Loading...
HomeMy WebLinkAbout001281 Original Contract CLERK'S F IGINAL COPY City of Part Angeles Public Works&Utilities Dept. 321 E.5z"Street SERVICE CONTRACT Port Angeles WA 98362 City of Port Angeles Record #001281 Contract Title: 2017 Industrial Waterline Inspgction Service Number: SVC-2017-46 THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES, WASHINGTON ("City") AND POWER TECH INC, WASHINGTON ("Contractor"). 1. WORK BY CONTRACTOR The Contractor shall perform the work as described in Attachment"A"(Attachment"A"may include Contractor's Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents) which is attached hereto and by this reference is incorporated herein. 2.TERM OF CONTRACT All work under this Contract is to be completed as indicated (check one): F-1 All work under this Contract is to be completed by this date: Fq All work under this Contract is to be completed 15 days from the Notice to Proceed. No work is to be performed prior to written Notice to Proceed by the City. (See attachments A&C for specific schedule for work). 0 The performance period under this Contract commences 7 calendar days after notice to proceed and ends (90 days thereafter or after contract award). 3. PAYMENT A. The City shall pay the Contractor for the work performed under this contract(check one): F-1 Force Account-Time and material, not to exceed: $ Force Account-Time and actual expenses incurred, not to exceed: $10,000.00 Force Account- Unit prices set forth in the Contractor's bid or quote, not to exceed: $_ Ej Firm Fixed Price set forth in Contractor bid or quote in the amount of: $_ The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance with and as described in the Attachment "A". The Contractor shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof; except those indicated to be furnished by the City of Port Angeles in Attachment"A". B. The Contractor shall maintain time and expense records, which may be requested by the City. The Contractor shall submit invoices to the City for payment for work performed. All invoices must reference the City's service number. Invoices shall be in a format acceptable to the City. The Contractor will invoice the City per the rates in Attachment"D". C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt of a properly completed invoice. D. All records and accounts pertaining to this Contract are to be kept available for inspections by representatives of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon request. Service#SVC-2017-26 Page I Rev. 11/28/2016 E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the Contract, the Contractor shall correct or modify the required work to comply with the requirements of this Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the Contract Documents. 4. RESPONSIBILITY OF CONTRACTOR A. Safety, Contractor shall take all necessary precautlons for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and local regulations, ordinances and codes. Contractor shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public and shall post danger signs warning against known or unusual hazards. B. Warranty, Contractor shall be liable for any costs, losses, expenses or damages including consequential damages suffered by the City resulting from defects in the Contractor's work including, but not limited to, cost of materials and labor expended by the City in making emergency repairs and cost of engineering, inspection and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made against the City as a result of any defective work and the Contractor shall defend any such claims at its own expense. Where materials or procedures are not specified in the Contract Document, the City will rely on the professional judgment of the Contractor to make appropriate selections. C. Damages, Contractor shall be liable for any costs, losses, expenses, or damages including consequential damages suffered by the City resulting from defects in the Contractor work including, but not limited to, cost of materials and labor expended by the City in making emergency repairs and cost of engineering, inspection, and supervision by the City, The Contractor shall hold the City harmless from any and all claims that may be made against the City as a result of any defective work and the Contractor shall defend any such claims at its own expense. When materials or procedures are not specified in the Contract Document,the City will rely on the professional judgment of the Contractor to make appropriate selections. D. Nondiscrimination/Affirmative Action. Contractor agrees not to discriminate against any employee or applicant for employment or any other persons in the performance of this Contract because of race, creed, color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local law or ordinance, except for a bona fide occupational qualification. Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by Contractor setting forth the provisions of the nondiscrimination clause. E, Employment. Any and all employees of the Contractor, while engaged in the performance of any work or services required by the Contractor under this Contract, shall be considered employees of the Contractor only and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of said employees, while so engaged, and all claims made by a third party as consequence of any negligent act or omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or rendered herein, shall not be the obligation of the City. S. COMPLIANCE WITH LAWS The Contractor shall comply with all federal, state and local laws and regulations applicable to the work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of a material provision of this Contract and shall be grounds for cancellation, termination or suspension of the Contract by the City, in whole or in part, and may result in ineligibility for further work for the City. 6.TERMINATION OF CONTRACT A. This Contract shall terminate upon satisfactory completion of the work described in Attachment "A"and final payment by the City. B. The City may terminate the Contract and take possession of the premises and ail materials thereon and finish the work by whatever methods it may deem expedient, by giving 10 days written notice to the Contractor, upon the occurrence of any one or more of the events hereafter specified. I. The Contractor makes a general assignment for the benefit of its creditors. Service#SVC-2017-26 Page 2 Rcv, 11/28/2016 9 1()Z/ Z/I I ".ail E aged 9Z-L IOZ-DAS#-)-)IU--)S �Pej4uoD S141 jo u0pupial jo uoileAxa Di4l aAlAins 11214S U01PaS S1qj JO SUOIS[Aoid at4i -sa!4jed aqj Aq paje!4o6au Allenjnw uaaq seq JaAl2M S14j_ °uoi4eDgpwapui siql 4o sasodind aqj joj Alalos IM:),d TS alILL la:)uejnsuj leujsnpuj japun A4!unwwi jo J,9AIeM S,JOP2JIUO:)aqj SDjnj1jSUO:) UQJaq P@P!Aoid uoteDU!uwapui aq4 4eLp poapapun Alssajdxa pue Alleo4pads 'I jaq:pnj si 11 -aDuabilbau s,io4:)ej4uoD aqj jo juaixa aqj of Aluo aq lleqs japunajaq Al!l!qeil s,jo:pejjucr)aqj lsjaa4unlOA pue 'saDAoIdw@ lsleiDyjo IsiaoUjo s4! 'AI!:)aqj pue iopeiluoD aqj jo aauabilbau luz)j-InDuo:)aqj w04 buillnsai jo Aq pasne:)Aliadoid of sabewep jo suosiad ox/Unfui AlpocI 4o Ino buispe sabewep joj/,4!1!qeil 4o Juana aL41ul 'uaq4 'STT't,Z'i;,NO'doll:)afqnssi:pei.luo:) siql4eqlauiwja4apuoip!ps!jn[4ualadwo:)jo:pnO:) 2pinoqS *9 ,Aj!D aqj jo @:)ua&Ibau al os aLp Aq pasneD sabewep pue sz)ijnfui joj jda:ma ':peiluo:)s!qjp aDuewjop@d,?,L4j pm uopauum U!jo jo ino 5uispe Isaa;/,aujo:ae 6utpnioui s4ps jo serol Isabewep lsapn.fui 'SW12P Ile pue Aue WOJ4 SSaIWJeq sjaalunIoA pue saaAoldwa IspD!4o 1sjaD!4o sj! '/q!:)aLp ploq pue 'A4!uwapu! 'puajap (legs jopejjuo:)a4, *V SS3*1WH%fH GIOH /3:)N"nsNi 'oT 'P21JUO:)spi japun lsaDpAui Ile aAojdd2 PU2 MalAal pue 1suo!jeopnwwo:)aleupooD 'pawjoljad aq of�jom lle aAoidde pue aaSJ@AO lIeqS pue jDejjuo:)ssq4.spun Alo aql jo4/q!I!q.isuods@j Ajewud @Aet4 lleqs a@u61sap jaq/siq jo juaw:peda(] saillimpue s�joM:)tlqnd z)q1 40 JOPaJ ICI @41 IN3W39VNVw aNV N011"ISINliwavl"31NI39 '6 -wielD pns saq!jDsap AllnI pue wiep jewlippe 4o aopou sapnl:)ui juawAed jeu!j jol wielo q3ns ssalun lapew uaaq jou seq uoile:)ildde 4DILIM JOI Sa52Wep jaqjo Aue joj W121D 04;qblj Sj! PaAl2M aAeq of pawaap aq IIL>qs 'juawAed leu! Joj uoileDildcI2 bupfew uodn 'jopejjuo:) quawAed leu!;jo4 Aq!:) aqj Aq JeAoidde jo awil aqj Ueqj J@121 jUaAa OU ui pue Issq jo asuadxa '@62wep q:)ns jo AjaAOZ)SIP a444 Ja:U2 sAep A:p!ql uipm Aj!-D aqj of builpm u! apew aq Isms :pejjuo:) slqjp a:)uewjopad aqj 4o ino 6uppe seilxa jo s4so:) Isaisuadxa 'sabewep joj Ajo:)aqj isuiebe pep Auv SWIVID 's ,iapio:pno:) Aq jo Al!:)at4l jo lemidde uappm joild Inoq.l!m jo:pejluO:)aqj Aq uoqeztue6Jo jo lenp!A!pui Aue ol a1qefleAe apeW aq jou IpL.Is pue Ie!luapquoD 4da)l aq Ipm pejjuo:)siql japun jo:peiluo:)aqj Aq palqwasse jo pajeclaid jo 04 UaA16 slepajew jo squawnDop j@t4jo jo e4ep 'UOQ2WJ0jIU1 'sliodai Ispioni AuV q -isanbai sj! uodn Aj!D aq4 ol papjeAuo4 @q Reqs pue Aj!:) aqj jo A:pz)doid @L4 @wo:)aq liet-Is :peiluo:) siq4 japun /,4!:)aqj Aq ped spun] pm jo:pejjuo:) aqj Aq pajeclaid lepa4ew pue sluawn:)op paqsiu4un Jo paqsiug Ile ':pej1uOD spj japun anp uoilesuadwo:) Ile 4o/\4!:) at44 Aq joloeiluo:) aqj ol juawAed up °V SIN3wn:)00-40 dIRS'83NMO 'I- ,alqeuose;Dj a,q lleqs sism lebal q:)ns P,3p!Aoid 1pejjuco aq4 japun Aj!:)aqj jo s1saja4uf PU2 S145l1 aq4 pajoid of A4!:)ap Aq pajinDui sisoD lebal Ile apnlow lleqs sa6ewep PU2 asuadxa qDnS `A4!:) @44 of wuajapp qDns Aed lleqs pue Aj!D aqj of ajopjaqj alcleq AilejaAas pue 1,11upf aq lleqs)(4ains siq pue jo:pej4uo:) la:)ueleq pedun aqj paa:)xa sabewep PU2 asuadxa s,A:PD aq4 41 *jo:pejjuoD a4l of Al!:)aqj Aq pled aq Het4s ssaDxa qDns 'juawAqdwa;o amenuijuwsip jo z)jnl!ej ':pal6au Ilesnjai qDns jo uoseaj Aq pau!e4sns aq A2W 4D!qM jo A4!:)aq4 Aq pauie4sns sa5ewep Ile PU2 'NJOM aL4 buiLls!ug ui A4!:) at4i Aq paijmui asuadxa aq4 spze:)xa peiluoo s!qj japun ped aq of 4unOW2 aq4 4o a:)ueleq pedun all;! 'awil q:)ns IV -mieuiwial jo alep at4l of do 'pappaps se 'pajaidwa) Apopep4es si ,V,, juawq:)e:gV u! pagpads sjom @L41 pun:pe1juo:)slql japun anp sJunowe jaq:pn4 Aue aAiz):)aj of pall!luz)aq jou IIL>qs jol:)ej4uo:) 'Al!:) aqj Aq pa4eutwial si, :pejjuO:)SIL4 IU@AZ)@44 Uj �jo4 papeilum Niom aqj 4o uotialdwa) pun4 of alqel!eAe 4ou aje spun4 bui4eiado juapgns 4eqj saupialap Aq!D ;)t4i 'pel4UOD SIL4140 SWJDj aqj Sa4elOIA Alleiluelsqns asimiaqjo jo 'jojejjsiuiwpV pejjuo:)aL41 jo suoipnj-lsui spie6aisip Allualsisiad jopejjuo:) -9 'Sameupo pue su04ejnbaj le'Dol jo aje:p Ilejapa4 spiebaisip Allualsisiad jol:)equo:) -S ,jOq2j JO lelAaleW 104 AO:P2JIUoDqns 04 IU@WA2d Idwojd a>Iew of sl!q jopejjuoD ,t, "upjaq pajinbai ajom aqj,34,3Idwo:)o4 sl!p4 jo sasn4ai Alpajeadai jo Allualsisiad jope,14uo:) aqj -C '10jDeJjUO:)aqj 40/OUaAlOSUI aqj 4o lInsai e se pa4updde S1 JDAIM,91 V 'Z 11. INSURANCE A. The Contractor shall maintain insurance as set forth in Attachment"B". 12. INTERPRETATION AND VENUE This Contractor shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. 13. BRANDS OR EQUAL When a special "brand or equal"is named it shall be construed solely for the purpose of indicating the standards of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered, provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid containing a brand which is not of equal quality, performance, or use specified must be represented as an alternate and not as an equal, and failure to do so shall be sufficient reason to disregard the bid. 14. INSPECTION AND REJECTION All goods, services, work, or materials purchased herein are subject inspection and to approval by the City. Any rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specificabons of this order, whether held by the City or returned, will be at Contractor's risk and expense. 15. SUBLETTING OR ASSIGNING OF CONTRACTS Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from this Contract without the express prior written consent of the other, 16. INDEPENDENT CONTRACTOR The Contractor is and shall be at all times during the term of this Contract an independent Contractor and not an employee of the City. 16. EXTENT OF CONTRACT/MODIFICATION This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written or oral. This contract may be amended, modified or added to only by written instrument properly signed by both parties hereto. 17. SUBCONTRACTOR RESPONSIBILITY The Contractor shall include the language of this section in each of its first tier subcontractors, and shall require each of its subcontractors to include substantially the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties, The requirements of this section apply to all subcontractors regardless of tier. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: -At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW; - Have a current state unified business identifier number; - If applicable, have: 1) Industrial insurance coverage for the subcontractor's employees working in Washington as required in Title 51 RCW; 2)An employment security department number as required in Tile 50 RCW; and 3)A state excise tax registration number as required in Tile 82 RCW; 4)An electrical contractor license, if required by Chapter 19.28 RCW; 5)An elevator contract license, if required by Chapter 70.87 RCW. Service#SVC-2017-26 Page 4 Rev. 11/2&2016 9 1 OZISZ/I I 'Aas 5 a9rd 9Z-LI0Z-DAS#-)3TM0S aq wnN au04d :# 0i xel z J, :4:) :Ssajppv L -------------- uag)PW ue( :aweN Palulld -a2 /,v" 'awe Pa4ulld :Ag S3139NV IVOd:10 AlM *:)NI HMI H3MOd plaxWe ajn4eu5p isel at4j jo a4ep ai4l jo se pej=3 SiL41 pain 0,3Xa aAeq sallied a4l '403'd3HM SS3NiIM NI UO!JeWJ0JUI @JOW JOJ aAOqe 4uawAed -C uqPas a:)uaja4ad -jDejjuo:) sqj ui qljo4 las pue paUquapl se IdaDxa jopeiluo:) at4l Aq pajapuai alio m Aue jol @pew aq lleqs 4uawAed ON -A4!:) aq4 Aq 6u!4!jm ul paAoidde pue mel Aq pa44!wjad asimia4lo ssalun I�ljom L4:)ns jo aDumiopad aqj 6ulmolloj apew aq lleqs japunajaq PaP!Aojd Niom ioj s4u@wAed *9 ,jaej4uoD aq4 ui pajejodimui se 1p!q at4l ui paj!ejap se :pej4uo:) siql japun pawjojjad jam ail jopeiluo:) aqj Aed lleqs Al!:) aqj_ "IN 3WAVd :10 WHIM (INV NOIIVSN3dWO:) 'ST '(0S90'ZV6E JO 010'90*6C AADd japun:pei4uoo qjom-)ilqnd Aue uo 5uipp!q woj,4 paq!jenbsip aq 4ON - City of Port Angeles ATTACHMENT "A" Engineering Office Public Works and Utilities Department WORK BY CONTRACTOR The Contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the project described below. The Contractor will be responsible for obtaining and paying for any and all permits required for this work, General Scope: The work covered in this section is for a combination of dosed circuit television (CCTV)and sonar inspections to determine the condition of the Industrial waterline (IWL) between the screen house adjacent to the Hwha River(IWL point of beginning) and the terminus of the 57-inch IWL pipeline at the Wye at the base of Ediz Hook. The approximate length of the inspection is 8,000 feet. The inspections will determine the general amount of debris within the pipeline, locations of pipeline deterioration, separated joints, or noticeable leaks, and/or other conditions detrimental to the normal operation of the pipeline, Location: Screen house adjacent to the Elwha River (IWL point of beginning)to the terminus of the 57-inch IWL pipeline at the wye at the base of Ecliz Hook, at the McKinley mill, Port Angeles, Washington. Site Point of Contact: Jason Hart, Water/Wastewater Field Superintendent, 360-417-4855 Work Hours and Schedule: The Contractor will be allowed to work from 7 AM to 3:30 PM, Monday through Friday, excluding all legal holidays. Work outside of these hours may be requested from and is at the discretion of the Site Point of Contact. Construction Schedule and Preconstruction Conference: The Contractort shall arrange with the Site Point of Contact for a preconstruction conference as soon as practical after being awarded the contract. All relevant supervisory personnel in charge of the operation of the Contractor and subcontractors shall be made available to attend this meeting, The Contractor is urged to submit a list of agenda items to discuss, along with the construction schedule prior to this meeting. Approval of this schedule by the City will be required prior to the beginning of construction. Confined Space Entry: The Contractor shall comply with all requirements and have all necessary equipment for confined space entry. The Contractor is referred to Title 29662 WAC and any other applicable laws. Payment for any equipment or labor to meet confined space entry codes will be considered incidental to the project and no separate payment will be made. The Contractor may be required to provide documentation or proof of Contractor ability to comply with confined space requirements outlined in the above WAC provisions prior to beginning work. Work Requirements: 1.0 Video Inspection A. The Contractor shall inspect the line interior using a color closed circuit television camera (CCTV)and document the inspection on a digital recorder. All inspection video shall be captured in r Windows Media Video (.WMV)file format and saved on portable hard or flash drive for submittal. Each inspected line segment should have an associated WMV file. Digital photographs (.JP G files), inspection reports(.PDF files)and scanned copies of any handwritten inspection logs or field maps (.PDF files) shall accompany the video inspections for each line segment. B, DATA DISPLAYS The CCTV images shall include an initial data display that identifies the line segment being surveyed and a survey status display that provides continuously updated information on the location of the survey unit as the survey is being performed. These data displays shall be in alphanumeric form. The size and position of the data shall not interfere with the main subject of the monitor picture. At the beginning of each reach of line segment being inspected, the following information shall be electronically generated and displayed on the CCTV monitors as well as included in the audio track: A. Date of survey Service#SVC-2017-26 Page 6 Rev. 11/28/2016 B. Inspection company name and inspector C. Access point Q. Direction o[survey(upstream ordownstream) E. Time of start mfsurvey During inspections, the following information shall be electronically generated, automatically updated, and displayed onthe CCTV monitors: A. Survey unit location in the line segment infeet from adjusted zero 8. Line diameter C. Access point C. The CCTV camera location footage counter shall be zeroed at the beginning of each inspection. The survey unit location entered on the footage counter at the start of the inspection shall allow for the distance from the accepted start of the length of the line to the initial point of observation of the camera (pre-set footage). In the case of resuming an inspection at an intermediate point within a line, the footage counter shall be set to start at the distance from the access point to that point, as previously recorded bythe counter. The Contractor shall ensure that the footage counter starts k; register immediately when the survey unit starts to move. D. Contractor shall maintain a copy of all inspection records including video files, photographs, and reports for aminimum 3years after completion ofthe inspection work. E. The following deliverables shall be submitted on a portable hard drive at the completion of inspection: a. Inspection videos saved inWindows Media video (.VVMV)format b. Electronic version (.PDF)nfthe pipe inspection reports c. Inspection digital photographs in]PEGformat d. Map of sub area depicting area inspected, inspection status, asset identification numbers and markups 2.0 Sonar Inspection A. The Contractor shall inspect the line interior of filled or semi-filled pipe segments using a sonar inspection device and document the inspection with digital photographs (.]PG files), inspection reports(.PDF files) and scanned copies of any handwritten inspection logs or field maps(.PDF files) for each line segment. B. The sonar inspection device footage counter shall be zeroed at the beginning of each |nspecdon. The survey unit location entered on the footage counter at the start of the inspection shall allow for the distance from the accepted start of the length of the line to the initial point of observation of the camera (pre-set footage), In the case of resuming an inspection at an intermediate point within a line, the footage counter shall be set to start atthe distance from the access point to that point, as previously recorded by the counter. The Contractor shall ensure that the footage counter starts bo register immediately when the survey unit starts to move. C. Contractor shall maintain a copy of all inspection records including video files, photographs, and reports for aminimum 3years after completion ofthe inspection work. D. The following deliverables shall be submitted on a portable hard drive at the completion of inspection: a. Electronic version (.PQF)ofthe pipe inspection reports b. Inspection digital photographs in]PEGformat c. Map of sub area depicting area inspected, inspection status, asset identification numbers and markups Survioe#S\7C-2Ol7-20 Page Rev. 11/28/2016 910Z/8Z�j[ 'AaH 8 aguj 9Z-L I OZ-DAS#�13WOS (sated Z) PS weld :PafoJd UOISU@JX3 J@4eM JaAl'd eqM13 6Z61 aq1 JO SUOI:POd 'S -A.ijua jo sluiod buipnl:)ui )100H zp3 4e aAm aqj of asnoq ua@j:)s aqj wojj mam ueld @uqjaleAA leu1snpul aqj 5utmoqs dew /,4o .v :S4uaw4:)814V 0-9 PaSO[:)amen/14!Jan 01 uollndsui Buunp snjejs aAleA M @qj JOI!UOVJ asnoq u@aj:)s aqj le sbol dols ilam aq4 DAOWad 'a asnoq uaajz)s aqj of mog aleupila of ajnpnjjS UOGJ@Al(j molI juan[43 @L44 le amen MOL4 aqj aSOlD V sail!I!q!suodsa)j eiloaA O-S liod uoiloadsui)IOOH zP3 aq4 of Ipw Aajui>jDW aq4 qbnojL41 ssame,3p!AOJd -9 111w Aalui)IDW at4l le sueaw apelps Aq IMI aLIJ Ja4eMR,(] 'V sa4!1!q!suodsaH Aajui)pW O-t, alcIeDildcle ajaqm auiladid aqj ui saldwes 4uawipas a>Iej_ uoisnAui jajew4jes si ajaqj J! aupialap 04 juawbas peaq ut aqj bululewai Jolem aldweS -9 ajqe:)l:pejd se,IMI aq4 Io uoi:pod t4:)eaq aqj umo(j dwnd '=1 sale b papi4uoD Al!:) t46nojql ssame DP!AOJd *9 aDue-Qua IMI N4 alelOs! 01 w2P PaLID e aP!AOJd 'G iauuew Ajawl4 e ui quiod ssame Ile uado -:) auiladd aq4 to sapeaj jaddn at4l ajenDeAa of suiejp IMI paiinbai Ile undo 'S paj!nbaj jl asnOLI uaaj:)s aqj 4e buldwnd 6usialemap snonuilum ap!AOJd -V saqij!q!suods,aU A4!:) O-E nc � t o -- �1`��Att Shaft �• � Ln to kv co CA SO A ,y_�, q I • ,1 ,s - 3sVs r Oo co v. ,\ lot rn i �►j a - ` '---f Poriat�i `� t► '� d a i J ^ • `- IT s >s, i •I t .i l d t S r t c� * r f ,T • P IV 4 ,1 0° � Y r l • C Za f ' 8` . a Verus wsl.wsav .1�7 •s+ [4Mryw AWN YA?RGRrNS+aNw. .00 w • • 1� `�'a.y � ?rte _ - - � • V ✓ N f' .fi rl f � oft CS� 63 s�..e _I � • j O C 1 �II • b O t I Z 1 C � 1 iii T • I i Z 1 - z 1 - 1 � o � I n , a 1 3 1 1 • I 1 1 ..r 1 Z Y 1 1 = n 1 1 r I r c n 1 1 1 i ? 1 D 1 zt ? y 1 1 1 1 I t t g f _ C 3 _, • 1 a / i t a� 1 L 1 .�. iit iI . . � � ' f i° ( c„ 1 � F � ��� � � i i' i i 1 �, 4 Q �t 6 � 11 ��t Y � 1 1 _ 1 ` j 2 �( `, \' z �' e. ,' 1 1 1 1 C".� S a .� �y 1 * ... `, t y � ,, � { k_ `-3- i I I ' � r ' i 1 4 I. ! 1 1 iI j " 8 1 �i < x` f r f a � 1 � ff f 1{ Y � o } 1 4 I y I li 1 ,t I _ JLk. $ �^ \ -< :. � 1 1 • I � , , � � -�.. �� �r' 1 .�l` 1 .. _.� i �, ;� .� � a �ti / _ _� i �f _. .7 / ' •, .. � � R !r / 'i � 'y/ .� .at.\ �`�� d' /, R., l � '.+�. f / � ,� �� .. i � - __ .-�. - - _ . , _ . I / F' � ��/s / ..�� / x � � � � / •% / E / /" � / / .' / � t / I / �� �� l �'"_' / � � ,j / 1 , ` J / � ._.!�srl TS h tiwa�_!Ga :.,��R narte-,•tn�sww • '�'ncr `��Y Sa y __.. _.... ,...._..�� � %?1�- .. ` ' � � � � . , t . fi � � - � � �. ., �_. . ._. ._ _ _ _ _._ __T_.�. � . �� k � ' .{ , e: { � a M y { � r � ��; �. _ , .i =x . . . .�.___._. _ � ' __y_ � � 4 Lt. _.._—t__------- "1 � � i:i # a ,. , � a . .. . � � _: V Y ^ � � � .. , .. } . _ � j i_. ;a � � i _ '0 � _ [ i `, . i ... ,. ._...._._.__—�..L—_ � _..._._r_ _....._..._� .f_� � .,. � .: n s ', ;' .. ... � 4 .... .{ . � - }— ��- _. � � .a,�� _____. .._--_—_._ � r_ � � � .�.. w. x 1 `_. ; :� i s : _ M _ ._ i ' P 9 . t � � __.t. _...`. ... ...__.._.._. _. +yl ._ f � �� _• _ ... 1 J .. � �. � { _ : G � � , _. __� __. _ __.� _ , __ ________j_ .. . : f 4., .. .e.. _.�___�_.__.__ _ � _. r _. . h � lIJr1YYM� n ' k 7 .. �'NQyJfiT w ' i ... .. .. d oe _" T 91(:Z/ ZlI I 'A-I'd 6a ed 9Z-LIOZ-DAS#301AJOS aq jo 'uie4uo:) of aje saplod @Duejnsui A4qpeil JeJDUDE) leiDJaWWO:) PU2 /q!l!qerl al!qowolnv s,jopejjuo:) OLU UOISIAO'd aoiuejnsuljaqlo 'Jplj alebaibbe suo!4eiado pa4ajdwo:)-spnpojd 0001000'Z$ pue a4ebaj66e jejauab 0001000'Z$ laouaijnmo q:)L';)000'000'T$ ueq4 ssal ou sl!wil ql!m ua44!jm aq lleqs aDuejnsui Mmae,11 jejauaE) lep jawwof) °Z quapme jad 0001000'1$jo a6ewep /qjadoid pue Ajnfu,i Appoq jol 4pil albup pauiqwo:) wnwiuiw e ql!m a:)uejnsui qqqj al!qo—wblffV— -T :sjpil aDuejnsui 6utmollol aq utquiew lleqs jo4:)ej4uo:) a3ue.insuj jo s4unowV wnwiuiW w46uqSem jo a4e1S aq4 p smel aDuejnsuj leillsnpul aq4 Aq paiinbai se aftlaAOD-�UO jesuaclwo:),Sj@�ljom °E ,abejaAo:)4ualeAinba 5UIPpAoid quawasiopua alnl!lsqns jo To OT Ze OZ E):)4uawasiopua suoi4eiado palaidwo:)-painsul leuo!4!ppV pue To OT OT OZ 9:)4uawasiopua painsuj leuoil!ppV OSI buisn A4!:)aqj jol pawjopad �jom aqj ol:padsai ql!m ADilod aDuejnsui A4!1!qeil jejauac) lei:)jawwoD s,jojDejjuo:) aq4 japun pajnsup ue se poweu aq lleqs A4!:)a4.L �aftwep A:padoid punoi6japun Jo asdep:) luoisqdxa wojj 6us.ueA4!pqeq jol aauejnsuj A4!1!qen lejauaD ppjawwo-) at4l jo uq4mgpow JO JUgWaSIOPUa OU aq 112LIS aJaq_L -4UaWaSJ0PUa JUZ)leAinba ue jo qq TT Eo SZ !)D wiol OSI luawasiopu3 :PafOJd J@d a4e63MV at4l ap!Aoid ol pasiopu@ aq lleqs aDuejnsui A4!1!qeil jejauag p:uawwoD @LLL ':peiluo:) painsui ue japun pawnsse A4!1!qeil pue 1/unlu.i buigpaApe pue /Unful leuosiad '41pell deb dols Isuoilejado palaldwo:)-spnpoid 'siopeijum juapuadapui Isuoilejado Isasiwaid woj4 5uisije/q!l!qeil JaAO:) lIeLls pue 10 00 9D wjol;)Duaiin:):)o OSI uo ua44!jm aq lleqs aDuejnsui qqe!j-10-505E) lepJaMM55 Z 'a6eJaAOD/4q!qeil jenpeilua)ap!Aoid ol pasiopua aq lleqs/bijod aq4 'AiessaDau 41 -a6ejaAoD A4!1!qL>il JU@lMnba 6upAoid wjol alnl!lsqns e jo To 00 VD wjoj (OSI) aDtjjo saovuaS aDuiejnsuj uo ua:a!jm aq lleqs z)6ejaAOD °SajDfq@A PaSe@j pue pally 1paumo-uou 'paumo lie buijaAoD aDuejnsui)q!l!qe!-1 Z)I!qowo4nV -1 :mol,3q p@q!JDSap sad/4 aqj jo @Duejnsui uielqo lleqs jopeiluo:) aaue.insul jo adoaS wnwiuiW -/4!nba ui jo mel le z)lqel!2Ae/,PaW@J AUe o4 asinoDai sA!o aqj I!wil aspjaqjo jo 'a:)uejnsui vans Aq Pap!Aoid 2)6PJaAO:) aLp o4 jo:peiluo:) aql 4o A4!pqeij aqj I!wil ol panjisum aq jou lleqs uiajaq pajinb@j se sl!wtl pue @5ej@AOD�O adoas sj! '@DUejnsut jo a:)ueuajuiew siopej4uo:) uOQeMuJll ON -sjo:pejjuo3qns jo sa@Aoldwa IsaA.r4ejuasajd@j 'quabe jiaq4 ljoq:)ejluo:) aq4 Aq japunajaq �jom aq4 jo a:)uewjopad aqj q4!m uopauum ui jo wojj asue 4ew qDtqm Apadoid ol a6ewep jo suosiad of saiinfui jo;swiep Isuiebe aDuejnsu! '4u,?waaj6V aqj jo uo!q2jnp aqj Jot ulejutm pue ainooid 1l2qs jo:peiluo:) aLU 9:)uejnsuj SID"IN03 nimms aNV NotonlUSN03 'd0J S1N3wmin?)3B AJINW3aNI V 3:)NvBnSNI 33NvanSNI juawlieda(] swiwin pue s�joM oilqnd .9. JLNaWH:)VlIV6ulj,9au6u3 sq96uV IJOd JO 40 endorsed to contain that they shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A: VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors The Contractor shall have sole responsibility for determining the insurance coverage and limits required, if any, to be obtained by subcontractors, which determination shall be made in accordance with reasonable and prudent business practices. G. Notice of Cancellation The Contractor shall provide the City and all Additional Insureds for this work with written notice of any policy cancellation, within two business days of their receipt of such notice. H. Failure to Maintain Insurance Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Contractor to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Contractor from the City, Service#SVC-2017-26 Page 10 Rev. 11/28/2016 City of Port Angeles ATTACHMENT "C" Engineering TASKS/ORDER OF WORK Public Works and Utilities Department A list of tasks and order of work is attached. Dates for the activities may shift due to exigent circumstances, however, the order of work will remain as listed. Individual tasks are shown as shaded boxes on the list. Service#SVC-2017-26 Page 1I Rev. 11/28/2016 paq➢p otnj.n.;S uoum,,j moij 1.I an„ j 7T 7-5,T56 p auuc4:lei isnprat aouc saAlaA a3mvq7u(p uato Ajpnd jamol 6 laA43M IMJ-i aAgi 1a1a ao-U�C aMfA AQMW3gq QSOQ a2t15 Pue aSnOq Ualln%UaIMlOq Imt pajD T4-;Ij=ac i AbC aak4 rvej�}ffij up 4waj laleffi a:"WO 4,M*A,JCAMCfq OSOuD TIM 2uNP3 u4aq 7z IaAV M ISIedAq M-j mn Mquwa El 'Aam jjeljj5npljA 0.MOg;MOqS MO{pO 01 IaA{RA aM4"751!p uado S"rpCA olltU,:Slp UO A3pUla aAC,a-d alnl=4S l4asi4ml,mOl 4 luzNY93 71, ................................. ................. .1"OUTC/S 'So� 14— m m-05 HN XOlUDIZIN T 45331 ol IM WW-Ls'etuCs jq'a Aapa,pvq t 07M 04 soleTao 520 IVIS Aapl,14.11,V ET �IOVDVR ;V4EA aSZajaJ e e 40 1U4WdMbQ RqOW�O uM WOJ{:tSaAA 04 7 Pvv Isvi OZ4u!Palem 4o-Y,ig is u0l;'a,ASupAuOS ---j aA[tA aStagal 1pe;9lia�45 UO lUaWWs OMb4lJSU4felS I., t ITsm put Asea"Inq S,auuml;o uqzadsijj 1SQI 01 l*uunl Put ISOM 01 IAM.450uO�P4dul AL:T,> 6aaJa:e an as JPM DOqq 95epda$ A:G- "dwld T 1A.0p my% t,dclp gaAajj lalem jm 0; "a.'em4es 1Paap 0;jm" ww4 s4fMuel e,nem a,€Sj W4*,L JaMC4 0 pl.e wnoL uaajxs uaamlaq sucnnq laVpoads to WN yc uOlPadsuR AIX, OT 6'a a2ins pue asnotd uaae@s uaaml,;q j.*& J4MM tej$Uf ----—Ll-IZ/8 —IL" H:eaf, z alleA ale,�)aj �e 1sajol4uew Jado asnc 4PUl-9 41M Iml 1115 w Land uN 40 IRR,xa—luoN I 4o-1F,;q tlpsMje OAAA lal0l RvN A.—,,rvo I aAM71—51M—mipj a-!3 xafb4zva Fl, gZZX,y Auo le AP,,MUVW UaCo Ajj E ucq.dsix.oj apq aloquew uado ct 8'[ as'ns put aTnoq 4;8,15 uaamyaq!Ml asnot4 uaae,>s 7P,okand umpon qe4sw q8 uv4l lipjlsnpul Tr Mellua Ift le wep Fee Pups pmjnfuoa r arnopj uaar,s it sam,la,ueq.)llef,'lSnPw1c 5M4 dcs find nno,4 uaajn U 4,ga5'S Ajo 119 4000p9 VaOC; "D A.c 71W SaA,ASA aaaA uc mo��aj 17�r�W','Vjjqejsu,� jljed lUawwajj J atem 24m[$ zr UUljeqD 01 94A[eA Paa;WDO WPW'Uawlvajj Jalpm e4W3 fT sula"a jmV uado mvv Aal-wn ET MVT ZfE AM uoaml-aa I wd AOU3 dam AVOWWOOOV 1.10M 10 Jap;O/S�seL UOIJOIJSOAU�aull-laleM MJIS11PUl LTOZ City of Port Angeles ATTACHMENT"D" Engineering Labor Costs and Non-Salary Public Works and Utilities Department Reimbursable Cost A table of Labor Cost and Non-Salary Reimbursement Costs is attached, Service#SVC-2017-26 Page 12 Rev. 11/28/2016 ESTIMATE (service and materials) CWe: 811612017 Power Tech Job Number 11670 RVI Inspection Services Utility Locae t SPR Services TO- PO Box 2611 City of Port Anglesuio", WA 98382 Port Angeles,WA 360460-5207 P09 poweftechvideo0wavecable.com Attn: Mike Job n. Estimato fbr in ani v,idoo surveyof the IWL from the El wha to the McKinley Mill MATERIALS,MAVEL Ill I ImIN 11 OEM NOW FT UN I&AL 1.0 ni traffor package raW 1 i it 1,800.00 to lrra 1.0 rung smiiii ftMe $350.00 $33.00 0. onfiquiv for i m $0.00 0. survey d�, rate, $100.00 o, any rate 16-00.00 040 s0.00 SERME N1111 NNW 1 1 tr�a°�iaL 10. 0. 0. $0.00 o. $0.00 0. #0.00 0, $0 .00 0.00 sales ta,x $0.00 Tftb Inc rwflr not be Wd ttr to#or d rear duo I* $760.00