Loading...
HomeMy WebLinkAbout1710 W 4th St - Engineering S ~-.:~ CITY OF PORT ANGELES PUBLIC WORKS - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, W A 98362 PUBLIC WORKS CONSTRUCTION Issued: 3/03/99 TF Permit No: 931 & R/W PERMIT Cond: Work Order: 0 OWNER/APPLICANT------------------------PROPERTY LOCATION------------------------ DON WILEY 1710 4TH ST W 1710 W. 4TH Lot: 3 exc 8 x 31' in SE Cor PORT ANGELES,WA98363 Block: 141 Long Legal: 360/452-2189 Sub: TPA PROJECT INFO----------------------______________________________________________ Work is N/A traveled road Value Work: $0.00 Plans Required: N/A Contractor: OWNER Start: Finish: Performance Bond Required: N/A Proof Insurance: Amount: Work to Perform: INSTALL Watermain Sanitary Sewer / / / / $0.00 Storm Drain Underground Tele/Ele * Misc dwy NOTES--------------------_______________________________________________ PROJECT PROJECT FEES ASSESSMENT-------------------______________________________________ R/W Excav: Sidewalk: Curb/Gutter: Driveway: * Dwy Culvert: Street Cut: Other R/W: Fire Hydrant: Res Water Serv: 5/8" 3/4" 1" Comm Water Serv: 1" 1 1/2" 2" Oth Water Serv: Water Sys Dev: Receipt No: 4436 Inspection Fee: R/W SANIT AR Y $0.00 $0.00 San Sewer SFR: San Sewer MFR: Add Unit: 0 Other San Sewer: Sew Tap Wye/Man Tap: Sew Cap/ W/M Removal: Alter/Repair Sewer: Storm Drain Tap: Catch Basin~per ea: Sewer System Dev: Milwaukee Dr. Sew Assess: R/W Use Perm: D.R.A. : Admin Costs (D.R.A): Misc: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ------------------------------ ------------------------------ Signature of Contractor or Authorized Agent Date $0.00 TOTAL FEE: AMT PAID: $125.00 $125.00 BAL DUE: ----------------------- $0.00 $0.00 WATER DWY STORM DRA OTHER Separate Permits are required for electrical work. utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days. if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating co uction or the performance of construction. - ------ --~- ------------ --~-------~-----~-----"--~------_._----~---------. CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . . . . . INSPECTION REPORT. . . . . . REQUEST: Date / t) II .;,/ ov Time Received by (phone, person) Location of Work to be inspected Name of person requesting inspection Address of person requesting inspection Type of Inspection (circle appropriate one): Sewer Foundation Framing /7/ t) Iv <:/-0.... /) . --r /V '/)1- ttJ.-c~1 - / /Lt~ Phone No. Permit No. 9i$/ Sewer Excav. Other a~ Inspected: Date Remarks: Time 1-11 A711,?7UZJ /7" t:l~hl//~ II By ............ '-.) "- " ~ ~ \)! Chimney Plumbing Final INSPECTION NOTES: I' 'j ~h~~ooa T~ h ch-2- Z-P7rO S --;l~~?/c'~~L~ RESTORATION REQUIRED. . . . .. YES NO SURFACE RESTORATION: SURFACE TYPE: 0 Unimproved DGravel 0 Asphalt 0 PCC o Other [] Repaired by City [] Repaired by Permittee o No Damage Found Work Order # o COMPLETE o INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (DATE) BUILDING PERMIT INSPECfION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLA WFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION 1YPE DATE ACCEPnD COMMF1'ITS YES NO FOUNDATION: FOOTINGS WAllS FOUNDATION DRAINAGE FLECTRICAL (UGlIT DEn) ROUGH-IN I PLUMBING UNDER FLOOR I SlAB ROUGH-IN WATER llNE BACK FLOW I WATER AIR SEAL WAlLS I CEIliNG FRAMING JOISTS I GIRDERS SHEAR WALL WAlLS I ROOF I CEIliNG DRYWALL T-BAR INSULATION SlAB WALL I FLOOR I CEIliNG I MECHANICAL CHIMNEY WooDSTOVE I PEllET DUCTS PW urn.ITIES I SITE WORK (Engineering Division) WA TERUNE I METER SEWER CONNECTION SANITARY STORM SITE DRAINAGE I EROSION CONTROL PARKING OlllER FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE RESIDENfIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO EI.ECTIUCAL - UGlIT DEPT. 417-4746 EI.ECTIUCAL UGlIT DEPT CONSTImCTION R.W. I PWI CONSTRUCTION - R.W. ENGINEERING 417-4807 PW I ENGINEERING FIRE (MULTI-FAM. ONLY) 417-4654 FIRE DEPT. BUlillING 417-4815 BUlill1NG GENERAL COMMENTS: PW~II02.I~ (4/96)