwhat the City knows or should know about the Customer's Electric Cenerating Faciliry or is comection. 7.5 Customer recognizes that it is waiving immunity under Washington Industrial Insurance law, Title 5l RCW, and firther agrees that this indemnification clause has been mutually negotiated. This indemnification shall extend to and include aftorney's fees and the costs of establishing the right of indemnification hereunder in favor of the City. 8. INSURANCE 8.1 Customer shall maintain, during the term of this Agreernent, Comprehensive Personal Liability Insurance with a combined single limit in an amount equivalent to the industry standard for this type of insurance. 8-2 Such insurance shall, by endorsement to the policy or policies, provide for lhirty (30) calendar days written notice to the City prior to cancellation, terrnination, attention, or material change of such insurance. 8.3 The City shatl have the right to inspect or obtain a copy of the original policy or policies of insurance. 9. INDEPENDENTCONTRACTORS 9.1 The Parties hereto are independent contractors and shall not be deemed to be partners, joint venturers, ernployees, fianchisees or fianchisers, servants or agents ofeach other for any purpose whatsoever under or in connection with this Agreernent. PW1201-01 Net Metering Agreement.DOC 4of6 3/28107 IO. GOVERNING LAW I 0. I This Agreement shall be interpreted, governed, and constructed under the laws of the State of Washington as if executed and to be performed wholly within the State of Washington. Venue ofany action arising hereunder or related to this agreeme-nt shall lie in Clallam County, Washington. I I. AMENDMENTS, MODIFICATIONS OR WAIVER I l.l Any amendments or modihcations to this Agreement shall be in writing and agreed to by both Parties. The failure ofany Party at any time or times to require performance ofany provision hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any Party of the breach ofany term or covenant contained in this Agreernent, whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver of any such breach or waiver of the breach of any other term or covenant unless such waiver is in writing- 12. APPENDICES Appendix A: Customer's Application for Net Metered Electrical Generation to City of Port Angeles. Appendix B: City's Connection Standards for Customer Electric Generating Facilities of 100 Kilowatts or Less. I3. NOTICES City of Port Angeles: Electrical Engineering Manager 321 East 5s Street P€-Bertt50 Port Angeles, WA 98362 Customer: Kimberly sager - FroAki^ Name 511 E. 11th St. Address Port Angeles, WA 98362 City. Srat€ & ZiD PW1201-01 Net Metering Agreement.DOC 5of6 3/28/Ot The Agreement includes the following appendices attached and incorporated by reference: All written notices shall be directed as follows: Customer notices to the City, pursuant to this Section 13, shall refer to the Service Address sa forth in Appendix A. 14. TERM OF AGREEMENT This Agreernent shall be in effect when sigrred by the Customer and the City and shall remain in effect thgreafter month to month unless tgrminated by either Party on thirty (30) days'prior written notice in accordance with Section 13. I5. SIGNATURES IN WITNESS WHEREOF, the Parties hereto have caused two originals of this Agreement to be executed by their duly authorized representatives- This Agreement is effective as of the last date set forth below: CUSTOMER:CITY OF PORT ANGELES: Trrle '1. Date 4 SHAILESH SHERE Assistant Director of Power Systems Trlle L2/7/2016 f)ale IL S PW1201{1 Net Metering Agreement.DOC 6of6 3/28/o1 Prilt name APPENDIX A Application for Net Metered Electrical Generation Thank you for your interest in establishing a renewable energy or fuel cell connection with City of Pon Angeles, Electric Utility. Please note generation systems must meet certain requirements to be considered. o The project must be not more than 100 kilowatts (kW) in size. o Generation must be fueled by solar, wind, hydropower, orbe a fuel cell. o Owner provides power conditioning, connection, and safety equipment. . Projects will be considered on a first come first served basis. Please complete Customer and Installer tnformation and the appropriate section for the O?e of generation proposed to be installed. In addition, include a one-line diagram and description of protection equipment. Please allow at least ten working days for processing your application. Questions may be directed to Electrical Engineering Manager, at telephone number (360) 4174702 Owner Name:Ki mberly Sager - {1al y. 6 Mailing Address: City, State & Zip:Port Angeles, WA 98362 Email Address: kimberlysager@yahoo.com Service Atldress: 5 Nq6 (If different than Mailing Address) Dayime Telephone . (360)477-3221 Electric Utility Account No.. 20841-95970 Expected System Operational Date 12t1t2016 Installer Name: Smart Energy Today Mailing Addre ss. 1001 Cooper Point Rd. SW ciry, State & Zip . Olympia, WA 98502 Email Address: Andrew.E@smartenergytoday.net Dayime Telephone . 360-339-6660 P /1201 02 lRevised 01/2016]1of 2 Customer Information 511 E. 11th St. Installer Information (If different from Customer Information) Photovoltaic Solar Svstem Information PV Module Manufacturer: ltek Energy PV Module Model Nunber. tr280-HE PV Power Rating per Module: 280 DC Watts InveTtsr Manufactursr: B,ue Frog Sotar Number of Modules: t6 t.4480 DC WattsTotal Outpu Ilverter Model Number: YcsooA-Mlw I[stallation Cost Information Estimated cost of installation: $17000.00 Drawinqs Attached:r'one line r'manufacturers literature t/design drawings 8,11201_02 lRevised 01/2016]2of2 Inverter's Power Rating (kW): 0.50 (AC continuous) Describe the protection equipment to be used and the physical location of the installation: Resi{rential Rooflop Solar Ptrr' installation all micro-inverters equipped with €pid shrddown and fufl system disconnect PHOTOVOLTAIC NOTES EENFEsroiEotNEc@osl) PArE ^E'oi ciouNo FAlrrs oEcE40slF)) EcnNo sE^Ns * N.c @ $ (E) L^rc s @0 r lEr L nePEcron coM BonG uMc(norc) 4,48 KW DC PV SYSTEI\4 SOLAR ROOF PROJECT KI[/BERLY A, SAGER 511 E. 11TH ST. PORT ANGELES, WA 98362 1360) 417-3221 ->b: Eraih,Scope of Work PROPOSEO NEW 4,48 KW (OC) ROOF I\,IOUN-TED PHOTOVOLTAIC (PV)SYSIEMWITH FOLTOWING EOUIPMENT: (16)ITEK ENERGY i'28O.HE SOLAR MOOUTE (6)BLUE FROG SOLAR YC500A - tVtW MICROINVERTER SPIDER.RAX BIACK WIOOIII/ COMPOSITE RACI(ING SYSTEM s I s I o Eg a CODE AUTHORITYI 2015 WASHINGTON STAIE EUILDING COOE (20'I5IBC) 2015 WASHINGTON SIAIE ENEROY CODE (2O15IECC) 2015 WASHINGTON STATE RESIDENTIAL COOE(2015 INTERNATIONAI RESIDENTIAL COOE WASHINGTON AI'TENDMENTS 2014 wAc51-51-2300 sEcrroN M2302) 2014 WAC 296,468 (2014 NEC) 2015 WASHINGTON STATE MECHANICAL CODE(2015 UMC ) 2015 WASHINGTON STATE PLUIVBING COOE (2015 UPC) 20I5WASH|NGTON STATE F|RE CODE (2015 rFC) 2 6 6_ u9 t -'_ E E *8 ,9iI "Eii:-d: E;iB e SHEET INDEX A.1 GENERAL NOT€S, SHEET INOEX, BUIIDING OATA. PROJECT OATA, SIIE PLAN A.2 PV LAYOUI PLAN A.3 PV ARRAYANO RACKING CONNECTION E.1 SINGLE TINE OIAGRAM E.2 WARNING NOTES E.3 EOUIPMENTS PV MODULE SPECIFICATION SHEET E.4 EOI]IPMENTS INVERTER SPECIFICATION SHEET S-1 EOUIPMENIST RACKING SYSTEM S.2 EQUIPME\T5 RACKINC SYSTEM CERTIFICAIE t E !.ij 9E6Et EEEHH Eaar A-1 -rN Ea ! 0 gl C z \ g s e E: EE g Is E Bd2 ;?3i{.E9i H:rg 6 "sc) s 77DY s2 SOLAR AC DISCONNECT & PRODUCTION METER LOCATION NET METER LOCATION N PV ARRAY g ' a= 5.' PV Panel Total: 16 Pieces X 280W = 4.48 kW DC Solar Panel: iTek Energy iT2B0 HE (See Sheet E-3) lnverter: Blue Frog Solar APS YC500A - MIW Micro lnverter (See Sheet E-4) Racking: SpiderRAX Black Widow Composite (See Sheet S-1)A-2 ! a1 3 f 9r al €e I o -laolb- E',t o>I;elc;li l= g a q aoo { Eo ?aTZ!9 A s fr* E E frE 2$tz Htrfi v'o -{ d_ o o_ d a o l, a --.t m -+tqlz Sheet Date Smartenergy todayI(,CONNECTION 111'1lt16 mRr ^xcEEs, wA s4362 PV SYSTEM MAX DC OUTPUT (OC StC ): PV SYSTEM MAXAC CAICIJTATION USING PIC PMAX PMAX PER MODULE = 25r.8W 257 3Wr 16: 't 12 KW 4.12 KW x 95.5%:3 94 XW SUPPTY POWER = 30A+2OOA . 230A I 200A x 12:240A 230AOK 3/a'coloull (3) 10AWG TEHN (8l.ck, R.d,whib) {l)8IHHN Bmd Condudo, (G@n) l0 AWG RATE gO'C . aOA TEIIPER TURE D!.RATTNG O loa'F =0.91AllP:2.0t4 r a r 1251t= lO,4A aoA r 0.91 .36.44 ' lO.4A OK IO IN9TALI IOAWGTHHN SOLAN MODULES SOTAR MOOUTES SOLAR CIRCUIT CONNECTEO INTO EXISTING 2OOA MAIN SERVICE PANEL WITH NEW2P3OA SOIAR BREAKER TO BE INSTATLED AT ENO oF suss 8AR U''CONOUII (3) t0 AWO IHHN (Bl.d, R.d,Whil.) (1)l IHHN 8o.d Coiducbl (Gr..n ) l0 AWG RATE 90'C = .0 TEMPER TURE OE-SATING @ 104'F = 0.91 AMP=2.0!4 r 4 r 125i= io.aA 404r0.91=30.44>10.44 oK TO nsr Ll r0AwoIHHN INSTAL! NEW 2P3OASOLAR BREAKER AT ENO OF AUSS BAR IN 2OOA MAIN SERVICE PANEL A MICRO INVERIER 6LUE FiOO SOLAR APSYC5OOA.MIW MAX OC INPIJTVOLIAGE =55V RECOiIMENOEO PV MOOIJLE POWER RAa{6E (SIC) .130W.310W MPPT RAIIGE .22v15v MAx Ii{PUTOCCURRENT =l2Ax2 RAIEo OUTPUT POWER .500 W RAIEO OUTPUT CURRENT '203AO 2a0v.c NOMINAL VOLTAGE/RANGE .2a0V / 21 1V.264V NOMINAL FREoUENCY/RANGE =600/ 50 3-60 5 MAT IJNIIES PER 2OA BRANCH CIRCUIT .7 PEAK INVER'ER EFT IC IENCY =05 '% SOLAR FUSEO AC otscoNNEct 304 3/4"CONOUtr (3) I0AWGTHHN (Bhcr, R.d,Whil.) (1)8IHHN aond coduclor (c6..) 10AWG RATE gO'C = a0 TEMPERATURE OE-RAi|NG O 104',F =0.91 AMP=2.064r 6r 125!6- 20.84 404t0.91=36.44t20.8/\ OX TO INSTALL IOAWG THHN M€iER SOCKEI FOR SOIAR PROOUCTION -40'C - +90'C 2OOA MAIN SERVICE Pv MODULEiITEK ENERGY IT280.HE ELECIRICAL DATA PER PANEL {STC) NOMINAL MAX POWER MAX POWER VOLTAGE (Vnpp) MAX POWER CURRENT (lmpp) OPEN CIRCUIT VOLTAGE (voc) SHORT CIRCUIT CURRENT {lsc) POWER DENSITY OPERATING TEMP NET METER 1 2 3 4 5 6 7 8 : ilffi 1 2 3 756 8 : 2 \ -Lo Ea 9g 0 g E c* ,?}T.Exli d.3 a E;!E E H?E E-1 B ! o o c E9 Notes: 1, The markinE shall be placed adjacent to the main service disconnect clearly vislble for the location where the lever is operated, 2. MarkinB formati white letter on a red background, Minimum of 3/8 inches letter height. All letters shall be capitalired, aerial or similar font,non-bold. 3. MateriaI Reflective, weather reslstant material suitable for the environment. Lrse [rt969 as standard for the weather rating. Durable adheiive metal materials meet this requirement t.-'nto'o BY: NEC 690.U otscoNNtcTs PV IOAO CE|TIRS coMErNEn 80xE5 2--ntQ O 8Y: NtC690.3! lG){3) APPLY IO; {t)ETPOSED RACTWAY5, CAELE IfiAYS & OTHTR WININ6 M ETHO0S {2)COVERS O n TNCLOSUiESOF PUTL BOXES & JUNCIION BOXIS {3)CONDUTT 8O0Y W/OPENTNG UIIUSEO !-.-.itO'D 8ri NEC590.rl (8) AC 0|SCONNECTS a--itq'D 8Y:NEC 705.r2 (0)ll) MAIN SESVICE PANEL s-'''ntQ O 8Y: lttC ,05.12 {Oll2b}{3) APPI.Y TO: PVSVSTIM AAtAXtn 6-.-REq'0 8YrNEC690.54 ACDISCONNECT pRoDucTror{ MtTti PV 5t5TtM EnEA(tn 7--itQ'0 BY: NEC 690.56 (Cl AND NEC 6qO 12 AC DISCONNECT tNvEitai outPUt aot{NldtoN DO nOT RS.OaATI tHB ovfncuinEl{T 0Evtcc PHOtOVOtIAt( 5Y5TEM tQutPPCo wrtH i^flo $luloowtr otusfo: ->biC;t-:ai \ Is E 6_ i s &9 ss E 6 I ;9iH<EPE c'*Be E;38 I E 2! i_ E-2 "w^e lr,16" lllatRtc sgocr( NAan0 DO NOI IOUCH TIRMINAls tEtM[ilaBon ioYH tHE Llilt ANO TOAO SIOES MAY BE E'{Ef,GIZtD tN iHl oPEt{ Po'lltoN PHOTOVO LIAIC POWER SOUR(E rBrS lLECrirc sarvtct t3 At30sEnva0 BY A 'HOTOVOLTAIC SYSTIM PHOTOVOIIA|a slnaM orsaot{tact AC 'IJRICIII MAX AC CUNROI' -Avot r Gl _v IOTUSCDI o E @ o 6z Smart la 1!! :,1 Il. f,3 ?r 3P !; iB; € : & I IR +:i:.-l:! i! €< tt 6! Es. a:3ti9 :gg;" €r 5' I & ! € I , t ( a ! t ! Date Eli esiii .lEIc-a et;:4' 3. aE I E III5iF E EID, !.1 I+EA. ;: le lrl I ! @ Sheel m ! (^) =ox mzmvo IIlfl U,otv =o(] Ct-m(/, o zo o I o 0 ?PORr rrtGEl-Es, W r€052 '11111116 a g eI .. E; $Et,l-?4. iE$\ ? i itiil Et !It' il ari i: teE iiiEi ri! ! tit rs;d g i"!Blli,2\ EIit Ar!t -a ti{E :r tr ii ii iE;i nt II sl3i tit! Eti l! lt El! l,I |;F EEl:r l.I l;L l;t aaa aq 5 3 +E R * - V-E E PZ?:iH;--YZ<+ E tg;g z;>i2 ;aaieSiiZZ:- Efi +oOF = rTt .)mnn eO;-< 5..,-;m A,nX^ H>n =oU t--m U1 a a! 6 I aI a 2o energy tod.y Il 9o .F il g tro -o ro th 9.o Itgtz:: !u !i E s3: titS>airiiiisER ;g a ISEIaFIo iE': 3i EQ 0 t { :E!gg=3:5E1+!sia-93 iait;E:il =E:eiE63uii Ei!"ln iii;ici: 0gs33Eg6;;=E:iiiE!?. q9i;-r> ; ifiEi! rei;fi-,;;E > ;-i?eii ,=6r!iBE::isi:'+++;:n;.6669 G;{1:1i Cilqqq ' * 8EB! d.jd !:q2 ii :;= 3 E E I.-i e o e i i I .!i I : r " i #t:;ni E6:i ?: l;l 9r": R ;i i' { + ii 3 E!" i oii a z !t!l :5 !riliI i( Et xd,r!!!1!sr"e :6i;3;oE :8 E9 t !i:399"+?ii*-diiio!liippp135!.-Y668::d",4 :::iE::q644>@9 !:rl'^!q' ie"ci X 'u.'€3fg **ie ?_<5-. I .:. D!v, t@ a? 91 z_- a-6 :x zc_ 3_o3t iE:: t6 3@ :q 2-;g d 9. 3 I9i5*-Ag { 6 R ! It a g o oo oi-p m ! Smartcnergy today EOUIPMENIS: INVERTER SPEC|F|CATIOn SH€ET 11t14116 l'fi a T t g co oro t o 3 !o o(,oo 3 =3 9. o o o 0, 0, oo o(,oo I3 = ;: e F i €!! € F < E3g i i E ; iE E : E i 5-: i z 7 E IEiE4iA 3 9. TOP CLAMP SPIDER-RAX BLACK WIDOW COMPOSITE RACKTNG SYSTEM DETATL (NTS) I t\, ! o qr oc -SN Ea 9 o E .g 4 6 d t v9 E ; s- s-1 OE -! ^rooc ,* usr I \ \.OO\ aTuo.LEll natL-L983 INTEORATEO GIRClUNOINB CUI INETALLATIClN TIME EY 50" 5I t.I() /\ITAt:HMENT (lPYI'JN ,r\V./\ILl\OL' BENEFTTS oF 1', l \19tr\{ ..^r.o ,o. u. ro rlora INSTALLATION O' ,1,1, ..^-o.^-r!. r r l-.2- BOTTOM CLAMP INTEGRATED ILSCO GROUND LUG . COI\,IPATIBLE WITH #4. #6, #8 & #10 BARE ANO STRANDED COPPER WIRE S HOOK BASE PLATE ,a RAIL *tt..{ ! t93I.EsI "', U -- E;: E "* s,^Sf iEbl-.-$*E li!3 Se i'Fc 9t>altr{ R- i -*', Ftt! Ir- !t s !i$i r !i 3 3.*:s :-6 + E*1S t3 "'F SSsisira:trr'ba iir :EE I:= E6d EE 66 <z aFiE e IiF{E:9iiEtsL I ! -p IIEEA I EE:; rdE9E : -2, E 1il eri !€t I :E i di ii e l-, ? "rAfv/ (t i, = 2s YS I .g € E.$1Et 5 l;;. 6E59 ,t rI 9 agtt Eitl; iI Fi !i :i ; ' El a ts (e,) a 93 E^ rE ?; 88 Ei, Er =i E, <!z-. 6a?1 Dlawng oateSheel Smartenergy tod.yIa I N) SYSTEM CERT1FIC,ATE 11t11/16 o(D Ft Fl. -a.)PF}(D or{r oo E D a6 za: a=- ;.= ? :e== a (o) :a ! APPENDIX B CONNECTION STANDARDS for CUSTOMER ELECTRIC GENERATING FACILITIES of not more than 100 KILOWATTS A. General This Appendix sets forth the requirements and crnditions for interconnected non-utility- owned electric generation where such generation may be connected for parallel operation with the service of City of Port Angeles Electric Utility (the 'City'). For purposes of this Appendix, the interconnecting entity shall be designated 'Customel" . B. ConnectionRequirements 1 . Customer shall conform to all applicable National Electric Code (NEC) requirements [NEC Articles 690 and 705] and building codes, and shall obtain electrical permit(s) for the equipment installation. 2. Customer shall have a dedicated lockable disconnect device between sources of altemating-cunent, (i.e. between inverter(s) or other power conditioning unit(s)) and the City's distribution system. The lockable disconnect must be accessible to the City at all times and only the Ci!y's lock may be used on it. 3. Customeds over cunent device at the service panel shall be marked to indicate power source and connection to the Ciqy's distribution system. 4. Custome/s power production control system shall comply with NEC Articles 690 and 705, Underwriters Laboratories (UL) Standard 1741, Second Edition, and the lnstitute of Electrical and Electronics Engineers (IEEE) Standard 1547 minimum specifications, and standards for parallel operation with the City. ln particular, the: a. Power output control system shall automatically disconnect from the City's source upon loss of the Ci!y's voltage and not reconnect until the City's vottage has been restored by the City. b. Power output control system shall automatically disconnect from the Ci$s source if Custome/s voltage fluctuates beyond plus or minus',l0 percent, per UL 1741. c. Power output control system shall automatically disconnect from the City's if Custome/s and the City's frequency fluctuates plus or minus 2 cycles per second (Hertz). d. lnverter output distortion shall meet IEEE Standard 519. C. Safety All safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA) Standard 29, CFR 1910.269, the NEC, WAC rules, the Washington lndustrial Safety and Health Administration (WISHA) Standard, the City Service Requirements, and equipment manufacture/s safety and operating manuals. Net Metering-Apndx s.doc{2/19 /L3l