Loading...
HomeMy WebLinkAbout2930 W 18th St - Engineering PUBILlC WORKS & R/W PERMIT OWNER/APPLICANT 0 Attached Notes City of PA Issued' 12101/2000 Permit No Work Order' 1128 o Port Angeles, WA 98360 000/600-0000 PROJECT INFO Work is: Plans Required Start Date. Contractor EXCEL UTILITIES CONSTRUCTION Performance Bond Required Amount: Proof of Insurance. Work to Perform: PROPERTY LOCATION 2930 18TH ST W Lot: sub lot Subdivision. Parcel No' Block: 129 o Long Legal Value Work: $000 1 1 Finish Date: 360/452-1110 1 1 $000 o Install o Repair o Watermain o Sanitary Sewer o Storm Drain [6] Underground Tele/Elec o Misc PROJECT NOTES push under w 18th 5t open cut if necessary all restoration by contractor FEES ASSESSMENT 1 ) RIW Excav' $45 00 15 ) Other San Sewer' $000 2.) Sidewalk: $000 16) Sew Tap Wye/Man Tap $000 3 ) Curb/Gutter' $000 17 ) Sew Capl W/M Removal: $000 4 ) Driveway' $000 18 ) Alter Repair Sewer' $000 5 ) Dwy Culvert: $000 19 ) Storm Drain $000 6 ) Street Cut: $000 20 ) Catch Basin per ea: $000 7 ) Other RIW' $000 21 ) Sewer System Dev' $000 8 ) Fire Hydrant: $000 22.) Milwaukee Dr Sew Ass. $000 9 ) Res Water Servo $000 23 ) RIW Use Perm: $000 10 ) Comm Water Servo $000 24 ) Admin Cost (0 RA) $000 11 ) Other Water Service $000 25 ) 0 RA. $000 12.)Water System Dev' $000 26) Mise: $000 13 ) San Sewer SFR $000 TOTAL FEE. $45.00 14) San Sewer MFR $000 add unit: 0 Amount Paid. $45 00 Receipt No 6495 Inspection Fee. $000 Balance Due. $0.00