Loading...
HomeMy WebLinkAboutAgenda Packet 05/10/1999 UTILITY ADVISORY COMMITTEE ROLL CALL Call to Order: ~,~ .~ tg,.~'f ~ Members Present: Orville Campbell, Chairman ~ Bill Myers Joe Michalczik, Vice Chairman ~ Larry Williams Larry Doyle ~ Glenn Wiggins (Alternate) Members Absent: Others Present: UTILITY ADVISORY COMMITTEE PUBLIC WORKS CONFERENCE ROOM PORT ANGELES, WA g836~ ~V~Ay I O, I 3:00 AG EN DA I. CALL TO ORDER II. ROLL CALL Iii. APPROVal Of ~11NUTeS Of APRil I 2, 1999, REGULAR MELTING. IV. DISCUSSION ITEMS A. CABLE TELEVISION STATUS REPORT- PETE GRIGORieff, NORTHLAND CABLE REGIONAL ~IANAGER B. DRaft WATER SUPPLY StrateGY C. REVISED SCOPE fOR REGIONal WAter STUDY V. INfORMaTION ONlY Items A. FUTURE REOUIREMENTS fOR CONSERVatION AND RENEWABLE RESOURCES B. TELECOMMUNICATIONS AND FIBER OPTIC OPPORTUNITIES FOR PORt ANGELES VI. LATE ITEMS VII. Next MEETING - JUNE 7, 1999 VIII. ADdOURNMENT UTILITY ADVISORY COMMITTEE Port Angeles, Washington April 12, 1999 Draft Call to Order: Vice Chairman Michalczik called the meeting to order at 3:10 p.m. Il. Roll Call: Members Present: Councilmen Doyle [3:30] and Williams [3:35], Bill Myers and Joe Michalczik. Members Absent: Councilman Campbell. Staff Present: P. Ibarra, C. Knutson, R. Ellsworth, S. McLain, D. McGinley, J. Pittis, B. Titus, C. Rinehart, and K. Godbey. IIL ,4pproval of Minutes: Vice Chairman Michalczik moved to approve the minutes of March 15, 1999, meeting. Bill Myers seconded the motion, which carried unanimously. IV. Discussion Items: Councilman Doyle requested an additional discussion item. The Hearthstone Group letter was added under Late Items. }Eater Quality Report Public Works Director Pittis explained that the Safe Drinking Water Act required each community to provide each of its customers with a Consumer Confidence Report. This report gives consumers information about our drinking water supply covering such issues as infectious diseases, the water source, how we disinfect our water et cetera. Staff put together a draft Water Quality Report to address these concerns. Wholesale customers were informed by April 1 st by means of test results. The document must be to consumers by October 19th of this year and by July 1st each following year. A discussion followed regarding report contents. Corrections will be made in several areas. Testing issues and mineral content were addressed. Questions were asked regarding the cost to distribute and it was explained that it would be included with the Port Angeles Times. The Council will determine whether to produce the report in color or black and white Councilman Doyle moved to forward the corrected report to the City Council. Bill Myers seconded and the vote was carried unanimously. B. Utility Capital Project Information Deputy Director Bob Titus reviewed the basic projects planned for 1999. After questioning, an explanation was given by Director Pittis on why reservoirs need covers and how that is done. He indicated that the City would be making other improvements at the Jones Street Reservoir along with the cover such as sidewalks, landscaping, et cetera. This was an information item only and in most cases the projects will not involve any UAC action in the future. The next stage of review will be when bids are taken to Council for award. No action required. C. 1999 NWPP~4 Proposed Resolutions Proposed resolutions were included in the packet for UAC review. Vice Chairman Michalczik requested clarification on Resolution 99-1 Preference Clause second paragraph from the bottom. The wording in question was "We also oppose proposals to permit private entrepreneurs to bid competitively to perform operation and maintenance activities at federal dams or to add capacity and receive a share of the increased generation." Deputy Director Titus indicated he would look into it. There was some discussion regarding various dam issues and the political positions involved. This was an information item only and will next go to City Council as an information item. No action required. D. Discussion of Landfill Status Public Works Director Pittis gave extensive background on the issues. Operating thc landfill through 2006 is thc best for thc City (Option #1). The City has demonstrated that we have no bird/aircraft hazards as a result of the operation of the landfill and we have our permit. We are required to continue to make this demonstration. Staff took several approaches in calculating assumptions. These were reviewed at length by Director Piths. Discussion ensued, and Director Pittis responded to questions and provided additional information. City Manager Ibarra indicated staff looked at a varmty of cost/capacity issues which all point to the cost effectiveness to all parties of long term agreements with the haulers. The analysis will also demonstrate to the FAA that we have done our homework. An extensive discussion followed which included hauler costs, tonnage costs, the risks involved and other uses of the land. Bill Myers moved to recommend Option #1 to the City Council. Councilman Doyle seconded the motion, which carried unanimously. V. Information Only Items None. VI. Late Items ~4. Hearthstone Group Councilman Doyle received a letter from the Hearthstone Group (a private non-profit organization) stating that they had built two apartment buildings for the low income elderly in the Melody Lane area and have rent controls for 40 years. Each apartment has a meter and there is a meter charge every time they're read. They feel the City is taking advantage of the elderly. Scott McLain explained that the basic charge includes more than meter reading. Federal PURPA regulations dictates we not have master meters and we have been following that practice since the 1970's.. After some discussion it was determined the City should respond in writing by itemizing the types of charges that are included in the basic charge. Staff will put together the numbers.. B. Future UA C Meetings City Manager lbarra indicated that he wasn't sure if there would be monthly UAC meetings between the time Director Pittis left (May 14th) and the new director arrived (probably late June). He asked committee indulgence as this issue is worked out. VII. Next Meeting: The next meeting will be May 10, 1999, at 3:00 p.m. VIII. Adjournment: The meeting adjourned at 5:00 p.m. Chairman Cate Rinehart, Acting Secretary FROM:CH2M HILL TO: 368 417 4789 MAY S, 1999 7:31AM ~717 P.82 CH2MHILL =.,= May 6, 1999 ~ ~.~ Mr. Jack Pittb Dire(lot of Fublic Worlc.~ City ol Port Angek~ 321 East 5th Street Port Angeles, WA 98~62.1150 $ubjt'ct: Expansion of SCOpe and Budget for Contract NO. 97.10 (Water Supply Study) Dear Jack: This letter describes the budget o°tat~'~ et &c Port A~geles Water Supply Study contract (City Contract No, 97,16 dated October 21, 1997) and adctitional work to be completect by CH2M HILL related to the evaluation of m~miOpal water facility improvements alternatives needed in the event the Elwha river dams are removed. The scope and budget presented as Attachments A and B to this letter describe the expansion of the scope and budget of tho original cnnt~aet. Status of Current Work The scope, but not tho. hndgot, o~ fha original contract was revised per ~he November 30, 1998 change-of-scope letter from CI42.M HILL to tl~c City. This change o{ scope r~sultecI in the draft EIwha Dams Mitigation FaclIgies Re[~otl, whidt w~s submittud to the City on January 27, 1999. we underst.~md that this draft report will notbe Iinalized as a separate d0cument~ but instead will serve as a basis for work to be completed as part of the additional work described in Attachment A. The final. Water Suppl~/Strateg~./report was submitted to the City on April 30, 1999. This fina! report included revisions per City comment~ to th~, April ~ 998 draft Wafer ~x~'ply Study report. We onderstand the City will direct ue to revi~ thc Wator SuFply Strategy report one additional tithe to include revff, ed water u.sa~e hz/omt~tiu,/rum R~ymder and documematlon to be prepared by the Lower Elwha $"Klallam Tribe. Ap]?roxhnately $.3,000 ~v.m~t~t~ from the original contract budget. A portion of the~e funds will be u~d to tmdertake the linal revl~on o~ the Water Supply Strategy report. FROM:CH2M HILL TO: 360 417 4?09 MAY 6, 1999 ?:S2AM ~?lB P.02 Mr. J~ck Pittis Page 2 May 6, 1999 Additional Work In addition to the already-completed and goon-to-be completed work dc~ribed above, additional work will be com}~letcd. This additiuual wo~k iudud~ ~v~luatiml of tlu-ee water supply and trealmc, nt altc~onatives, related primarily to the location of a surface water treatment plant, needed to mitigate the effects of removal of the Elwha river darm. In addition to evalualing of thi~ water supply and treatment alternatives, their integration with Ih~ Oil)ds regional water supply objectives will be described as well. The de~ailed scope of thi~ additional work is pre.~.nted as Attachment A. Tho. Intdgat for tl~ additional work is pr~sm~d as Attachment B. The terms and conditions of the original contrf~et rern~in thc s~me for thi~ additional work. The not-to-exceed labor and cxpense~ total ~or thS. s additional work~ as presented in Attachment B, ts $12,119. If you have any questio~ or need additional in. formation plear, e call me at (425) 453 5005 ext. 5~:fi2. Sin¢c~'ely, CH2M HILL Project Manager Enclosures c: Bob Tit~x~ Agreed to by: CH2M HILL City of Port Angeles Ity~ ... By: Title: Tiile: DaLe; Dat~: FROM:CH2M HILL TO: 350 417 4709 MAY 6, lg99 7:32~M ~?l? P.04 Attachment A $¢oi of Work Th~ soups of work to b¢ compJeled by (:I*]2M Hrl J, for th~. City nf Po~ Angeles (City) for this additions] project acllv~ty enrltled '~lwha Mitlga6on Altomat;vcs]Reg~on'.d Water Supply Strategy" i~ p~ented herein. The ~co~ of tho original Contract No. 97.16 is hereby an~ndcd to include 0~osc additional tasks, The budget for this additional work is p~nt~ as Att=chm=at B, Tho work tasks for tl~s pmj~t am dcscri~ as follows. Tasl< 1. Description of Mitigation Alternatives ,Several water supply and treatment alicrnatives we~= described in the dndt (April 1998) and final (May 1999) versions el'the Water&~pply Strategy repoR prepar~ by CIt2M H~. These inclu~ s~ply and treat~nt al~nalives are ones the City may choo~ to pursue in the event t~ E]wha river dams a~ ~moved. City staffhave i~ntifi~ [1~ ~efe.~ alternatives that it ~lieves will effectively mitigat~ the ef'fects of dam removal nad intcg~ into i~a reginnal supply objectives, These mitigation allcrflalive~ am ~d on thc wmcz ~upply and I~att~nt altemative~ descd~ in tim Wawr Sopply Strategy repo~ and arc diffg~ntialed pri~rily by the I~ati~ of a ~tmnent guffac~ water t~atment plant that is a vommon component to ~gh, Tho~ th~c alternatives am: I. Treatment plant l~atM on the site of the Rayonier ~r mill or t~ old Rayonier raw water Ir~l~nl phmt, 2. Trcn~ment plant l~ated west of ~he City limits and cast Of the ~lw~ ~ver, out of I~ ~lwha river I]o~plain. 3. Treat~nt plant IocaI~ adjacont to ~ cast bank of flit Elwha H~r within ~c tie'plain. ~ch all.alive will be conceptually devdo~. Con.dss mw waler and ~n;ah~ water pi~line r~uiremm~s will ~ de. hatted. ~ curs~y ~ggegsment and degcfiplion of the gudace watex Ireatment plant and ttg com~nent process olengmg, oon*ider~ to ~ th~ ~l~ for ~h of the alt~ntiveg, ~ll ~ di~cu~M, 'l'h~ 8p~ifi~ pr~s~ o]c~ala of tho t~ui~d ~t~nl cann~ bo fully asse~ at this tlmc whhout further d~lail~ analys~s. Task 2. Rationale for Mitigation FaCilities A briel'discussion of tl~e rationale for iix', mitigation facilities necessary as a result o~ lhe removal of thc Elwha rJ¥cr dat~ls will tx: presented, 'J'l~i$ discussion will be mostly extracted fmlll text prcpar~ as pan of thc draR Fdwha Dam~' Mitigation Facilities Report completed in January 1999. This rationale description presents the CJly's assessment, based on currently available information, of the facililie~ ne~ed to continue to reliably supply a high quality water to it~ cnrrenl and future retail and wholesale customers it' the F. twh., dams ~re removed. Task 3. Cost Estimates Initial capital, concept-level cost ustimat'~ wilt be prepared for each of th~ mitig,~tion altomgtivcs doscrit~d. These estlmatcs will bc developed in sccond-gt[lartcr 1999 dollars. Cost =stlmete, s for MROM:CH2M HILL TO: 360 417 4T09 MAY G, 1999 ?:32AM ~?l? P.OS the facility Jmprovemc.~ts, such es conncctifq~ p¥clln,c.s m~! ptnnp stations, r~lat~l to the intcgratiu~ of th~ tiiti:rtmlives with the CJly's r~glonul water supply strategy will be developed as separate ltcnts and included In thc coal oslirm~te totals. I.and. permit acquisition, negotiations wltM'cderal and state sg¢ltclcs, and water rights costs will not be cslJmated, but will b¢ considered to be included in thc project contint~cncy which will be estimated at 30 lin'cent of tile. cstimat~ cost of con,traction. Task 4. Regional Supply Obje~tives A brief descriptinn of ~ City's regional water supply objeelives will be presented. This de~crlyion will b~ extracted primarily from the finel Water Supply $rr~t~gy document. Task 5. Integration of Alternatives with Regional Supply ObjecUvas Description.g of Itow each of tbs mitigation alternatives could be integrated with the City's regional supply objectives will bc presmted. N~ded facility improvements to supply adjacent systems such as the PUD No. ! of Clallam County, Dry C'rr~k Water Assoclalion, Black Diamond, and the lower F.}wha S'Klallam Tribe will be described. A regional l~calic, n map, similar to that pr~sentccl as Figure 2 of the Water ,~upply .~trnttp, y r~c~. displaying the facilities of the mitigatir~n ahemallve~ nnd their integration with the regioual supply objectives will bo p~e. pa~'eA. Three separate Io~atlon maps, one for oath mitigation alternative, will bo proparexl. t%ch (ff the maps will ~how the general lo~utlou of facilities such as the treatment plant, supply intake(s), raw water supply and finishc~ water pit. lines, and cum~cctlug facilities to adjacent Task 6. Evaluation o! Mitigation Alternatives Tile three mitigation alternatives will be evaluated based on their relative advantages at~d di~dvantagcs to the City and its regional supply objectives. Specific evaluation criteria will include initial capital cost, supply system rcliabililyh'edundancy, and suitabilily for inlegration with the City's regional supply objeelives. The mitigation alternatives will be ranked subjectively based on this evaluation IO facilitate selection of fl~e. pmfe. rmzt alternative. Task 7. Report Preparation A rejx~l of approxinaately ] 0 to ! 5 psg¢~., including tables and fisures, summarizing th~ r~sults of thin evaluation, will be prepa~'e~l. Ten comb-bound copies of a draft of this r~port will lac prclmmd and submltted to tho City for its I'cvJcw. Twv. ty t:umb-bound c. opics of this final version of thc [cpoll, in¢ludlug rcvisioils baaed on the City's IgVtcw colra~nts, will be prepared algl submitted to tho City. Task 8. Meeting/Presentation of Results A single n~.clin= is budgeted for C[--]2M HJLI.'s project manager and senior tr~atn~nt engineer to dJscust: the development of the. report and/or to present it to City staff mid/or thc City Council. ~R~M:CH2M HILL TO: 360 417 4709 MAY 6, 1999 ?:33P~ ~?17 P.06 PJ~:ulallon m,'~te~lal,~ ~ III bc hmlled to ovcrhcads of the report tlgurcs and approx ~at¢ly 10 Powerpoint slides, FROM:CH2M HILL TO: 360 417 4?09 ,gAY 6, 1999 7:~3;:~M ~717 P.B? pORT WASHINGTON, U.S.A. PUBLIC WORKS DEPARTMENT DATE: May 10, 1999 To: Utility Advisory Committee FROM: Bob Titus, Deputy Director of Utility Services ~ SUBJECT: Future Requirements for Conservation and Renewable Resources FOR iNFORMATION ONLY The new Bonneville Power Administration (BPA) rate case for the October 2001 through September 2006 rate period will begin at the end of this month. Among other things, it will include a new element known as the Conservation and Renewables Discount (C&RD). The C&RD will establish criteria for utilities to earn up to a 3% discount on their wholesale power bill through support for conservation and renewable resources. The details will be fixed in the rate case but the draft plan is to build the discount into the rates and have utilities report their achievements annually to BPA. If, at the end of the rate period, utilities did not spend at least 3% of their wholesale power costs on qualifying conservation or renewable resources the utility would be required to pay the difference between actual spending and 3% of annual wholesale power purchases back to BPA. Currently, City Light is not spending anywhere near 3% of its wholesale power costs on conservation and renewables. Until the CR&D chteria are finalized in the rate case it is hard to say what changes need to be made in the programs being offered by City Light but it is almost certain that conservation opporturfities alone will not total 3% of our wholesale power purchases. Therefore, it is likely that City Light will want to focus more attention on renewable resource options and, since the utility has not been active in this area previously, staff and policy makers will need to become better informed. BPA recently compiled information from a variety of national and region sources that attempted to gauge consumers interest in conservation and renewable energy. BPA undertook this project to provide utilities with a comprehensive source of information that no one had previously compiled. The summary of the report is attached and provides some insight as to the support that customers have expressed for conservation and renewables (green power) and their willingness to pay a premium for such resources. If you are interested, copies of the full report (36 pages) can be provided. With the rate case beginning this month I thought that this was an opportune time to provide this information and increase awareness of a topic that will gain greater importance as we approach October of 2001. Action to be taken: None. For information only. Estimated time: 10 minutes. N:/PWKS/LIGHT/DIRECTORAVIEMOS/GREEN.WPD Summary Report on Consumer Attitudes about Conservation and Renewable Resources by Edward G. Ferguson Introduction If Northwest utilities are to maintain consumer loyalty, it is important that they understand the wishes of their consumers regardless of the outcome of deregulation. Getting a clearer picture of consumer attitudes can help a utility begin to formulate a more effective marketing strategy. The information in this report can help utilities and others in the region think about ways to market power. It is a step in a process that starts by telling us there is a substantial market and public support for conservation and renewable resources. From there comes exploration of ways to show consumers that they are being heard. BPA hopes that this report will stimulate thinking and further exchange on the role consumers' attitudes can play in future policy making and business direction. Background BPA is aware that a variety of research has been produced over the years on consumers' attitudes about conservation and renewables, but it could not find where this information has been captured in one report. So, BPA's Energy Efficiency group decided to assume that task. Gene Ferguson, a conservation specialist in Energy Efficiency did the research and prepared the report. It is a comprehensive study of surveys, town hall meetings, and focus groups conducted in the region and elsewhere. It covers literature for the 1990s and includes research by a number of Northwest utilities. BPA Connection BPA wants to act in ways that reflect the values of the region, and the major reason that we undertook the study was to understand better what the consumers in this region value with regard to utility involvement in conservation and renewables. There is no specific decision or action that was anticipated to be driven by this study's conclusions, but rather, any decision that pertains to BPA's possible involvement in energy efficiency or renewables activity will be influenced by our understandings reached in this study. BONNEVILLE Key Findings The literature shows that a large number of consumers support utility investments in conservation and renewable resources. They want their utility to actively acquire clean resources. They would be willing to pay more to ensure their utility does this. Example 1: Survey of Those who Support Environmental Issues or Good Utility Environmental Practices Percentage Sacramento Public Utility District 87% (in favor of being environmentally friendly, and were also 98% willing to pay) Public Power (RKS survey) National 52% (ranked first in list of attributes ahead of Iow cost at 31%) Western Montana G&T 61% (agreed that utility should acquire resources with a positive or neutral environmental effect first) Seattle (Washington statewide survey) 73% (reported that environmentally responsible power generation that protects salmon habitat was either important or vary important) Survey constructed by the authors using information from surveys cited in this paper. Example 2: Survey Results Regarding Willingness to Pay Extra for Clean Energy Resources Percentage willing to pay Amounts or Range more Cambridge report, National (Reported by Farhar) 60% $6 to more than $21 per month. Sacramento Utility District 95% 5% to + 20% SWEPCO 84% $1 to +$10 WTU 87% $1 to +$10 CPL 86% $1 to+S10 EWEB 56% $1 to +$10 CARES 66% $1 every two months (same CARES study) 58% $3 every two months (same CARES study) 52% $5 every two months Orcas Power and Light 55% 50% more North Dakota 72% Something more (45 said $6-$10) Ravalli 22% yes, 26% maybe Willing to pay 10% more information from surveys cited in this paper. · Northwest consumer attitudes are consistent with those nationwide, although conservation support is somewhat stronger in the Northwest in terms of relative standing with renewables. Nationwide, support is slightly stronger for utility investments in renewable resources than in conservation. But taken together, both environmentally benign resource options were favored over thermal resources by significant majorities nationally and in the region. Some surveys asked consumers how green resources should be paid for. Should they be optional products or should the cost be put into rates where everyone would pay. A strong majority supported rate-basing conservation. It is reasonable to assume that people see renewables and conservation as beneficial to everyone and therefore, everyone should pay. If everyone pays then more green resources can be acquired at less cost to any one consumer. · Studies showed that attitudes about green resources change markedly in proportion to information consumers receive. The more education and information they have, the more consumers favor such resources. · Younger people and women are most likely to support renewables and conservation. In addition, people with higher incomes and more education are more likely to support these resources. There was general support among all groups for either continuing or increasing low-income programs. Example 1: Question: lf you were sure the money you spent for electrical energy was payingfor clean alternative sources of power, . . . how willing would you be to pay approximately l O percent more on your power bill." AGE 18-29 30-39 40-49 50-64 65+ Very willing 29% 38% 32% 27% 26% Somewhat willing 50% 35% 36% 32% 29% Not very willing 7% 12% 15% 14% 13% Not at all willing 12% 13 % 15% 21% 26% (Don't know) 2% 2% 2% 6% 5% Total willing 79% 73% 68% 59% 55% Total unwilling 18% 26% 30% 35% 40% Taken from CEERT Study, Fairbanks, Naslin, Kaullin & Associates (1996) Table 60. Example 2: Question: lf you were sure the money you spent for electrical energy was paying for~clean alternative sources of power, . . . how willing would you be to pay approximately lO percent more on your power bill." Gender M F Very willing 28% 32% Somewhat willing 34% 38% Not very willing 13% 11% Not at all willing 21% 15% (Don't know) 4% 4% Total willing 62% 70% Total unwilling 34% 26% Taken from CEERT Study, Fairbank, M~slin, Kaullin & Associates, (1996) Table 60. pORTANGELES WASHINGTON, U.S.A. PUBLIC WORKS DEPARTMENT DATE: May 10, 1999 TO: Utility Advisory Committee FROM: Bob Titus, Deputy Director of Utility Services 5~ SUBJECT: Telecommunications and Fiber Optic Opportunities for Port Angeles FOR INFORMATION ONLY High-speed, wide-bandwidth telecommunication systems are a huge asset to those communities who have one and an impediment to economic development for those communities without one. Access to high- speed, nigh capacity data networks is increasingly nigh up on the list of amenities that an industry looks for in a potential site for relocation or expansion. For any progressive community the question is not whether they need one but rather who can provide the infrastructure in a cost effective manner. In our region, U.S. West and municipal electric utilities have been the primary providers of such services. U.S. West is upgracY~ng its facilities and installing new fiber optic lines and new switches in many areas. They are motivated by the prospect of greater profits through the offering of additional services and the fact that with deregulation of the telecommunications industry, the possibility of competition. However, there is a limit to the amount of capital that can be spent in any given year and they will invest in areas with the greatest return on their investment. Rural areas like Clallam County are not high priority areas because of the limited population, low customer density and lack of likely competition. We would eventually get upgraded services but the question is when. U.S. West is adding a fiber optic submarine cable across Hood Canal this year and has pledged to continue adding fiber facilities up to Port Angeles but future expansion plans are subject to change. They have no plans to add fiber within the City. That leaves City Light as the most likely provider ora fiber network in the next few years. Here the issues are deciding to get involved in a business that could be in partial competition with the private sector and justifying the costs. Cities like Tacoma, Richland and Ellensburg (in Washington State) and Springfield and Eugene (in Oregon State) are examples of cities that have municipal electric utilities that are installing fiber optic networks. Electric utilities often have the need for real time communications with remote sites for SCADA (supervisory control and data acquisition) and in the future could use a data network for automated meter reading and load control. Beyond these applications, some utilities are also opting to utilize their telecommunications network to get into new business lines (cable tv, internet access, home security, etc.) or leasing excess capacity for these services. Another factor that is influencing municipal utilities is the benefits of a fiber optic network for general government. Port Angeles is currently looking to acquire a new SCADA system for the water utility. A SCADA system already is in place (but with communications problems) for City Light. Ultimately, there are plans to install SCADA at the pump stations, reservoirs, valves, substations, sewer treatment plant and landfill. Although not the cheapest option, a fiber optic network could tie all of these sites together (with the Corp Yard, City Hall and Light Ops) and would provide backbone facilities to virtually all areas of the City. The incremental cost of additional capacity (bandwidth) is fairly low so surplus capacity could be installed to provide for other users. The State is likely to have funding available for telecommunications/rural development later this year. Those cities that know what they want to do will be in the best position to tap into this funding source. At the same time those cities who actually install a system will have an edge in attracting new business to their area. It would seem prudent to have the utilities (mainly City Light) fund a feasibility study for Port Angeles so we can determine what costs would be like and who potential customers for excess capacity might be. I would estimate this would cost $15,000-$20,000. At the very least I think we need to work mom closely with the PUD, US West, Northland and other telecommunications users to keep up to date on what others are planning. As in other endeavors, we can best insure that the City's interests are met by taking charge of the planning/implementation process and not leaving it to others with broader or different interests. City staff has met with staff from the PUD and the Economic Development Council (EDC) about this subject and has agreed to work together. We have also met with representatives from U.S. West who have also expressed an interest in working with the City and others to share facilities to the extent that the law and regulators allow. To date the PUD has shown the most interest and initiative in exploring their involvement in telecommunications and fiber optics and has approached an expert in telecommunications and fiber optics to come to Port Angeles and present a briefing on the status of the telecommunications industry and fiber optics. Terminology will be explained as well as why rural areas need to be thinking about fiber networks and the role that utilities can play in fiber network development. Currently, the briefing is scheduled for Wednesday, May 28t~, 1999 at 1:00 PM. The session will probably last 2-3 hours depending on the number of questions. UAC and Council members are encouraged to attend if their schedules permit. Action to be taken: None. For information only. Estimated time: 10 minutes. N:/PWKS/L1GHT/DIRECTORAVIEMOS/F1BER.WPD W A S H I N G T O N, U. S. A. PUBliC WORKS DEPARTMENT 1).,' "-Ir':.. MAY 10, 1999 T(i: UTILITIES ADVISORY COMMITTEE l:~ )M: JIM HARPER SU ~IJECT: POLE USE AGREEMENT WITH PORT OF PORT ANGELES Mr Curtis Shuck of the Port of Port Angeles has requested permission for them to contact three(3) Po?t Angeles City Light poles with a communication cane (fiber optic and telephone cable lashed together). The purpose of the cable is to connect its facility at 338 West First Street with a newly acci'dired ~hcility at 112 South Valley Street with voice and data communication. The Port is pr~;'~osing to use Angeles Communications for the installation. Thc proposed pole rental agreement attached is identical in requirements, conditions and fees to the agreement with Virginia Mason Medical Center approved by the UAC and Council in December 1998. the agreement includes an annual fee of $324.00, which consists of $300.00 per year ad m inistrative charge and an annual per pole rental of $8.00. ACTION TO BE TAKEN: Recommend that the Pole Rental Agreement with the Port of Port Angeles be approved by the Council. ES !'IMATED TIME: 10 minutes. N:\I'\VKS\LIGI ITXENG R'Ol M\M EMO\ENG IN EE RU UPORTUA.WPD POLE RENTAL AGREEMENT THE CITY OF PORT ANGELES, Washington, a municipal corporation, hereinafter called "City", and PORT OF PORT ANGELES, hereinafter called "Port", mutually agree that the following terms and conditions shall govem Port's use of Cityts poles located in Port Angeles, State of Washington, as City may, as hereinafter provided, permit Port to use: Section 1. The City hereby grants Port the use of three (3) power poles as shown on Exhibit A, provided that Port shall comply with all terms, conditions and provisions as set forth in this pole rental agreement. Port's use of such poles shall be confined to supporting one communication cable, hereinatter called "equipment". Such equipment shall be used by Port only for the purpose of erecting and operating voice and data communication system between Port of Port Angeles Administration Bldg. At 338 W. First Street and 112 South Valley St~et. Section 2. Port shall place and maintain its equipment upon such pole(s): (a) in a safe condition and in thorough repair, (b) in a manner suitable to City and so as not to conflict or interfere with the current or future working use of such poles or facilities by City or others; provided that any costs incurred in moving its equipment when the move is necessitated by any party other than the City shall be paid for by such other party; and, (c) under such requirements and specifications as City may prescribe, and in conformity with all laws and regulations pertaining to pole line construction, including, but not limited to, the latest editions of the National Electrical Safety Code, the National Electric Code, and all other applicable state and local codes. In those cases where Port's anchorage requirements are not coincident with those of the City, or where requested by the City, Port shall place separate guys and anchors to hold the strains of its equipment upon said poles. Section 3. City may permit Port to attach its equipment to poles which are jointly used by City and others, in which case Port shall be responsible to the others to the same extent as though their equipment were the property of the City. Port will exercise special precautions to avoid damage to the facilities of City and others supported on such poles and agrees to immediately report any damage to the owner of the damaged facilities and to make reimbursement for the entire expense of repairs. Section 4. City reserves to itself the right to maintain its poles and to operate its facilities thereon in such manner as will best enable it to fulfill its own service requirements. Nothing contained in this agreement shall be construed to compel the City to maintain any particular pole(s) for a period longer than demanded by its own service requirements. Section 5. No use, however extended, of any pole(s) under this agreement shall create or vest in Port any ownership or property rights, but Port's rights therein shall be and remain a mere license, which as to any particular pole(s) may be terminated at any time by City upon thirty (30) days' written notice to Port. Upon notice from City, Port shall, within thirty (30) days, remove, relocate, or transfer such equipment to substituted poles in order to provide increased clearance, accommodate additional facilities of City or others, or perform any other work in connection with such equipment that may be required by City; provided that when the relocation is necessitated by any party other than the City, Port shall be reimbursed its moving expenses by such other party. However, if Port fails to remove its equipment within thirty (30) days or in cases of emergency, City may, at Port's sole risk, remove, relocate, or transfer such equipment to substituted poles or perform any other work in connection with such equipment that City deems necessary, and Port will reimburse City for the entire expense thereby incurred. Section 6. For the privilege of placing and maintaining such equipment upon such poles, Port shall pay to the City each year during the existence of this agreement $8.00 rental fee per pole plus an additional $300 administration fee. The total annual rental fee shall be payable on June 1 with the first payment due on June 1, 1999. In the event that state or federal law is changed to regulate the pole rental rate, the rate charged herein shall be revised to reflect such regulation; 2 provided that if such changed rate is not acceptable to the City, then the City may terminate this agreement as provided in Section 12. Such pole rental payments by Port shall be exclusive of the utility payments required by City ordinance for use of electric current. Section 7. In addition to all other indemnity and assumption of liability provisions herein contained, it is further expressly agreed that Port and its Contractors shall pay, save harmless and indemnify the City from any loss or claim against the City on account of or in connection with any activity of Port or its Contractors in the construction, operation or maintenance of its technical facilities and system services. Section 8. Throughout the life of this agreement, Port will maintain insurance in full force and effect with a carrier or carders selected by Port and satisfactory to the City, naming the City as an additional insured for: A. Compensation Insurance under and in compliance with all Workmen's Compensation Insurance and Safety Laws of the State of Washington and amendments thereto; B. Bodily Injury Liability Insurance with minimum limits of $1,000,000 for each occurrence; C. Property Damage Liability Insurance with minimum limits of $1,000,000 per occurrence. The insurance described in B and C above shall also provide contractual liability coverage satisfactory to the City with respect to liability assumed by Port under Section 8 and contain a provision that the policy may not be canceled until thirty 00) days' written notice has been given to the City. Written proof of compliance with the requirements of this section shall be filed with and approved by the City for each policy year. Section 9. If Port defaults in any of its obligations under this agreement and such default shall continue for thirty (30) days after written notice thereof, the City may, by written notice to Port, immediately terminate this agreement, in which event Port shall be allowed thirty (30) days from such notification within which to remove its equipment. 3 Section 10. All amounts payable by Port to the City under the provisions of this agreement shall, unless otherwise specified, be payable within thirty (30) days after presentation of bills therefor. Non-payment of any such amount when due shall constitute a default by Port under this agreement. Section 11. Nothing herein contained shall be construed as affecting any rights or privileges previously conferred or which may be conferred hereafter by the City, by contract or otherwise, to others not parties to this agreement to use any poles covered by this agreement; and the City shall have the right to continue and extend such rights or privileges. The privileges herein granted to Port are not exclusive and shall at all times be subject to any such existing contracts and arrangements and to any contracts and arrangements entered after date hereof by the City. However, any future use of such poles by the City or others that may require relocating Port's equipment shall be contingent upon Port's moving expenses being reimbursed any party other than the City necessitating the move. Section 12. Unless sooner terminated as herein provided, this agreement shall continue in effect for fifteen years, commencing on June 1, 1999. Either party hereto may terminate the agreement by giving the other party at least six (6) months' written notice to that effect. At the expiration of such six (6) months, all fights and privileges of Port as to the poles affected by said notice shall forthwith terminate, Port shall remove its equipment from the poles within such six (6) months and if it fails to do so, the City may remove same or have it removed at Port's risk and expense. Termination of this agreement shall not release Port from any liability or obligation hereunder, whether of indemnity or otherwise, which may have accrued or be accru'mg or which arises out of any claim that may have accrued or be accruing at the time of termination. Section 13. In the event either party brings any action for breach of this agreement, such party shall be entitled to recover, in addition to any judgment for costs, such sum as the court shall judge reasonable as attomey's fees. Section 14. The failure of the City to enforce any provision of this agreement or the waiver thereof in any instance shall not be construed as a general waiver or relinquishment on its part of any such provision but the same shall nevertheless be and remain in full force and effect. Section 15. Port shall not assign, transfer or sublet any privilege granted to it hereunder without the prior consent in writing of the City, but otherwise this agreement shall inure to the benefit of and be binding upon the heirs or successors and assigns of the parties hereto. Section 16. Wherever in this agreement notice is provided or required to be given by one party hereto to another, such notice shall be in writing and transmitted by United States mail or by personal delivery to the City at its office at P. 0. Box 1150, Port Angeles, WA 98362, and to Port at its office at 338 West First Street, Port Angeles, WA 98362, or to such other address as City or Port may designate for that purpose by written notice to the other party. Dated at Port Angeles, Washington, this day of ,1999. THE CITY OF PORT ANGELES PORT OF PORT ANGELES By By Gary Braun, Mayor ATTEST: APPROVED AS TO FORM: By:. By:~ Becky J Upton, City Clerk Craig D Knutson, City Attorney FIRST STRL~T ~T ~ P~T AN~ SECOND EXHIBIT A C~UNICA~ CAB~ CITY OF POR~ Preliminary docuraent prepared for discussion purposes only - not subject to disclosure. Water Supply Strategy City of Port Angeles Prepared for: City of Port Angeles May 1999 Prepared by: CI'I2M HILL P,O, Box 91500 Bellevue, Washington 98009-2050 {425) 453-5000 Preliminary document prepared for discussion Purposes only- not subject to disclosure. Contents Page - 1. Introduction .................................................................................................................................... 1 2. Water Supply Objectives .................................................................................... , .......................... 1 3. Existing Conditions ....................................................................................................................... 3 4. Issues/Decision Drivers ................................................................................................................ 3 4.1 Rayonier Mill Closure ........................................................................................................ 5 4.2 Elwha Ranney Collector ................................................................................................... 5 4.3 Elwha Dam(s) Removal Process ...................................................................................... 8 _ 4.4 Lower Eiwha S'Klallam Tribe ............................................................................................ 9 4.5 Water Rights Law Changes ............................................................................................ 10 - 4.6 Watershed Planning ....................................................................................................... 12 4.7 Morse Creek Hydropower Station ................................................................................... 13 - 4.8 Growth (Water Supply Needs) ........................................................................................ 14 4.9 Endangered Species Act ................................................................................................ 15 4.10 Corrosionn Control..: ..................................................................................................... 16 5. Alternative Supply Options ......................................................................................................... 16 6. Recommended Supply Strategy ................................................................................................. 21 6.1 Immediate/Near-Term Activities ...................................................................................... 21 6.2 Possible Strategy Direction(s) ........................................................................................ 22 Appendices - A Supply Strategy Objectives B Development of Demand Projections Tables 1. Water Rights ................................................................................................................................. 11 2. Water Demand Projections ........................................................................................................... 14 - SENplm/contents.doc i Printed: 4/28/99 Preliminary document prepared for discussion Purposes only- not subject to disclosure. 3. Preliminary Qualitative Evaluation of Alternative Strategy Outcomes ........................................... 19 B-I. Historic City and PUD Average Annual Water Demand ............................................................. C-1 Figures 1. Strategy Development Process ...................................................................................................... 2 2. Regional Location Map ................................................................................................................... 4 3. GWI Classification Process ............................................................................................................. 7 4. Possible Strategy Direction(s) ....................................................................................................... 23 SENpIm/contents.dcc ii Printed: 4/28/99 Preliminary document prepaid for discussion Purposes only - not subject to disclosure. 1. Introduction This study was prepared in response to the need to reexamine the City of Port Angeles' (City's) strategy for meeting its long-term future water supply needs in light of recent and -- forthcoming events that affect the City's supply. The City's water supply objectives, the existing supply conditions, issues that affect the City's water supply decision process, alternative supply strategy outcomes, and a recommended supply strategy are discussed - herein. The relatively near-term timing, less than one year up to perhaps ten years, in which several issues will unfold make it critical that the City respond quickly to develop a clear strategy to meet its supply objectives while minimizing impacts to its current and future rate payers. These issues include: · the recent closure of the Rayonier mill, · the impending regulatory decision regarding the status of the City's Elwha Ranney collector as a groundwater supply, · the Elwha dam(s) removal process, · potential impacts related to the Endangered Species Act (ESA), and __ · a potential regional supply strategy as a means of implementing and maximizing Elwha dam(s) removal mitigation. Further discussion of how each of these and other issues impact the City's water supply are addressed in Section 4. A flowchart that graphically summarizes the City's supply strategy development process is presented in Figure 1. - The City's supply strategy serves as a tool to guide it toward a desired endpoint or set of endpoints, representing facilities that enable it to achieve its strategy objectives. This tool will aid the City in making decisions in response to resolution of important supply issues -- and refine the pursuit of its supply strategy if necessary. Successful achievement of its objectives will result in a long-term, reliable supply that meet the demands of its current and future customers. Although the City's supply strategy can be envisioned as the facility · - endpoints to which it may lead, it is in fact the City's water supply "roadmap' to the future. 2. Water Supply Objectives The City's water supply objectives provide the foundation for the development of its water supply strategy. The City's challenge is to accomplish its objectives in an effective manner while addressing all of the issues and events that affect its supply system. The City's primary water supply objectives are as follows: · Develop a capacity that can safely, reliably, and efficiently supply all customers between the Elwha river and Morse creek. · Maintain its industrial supply system infrastructure and Elwha manufacturing water right to supply current and future users. Preliminary document prepared for discussion purposes only- not subject to disdosure. · Develop its supply strategy in concert with the Elwha dam(s) removal process and obtain the maximum federal mitigation funding to offset the cost for related water supply improvements. In addition to these primary water supply objectives, other needs and requirements must be integrated (regardless of the supply strategy the City pursues) into its supply strategy, including: complying with all applicable regulatory requirements, ensuring adequate water rights are in place, meeting the supply needs associated with growth, and continuing to provide a high-quality, reliable supply for its customers. A more detailed discussion of the City's three primary supply objectives is presented in Appendix A. 3. Existing Conditions The City's existing domestic and industrial water systems, including pipes, storage reservoirs, pumps, supply intakes, and water rights represent the initial building blocks for developing the its supply strategy. The existing facilities and water rights that comprise these systems provide reliable and economical water supplies that are the foundation of the City's present and future economy and a fundamental, essential public service to the community. The City has benefited over the years from its large capital investment in this system. Preserving these advantages and the City's investment in the context of achieving its supply objectives and the critical supply issues it faces is important. The City's domestic system is supplied from the Elwha Rarmey collector and the industrial system is supplied from a diversion and intake system on the Elwha river. The industrial supply pipeline is a very old, large-capacity system that operates at low pressure. The domestic supply pipeline is a 20-year old, 24-inch ductile iron pipeline that is adequate to meet the City's supply needs now and well into the future. Water rights for both of these systems are adequate to meet the City's projected needs well into the future. Development of the City's supply strategy includes the integration of these existing conditions with the City's supply strategy objectives and the supply issues it faces. A map showing the relative location of these facilities is presented in Figure 2. 4. Issues/Decision Drivers Several issues affecting the City's supply systems have recently arose or are anticipated in the coming years. These issues have affected and will continue to affect the City's water supply decision-making process, and its long-term strategy must be developed to incorporate the outcomes from these issues, some of which are currently unknown. In essence, the issues are "decision drivers" within the strategy. In some cases the City can help shape the decision driver within the context of the supply strategy; however, in other cases the strategy must incorporate options so the City can respond once the results of the decision drivers they have little control over are known. These issues and decision drivers include: Preliminary document prepared for discussion purposes only- not subject to disclosure. 1. Rayonier mill closure 2. Regulatory and capacity issues related to the Elwha Ranney collector 3. Elwha dam(s) removal process/mitigation planning 4. Lower Elwha S'Klallam tribe (instream flows and fisheries habitat) 5. Water rights law changes 6. Watershed planning (RCW 90.82) 7. Closure of the Morse creek hydropower station 8. Growth (Water Supply Needs) 9. Endangered Species Act (ESA) 10. Corrosion control It is important to note that the discussions of the issues/decision drivers presented herein are presented somewhat independently of each other. However, the results of some of these issues could have significant impact on the desired outcomes of others. Later in this report an attempt is made to demonstrate the most likely inter-relationship between two of the most critical issues. 4.1 Rayonier Mill Closure The closure of the Rayonier mill in 1997 made the site available for possible use as a regional water treatment facility. The City's ability to provide treatment and distribution of Elwha river water to itself and the Clallam County PUD could enhance its ability to obtain mitigation funds related to Elwha river dam removal. Development of a regional water system would also provide an opportunity to enhance instream flows in Morse creek and increase the reliability of water service to the City's eastern UGA all the way to Morse creek. Closure of the mill also creates the need to plan future uses of the City's water rights for manufacturing, and to protect this source of water for the future economic development of the region. Future use of the manufacturing water right may be limited by salmon habitat/endangered species considerations, These factors must be considered when planning investments in upgrading water transmission lines and treatment facilities from the Elwha river diversions. 4.2 Elwha Ranney Collector The Elwha Ranney collector was constructed in 1978 and has supplied the City and most of the PUD No. 1 of Clallam County's (PUD's) service area west of Morse creek since that time. Two key issues related to the Elwha Ranney collector have arisen in recent years and are discussed in this section. 4.2.1 Possible GWl Designation The Elwha Ranney collector is supplied by groundwater from an aquifer that is fed by the Elwha river. The Ranney collector is situated adjacent to the Elwha river on its east side. Because of its proximity to the Elwha river and its design as a Ranney collector it was Preliminary document prepared for discussion purposes only - not subject to disclosure. identified by the DOH as a candidate for GWI designation (all Ranney collectors were identified). As stated above, GWI stands for "groundwater under the direct influence of surface water." If the Rarmey collector is designated by the DOH as a GWI source, it will be subject to the regulatory requirements for surface water supply sources. All surface water supply sources are subject to the requirements of the Surface Water Treatment Rule (SWTR). These regulatory requirements are more stringent than those for groundwater supply sources. The City began collecting 12 months of water quality data, including temperature and conductivity, from the Elwha river and the Elwha Ranney collector, in February of 1998, as directed by the DOH. The first six months of data collected by the City was submitted to the DOH to enable it to make a preliminary determination as to whether or not there was a sufficient water quality connection between the Elwha river and the Ranney collector to warrant further testing. The DOH reviewed the initially collected data and stated that a correlation between the Elwha river water and water collected from the Ranney collector was apparent. The DOH directed the City to continue with the final six months of required data collection as well as to collect microscopic particulate analysis (MPA) sample. The City will soon collect this sample and submit it for laboratory analysis. Per DOH guidelines regarding GWI classification, the DOH will use the results of the MPA to determine whether or not the Ranney collector is GWI. A graphical summary of the GW! classification process is presented in Figure 3. If the Ranney collector is not designated as a GWI supply source, no significant changes in operation of this facility based on regulatory requirements are expected. However, if the Ranney collector is ultimately designated as a GWI supply source, several costly requirements could be imposed including filtration, as indicated in Figure 3. These compliance approaches range from having minimal impact to requiring extensive and costly facility improvements. Regardless of whether or not filtration or ozonation is required, the City would have to comply with the disinfection requirements of the SWTR. These disinfection requirements, referred to as "CT" requirements are based on providing adequate contact time for a disinfectant such as chlorine prior to the first customer. Imposing CT requirements would affect how the Ranney collector is operated, and depending on the level of CT requirements, could make it necessary to construct additional storage to provide adequate contact time. Preliminary computations reveal that the City could meet CT requirements for "l-log" (90%) inactivation of Giardia lamblia with only minor piping changes, relating primarily to the connection to the Elwha Heights system, and minor operational changes. This l-log CT requirement would likely be the minimum disinfection contact requirement if the collector is classified as GWI. Requiring the City to provide as much as 3-log (99.9%) inactivation of Giardia lambIia and viruses, or even Cryptosporidium inactivation, would make extensive and costly facility improvements necessary. This issue, with the exception of the Elwha dam removal process, could have the greatest single impact on the City's strategy. Although the outcome of the GWI process is expected to be resolved soon (sometime in 1999), it is only possible to speculate as to the compliance requirements that might be imposed by the DOH. Preliminary document prepared for discussion purposes only - not subfect to disclosure. 4.2.2 Declining Yields The Elwha Ranney collector had a stated reliable capacity of 11 mgd when it was constructed in 1977. The capacity of the Elwha Ranney collector has shown to be dependent on the flow conditions and proximity of the Elwha river. In recent years the City has been unable to operate both the Elwha pumps simultaneously for more than a few hours during the summer months when river level is low and demand is high. Although the City typically operates the Ranney collector with a single pump during most of the year, peak demands occur during the summer, requiring that the City operate both pumps simultaneously. When operated simultaneously, the Elwha pumps withdraw an instantaneous flowrate of 10 mgd from the collector. The continual westward migration of the Elwha river away from the Ranney collector has contributed to declining summertime yields. Continued migration of the river to the west could result in further yield reductions from the collector. This issue is important because it signals the eventual need for additional supply development regardless of the impact of other issues facing the City's water supply. When additional supply development is necessary is dependent on many factors. These factors include: the capacity of distribution system storage, the rate of growth in water demand, conservation measures, efforts to offset the westward migration of the Elwha river, and whether or not to supply additional customers outside the City's existing service area. 4.3 Elwha Dam(s) Removal Process/Mitigation Planning Removal of either or both of the Elwha river dams represents the core issue and greatest challenge around which the City must develop its supply strategy. Removal of the dam(s) will result in federally funded changes and additions to the City's supply facilities. Equally important, however, is the timing of the dam removal process. The City's supply strategy development in response to the other issues it faces must be intimately linked to the timing of the Elwha river dam removal process to avoid, capital expenditure that could prove ineffective once the dams are removed. The bill before the United States Congress in 1998 was contentious and linked to requirements for the Columbia and Snake river systems. It included initial removal of only the lower Elwha river dam and is a change from the original proposal to remove both dams. However, this bill was not passed. Although continued debate on the issue of removing either or both of the Elwha dams is expected in 1999, it is unclear what specific measures and conditions it will include. The initially proposed mitigation measures proposed by the United States Department of the Interior's Bureau of Reclamation were based upon the simultaneous removal of both dams. Thus, should a bill that includes a phased removal of the Elwha dams be passed by Congress, revision of these proposed measures would be warranted. As stated, the Bureau of Reclamation has proposed specific mitigation measures for the City's industrial and domestic supply systems. These proposals have been developed with minimal opportunity for input from the City or its advocates. The specific details of these proposed measures are important and must be evaluated based on sound science and engineering principles to ensure the City's interests are protected. However, the Preliminary document prepared for discussion Purposes only- not subject to disclosure. appropriate mitigation measures will likely not be determined until a specific Elwha dam removal bill is approved. CH2M HILL prepared a draft report dated January 27, 1999 entitled "Elwha Dams Mitigation Facilities Report (Draft)." This report discusses alternative water supply diversion and treatment facilities that would be required to mitigate the impacts of dam removal. The report is a starting place for development of a mitigation strategy by the City and Clallam County PUD for presentation to the Department of Interior and the congressional delegation. It will need to be updated by the City following Utility Advisory Committee and City Council consideration of this Water Supply Strategy. A critical decision for the development of a mitigation strategy is a decision by the City and PUD regarding a regional water supply system, which could alter the mitigation facilities required and change the region's endangered species response plan. Considering the above discussion, it appears likely that resolution of other important challenges facing the City such as the GWI and water rights issues will need to occur prior to the determination of the specific mitigation measures to be included as part of the Elwha dam(s) removal process. This fact is important because it helps define the implementation timeline for the City's supply strategy. Substantial further delay in the Elwha dam(s) removal process could adversely affect the City's decision-making process regarding addressing its corrosion control issue (discussed in Section 4.9). If the Elwha dam(s) removal process remains an unresolved, pending, or imminent issue at the time the City is required to install a corrosion control treatment system (not until the year 2003 or 2004), the City may have to face the possibility of installing a treatment system that might not be needed, depending on the specific components of federally-funded, dam(s) removal mitigation facilities. 4.4 Lower Elwha S'Klallam Tribe The Lower Elwha S'Klallam tribe is one of the important stakeholders in the future of the Elwha river. The tribe has unadjudicated treaty and Winters Doctrine water rights to instream flows for the survival of fish species, and federal agencies have a trust responsibility to protect such rights on its behalf. The tribe has an interest in improving the Elwha river fish habitat with respect to the establishment of minimum instream flows. The tribe would also like to construct and operate a fish rearing channel or "stock preservation channel" (in addition to the existing Washington State hatchery). It is understood that the tribe believes that the closure of the Rayonier mill provides an opportunity to enhance protection of the Elwha river fishery below the industrial system intake and supply a stock preservation channel. With the closure of the Rayonier mill, diversions from the Elwha river will be reduced by approximately 54 cfs (35 mgd). The City believes it is important to consider the tribe's objectives and concerns in the development of its supply strategy. The tribe is participating with the City and other parties in a watershed planning effort for WRIA 18 under chapter 90.82 RCW. The parties have elected to include instream flows for - 9 Preliminar~z document prepared for discussion Purposes only- not subject to disclosure. the Elwha river as an element of the watershed plan. Adoption of instream flows may ultimately be necessary to address issues related to the Endangered Species Act (discussed in Section 4.9 below) and to achieve regional consensus on future water resources management in the Morse creek to Elwha river sub-basin. It could also adversely affect the operation of the City's supply system, although the priority date of any new instream flows would be junior to the City's existing water rights. The tribe's interest in salmon recovery and instream flows will likely have the greatest impact on the City's strategy as it relates to its industrial supply system. The City's industrial supply system has a much greater withdrawal capacity than does the domestic supply system and much greater water rights as well. Another potential factor is that there is only a single customer currently using the industrial supply system. Thus, only a fraction of the capacity of the industrial supply and its associated water right for manufacturing purposes are currently being put to beneficial use. 4.5 Water Rights Law Changes Water rights law in the state of Washington is rapidly changing as a result of the endangered status of salmon and other fish species and the perceived need for restoration of instream flows in rivers and streams to preserve them from extinction. The combination of tribal rights, endangered species law, and state policy favoring instream flow protection has permanently altered the way the state manages water resources, including municipal water rights. This new dynamic requires that the City's assumptions about its water rights be reevaluated in light of recent case law, Department of Ecology regulations, and ESA listings. The City must be aware of the potential vulnerabilities of its water rights and the limitations that salmon restoration can have on the water supply system. The City has several water rights certificates and permits that are granted for municipal (domestic), manufacturing, and hydropower generation uses. Because of the Rayonier mill closure, potential permanent closure of the Morse creek hydropower station, potential Elwha dam(s) removal, and watershed planning, the issue of water rights is a key element of the City's supply strategy. The City's Morse creek water right and its Elwha manufacturing water right have issues that need to be resolved. The City is currently working with a water rights consultant on these two issues. The Morse creek water right certificates, No.s 874 and 2345, were formerly used to permit use of Morse creek as the City's primary supply prior to construction of the Elwha Ranney collector in 1978. However, their use designation was changed in the 1980s to "non- consumptive" to support the City's Morse creek hydroelectric project. The City intends to obtain written certification from the Department of Ecology permitting use of this supply for municipal uses in the event of emergencies or possibly even to support use of Morse creek as a primary supply (depending on the City's ultimate long-term supply strategy. The City also intends to preserve its Elwha manufacturing water right (often referred to as the "Elwha industrial right"), Certificate No. 1328 for future manufacturing purposes. While this water right is not currently being fully utilized, it is critical to the long-term 10 Preliminary document prepared for discussion Purposes only - not subject to disclosure. industrial growth and vitality of the City, particularly in light of the recent closure of the Rayonier mill. Rayonier formerly used approximately 35 mgd under this water right. With the closure of the Rayonier mill, only approximately 10 mgd of the Elwha manufacturing water right is currently being used (by the Daishowa mill). Because it is not legally clear whether the City's manufacturing right is exempt from potential relinquishment for nonuse, the City's water rights consultant is developing a recommended strategy for preservation of the Elwha manufacturing right. This strategy will be coordinated with the City's Economic Development Director, and a long-term industrial development program may be initiated to preserve this water right for future development. The City's supply strategy must ensure that adequate water rights are available to meet current and projected future water uses. A summary of the water rights held by the City, the PUD, Dry Creek Water Association, and Black Diamond Water District is presented in Table 1. Table 1 Water Rights (mgd) Instantaneous Average Annual Water System I Source Rate Rate City Elwha Municipal (t) Elwha Ranney Collector 19.440 18.390 Elwha Industrial (2) Elwha River 96.900 96.900 Morse Creek (3) Morse Creek 12.920 12.920 Subtotal 129.260 128.210 PUD (4) I Morse Creek 0.969 0.342 I~ Bluff Well 1.942 0.167 ! Township Line Well 0.050 0.050 Subtotal 2.9611 0.859 , Dry Creek Water Association Elwha River Wells 0.403 0.300 Black Diamond Water District Little River 0.162 0.162 Totals 1) Overall 132.8 129.2 2) Without Hatchery and PUD 97.5 96.4 3) Without Hatchery, Elwha Industrial, and PUD 32.9 31.8 4) Without Hatchery, Elwha Industrial, PUD, and Morse Creek 20.0 18.9 r Notes: (1) This permit includes a development schedule with a completion date of July 1,2000. An additional 12.94 mgd is granted as a "supplemental right" to the Morse Creek rights. Thus, a total of 32.37 mgd is permitted to be diverted on an instantaneous basis if no diversion is being made from Morse Creek. (2) 32.2 mgd of the Elwha Industrial right is dedicated for fish rearing at the Washington State hatchery. (3) This water dght is currently granted for hydroelectric power generation and is subject to instream flow requirements. Resolution with Eco[ogy of this water right would be necessary if the City were to chose to use Morse Creek as a primary source of domestic supply. _ (4) These permits and rights are granted for the PUD's use east of Morse Creek. 11 Prellmina~ document prepared for discussion Purposes only - not subject lo disclosure. The purpose of summarizing the existing water rights of each of the water systems within the region is two-fold: 1) to help identify which existing supply sources represent viable long-term supply alternatives, and 2) to compare existing water rights to current and project supply needs. From Table 1 it is apparent that water rights held by Dry Creek Water Association and Black Diamond Water District are only a fraction of those held by the City. The capacities of the supply facilities for both of these systems are correspondingly small and only marginally adequate to meet their current customers. Both systems face the challenge of maintaining existing treatment systems and/or installing new treatment systems. The PUD's water rights are primarily used for supplying customers within the PUD's system east of Morse creek; thus, they do not apply to the City's strategy objective of serving customers between the Elwha river and Morse creek. It is the City's water rights and its supply sources that represent the best opportunity for supplying all existing and future customers between the Elwha river and Morse creek. Furthermore, the water rights held by the City are substantial - enough to meet the combined long-term future supply needs of projected domestic customers and industrial customers. A summary of projected future water uses and a comparison of water rights and projected demand is presented Section 4.7. 4.6 Watershed Planning Watershed planning is a process authorized by RCW 90.82 (HB 2514) to involve a wide range of water resource interests in a locally managed process to investigate and plan actions relating to water quantity, water quality, habitat restoration, instream flows and the identification of projects and actions to protect water resources and improve aquatic habitat. On behalf of the City, the Elwha tribe and others, Clallam county applied for and received a grant from the Department of Ecology to initiate watershed planning in the Morse creek to Elwha river portion of WRIA 18 and to continue the pre-existing planning process for the Dungeness river portion of WRIA 18. An Intergovernmental Agreement was executed by the initiating governments of the WRIA 18 planning process in late 1998. The City is currently involved in the initiation process of identifying members of a planning unit for and goals for the planning process. The development of minimum instream flows for the Elwha river is expected to be the most important element of the Morse creek to Elwha river plan. If ultimately adopted as a regulation by the Department of Ecology, an instream flow could affect future management of the City's water rights, especially if the City seeks any changes to its water rights requiring Department of Ecology approval. Legally, however, the City's existing water rights would continue to have a senior priority date and should not be affected by an instream flow level adopted as a regulation. It is unclear, however, whether future expansion of the City's domestic supply system could be affected by instream flow regulations, because the water right for the Elwha Ranney collector is not fully perfected. This is one of the evolving water rights issues that the City is analyzing with its consultant. 12 Preliminary document prepared for discussion Purposes only- not subject to disclosure. The planning unit for eastern WRIA 18 will most likely be lead by a management team including the City and the Lower Elwha S'Klallam Tribe. This management team may evolve into the organization best suited for obtaining regional consensus for the City's final water supply development strategy. Obtaining consensus or feedback from the watershed management team could be instrumental to avoiding future administrative appeals and litigation. 4.7 Morse Creek Hydropower Station Morse Creek served as the City's primary municipal water supply from 1924 until development of the Elwha river domestic supply (Elwha Ranney collector) in 1978. Water rights for the Morse Creek supply were altered by Ecology to support the Morse creek hydropower station (hydropower station). However, stringent instream flow requirements were also included in the altered water right. These instream flow requirements were included to protect Morse Creek's fish habitat. The hydropower station was operated in conformance with these instream flow requirements, which typically restrict operation in April, late summer, and early fall. The City has not operated the hydropower station since April 1997 and is considering its permanent closure. Because of escalating maintenance costs primarily related to the old Morse creek supply pipeline and recent reductions in the cost of purchased power from the Bonneville Power Administration, the City estimates it would lose approximately $20,000 per year if it continues to operate the facility. The Morse creek supply pipeline is constructed of concrete cylinder pipe. Downstream sections of this pipeline still used within the City's distribution system have proven to be maintenance-intensive with several leaks and breaks. The section of supply pipeline upstream of the penstock connection to the hydropower station had several significant leaks in recent years. Continued degradation of the pipeline is expected and could represent a risk for the City related to environmental or other damage resulting from a major break. This issue is important for the following reasons: · If operation of the hydropower station is discontinued permanently, the Morse Creek supply represents a possible domestic supply alternative for the City. If the Morse Creek supply were to be developed for municipal use, a treatment facility would be required and the Morse Creek water right would have to be altered (resolved) by Ecology. · Discontinuing operation of the hydropower station would enable the City to reliably count on the Morse creek supply as an emergency backup to the Elwha Ranney collector. Although emergency use of this supply is specifically permitted by the City's Morse creek water right, the issue of whether or not the instream flow requirements governing the hydropower station operation still apply after its closure would need to be resolved. 13 Preliminary document prepared for discussion Purposes only - not subject to disclosure. Discontinuing operation of the hy,dropower station raises the issue of the status of the Morse creek water right. The City contends that the Morse creek water right, upon closure of hydropower station operation, should revert to its status (without instream flow restrictions) prior to issuance of the superseding certificate permitting hydropower station operation. Although the Morse creek water right issue is an important factor in development of the City's supply strategy, particularly as it relates to establishing a reliable emergency backup supply, it is not the primary issue that requires resolution. Development of Morse creek as a primary supply for domestic uses will likely only become a part of the City's supply strategy if the City is unable to continue using the Elwha supply. 4.8 Growth (Water Supply Needs) Projected regional water supply needs (demands) were estimated based on available data from each of the four water systems between the Elwha river and Morse creek: the City, the PUD, Dry Creek Water Association, and Black Diamond Water District. Current water use figures were developed from existing meter data and other current information. Future demands were estimated based on recent growth trends identified for each system. A summary of the projected average annual demand (ADD) and maximum day demand (MDD) is presented in Table 2. A more detailed discussion of how the demand projections were developed for each water system is presented in Appendix B. Table 2 Water Demand Projections (mgd) 1997 Demand 20-year Projection r-40.year Projection Water System ADD MDD ADD MDD ADD MDD City of Port Angeles 3.10 6.98 3.78! 8.51 4.62 10.38 Adjacent Water Systems Clallam County PUD No. 1 0.501 1.13 0.87 1.95 1.51 3.40 Black Diamond Water District 0.061 0.13 0.10 0.23 0.18, 0.41 Dry Creek Water Association 0.12 0.27 0.19 0.42 0.30 0.66 Subtotal 0.67 1.52 1.16 2.60 1.99 4.47 Total 3.8 8.5 4.9 11.1 6.6 14.9 The data presented in Table 2 represents the most recent data available for current demands and future projections. Records for the City and the PUD, as summarized in Appendix B, indicate that water use has remained level or decreased slightly in recent years. This stagnation in water demand growth can be attributed to a combination of several factors Preliminary document prepared for discussion Purposes only - not subject to disclosure, including: distribution system leak detection and correction, increases in water rates, a greater awareness of the need to conserve, and above-average precipitation. It is assumed for the purposes of this evaluation, that the demand projections for the City and adjacent systems do not exceed the demand associated with "buildout' based on current City and county zoning. A 1-percent annual growth rate, based on recent growth trends, was used for projecting the City's future demand. Developing buildout demand projections based on current zoning would provide alternate future demand estimate, but would not improve the accuracy of long-term future projections. It is also important to note that the projections presented in Table 2 are "estimates," are not overly conservative, and do not reflect possible acceleration in growth that could lead to even greater supply capacity needs. Estimating future water use needs is an essential component of any long-term supply strategy. The City's supply capacity will need to increase as growth within the City continues and as the City annexes adjacent areas and extends services. The current reliable capacity of the existing Elwha Ranney collector for meeting the maximum day demand (MDD) is somewhat less than 10 mgd based on the City's recent experience during the summertime demand season. Even if the City does not expand its service area or agree to supply Black Diamond Water District and Dry Creek Water Association in the near-term future, its supply needs will exceed the capacity of the Ranney collector in as few as 10 to 15 years. The City's Elwha Ranney collector water right permit has an adequate quantity of water to serve the future demand estimates shown on Table 2. The current development schedule on the permit requires the City to put the water to beneficial use by July 1, 2020. Quantities of water put to beneficial use by that time would be perfected and available for future demands in the City's service area. In order for the City to continue expanding its water system beyond 2020, additional extensions of the development schedule may be necessary. 4.9 Endangered Species Act The Endangered Species Act (ESA) could impact the City's supply system because of the listing by the National Marine Fisheries Service (NMFS) of the Puget Sound Chinook salmon as a threatened species. Although not specifically located in the Puget Sound area, the Elwha river has been identified as supporting a Fall Chinook salmon population that is intimately linked with, and thrives within, the waters of the Puget Sound for the majority of their lives. The United States Fish and Wildlife Service (USFWS) has also proposed the Puget Sound Bull Trout for listing under the ESA as a threatened species. The City has several options to consider in order to continue use of its water supply, in compliance with the ESA, including, but not limited to, applying for an "incidental take" permit and preparing a Habitat Conservation Plan (HCP) in support of this permit. Pursuit of these activities, if necessary could require extensive involvement of other stakeholders in the affairs of the City's water supply, significantly complicating its ability to direct the future of its water supply strategy. The City recognizes that development of a strategy to 15 Preliminary document prepared for discussion purposes only - not subiect to disclosure. address this issue is important and has begun to undertake that task, including participation in Southwest Puget Sound regional salmon recovery planning efforts. 4.10 Corrosion Control As a result of the lead and copper samples the City collected from the distribution system in 1992 and 1993, the City is required to install corrosion control treatment for the Elwha Ranney supply. The City exceeded the copper standard but not the lead standard. Copper concentrations at customer taps is the result of corrosion of copper pipes. There are no known serious acute or chronic health-related affects of copper in drinking water at the concentrations measured at some customer taps. The health risk associated with these low concentrations is not considered serious. However, the cost associated with installing corrosion control treatment for the Elwha Ranney supply is not insignificant. As already discussed, there are uncertainties in the near-term future of the Elwha Ranney collector related to the GW! issue, removal of the Elwha dams, and the City's budget constraints related to closure of the Rayonier mill. Thus, to avoid potentially unnecessary capital expenditure to solve the City's corrosion issue based on the existing supply configuration, a compliance schedule was negotiated by the City and DOH to install corrosion control treatment after the City's uncovered distribution system reservoirs are covered. The primary rationale for this compliance approach was to attain the greatest possible health-related benefit per dollar expended. The City had planned to cover its uncovered distribution system storage reservoirs independent of the corrosion issue. The DOH concurred that accelerating the schedule for covering these reservoirs represents a more effective use of the City's limited capital resources than constructing corrosion control facilities, particularly in light of the potential outcome of the other issues described above. Addressing its mildly corrosive supply is an important issue facing the City; thus, it warrants consideration in the development of its supply strategy. However, the extent of the measures necessary for the City to address this issue depends on the resolution of other more pressing issues facing the City. Despite the importance and potential impacts of this issue, it is not likely to overshadow the other issues discussed above in the development of the City's supply strategy. Likewise, covering the uncovered storage reservoirs are not considered to be major considerations in the development of the City's supply strategy. The City would have been required to cover its distribution system storage reservoirs regardless of the supply source. 5. Alternative Supply Options The following alternative supply options represent the various means by which water supply facilities can be used or developed in light of the issues described above in order to meet the City's water supply objectives. It must be recognized that the desirability of various supply options will affect the need and timing for resolution of particular water rights issues. For example, development of the Morse creek supply as a primary supply 16 Preliminary document prepared for discussion purposes only - not subiec! to disclosure. source would require resolution of the water rights permitting issue described in Section 4.7. Development of a second Ranney collector on the Elwha river would require resolution of the GWI issue and/or mitigation planning and funding for Elwha dam(s) removal. Therefore, it is important to recognize the connection between the following supply options and the need to prioritize issues for resolution. 1. Continue Using Elwha Ranney Collector. Continue to use the Elwha Ranney collector as the primary water supply source and develop a second Ranney collector, when needed, to meet future water supply needs. Develop and maintain Morse creek as an emergency backup supply. 2. Develop Morse Creek. Permanently discontinue hydropower station operations and develop the Morse creek supply as the City's primary supply or as a supplemental supply to the existing Elwha Ranney collector. 3. Elwha-Supplied Treatment Plant. Construct a new treatment facility in conformance with the regulatory requirements for surface water to be supplied from the Elwha industrial system intake or the Elwha Ranney collector. It is important to note, particularly as it relates to the Elwha dam(s) removal process, that continued use of the Ranney collector as a supply to a surface water treatment plant would be a superior treatment approach to direct withdrawals from the fiver. Develop and maintain Morse creek as an emergency backup supply without surface water treatment. 4. Elwha/Morse-Supplied Treatment Plant. Construct a new treatment facility in conformance with the regulatory requirements for surface water to be supplied from the existing Elwha industrial system intake or the Elwha Ranney collector and the Morse Creek supply. 5. Regional Water Supply System. The City and PUD are reviewing possibilities of cooperatively developing a regional water supply in conjunction with the removal of the Elwha dams. The goal of a regional water supply would be to have one source supplying the combined City/PUD water service area, eliminating the need for the PUD to construct a separate treatment plant to serve the area east of Morse creek and also eliminating the need for the PUD to use its Morse creek diversion. Eliminating the PUD's Morse creek diversion could be part of a regional response to the ESA listing, with the possibility of additional state or federal salmon conservation/restoration funds available to "purchase" the Morse creek water rights and construct a new treatment facility. A new treatment plant could be sited on the Rayonier mill site adjacent to the city wastewater treatment plant. A pipeline would be needed from the treatment plant to the middle zone, with the possibility of a parallel line to bring emergency water to the treatment plant from Morse creek or to deliver treated wastewater for reuse by the golf course or other non-potable future . water uses. 17 Prelhnina~ document prepared for discussion purposes only - not subject to disclosure. 6. Develop Groundwater Supply. Develop a groundwater supply or multiple supplies, the availability of which would need to be determined by exploration, and avoid the more stringent regulatory requirements for using surface water. Develop and maintain Morse creek as an emergency backup supply. 7. Develop Industrial/Manufacturing Supply Retention Strategy. To protect the City's Elwha manufacturing water right from future potential actions aimed at restricting this supply to current usage, the City should develop a strategy that links its economic development planning and water supply for large non-potable uses to the future use of the industrial diversion and pipeline. The City's water rights consultant is currently addressing this issue. The use of the industrial diversion or pipeline for any other water supply option must be examined for its impact on future uses of the manufacturing water right. It should also be recognized that the historic diversions for this water right were considerably larger than current diversions and projected future needs for manufacturing and other non-potable purposes. ~'herefore, the City should also consider using some portion of this water right for purposes consistent with salmon recovery, watershed planning and ESA compliance. If it is assumed that each of these primary domestic supply options can be developed to meet the City's three primary supply objectives, their relative merits depends primarily on their costs (capital, operation, and maintenance) as well as their capacity to reliably meet the City's needs in view of other issues such as dam removal. It is most more important at this time to pursue a strategy that enables the City to achieve the desired outcome based on the resolution of the supply issues it faces. As stated previously, developing any of the supply options identified herein prior to the systematic resolution of the supply issues facing the City such as, GWI, the Elwha dam(s) removal process, and water rights issues, could lead to ineffective capital expenditure. Nevertheless, the City's supply strategy must be directed toward a desired outcome or set of outcomes. To help identify this strategy direction a preliminary qualitative evaluation of these primary domestic supply options is presented in Table 3. Based on the qualitative information presented in Table 3: · The City's current domestic supply system (the Elwha Ranney collector), in combination with a future similar facility, has several advantages over the other primary domestic supply options. It is also understood there are two key unresolved issues: 1) GWI classification, and 2) Elwha dam(s) removal. If the GWI classification process does not prevent continued use of the Elwha Ranney collector, and if the Elwha dams were not considered for removal, continuing to use the existing Rarmey collector and installing an additional future collector would be the most desirable supply option for the City. In the event that this primary domestic supply option becomes infeasible as a result of these issues, particularly the Elwha dam(s) removal process, one of the other supply options based on a surface water treatment facility will become attractive. 18 Preliminary document prepared for discussion Purposes only - not subject to disclosure. · Development of the Morse creek supply as a stand-alone primary supply source or as a reliable supplemental primary supply to the Elwha would be costly because of treatment needs and because of supply pipeline replacement needs. Other difficulties related to the lower flow in Morse creek compared to the Elwha river, as presented in Table 3, should be expected. · No specific assessment of the development and maintenance of the Morse creek supply as an emergency backup is made. Its use in this is, to some degree, independent of the primary domestic supply options. The viability of the existing Morse creek supply system (intake and pipeline) is questionable. However, it should not be assumed to be unusable. Reserving the right to undertake development of this element of the City's supply strategy is important because if the Elwha domestic supply facilities are lost because of a flood or groundwater contamination, Morse creek could serve as an high-quality emergency backup supply (despite the fact it does not comply with SWTR requirements). However, the strategy objectives related to development of a primary supply outcome are the more important area of focus at this time. Furthermore, because Morse creek would serve only as an emergency backup supply, allocation of funds for this purpose would need to be evaluated based on implementation of the strategy. To further quantify the relative merits of each of the domestic supply options presented, more detailed quantitative comparisons based on economic and other relevant criteria would be necessary. Such comparisons may be warranted and more effective as the results of the GWI classification process become known, water rights issues are resolved, and the specific mitigation measure of the Elwha dam(s) removal process are developed. At this time, the following assertions can be made regarding these primary domestic supply options: · Continued supply of its domestic customers from the existing Elwha Ranney collector and a future Ranney collector is the preferred domestic supply option. The Elwha dam(s) removal process, and to a lesser extent the GWI classification process, pose the greatest threats to the continued long-term use of this facility as a stand- alone groundwater supply. Assuming the Elwha dam(s) are removed, reliance solely on a Ranney collector supply system is not likely a feasible option. However, a Ranney collector as a supply intake to a surface water treatment plant could prove to be a mitigation measure of the Elwha dam(s) removal process that best serves the City's interests. Such a configuration would provide the City with the reliability of surface water treatment as well as the potent/al option of bypassing the treatment facility, if permitted by the DOH, thus reducing operation and maintenance costs. · In the event supply from the Elwha Ranney collector becomes unfeasible, development of an Elwha-supplied surface water treatment facility represents an attractive option. · Development of a regional water supply system with the PUD may be an attractive alternative to state and federal agencies in light of endangered salmon issues and options for increasing flows in Morse creek and the Elwha river to accommodate 20 Preliminary document prepared for discussion Purposes only- not subject to disclosure. salmon recovery. If it is assumed that the bulk of financing for a surface water treatment facility would be provided by state and federal grant funds linked to Elwha dam(s) removal and/or salmon recovery, options which maximize benefits to salmon are more likely to get funded, reducing the City's share of costs. The viability of development of a groundwater supply to meet the City's needs is unknown at this time. Because of the lack of identified existing local high-capacity groundwater systems, this alternative outcome should be considered low on the City's priority list. Investigation of this alternative should not be undertaken until further resolution of the key supply issues facing the City. Alternative strategy outcomes for the City's industrial supply system were not identified or evaluated' as part of this study, but are being analyzed by the City's water rights consultant. It is assumed for this study that continued use of the existing system along with the mitigation modifications proposed as part of the Elwha dam(s) removal process is the desired and by far most likely strategy outcome. Pursuit of this strategy outcome mirrors the strategy implementation activities designed to achieve the desired domestic supply system outcome. 6. Recommended Supply Strategy -- The recommended supply strategy for the City includes taking immediate action toward resolution of some of the supply issues identified herein, monitoring the progress of others, adjusting the direction of the supply strategy as these issues are resolved. 6.1 Immediate/Near-Term Activities The activities presented in this section are those in which the City has a significant level of control and should undertake immediately or in the near-term future. Possible subsequent activities and strategy revisions dependent upon issues resolution are described in Section 6.2. 6.1.1 Water Rights The City, in accordance with the recommendations of its water rights consultant, should issue a letter to Ecology regarding Morse creek. The letter should state the City's intention to permanently close the hydropower station and requesting existing certificate be amended with a superseding certificate once the City has decided whether or not to use the Morse creek supply as a primary supply source or as an emergency backup supply. -- The City should follow the recommendations of its water rights consultant regarding protection of its Elwha manufacturing water right. Those recommendations include, but are not limited to, monitoring legislation regarding this issue and revising the City's Water - 21 Prelhninary document prepared for discussion purposes only- not subject to disclosure. System Plan. A more detailed analysis of these issues and a recommended strategy will be presented to the City in May 1999, following the current legislative session. 6.1.2 Monitor Development of Tribe's Instream Flow Study The City should monitor the progress of this activity, as part of the WRIA 18 watershed planning process, including an evaluation of the methodology to be used prior to undertaking the study. The results of this instream flow study could have a significant impact on operation of the City's supply systems. 6.1.3 ESA/Watershed Planning The City should immediately begin development of its strategy to address the proposed listing by the NMFS of the Elwha river Fall Chinook Salmon. Being pro-active on this issue will enable the City to have more control in identifying the need for, as well as directing any recovery or mitigation strategies that might be imposed. It is understood that these efforts have begun through the City's planning department and its water rights consultant. The City has communicated with state and federal agencies and sub-regional groups who are attempting a coordinated ESA response. If subregional responses do not adequately address the City's concerns about Chinook listing, the City should present its own recovery plan to the NMFS for inclusion in the forthcoming ESA 4(d) rule. 6.2 Possible Strategy Direction(s) Although many of the issues presented in Section 4 could have a significant effect on the City's supply strategy, it is recognized that the GWI classification issue and Elwha dam(s) removal process are most likely to have the greatest impact. In addition, it is going to be important that the City understand the strategy outcomes available (resulting from the GWI process) during the process of determining and negotiating the specific mitigation measures associated with the Elwha dam(s) removal process. Thus, the flowchart presented in Figure 4 summarizes the alternative strategy directions likely to be available to the City as the GWI and Elwha dam(s) removal processes move forward. This flowchart was developed in recognition of the following assumptions: · Elwha dam(s) removal process directly follows GWI process · Elwha dam(s) removal process is complete within 7 years · Lower Elwha S'Klallam tribe's objectives do to not conflict with City's supply objectives · The ESA issue does not materially limit the City's withdrawals from its Elwha supplies 22 Preliminazy document prepared for discussion purposes only - not subiect to disclosure. Appendix A Supply Strategy Objectives A more detailed discussion of the City's supply strategy objectives presented in Section 2 of the main report is presented below. A.I. Supply Customers Between the Elwha River and Morse Creek The City's primary objective is to pursue a water supply strategy that enables it to supply its existing and potential future customers between the Elwha river to the west, Morse creek to the east, and the Olympic Mountains foothills to the south. This objective does not include forcing service on customers or existing systems outside the City or unincorporated urban growth area that do not wish to be provided service. However, because of anticipated increased stringency in future drinking water regulations and the ever- increasing cost of providing service (particularly treatment), the City recognizes that a regional approach with the City as the service provider likely represents the best opportunity for long-term reliable supply to its customers within the City limits as well as those adjacent to the City. The City currently supplies all customers within the City limits, not including the Elwha industrial water system customers (Daishowa), on a retail basis and most of the PUD's customers west of Morse creek on a wholesale contract basis with the PUD. Most of the PUD's service area west of Morse creek lies within the unincorporated Port Angeles Urban Growth Area (PAUGA). Much of the Dry Creek Water Association service area is also within the PAUGA. Thus, it appears likely these areas will be annexed. Although portions of these service areas and all of the Black Diamond service area are located outside the PAUGA, the City believes that it may ultimately supply them as well, either through future annexation (as retail customers) or on a wholesale contract basis with the purveyor. Regardless of the manner and the time-frame in which the City ultimately supplies the customers of these adjacent systems, it is committed to ensuring that it has the supply capacity and the water rights to do so. The City has already received a request from Dry Creek Water Association to purchase enough water to meet its entire supply need and has also had some discussions within the past several years with Black Diamond Water District regarding supplying a portion of its supply needs. The PUD has also requested additional supply from the City. Thus, it is apparent that the City's role as the primary regional water supplier is a likely eventuality that should be addressed by the supply strategy. Preliminary document prepared for discussion Purposes only - not subject to disclosure. A.2. Maintain Viability of Industrial System and Water Right The City's owns the Elwha industrial system, including the diversion and intake system on the Elwha river, the supply pipeline to Daishowa and the old Rayonier mill site, and surge protection facilities at the old Rayonier mill site. These facilities have supplied manufacturing uses since the late 1920s. Despite the recent Rayonier mill closure which reduced withdrawals from this system from approximately 45 mgd to about 10 mgd, Daishowa continues to operate and use the Elwha industrial supply. The Elwha industrial system and the City's associated manufacturing water right are extremely valuable assets to the City. The City plans to continue using this system to supply its current customer, Daishowa, as well as potential future water-intensive industries. Being able to attract such industries is critical to efforts to expand the local economy. Thus, maintaining its ability to make beneficial use of this system and is associated water right is an important objective of the City's supply strategy. A.3. Coordinate with Elwha Dam Removal Process Removal of either or both of the Elwha Dams will have an adverse impact on both of the City's supply systems. The United States Department of the Interior's Bureau of Reclamation has proposed measures including substantial facility development to mitigate the adverse impacts associated with dam removal. The details and merits of the Bureau's specific proposed mitigation measures are somewhat questionable and subject to change, based on pending dam-removal legislation. When a dam(s) removal process is ultimately finalized, monetary funding is expected to be available to construct new supply facilities for the City. These new facilities would be specifically designed to mitigate the adverse impacts associated with removal of either the lower or both of the dams. It is anticipated that the water quality and related impacts of dam(s) removal will be the overriding factors in determining treatment and supply improvements. As such, much of the cost for the required facilities should be funded by the dam(s) removal process. Treatment investments made by the City prior to finalization of this process may prove to be "sunk" costs. Such improvements could be either incompatible with the treatment provided as a result of dame(s) removal or simply unnecessary. Thus, the City's supply strategy must be coordinated with the Elwha dam(s) removal process not only in terms of the physical facility issues that are relevant, but also with the relative timing of that process and the other supply issues facing the City. Preliminary document prepared for discussio~ purposes only- not sub}ect to disclosure Appendix B Development of Demand Projections The methods used for estimating future water use for the City and adjacent water systems, as presented in Table 2 of the main report, are presented herein. B.1. City of Port Angeles Current demands for the City were determined from reviewing the Elwha supply meter records from 1993 through 1997. A summary of the Elwha supply meter records, PUD water use, and the resultant City demand is presented in Table B-1. The Elwha supply meter values include the volume supplied to the PUD. Thus, the PUD's water use must be subtracted to determine the City's demand. The City's recent demand was used for projecting future water supply needs. The City's 1997 average annual water demand (ADD), as presented in Table B-l, as well as Table 2 of the main report, was approximately 3.1 mgd. Table B-1 Historic City and PUD Average Annual Water Demand (mgd) Elwha Supply Meter Year (Combined City and PUD) PUD West of Morse Creek (1) City 1993 3.38 0.40 2.98 1994 3.60 0.47 3.13 1995 3.54 0.50 3.04 1996 3.44 0.44 3.00 1997 3.46 0.41 3.05 (1) The PUD's use was estimated based on a ratio of the number of metered service connections west of Morse Creek to the total number in the P.A. Composite s~/stem (56 pement) multiplied by the total P.A. Composite demand. Future water use projections for the City were based on population growth rates and the rate of increase in the number of service meters. The Washington State Office of Financial Management's Forecasting Division estimates population growth in the City to be 1 percent per year from the 1990 census population of 17,710 to an estimated 1997 population of 18,890. Growth in service meter connections over the same time-frame was checked to confirm the estimated 1 percent population growth rate. Irt 1990 there were approximately 7,047 metered service connections and approximately 7,588 in 1997. This increase reflects a 1 percent annual growth rate, which was used to develop the demand projections presented in Table 2 of the main report. The ratio of the City's MDD to its ADD is approximately 2.25 based on production data from the Elwha supply meter. This ratio was used for projecting the City's future MDD. This ratio of 2.25 was also used for estimating the current and projected future MDDs for Preliminary document prepared for discussio~ purposes only- not subject to disclosure each of the other water systems, as presented in Table 2 of the main report, because of the lack of reliable MDD information from these systems. B.2. PUD No. 1 of Clallam County The PUD provided water use data for its system directly adjacent to the City, referred to as the "P.A. Composite." The P.A. Composite system includes services within and outside the PAUGA and on both sides of Morse Creek. The P.A. Composite system is supplied by two groundwater wells, a surface water treatment plant, and purchased water from the City. Historically, the area west of Morse creek has been supplied by purchased water from the City. The area east of Morse creek is supplied from groundwater wells and the PUD's Morse creek surface water treatment plant. Thus, purchased water from City has, for some periods in the past, provided an accurate assessment of PUD demand west of Morse creek. However, beginning in 1996 the PUD began supplying the area west of Morse creek with treated surface water from its Morse creek treatment plant. Furthermore, up until 1995, not all of the PUD's supply from the City was metered. A separate tmmetered bypass connection from the City to the PUD was available for the PUD's use to meet peak summertime demands. Use of this bypass connection was terminated prior to the summer of 1996. Because the amount of un-metered water from the City is unknown and the fact that the PUD has recently been using treated surface water from its Morse creek plant to supply customers west of Morse creek, using water purchases from the City as art estimate of demand in the PUD's P.A. Composite system west of Morse creek is unreliable. Thus, total water usage in the P.A. Composite was converted to water use west of Morse Creek using the ratio of metered service connections west of Morse creek to the entire P.A. Composite system. This ratio is approximately 56 percent based on data from 1994 through 1997. The resulting water use estimates for the PUD west of Morse creek are presented in Table B-1. Water demand projections for the PUD west of Morse creek presented in Table 2 of the main report were based on the recent historical growth in the number of metered service connections. Metered service connections were used as the preferred growth indicator because population data for this area was not available. The annual rate of increase in the number of P.A. Composite service meters from 1989 to 1997 was 2.8 percent from 2,061 to 2,568. Thus, the PUD's 1997 water demand west of Morse creek, estimated as 0.5 mgd, was escalated at 2.8 percent per year. B.3. Dry Creek Water Association The Dry Creek Water Association provided water production data from its supply wells for 1995 and 1996 which was reviewed to estimate current 1997 water use. The ADD for 1996 was approximately 0.115 mgd. Dry Creek's 1993 Water System Plan developed an annual . water use growth rate of 2.32 percent based on historical population and connection data. This growth rate was used to determine the 1997 ADD of 0.118 mgd by escalating the 1996 ADD. Future projections were also developed using the 2.32 percent annual water use . B-2 Prelhninat~ document prepared for discussion purposes only - not subject to disclosure growth rate. B.4. Black Diamond Water District The Black Diamond Water District provided average water use information per connection as well as information on the number of connections. According to the Black Diamond Water District, the number of metered service connections in 1997 was 168 and the usage per connection was approximately 333 gallons per day. Thus, the 1997 ADD was determined to be 0.056 mgd. The District estimates its "buildout" number of cormections to be approximately 550 based on current zoning. The District also estimates that it is growing at approximately 5 connections per year (about 3 percent per year based on the current nvax~ber of connections) in the last few years and expects that rate of growth to continue. ~. 3 percent growth rate was used for estimating future water demands resulting in buildout conditions being reached in 40 years (coincidentally, the same time-frame as the 40-year projection). B-3 NORTHLAND'S REPORT TO THE CITY OF PORT ANGELES 1999 TABLE OF CONTENTS System Structural & Operational Information ........................ Section A System Ownership Organization Flow Chart Local Business Office & Employees Cable System Mileage & Homes Passed Cable Subscriber Information Cable Services Provided Schedule of Northland's Rates Program License Fees Summary of Previous Year's Activities ....................................... Section B Local Origination Programming Audits & Investigations 1998 Communications With Federal or State Regulatory Agencies Planned Construction and Upgrades .........................................Section C For 1999 Future Upgrades Current and Future Technology Advances and Services ......... Section D Current Technology Future Technology & Service Additional Information ................................................................. Section E Quality Assurance Results Planned Community Involvement Zz~ Local Business Office & Employees Northland Cable Television 725 East First Street Port Angeles, WA 98362 We currently employ 23 full-time people and I part-time person. Our staff are all local area residents who support our community and economy. System Structural & Operation Information Total Cable System Mileage and Overall Homes Passed Information Total Cable System Mileage 400 miles Total Homes Passed 17,780 homes Total Port Angeles Cable Miles 200 miles Total Port Angeles Homes Passed 10,600 homes NUMBER OF CABLE SUBSCRIBERS INFORMATION PROGRAMMING NUMBER OF SUBSCRIBERS Standard Basic 5,161 Economy Basic 618 The Disney Channel 124 Home Box Office 371 Cinemax 323 Showtime 342 Tier (Ultra Basic) 3,789 Service Agreements 2,100 CABLE SERVICES PROVIDED 98 NWCN Northwest Cable News 2 * CBUT (CBC) Vancouver 3 * NCN Northland Cable News 4 * KOMO (ABC) Seattle 5 * KING (NBC) Seattle 6 * CHEK (CTV) Victoria 7 * KIRO (CBS) Seattle 8 TV Guide Channel 9 * KCTS (PBS) Seattle 10' CKVU (IND) Vancouver 11' KSTW (UPN) Tacoma 12' KVOS (IND) Bellingham 13' KCPQ (FOX) Tacoma t7 CSPAN 18 Fox Family Channel 19 QVC Quality Value Channel 20 TLC The Learning Channel 21 EG Education & Government Channel 22* KTZZ (WB) Seattle 23 Headline News/NCN 24 CNBC Consumer News & Business Channel 25* TNT Turner Network Television 26* ESPN 27 CNN Cable News Network 28* WTBS Atlanta Superstation 29* The Discover Channel 30 FNC Fox News Channel 31' FSN Fox Sports Northwest 32* The Travel Channel 33* USA Network 34* TNN The Nashville Network 35* TCM Turner Classic Movies 36* GAC Great American Country 37* A&E Arts & Entertainment 38* Lifetime 39 AMC Classic Movies 40* ESPN-2 41' Nickelodeon 42 The History Channel 43 The Cartoon Channel 14' HBO 15' Showtime Premium Packages Available 16' Cinemax (see package rate sheets) 99* The Disney Channel Effective 3/1/99 Cable Service Provided (cont.) FM Stereo Service Frequency FM Station Programming 88.5 KPLU Ja77/News 90.9 Satellite Classical Collections 91.7 KNWP Northwest Public Radio 92.9 KISM Top 40's 93.5 CRN Cable Radio Network 94.1 KMPS Country 94.9 KUOW Public/Classical 95.7 KJR 70's Rock 96.5 KYCW Young Country 96.9 CKKS Soft Rock 97.3 KBSG Oldies 98.1 KING Classical 98.5 CIOC Middle of the Road 98.9 KWJZ Smooth Jazz 99.3 CFOX Rock 99.7 Satellite Music of Your Life 100.7 KIRO The Buzz- Talk Radio 101.1 CFMI Adult Contemporary 101.5 KPLZ Contemporary Hits 102.5 KZOK Classic Rock 103.5 CHQM Easy Listening 103.7 KMTT Adult Alternative 104.3 KAFE Adult Rock 104.7 Satellite New Age of Jazz 105.7 CBU Middle of the Road 106.5 KLYN Contemporary Christian 107.3 LOCAL National Park Radio 107.7 KNDD Alternative Rock Effective 5/1/98 Schedule of Northland's Rates New Account Installation Fees (All new customers must pay in advance) (Effective May 1, 1999) Aerial $50.00 Underground Call for Quote Reconnect (or Transfer) $40.00 Additional Outlet (at time of connect) $10.00 (Ea. Up to 3) Additional Outlet Activation (at time of connect) $10.00 (Ea. Up to 3) FM Service (at time of connect) $10.00 Premium Channels (at time of connect) NO CHARGE Changes In Service (For existing customers) Per Call $40.00 Premium Channels $30.00 Monthly Service Charges Ultra Basic $37.00 Standard Basic $26.75 Economy Basic $18.50 FM Service (with basic) $ 2.75 Maintenance Service Agreement (NES) $ 2.75 FM Service $ 7.95 Premium Services HBO $11.95 Showtime $11.50 Cinemax $ 8.95 The Disney Channel $ 8.95 Movie' Packages Available (see package rate sheet) Service Calls Service Call with no Service Agreement $40.00 Service Call with Service Agreement NO CHARGE Miscellaneous Charges Prewires (cabled area) $15.00 (each outlet) Prewires (non-cabled area) $25.00 (each outlet) Cable in open ditch $25.00 Late Fee: Charge for payments received after the due date $ 3.50 Schedule of Northland's Rates Premium Packages Package #1 Ultra Basic, HBO, Cinemax, Showtime & NES $65.95 (savings of $6.20 per month) (installation is free if package is kept for 6 months) Package #2 Ultra Basic, HBO, Cinemax, & NES $56.95 (savings of $3.70 per month) (save 75% on installation) Package #3 Ultra Basic, HBO, Showtime, & NES $59.95 (savings of $3.25 per month) (save 50% on installation) Package ~4 Ultra Basic, Cinemax, & NES $44.95 (savings of $3.75 per month) (save 30% on installation) Package #5 Ultra Basic & NES $39.00 (savings of $ .75 per month) (save 20% on installation) Effective May 1, 1999 Program License Fees Cable Networks like ESPN, CNN, Discovery Channel, Nickelodeon, and HBO purchase and create a wealth of quality programming that brings enjoyment and education to Northland's subscribers. The cable networks charge cable companies to carry their programming. (This relationship is opposite of that in the broadcasting industry where CBS, NBC, ABC, and FOX pay their local affiliates to carry the network programming.) The rates charged by cable networks have increased dramatically in the last several years so the number and quality of programming choices has expanded. The cost of sports programming, in particular, has skyrocketed as networks have paid ever increasing amounts to secure high profile sporting events such as the NFL, NBA, and major league baseball. To obtain programming from cable networks, Northland must enter into contractual arrangements, often for a long term, that stipulate channel placement, the level of service (basic, expanded basic, tier, etc.) on which the programming must be carried, as well as dozens of other provisions that affect Northland's ability to deliver programming to subscribers. Along with hundreds of other cable companies, Northland has joined a cooperative purchasing organization to negotiate better deals with the powerful networks so we can provide a wide variety of high-quality programming to our customers at the lowest possible price. Summary of Previous Year's Activities Local Origination Programming Channel 3 is Northland's local origination channel in the Port Angeles area. Local origination programs consist of Northland Cable News, public service announcements, and public awareness announcements. Channel 3 is also used to provide information about planned outages, schedules of taped events, and any other information that would be important to our customers. We also provide advertising space to local businesses. Audits and Investigations 1998 Total Homes Audited 1,219 Illegal Connections 51 NORTHIZlND COMMUNI~TIONS , CORPORATION 1201 Third Avenue, Suite 3600 January 7, ]099 Seattle, Washington 98101 FAX (206) 623-9015 (206) 621-1351 VIA FEDERAL EXPRESS John P. Wong, Chief Engineering and Technical Services Division Cable Services Bureau Federal Communications Commission Washington, DC 20554 Dear Mr. Wong: Submitted herewith are the Basic Signal Leakage Performance Reports (FCC Forms 320) for: Northland Cable Properties Seven LP WA-0274 Camano Island (C) WA-0468 Snohomish (NW) WA-0555 Camano Island (S) WA-0576 Utsalady WA-0289 Stanwood Northland Cable Properties, Inc. WA-0189 Newport ID-0004 Priest River ID-0005 Oldtown Northland Cable Television, Inc. CA-0494 Yreka CA-1237 Montague CA-0865 Siskiyou WA-0134 Port Angeles WA-0177 Port Angeles If there are any questions concerning the foregoing, please contact my office at (206) 621-1351. Sincer/g!~ Vice President Technical Services cc: FCC file System copy Approved '~y OMB FEDERAL COMMUNICATIONS COMMISSION 3060-0433 Expires 1131199 WASHINGTON, D.C. 20554 BASIC SIGNAL LEAKAGE PERFORMANCE REPORT FCC FORM 320 SECTION [ -- GENERAL INFORMATION (1) Cable System Owner: NORTHLAND CABLE TV INC Phone Number: (2~06) 621-1351 Address: ]20{ TH{RD AVENUE #3600 SEATTLE WA 98101- (City) (State) (Z~) (2) Community Served : FORT ANG~T.~.q (3) Community Unit No.: WAOI77 (4) PhySical System Id: 000417 SECTION il -- LOCAL SYSTEM INFORMATION (1) Person(s) Responsible fcr report: Name: STURGEON MIKE (Last) (First) (M) Phone Number: (360) 452-8466 Address: 725 FAST FIRST ST PORT ,~N GF..T .F.q ~ 9~362-__ (City) (State} {ZIP) (2) Are aeronautical frequencies (i.e., 108-137 or 225-400 MHz) used by this cable television system? Yes X No (a) If No, complete Section iV Oelow and c'eturn to FCC. (b) If Yes, attach as Exhibit A all precisely offsetted aeroilautical frequencies used by this Community Unit. (3) TEST RESULTS: CLI: lOLogIoo: 51.67 ; lOLogI300~: Airspace: Passed: Failed: SECTION Ill -- LEAKAGE PERFORMANCE CRITERIA For operators conducting measurements on geographical areas that contain more than one Community Unit, (e.g., headends t~at ~erve more than one community unit) fill i~ the measurement information below. NOTE: ?he s~bmission of the accompanying exhibits, either 8 or C, may De incorporated Dy reference to another Community Unit filing that had undergone the same measurement tests as this Community Unit. That Community Unit must be identified by z~s Cormunzty Unit Code Number in response to Question (2) or (4) below. (1) GROUND-BASED MEASUREMEN75: (a) Person(s) Respcns~ble Name: FUDALLY .... MICHAEL Phone Number: {360 452-846~ '~ (First) (M) (~) Miles of plant ~e FCC 320 EXHIBIT A AERONAUTICAL FREQUENCIES USED PO~T~GET,~ 1 of 2 Authorized Measured Channels Frequency Frequency Comments 98 109.2750 109.2750 0 Hz 99 115,2750 115.2761 +1100 Hz SCRAMBLING ~RT~ 117.5250 117.5261 +1100 Hz 14 121.2625 121.2632 + 700 Hz SCRAMBLING CARRIER ~23.~1~ 123.5132 + 700 Hz 15 ~27,26~5 127.2629 + 400 Hz SCRAMBLING ~R~T~ 129.5125 129.5129 + 400 Hz 16 133.2625 133.2619 - 600 HZ SCRAMBLING ~ARRIER ~$$.~1~ 135.5119 - 600 Hz 25 2~9.2~ 229.2626 + 160 Hz 26 2~,26~ 235.2616 - 900 Hz 27 2~,2625 241.2624 - 100 Hz 28 ~7,2~ 247.2619 - 600 Hz 29 ~3.2~ 253.2617 - ~00 Hz 30 259.2625 259,2620 - ~00 Hz 31 26~.2625 265.2629 + 400 Hz 32 271.2625 271.2597 - 2800 Hz 33 277.2625 277.2630 + ~00 Hz 34 ~83.2625 283.2619 - 600 Hz 35 2~9,2625 289.2629 + 400 Hz 36 295,2625 295.2630 + 500 Hz 37 301.2625 301.2634 + 900 Hz 38 ~Q7,2625 307,2628 + ~O0 Hz --~' ~' I FCC 320 EXHIBIT A AERONAUTICAL FREQUENCIES USeD SYST~4 PORT AN~.~,~-q Sheet 2 of 2 Authorized Measured Channels Frequency Frequency Comments 39 313.2625 ' 313.2628 + 300 Hz 40 319.2625 319.2633 + 800 H~ 41 325.2625 325.2633 + 800 H~ 42 331.2750 331.2753 + 300 Hz 43 337.2625 337.2625 8 Hr 45 349.2625 349.2634 + 900 Hr 53 397,2625 397,2621 - 400 H~ QA02-2 Rev. NO ND CABLE TELEVISION FCC 320 EXHZSZ? B FIELD WORK SYSTEM PORT ANGELES Employee/Title MICHAEL FUDALLY/CUSTOMER SERVICE TECHNICIAN Detection Equipment Operational Below 20 Microvolts/Meter Yes X No Sheet 1 of 1 Date Work Order Date Level Detected Location Written Repaired ~v/m Probable Cause 12-15-98 323 E 10TH YES I-~-~q 150.00 F FITTING/INSIDE 12-16-98 623 W 14TH YES ~- ~-~ 150.00 5~qTRY FITTING 12-16-98 2111 W 4TH YES I-~'-9~ 150.00 F FITTING 12-15-98 I 707 S LINCOLN YES l-S-~q I 100.00 DROPS 12-17-98 1326 W 9TH YES /--~---~ 100.00 ~qTRY FITTING 12-17-98 1327 W 16TH YES ~_ ~.~[ 100.00 ENTRY FITTING 12-15-98 2640 HWY 101 YES I-~-~ 75.00 HOUSE AMP 12-15-98 3034 MCDOUGAL YES ~ _ ~ _ ~ ~ 75.00 F FITTING/INSIDE 12-15-98 503 E 6TH YES ~_ ~. _~ 75.00 F FITTING/INSIDE 12-16-98 720 S C~DAR ~8 YES /_ ~_~ 75.00 F FITTING/INSIDE 12-16-98 l, 922W6TH YES /_~_C~C~__.__ 75.00 ENTRY FITTING 12-17-98 904 S F YES ~ -I,~ - ~ 75.00 F FITTING 12-15-98 8TH & PEABODY YES / - ~-q~ 50.00 F FITTING 12-16-98 310 W 12TH YES J-~ -q~ 50.00 F FITTING UPTOWN MOTEL 12-16-98 101 E 2ND YES ~o~- ~P~,.~. 50.00 F FITTING [ 12-15-98 138 SHALE RD YES [-'7-C~Cl 75.00 F FZTTTNG 12-16-98 505 W 16TH YES I' 7-~ 50.00 F FITTING ~oNO~hJandCableTelev~ion S~S~ FCC Exhibit CLI Procedures and Calculations TEST PROCEDURES Test Signal for Detection: Frequency 133.2625 MHz Level Carried on System 49 dBmv Type VIDEO Test Signal for Measurements: Frequency 133.2625 MHZ Level Carried on System 49 Modulation Type VIDEO Correction Factor of Unmodulated Signal 1 dB After completing the leakage detection equipment operation verification, the system was monitored for signal leakage. The system monitoring included all areas of the system that may have less leakage integrity than the rest. The test signal used for measurements was set to the same level as the highest carrier level on the system, and a 1 dB correction factor was used to compensate for the difference between a modulated and unmodulated test carrier. During the test, all detected leaks were logged and measured using the level measurement equipment described. After tuning the equipment to the test signal, the dipole was placed 10' from the suspected system component, keeping it a minimum of 10' from the ground and other metallic objects, then rotating the dipole on a vertical axis to obtain a peak reading. CALCULATION PROCEDURES Readings were converted to microvolts/meter using the following steps: 1. Convert readings to actual leakage level in ~mmv using the following formula: Leakage level dBmv = Reading - Pre Amp Gain + Correction Factor Example: -39 dBmv = -26 dBmv - 16 dB + 2 dB 2. Convert leakage level in dBmv to microvolts using the attached chart. Example: -39 dBmv = 11.22 microvolts 3. Convert microvolts to microvolts/meter using the following formula: Microvolts/meter = voltage in microvolts X .021 X frequency in MHz Example: 31.4 microvolts/meter = 11.22 microvolts X .021 X 133.250 QA09 rev.9.98 page 1 of 3 ~]oNO~hland Cable Television d~mv to. Voltage Conversion 0 dBmv = 1.0 my across 75 Ohms d~mv ~v 4B~v ~v d~mv ~v d~mv ~v -59 1.12 -29 35.48 +1 1,122 +31 35,480 -58 1.26 -28 39.81 +2 1,259 +32 39,810 -57 1.41 -27 44.67 +3 1,413 +33 44,670 -56 1.58 -26 50.12 +4 1,585 +34 50,120 -55 1.78 -25 56.23 +5 1,778 +35 56,230 -54 1.99 -24 63.10 +6 1,995 +36 63,100 -53 2.24 -23 70.79 +7 2,239 +37 70,790 -52 2.51 -22 79.43 +8 2,512 +38 79,430 -51 2.82 -21 89.13 +9 2,818 +39 89,130 -50 3.16 -20 100.00 +10 3,162 +40 100,000 -49 3.55 -19 112.2 +11 3,548 +41 112,200 -48 3.98 -18 125.9 +12 3,981 +42 125,900 -47 4.47 -17 141.3 +13 4,467 +43 141,300 -46 5.01 -16 158.5 +14 5,012 +44 158,500 -45 5.62 -15 177.8 +15 5,623 +45 177,800 -44 6.31 -14 199.5 +16 6,310 +46 199,500 -43 7.08 -13 223.9 +17 7,079 +47 223,900 -42 7.94 -12 251.2 +18 7,943 +48 251,200 -41 8.91 -11 281.8 +19 8,913 +49 281,800 -40 10.00 -10 316.2 +20 10,000 +50 316,200 -39 11.22 -9 354.8 +21 11,220 +51 354,800 -38 12.59 -8 398.1 +22 12,590 +52 398,100 -37 14.13 -7 446.7 +23 14,130 +53 446,700 -36 15.85 -6 501.2 +24 15,850 +54 501,200 -35 17.78 -5 562.3 +25 17,780 +55 562,300 -34 19.95 -4 631.0 +26 19,950 +56 631,000 -33 22.39 -3 707.9 +27 22,390 +57 707,900 -32 25.12 -2 794.3 +28 25,120 +58 793,300 -31 28.18 -1 891.3 +29 28,180 +59 891,300 -30 31.62 0 1,000 +30 31,620 +60 1,000,000 QA09-1 rev.9.98 page 2 of 3 L,~'Northland Cable Television ACTUAL CA.~CC~.~T IONS Microvolts/meter = Squared x Qty Total 150.00 z = 22500.00 x 3 67500.00 100.00 z = 10000.00 x 3 30000.00 75.00 ~ = 5625.00 x 7 39375.00 50.00 ~ = 2500.00 x 4 10000.00 2 = X 2 = X 2 = X 2 = X Sum Total I 166875.00 I Plant Miles CLI 10 LOG = 10 LOG (Sum Total x Miles Plant Tested) 190.5 ) 51. 67 = 10 Log ( 146875.00 x 190.5 Completed by Date 12-21-98 Title SENIOR TECHNICIAN QA09-2 rev.9.98 Page 3 of 3 Planned Construction and Upgrades Planned Construction and Upgrades For 1999 Purchased 450 MHz S/A trunk amplifiers $34,133 Line Extensions $10,000 Quality Assurance Upgrades $38,597 Subscriber Tap Audit $20,000 MDU Security Replacement $12,437 Quality Assurance Headend Equipment $ 1,350 Amplifier Module Upgrade $ 2,967 NCN Equipment Upgraded $30,000 Local Ad Insertion Upgrade $35,000 Ghost Canceling Equipment - Channel 9 $ 3,800 Future Upgrades Future plans are to increase our operating bandwidth to a minimum of 450 MHz. This planned upgrade, along with digital compression technology, will greatly increase our channel capacity and services that we can offer. Current and Future Technology Advances & Services Current Technology We currently employ fiber technology. We have five fiber optic node receivers strategically located in the Port Angeles area, positioning the system to offer interactive digital service. The fiber optic system also provides improved quality and reliability by delivering high quality signals directly to the fiber optic nodes located in the neighborhoods we serve. The fiber optic cable and equipment we utilize are: Fiber cable Siecor Fiber count 60 / 34 / 24 / 12 / 6 Laser transmitter AT&T High power laser 750 MHz bandwidth Optical receivers Harmonic Lightwave / 550 MHz bandwidth Future Technology and Service Digital Television This technology allows approximately a 12:1 channel compression ratio. Twelve digital channels can be compressed into one 6 MHz standard analog television channel. In other words, twelve channels can be put in the bandwidth space of one. Deployment of digital television in the cable industry became feasible within the last 18 months with the commercial production of digital set top converters. The cost of the digital set top converters has dropped by approximately 30% since they were introduced in 1997. We are currently investigating digital program providers and the services they offer. Cable Modem/ISP Service Providing high speed Internet access using cable modems is another area we are investigating in two systems. The ISP Channel was launched in a Beta test group in February 1999, at our Bainbridge Island system. Our Starkville, Mississippi system also recently launched the ISP Channel. The ISP service on the Beta test systems is being evaluated for quality, reliability, and customer service in preparation for company wide roll-out in the near future. Additional Information Quality Assurance Results Customer service is a top priority at Northland Cable Television. We follow an aggressive company-wide Quality Assurance Program and we strive for the highest standard of service to our customers. Northland's Quality Assurance Program includes the requirement that members of our staff randomly select names from our customer list and contact those subscribers to determine their level of satisfaction with our service. In this Random Customer Call Program we contact about 10% of our customers each year. The information gathered from these surveys is used to detect and resolve unreported signal quality problems and to improve how we conduct business within the community. Throughout 1998, Northland's Port Angeles office maintained a 99% satisfaction rate on the customer call program. Northland's Quality Assurance Program also includes the requirement that members of our staff follow-up on service calls and the work performed as a result of such calls. In this Service Order Call Back Program, we attempt to contact every customer who requests a service call, after the work has been performed, to determine their level of satisfaction with the work performed. Throughout 1998, Northland's Port Angeles office maintained a 100% satisfaction rate on the call back program. Planned Community Involvement Port Angeles Community Outreach Calendar May 1999 Boys and Girls Club Donations PA 500 Food Bank drive through NCN and KONP YMCA Hook-Up Donations Youth Salute through KONP (throughout entire year) Car Seat Coupons/Give-Aways coordinated through Northland, Wal-Mart, and The State Patrol Community awareness spots on NCN (car seats) in coordination with State Patrol July 1999 Family/Kids month August 1999 Customer Appreciation Day (August 11, 1999) - Live feed with KONP October 1999 Fire Safety Month Free fire detectors for the first 25 hook-ups Fire safety spots once a week on NCN - coordinated with PA Fire Dept. PA Fire Dept. has offered free batteries to anyone who gets connected to cable or to anyone who has any service or trouble performed during the month of October November 1999 Food Bank Special - $10.00 off hook-ups with donation of 5 or more cans of food Northland employees volunteer to bag and hand out Thanksgiving baskets Thanksgiving Turkey give-away December 1999 Salvation Army Food Bank special - $10.00 off hook-ups with donation of 5 or more cans of food Toys for Tots drop-off site Employees volunteer at the Salvation Army to hand out the gift and food baskets Christmas Turkey 9ive-aways Christmas coloring contest Development of a Student of the week program with NCN