HomeMy WebLinkAbout001187 Amendment 1 001187 ROUTE SLIP URGENT of Pow Change Orders # 1 & 2 — 2017 Pavement Repair — -�� SUBJECT: Various Locations Ar-�� ORGINATOR: Jonathan Boehme DATE: 3/1/17 N,p ` TO: ACTION REQUESTED: INITIAL: DATE: 1. Lucy Hanley Review & Distribute 311 I 2. Craig Fulton Review & Confirm for Signature ! °i 3. Tri Confirm Funding3 ! 4. Dan McKeen Sign Change Orders 3 i Change Title: Change Order # 1 — Street Pavement Repair at E Street Change Order # 2 — 10" Street and Park Ave. Pavement Repair Justification: Additional pavement damage has been identified on 8`h Street near E Street, 10`h Street between N and M, and Park Avenue near Peabody Street. Adding this work to the current contract will result in project savings compared to going back out with a separate small contract for any of the individual locations. Change Scope: Contractor will perform pavement repair as outlined in Contract for the additional locations: Change Order #1 — Work includes approximately 2,100 square feet of arterial pavement repair as marked out by the engineer on 8' Street. A lump sum amount of$14,000 has been agreed upon. Change Order #2 — Work includes approximately 11,702 square feet of arterial pavement repair as marked out by the engineer on 10`' Street and Park Avenue for a lump sum of$86,000. CITY COUNCIL Approved February 28, 2017 — memo attached BUDGET ACCOUNTS 102-7230-542-4810 RETURN BY March 01, 2017 Return to Lucy Hanley for Processing is � City of Port Angeles Public Works Department lir , 0? 321 East 5th Street/Port Angeles, WA 98362 h 1 NG Contract No.&Title CONTRACTORDER CONC-2017-03 Pavement Repair,Various Locations Project Manager: Jonathan Boehme Date Change Prepared 02/14/2017 Order No. 01 Prime: Lakeside Change Title: 8th Street Pavement Repair at E Street Change Scope/Justification: Additional pavement damage has been discovered on 8th Street near E Street. Contractor will perform pavement repair as outlined in contract at this additional location. This work includes approximately 2100 square feet of arterial pavement repair as marked out by the engineer. One lane must remain open at all time, City will provide traffic control. A lump sum amount of$14,000 has been agreed upon. • CONTRACT AMOUNT SCHEDULE Original Contract $162,740.00 Original Substantial Completion 10 working days Previous Change Orders 0 Previous Time Extension by 0 Change Order(days)' This Change Order Amount(including $14,000.00 Suspension of Work(days) 0 applicable taxes) New Contract Amount $176,740.00 Change Order#1 Time 2 Extension(days) New Substantial Completion 12 working days CONTRACTOR: CITY OF PORT ANGELES Signature Signature l4- Name&Title Name&Title Dan McKeen—City Manager m;Kf- --lbanny.% J Date: 2.14(. 17 Date: 31 f 1 11 `7 This Change Proposal shall represent full and complete compensation and final settlement of all Claims for all(1)time;(2) direct,indirect,and overhead costs;(3)profit;and(4)costs or damages associated with delay,inconvenience,disruption of schedule,impact,ripple effect,loss of efficiency or productivity,acceleration of work,lost profits,and/or any other costs or damages related to any work either covered or affected by the Change Proposal,or related to the events giving rise to the Change Proposal. 2017 Pavement Repair,Various Locations 1 Change Order No.01 tl r.. r .s • + r " y� ✓, 'Y7 T �� }� ixr r w ate• �� ir � o y , s - s e� }( .y _ •, 1. �P 'r ..� rr 'r y �. r mfr rr..t C' -P [�.+ � ." �-. �Y�•t'y � ' {� b s�� � � v' tl y �� _ 7 - 7 1 , y 1� r r i •1• ( .'P l %t � •� ! r ,•� �j rel 1 '' r .• , r ,!,, ,� �, y ,� r" '► �"r�'l p f° r � y ��> )i °% � � ��ri� tf. �'afi p. � ,�,�,�1. �,. s, .Y �- ) �s' ) P " , ,. '1t .�r� "f• �' is ,f� �� t YS io 11A N, J4 r P A/ - ra 14' j►,�.'` City of Port Angeles J� 7illl� Public Works Department i 321 East 5th Street/Port Angeles, WA 98362 sh NGS` Contract No.&Title CONC-2017-03 Pavement Repair,Various locations Project Manager: Jonathan Boehme Date mange Prime: Lakeside Prepared 02/27/2017 order No. 02 Change Title: 10`h Street and Park Ave Pavement Repair Change Scope/Justification: Repair additional pavement damage on 10th Street between N and M and Park Ave near Peabody Street. Contractor will perform pavement repair as outlined in contract at these additional locations. This work includes approximately 11,702 square feet of arterial pavement repair as marked out by the engineer. The City will provide traffic control. A lump sum amount of$86,000 has been agreed upon. FContract CONTRACT AMOUNT SCHEDULE7PreviousCChange $162,740.00 Original Substantial Completion 10 working days Orders $14,000.00 Previous Time Extension by 2 Change Order(days)* This Change Order Amount(including $86,000.00 Suspension of Work(days) 0 applicable taxes) New Contract Amount $262,740.00 Change Order#1 Time 7 Extension(days) New Substantial Completion 19 working days CONTRACTOR: CITY OF PORT ANGELES SignatureSi a Name&Title Name&Title AJR-XJCA�(Vim,j 0,?Af XtE, Dan McKeen—City Manager Date: 2-147.117 Date: 3 ! t ! —7 This Change Proposal shall represent full and complete compensation and final settlement of all Claims for all(1)time;(2) direct,indirect,and overhead costs;(3)profit;and(4)costs or damages associated with delay,inconvenience,disruption of schedule,impact,ripple effect,loss of efficiency or productivity,acceleration of work,lost profits,and/or any other costs or damages related to any work either covered or affected by the Change Proposal,or related to the events giving rise to the Change Proposal. 2017 Pavement Repair,Various Locations 1 Change Order No.02