Loading...
HomeMy WebLinkAboutMinutes 03/14/2017 Utility Advisory Committee Jack Pittis Conference Rooms Port Angeles, WA 98362 March 14, 2017 3:00 pm. L Call To Order Vice Chair Lee Whethani called the meeting to order at 3:01 p.m. 11. Roll Call UAC Assigned Councilmernbers Present: Sissi Bruch, and Vice Chair Lee Whethani Councilmernbers Absent: Brad Collins, Mayor Patrick Downie, Dan Gase, Cherie Kidd, and Michael Merideth UAC Members Present: Rob Fetter UAC Members Absent: Chair Lynn Bedford and Laura Dodd Staff Present: Craig Fulton, Gregg King, Kathryn Neal, William Bloor, Shailesh Shere,Jonathan Boehrne, Michael Szatlocky, Jeff Bender, and Michelle [late Others Present: William,Atkinson Ill. Approval Of Minutes Vice Chair Lee Whetharn requested a motion for approval of the January 10, 2017 minutes. Sissi Bruch moved to approve the minutes and Vice Chair Lee Whetharn seconded the motion, which carried unanimously. IV Late Items: Sissi Bruch requested to add a point of discussion on PAPA (Peninsula Area Public Access) contract questions. Moved to V. Discussion Item A. V Discussion Items: A. PAPA Contract—Peninsula Area Public Access Sissi Bruch requested information on the PAPA contract. Craig Fulton, Director, Public Works & Utilities explained the PAPA contract is written so it, lines up with the termination of the WAVE Contract which ends May 2017. If negotiations are not settled, the contract can be extended. Sissi Bruch asked if there was a draft WAVE Franchise Contract available to review as City Council has to approve this. William Bloor, City Attorney stated many items were still under discussion. Cram Fulton or William Bloor will provide an update to City Council in an executive session. B. UAC Candidate Interview and Discussion Craig Fulton, Director, Public Works& Utilities, introduced Bill Atkinson who applied for the vacancy on the UAC. Craig Fulton and Gregg King, Power Resource Manager had discussions with Bill on the UAC position and felt he would be a good fit, [.UAC Members reviewed the UAC Candidate application, interviewed and their welcomed Bill Atkinson to the(.:Utility Advisory Committee. Sissi Bruch moved to recommend to City Council to appoint the applicant to serve can the Utility Advisory Committee to represent the community. Rob Feller seconded the motion, which carried unanimously (3-0) C. Second Conceptual Design Briefing for Pump Station No.3 Replacement, Traject WWO308 Craig Fulton, Director, Public Works&Utilities provided an introduction to the second conceptual design briefing. '['his was in response to questions and requests for additional information by UAC members at the January 2017 informational briefing on the Pump Station No. 3 Replacement Project WW0308. Kathryn deal, P. I.U., Engineering Manager, Michael Sratloc y, P.E., Civil Engineer, and Jeff Bender, P.E., Civil Engineer provided a ppt presentation detailing their analysis of the issues and questions raised by UAC members in a second design briefing. Focus was on tine stormwater inflow and infiltration (1&1) into the existing wastewater system, including the ceases of separating the stormwater and building new infrastructure to convey and treat it,versus the costs of continuing to process the stormwater through the wastewater plant. The presentation explained the team's design analysis of the stormwater 1&1,outlined the costs of alternative approaches, and described measures the City is currently implementing to control l&1. The design team sought concurrence from the UAC for the conceptual design strategy for Pump Station No. 3 Replacement, Project. WW0308. The first phase of construction is scheduled for 2018, after the design is finalized and contract documents are prepared. Discussion followed with input from UAC Members to address additional concerns and questions. UAC members were complimentary about the presentation and would like a copy emailed to them. Members requested an evaluation of the 1&1 contribution from the Flwha sewer system, and the costs of responding to wastewater overflows, The UAC stressed the importance of ensuring that the wastewater system proposed will accommodate future growth. Craig Fulton will respond to the issue brought up regarding in-house design vs consulting engineers on whether the design concept should go to council when it exceeds $25,000. The UAC endorsed the conceptual design strategy for Pump Station No. 3 Replacement, Project WW0308. The next step is to move forward with final design. Staff will brief the UAC before advertising the contract fiat•construction regarding any major changes or cost impacts. Craig Fulton will schedule a public meeting for community input and awareness. D. Ediz Hook Sewer Corrosion Repair Project WW01 14,Phase 1—Design Briefing Jeff Bender, P.E,., Civil Engineer,provided a handout detailing the design briefing of the Ediz Hook Sewer Corrosion Repair Project and discussed the major points of the design. The project aims to reduce hydrogen sulfide gas in the concrete gravity sewer pipeline at Ediz Hook. Phase I of the project involves installation of a vent stack in a manhole located near the Nippon Mill site. Phase 2 of the project involves installation of a hydrogen sulfide treatment facility adjacent to wastewater Pump Station 3, located near the base of Hill St. Phase 2 construction is planned to coincide with replacement of Pump Station 3 in about 2021. Staff expects to request City Council approval of the construction contract for Phase I in April or May 2017, with the Engineer's Estimate for Phase I to be less than$30,000. Discussion followed. Sissi Bruch moved to inform City Council that the UAC has concurred with the design strategy for Ediz Hook Sewer Repair,Project WW0014,and recommends that City Council approve the award of a construction contract in 2017 that fits within the approved project budget. Vice Chair Lee Whetham seconded the motion,which carried unanimously (3-0). V1. Information Only Items: A. Volunteer Appreciation Ceremony Gregg King reminded members of the announcement sent out for the Volunteer Appreciation Ceremony at the Tuesday, April 11, '2017' City Council Meeting. Citizen members of the UAC are volunteers and welcome to attend. V11. Next Meeting Date: April 11,2017 VIII. Adjournment: 5:00 p.m. F .Chair Lynn bedford Michelle Hale,Administrative Specialist It