Loading...
HomeMy WebLinkAbout1300 E 8th St - Engineering PUBILIC WORKS & R/W PERMIT OWNERlAPPLlCANTIJ Attached Notes CITY OF PORT ANGELES (GAil) 321 E 5TH ST Port Angeles, WA 98362 000/604-7408 PROJECT INFO Work is Plans Required Contractor. COl VICO Performance Bond Required Proof of Insurance Work to Perform. Start Date Amount: C Install r-J Repair r-I Watermain Issued. 5/04/2000 Permit No Work Order. PROPERTY LOCA TIO~ 1300 8TH ST E lot: Subdivision Parcel No Cresthaven / 1058 o Block: Value Work: $000 CI long legal 1 1 Finish Date 253/856-8060 1 1 $000 D Sanitary Sewer D Storm Drain D Underground Tele/Elec Misc PROJECT NOTES_n __ UNDERGROUND ELECTRICAL INSTALLATION 8TH ST BOTH SIDES OF ST ENNIS SO OF 8TH W SIDE, BLVD E. OF ENNIS NO SIDE,ALDER ST W SIDE 6TH ST BOTH SIDES ENNIS NO OF 6TH ST 5TH ST SO SIDE LIBERTY ST E. SIDE Contract for City of Port Angeles UG electrical work in Cresthaven Sub FEES ASSESSMENT__ ~..~--------,--~ 1 ) R/W Excav. 2.) Sidewalk: 3 ) Curb/Gutter. 4 ) Driveway. 5) Dwy Culvert: 6 ) Street Cut: 7 ) Other R/w. 8 ) Fire Hydrant: 9 ) Res Water Servo 10 ) Comm Water Servo 11 ) Other Water Service 12 )Water System Dev. 13 ) San Sewer SFR. 14) San Sewer MFR. add unit: 0 -.-'--.----- -------- Receipt No Inspection Fee $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 15 ) Other San Sewer. $0 00 16) Sew Tap Wye/Man Tap $000 17 ) Sew Capl W/M Removal: $0 00 18 ) Alter Repair Sewer. $0 00 19 ) Storm Drain. $0 00 20 ) Catch Basin per ea. $0 00 21 ) Sewer System Dev. $000 22.) Milwaukee Dr Sew Ass $000 23 ) R/W Use Perm: $0 00 24 ) Admin Cost (D R.A) $0 00 25 ) D R.A. $0 00 26 ) Misc: NO FEE $0 00 TOTAL FEE. $0.00 Amount Paid. $0 00 Balance Due. $0.00 CRESTHAVEN PROJECT LOCATE NUMBER. 20002203315 20002203341 20002203327 20002203347 20002203331 20002203352 20002203335 20002203356 ~ PROPOSED TRENCH AREA TO BE LOCATED ~ ~ ~ -.<-.. -I {f ~ :~ ij 1; \j l}' ~ J> - .4 \j [ (0---' - - ~ fg~- D } v -t :~~ ~ ~ ~ J ~ ~ ~ -- 6