HomeMy WebLinkAbout1300 E 8th St - Engineering
PUBILIC WORKS & R/W PERMIT
OWNERlAPPLlCANTIJ Attached Notes
CITY OF PORT ANGELES (GAil)
321 E 5TH ST
Port Angeles, WA 98362
000/604-7408
PROJECT INFO
Work is
Plans Required
Contractor. COl VICO
Performance Bond Required
Proof of Insurance
Work to Perform.
Start Date
Amount:
C Install
r-J Repair
r-I Watermain
Issued.
5/04/2000
Permit No
Work Order.
PROPERTY LOCA TIO~
1300 8TH ST E
lot:
Subdivision
Parcel No
Cresthaven
/
1058
o
Block:
Value Work:
$000
CI long legal
1 1
Finish Date
253/856-8060
1 1
$000
D Sanitary Sewer
D Storm Drain
D Underground Tele/Elec
Misc
PROJECT NOTES_n __
UNDERGROUND ELECTRICAL INSTALLATION 8TH ST BOTH SIDES OF
ST ENNIS SO OF 8TH W SIDE, BLVD E. OF ENNIS NO
SIDE,ALDER ST W SIDE 6TH ST BOTH SIDES ENNIS NO
OF 6TH ST 5TH ST SO SIDE LIBERTY ST E. SIDE
Contract for City of Port Angeles UG electrical work in Cresthaven Sub
FEES ASSESSMENT__
~..~--------,--~
1 ) R/W Excav.
2.) Sidewalk:
3 ) Curb/Gutter.
4 ) Driveway.
5) Dwy Culvert:
6 ) Street Cut:
7 ) Other R/w.
8 ) Fire Hydrant:
9 ) Res Water Servo
10 ) Comm Water Servo
11 ) Other Water Service
12 )Water System Dev.
13 ) San Sewer SFR.
14) San Sewer MFR.
add unit: 0
-.-'--.----- --------
Receipt No
Inspection Fee
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
15 ) Other San Sewer. $0 00
16) Sew Tap Wye/Man Tap $000
17 ) Sew Capl W/M Removal: $0 00
18 ) Alter Repair Sewer. $0 00
19 ) Storm Drain. $0 00
20 ) Catch Basin per ea. $0 00
21 ) Sewer System Dev. $000
22.) Milwaukee Dr Sew Ass $000
23 ) R/W Use Perm: $0 00
24 ) Admin Cost (D R.A) $0 00
25 ) D R.A. $0 00
26 ) Misc: NO FEE $0 00
TOTAL FEE. $0.00
Amount Paid. $0 00
Balance Due.
$0.00
CRESTHAVEN PROJECT
LOCATE NUMBER.
20002203315 20002203341
20002203327 20002203347
20002203331 20002203352
20002203335 20002203356
~ PROPOSED TRENCH AREA
TO BE LOCATED
~
~ ~
-.<-.. -I {f
~ :~ ij
1; \j l}'
~ J> -
.4 \j
[ (0---'
- - ~
fg~-
D } v
-t :~~
~
~
~
J
~
~
~
--
6