Loading...
HomeMy WebLinkAbout1533 Milwaukee Dr - Engineering ft ';'c1I'OAT""o.., S~~ ~ ~ -- "".""" CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number pin number Property Address ASSESSOR PARCEL NUMBER: Application description Subdivision Name property Use Property Zoning . Application valuation 10/11/04 04- P33 B 04-00000838 Date .865790 1533 MILWAUKEE DR 06-30-00-1-0-8450-0000- RES MANUFACTURED HOME RS9 RESDNTL SINGLE FAMILY 108876 Owner Contractor ANDERSON,CHARLES/GRAHAM, 298 RIFE RD PORT ANGELES LISA C&J EXCAVATING PO BOX 430 CARLS BORG (360) 683-7741 1836 SF MANUF W/ATT 648 SF TYPE V NON-RATED SINGLE FAM & CONGREGATES TOTAL % LOT COVERAGE EXISTING LOT COVERAGE LOT SIZE PROPOSED LOT COVERAGE TOTAL LOT COVERAGE NUMBER OF UNITS WA 98363 WA 98324 Structure Information Construction Type Occupancy Type Other struct info GARAGE 7.60 1. 00 29010.00 2214.00 2214.00 1. 00 Permit PUBLIC WORKS RES WATER SERV Additional desc Permit Fee 640.00 Plan Check Fee Issue Date 10/08/04 Valuation Expiration Date 4/07/05 .00 108876 Qty Unit Charge Per 1.00 640.0000 EA PW W/M I" SERV 5/8" METER Permit Additional desc Permit Fee Issue Date Expiration Date RIGHT OF WAY plan Check Fee Valuation 45.00 10/08/04 4/07/05 .00 108876 --------=~~~---~:~:~~~~~~~-~~;:_-~=~~=-~~-~~=_:~~==-------------_:~~~~~ Permit SANITARY SEWER HOOK UP Additional desc permi t Fee Issue Date Expiration Date 95.00 10/08/04 4/07/05 plan Check Fee Valuation .00 108876 ________=~~~___Unlt=~~~~~~_~;::__~~-:~~~R-H~~~UP------___________~e~;~~ special Notes and Comments Building address sign shall not be less than 6" & not more than 12" in height. Numbers colors must contrast with wall color they are mounted on. {Ord. 14.36.050-El When roof gutters are installed, drains will located in dry wells or piped to approved storm drain locations. J733jYlr/~ CA~ Ibtd~ ;;,1,0< V' Z/7/07 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utiiities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Date Signature of Owner (if owner is builder) T:\PLANNING\FORMS\1102.15 [I 1114/2003] . ;,. '<fcPORT~ ......~~~ O~. L~ :-::;; CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number Pin number 04-00000838 .865790 Page 2 Date 10/11/04 Special Notes and Comments Manufactured home must be pit set so that no more than 12" of skirting is visable above grade. A residential fire sprinkler system shall be installed per NFPA 13D will be required. 2nd option is to install an out side alarm bell that is eletronicly connected to the residence's smoke detectors. The alarm bell will he painted red in color and identified as "Fire alarm" The proposal will result in the placement of a manufactured home and attached garage in the RMD zone. Setbacks are good as shown with lot coverage of 7.6%. No land use issues are noted. Electrical load calculations and elctrical permits are required. will require 29' wide all weather road improvements -----~~~~~-;~~~--:-:-:-:-:-:-:-:-:--~~~::~:~~~~~~:~~~~~~~--~:~:~ STATE SURCHARGE 4.50 PW WATER SYSTEM USE FEE ~025_0~ Fee swnmary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 780.00 780.00 .00 .00 plan Check Total .00 .00 .00 .00 Other Fee Total 2014.50 2014.50 .00 .00 Grand Total 2794.50 2794.50 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether speCified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is buiider) Date T:\PLANNING\FORM$\1102.15 [1111412003) CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . . . . . ... . . . INSPECTION REPORT. . . . . . . . . . . REQUEST: I J Date 'fr' 1 ((;) ,.:;- Time I Received by (phone, person) Location of Work to be inspected Name of person requestin'g inspection Address of person requesting inspection Type of Inspection {circle appropriate one}: Sewer Foundation Framing Chimney Plumbing 165:5 ;?tGQ w-.L...} L 0 DfL. C. ~ ,j E1{'.> R~6~ . Phone No. 4& l-"S 4 n D4 -836' Permit No. Final ~er Exc~ther INSPECTION NOTES: I / Inspected: Date ;;;17 bS Remarks: iJ.~~ Time II: 4'5" A+.v1 By ~/" c. .~ RESTORATION REQUiRED...... YES NO~ 1 ~ ,. f'vc.. \0 J~ ,,,,," ~,' - (.!- I;.d,..... 'j""f I. {I".^~./- t" 10' P .., I 1$>.... r" ~. ~~ / //~ ~ b ~s"",,..J~ ~ ,.- ~ SURFACE RESTORATION: SURFACE TYPE: 0 Unimproved 0 Gravel 0 Asphalt 0 pcc o Other o Repaired by City o Repaired by Permittee o No Damage Found Work Order # o COMPLETE o INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (DATE) CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . INSPECTION REPORT. . . . . . REQUEST: Date 2 - I - D~ Time 7 I'l "^-- Received by Pc"'-.... ,:; E. (phone, person) Location of Work to be inspected 1S-~'3 M.,'luJc~tJkee. Dr, Name of person requesting inspection rue",-"" ,':> E . Address of person requesting inspection 6.r() liD- rJ I Type of Inspection (circle appropriate one): Sewer Foundation Framing Chimney Plumbing Final 170&- B Phone No. LIt 7 -/.f8<f9 Permit No. 09--~8 Sewer Excav. Oth~ INSPECTION NOTES: Inspected: Djlte Z- - (- 0<) Time I ( A tvL By Remarks: Ai ei{) I x.. "518 ~ rv/<::..e ti..<;-h..( (",+,'00/\. . f}Cl4.Vt IS E.. C- J J <:) L7 .~ {;J '10 C;; .'>? ';;Y:f;; RESTORATION REQUiRED...... YES NO x: .J::. . cr- 8il.l ( ..Q M,(wz..u It te.- Dr. SURFACE RESTORATION: SURFACE TYPE: 0 Unimproved DGravel o Repaired by City o Repaired by Permittee o No Damage Found o Asphalt 0 PCC 0 Other Work Order # 50"34.'i -DD3 o COMPLETE o INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (DATE) ..~~ ..-.!..'~' INCORPORATED CIVIL ENGINEERING LAND SURVEYING 519 South Peabody Street. Suite 22 Port Angeles. Washington 98362 (360) 417-0501 FAX (360) 417-0514 E.mail: zenovic@olympus.net DATE: January 5, 2005 City of Port Angeles P.O. Box 1150 Port Angeles, W A 98362 Job No. 04282 ATTN: Steve Sperr ~' OI/-t3Y /07? /77/~ TO: FROM: Steve Zenovic We are transmitting the following item: o Attached c{ Hand-carried D Under Separate Cover o FAX PROJECT: Milwaukee Drive Improvements for C&J Excavating COPIES 2 PAGES 1 DESCRIPTION Road Improvement Plan and Details Comments: Steve- Attached for your information is the plan for the improvements to Milwaukee Drive to provide access to the new modular home tor Charles Anderson. The center ot the constructed roadway will be 5' south ot the right-ot-way centerline; the Milwaukee Drive right-ot-way is 100' wide in this area and the proposed centerline offset was approved by Gary Kenworthy previously. Please give me a call it you have any questions. work next week. The contractor injndS to begin the ?fr-ravC' IHo!7 Steve Page 11 I Trenia Funston - Re: utility fees From: To: Date: Subject: Trenia Funston wjaythorp@comcast.net 7/23/042:13PM Re: utility fees Jay I've been out of the office, sorry about the delay in getting info back to you. There is no storm drain on the east side of Peabody Street. Our crew dye tested the line. So the plan will be as previously discussed with Eric, go down the alley turn at the corner west side of Peabody and take the line down the planting strip. Eric has indicated that the city will be installing a curb drain inlet just south of th~ Front & Peabody intersection, it will be about 20' south of intersection. This is where you will connect into the stm . drain. Have you determnined what the water meter size will be? Trenia >>> <wjaythorp@comcast.net> 07/20/04 04:59PM >>> Trenia, Before you left on vacation we had discussed various utility options on our condominium project with you. As I recall, you were going to contact others in your department. Have you had a chance to discuss our issues and come to some kind of resolution? Thank you, Jay Thorp Kiket Bay Co. Inc l Trenia Funston - Re: Wednesday > From: To: Date: Subject: Page 11 Trenia Funston wjaythorp@comcast.net 6/30/0411:11AM Re:Wednesday He told me 1 :00 but who cares? >>> <wjaythorp@comcast.net> 06/30/04 07:09AM >>> Eric, My partner and I will be in your area today, specifically to address engineering issues. 2pm with our engineer and will come by your office after that to fill you in. Jay ITrenia Funston - Re: From: To: Date: Subject: I have a meeting at Page 1 j Trenia Funston wjaythorp@comcast.net 6/29/04 3:07PM Re: see you at 1:00 TF >>> <wjaythorp@comcast.net> 06/29/04 01 :25PM >>> Trenia, f h' 'bl I h I will be in you area tomorrow and would like to meet with you around 1 pm i t at IS pOSSI e. ave a meeting at 2pm with an engineer and would like to present him with your data at that time. Let me know if that works for you. Page 11 1 Trenia Funston - Re: Fwd: 6 multi plex building @ 326 East Front St From: To: Subject: Trenia Funston Annette Owens; Bill Beverford; Neil Wells; Steve Sperr Re: Fwd: 6 multi plex building @ 326 East Front St I'll let Danny know about WDOT , transit and to notify dispatch. I'll have him submit his plan then we can review. Thanks at this point no HTE. TF >>> Neil Wells 12/09/04 01:52PM >>> Let me know if you need assistance with TCP process?... be sure that W.D.OT is a ware of type of work and the duration as well as transportation systems and emergency (PSA), as Front is part of Inter-state highway system. Neil (P.S.) ...will need project (HTE) numbers for labor? 326 East Front St Pa e 1 Trenia Funston - 6 multi lex buildin From: To: Date: Subject: Trenia Funston Annette Owens; Bill Beverford; Steve Sperr 12/9/04 10:53AM 6 multi plex building @ 326 East Front St Dan Morrison came in and discussed the utility connections for the above ref. address. This complex requires a connection for water service, fire protection and san. sewer all off Front Street going down over the slope. I suggested that he meet with you on site to discuss what he proposes to do. He is looking at using his excavator with a 3' bucket from up above and at street level. Since this is in a high traffic area and on a hill side slope a field review of the project will be necessary. He will supply a traffic control plan so Neil should also be involved. The area for traffic revision may close to the area of Front Street that has slippage problems on the north lane. He would like to meet maybe next Monday, but you tell me when and I will cardinate all parties. Thanks TF cc: Neil Wells I Trenia Funston - 6 plex condo From: To: Date: Time: Subject: Place: Page 11 Trenia Funston Annette Owens; Bill Beverford; Eric Walrath; Neil Wells; Steve Sperr; Trenia Funston 12/13/04 8:30AM - 9:00AM 6 plex condo 326 East Front St meet with Danny at the lot (Frist /Front) alley to discuss utility installation for 6 plex condo project. Neil you mayor may not want to go to this but It would give you an idea of what's planned. ~ . From: To: Date: Subject: <wjaythorp@comcast.net> trenia funston <Tfunston@cityofpa.us> 6/28/04 4:28PM condo project Trenia, We met about 6 weeks ago when I inquired about fees for utilities for a condominium project my partner and I are designing. The location, to refresh your mind, is at 326 East Front. There are a few issues we have uncovered in our feasibility study that we need you to address. 1) We will be tying into the storm and water via the alley to the south of the property, to the east via the alley, then north in the grass median to Front street where we will connect to both water and storm. The city is going to be starting a paving project on Peabody Street that will include a new apron entrance to the alley. This work will be done well before we will be starting our project and the new apron is in direct line with the trench we will be digging. Of course, we don't want to disturb the new apron so we want to put either some kind of sleeve or the actual piping in this area during the Peabody construction. From your standpoint, is there an issue with the storm, building water, and a second water line for fire sprinkler in this trench? We will be working with an engineering firm on the details but wanted to check with you first for your input. Eric Walrath has been very helpful to date in finding solutions with the road construction. 2) Since this is a condominium project, we may only require 1 meter for water and the costs to be shared by the condominium association. If we only use one meter, are we then required to pay the water development fees for all the units or just the one meter? This same question may apply to the sanitary sewer. We will be making only one access to the city system. We hope to have preliminary drawings fairly soon, and will get those to you for your input. We realize there are retention water issues and potential repaving issues that we will need to talk about, but the above are very critical to our development. Thank you in advance to your help. We hope to be in your area this week and will stop by. Jay Thorp President Kiket Bay Company, Inc " ~ cc: bob rohrer <bobrohrer@nventure co I Trenia Funston - Re: condo ~ect Page 11 From: To: Date: Subject: Trenia Funston wjaythorp@comcast.net 6/29/04 8:45AM Re: condo project Jay, I will discuss the proposal with the water division on how best to deal with placement of the water meter (s). Bill Beverford will be here this morning so I'll run it past him. I have attached the Public Works 2004 fee schedule so you can determine what works for you on sizing the meter. Normally a single family dwelling has a 5/8 meter, if you choose to do a single larger meter, the fees are based on a meter factor as shown. I will be in touch after I have a discussion with the powers that be. TF >>> <wjaythorp@comcast.net> 06/28/04 04:21 PM >>> Trenia, We met about 6 weeks ago when I inquired about fees for utilities for a condominium project my partner and I are designing. The location, to refresh your mind, is at 326 East Front. There are a few issues we have uncovered in our feasibility study that we need you to address. 1) We will be tying into the storm and water via the alley to the south of the property, to the east via the alley, then north in the grass median to Front street where we will connect to both water and storm. The city is going to be starting a paving project on Peabody Street that will include a new apron entrance to the alley. This work will be done well before we will be starting our project and the new apron is in direct line with the trench we will be digging. Of course, we don't want to disturb the new apron so we want to put either some kind of sleeve or the actual piping in this area during the Peabody construction. From your standpoint, is there an issue with the storm, building water, and a second water line for fire sprinkler in this trench? We will be working with an engineering firm on the details but wanted to check with you first for your input. Eric Walrath has been very helpful to date in finding solutions with the road construction. 2) Since this is a condominium project, we may only require 1 meter for water and the costs to be shared by the condominium association. If we only use one meter, are we then required to pay the water development fees for all the units or just the one meter? This same question may apply to the sanitary sewer. We will be making only one access to the city system. We hope to have preliminary drawings fairly soon, and will get those to you for your input. We realize there are retention water issues and potential repaving issues that we will need to talk about, but the above are very critical to our development. Thank you in advance to your help. We hope to be in your area this week and will stop by. Jay Thorp President Kiket Bay Company, Inc KJ I(vl-- &~ Co ~ JnC- ~ZbFf?OJ- J, rnoILp ! Trenia Funston - Re: Primo Construction Slide Re~air at Hos~1 Page 11 From: To: Subject: Trenia Funston Marc Connelly Re: Primo Construction Slide Repair at Hospital ... The hospital has taken out the clear and grade permit & the right of way use permit, Primo will be responsible for the right of way permit which means any area within the trail. I called Primo leaving the mesage about the permit. I'm sure they will comply with what ever we require. If there is a problem just let me know. Trenia >>> Marc Connelly 09/07/04 08:16AM >>> I would expect that he can coordinate his work on the public use of the trail through you. Please make sure that he advises us of temporary trail closures in advance so the main office is aware. Also would you mind preparing a media release advising that trail work will result in temporary trail closures and give a general time frame for the work to be completed by whom and why. Provide the draft release electronically to me and I will ensure that it is distributed.--Thanks--Marc >>> Ralph Dyker 09/03/04 02: 16PM >>> Marc, Was contacted by Bob from Primo about starting construction repairs to the slide area at the hospital on Tuesday Sept. 7th. Bob said that he has all his permits, but hasn't heard back from Trenia Funston concerning the right of way permit. Primo anticipates construction to last about ten days. The trail will be closed at times from the West Rayioner gate to the West side of Francis St. Park, but open on weekends. Ralph cc: Gary Kenworthy; Glenn Cutler; Ralph Dyker ~~ ~("j i3~ tl <'; ~ I ~ ~~~ "I:l~ ~:i!" . Cj" ,.!1 is,,, ~ n li~ ~~ ~~ "'~ ~:;; "'~ ~~ \'!~ ~<;: ~S! o ." ~ ~ .... ~ ~ ~ ~ ~ ~ ~ \. ': ~ ;0: ~ .... ~ ~ ~ ~ ~ ~ " ~ " .. . ~ ;0: ~ " .... ~ ~ ~ ~ is II? I'l ~ ~ ;iji;:~ "..... h~ ~~" >! ,. "~iS ~g!:: ,."''' ~!<!;! i3!~~ ~~'" ~C3 ~~'" ~)i:1'l'j ,~ C)r") ~ ~~B ~~~ """ l:l"'" 8.~~ " ~ ~~~ '~!2 ~ili ~~ "," ~vf ~>! i1: I:l\:! !{l", ,,<:; '" ~~ ~~ ~~ ~ '" y ~ ~ --, - .:~ - ~ ..J"-.. '" ;r: '" '" ... ~ .-" ii"- ,II "1'1 ,~~~. t ;;:;:, .I~ 1--:- ~,i .. Iii': r,. iii, ~. , ,I ill" 1:-,1. iJl: "1 ',.p~ ~ ~ T-l,. III. q~ '. JI', i~ : , ~!.II:t.!04~=-- ~ M ~ "'!:l"i!lll';l ~<5~"~~ ~i:lii"~ ~~P~!il~ ~~~!~~ ~0l~"'i3~ il~~i3111~ ~C;lll ~ ~~qah "'''Il:~''~ ~~~l;1~~ lii"",>!"'" 1:"'< "'"1""(-i!:' ",l!!;ij~,,0l ~--'lIO:i!Ri:!l ~ill~'I!Q~ ~~"'~~~ Oj~ifi'~~ ...."lil;!~ "'''~'i:i' ~~~h~ ~~~~ ~ h~", '" ~~i~ ~ ~B"''' ~~i3~ l\illllll:l ~,. '" .."'~'" ~ ,,~ ~ ~" S! . ~ ~ 'Ii [:1 !Cl :,; ~ ~ i3 ~ OJ ~ " !1 <.. " "\ (i ~ " " ~ 1'F)'j't '" ~ " ~ I "< ;; " " . .. " " . .. " .. . / / e o ( " (f)/ o o U> 0. ~, ( " ~ 1/ (J1 \ 0 u>, 'J / I / , , , ; , , / (e I I , 1 ! I / I \ , \ 1 I , , ," \.' / rt" , -tj ': , I I I '" " '- o ~ .- P,1 ~ II ~ ()~ ~ iB :!.i ~! ~ : 1 / ~ ~ ~ \II '" o o , , ( " I \ '\ , ,/-.r"w. I . \ ."-. ..;.u" I :1 .. /' - "- , + \ I \ 1 , ^' -t-., .---/ "1 ~/"-~ \ \' \' ;> \ x \ \ \ , i ,I , " \i .f '\'1 t,- ~_ ~ , '-, ;'- ,,^, ? \ \ \l ,. \ \ \ / \ \ \ -d...,. ZpOc .:!1",..!: ~ -)10(1) "'g...... ... n ...., ::t~ &xg1; "!il"'~ III :::lo( .,z !l!-C>n o~"2' Ii'~i' !il.. '''' EZ ~ :)> \ ~i!!i \ z... \ rl9z \ f~-< \(., \ , \ \ \ " \ \ \ I, \ " , \ \ " \ .~ \ \ \ f ~ , \ \ \ \ \ \ \ \ , ( \ \ \ \\ '.\ x .[ - ,.., / ,/ ( / ' , ~ ... , <; I;; ...... /lJ ')/1 \ ; / , ; / 1 1 ; I I / , 1 1 v j / ',I '\ 1 I I 1 1 ,( ) " <- "--~ - --'>- , ; "--I, / ~ TITlE: ,. .- P,1 PROPOSED IMPROVE:METNS TO MILWAUKEE DRIVE:. EAST OF 18TH STREET, PORT ANGELES, WA " .~ 'J.,j ROAD IMPROVEMENT PLAN AND DETAILS ~ o a CLIENT: C&J E:XCA VA TlNG. INe. P.O. BOX 430 CARLSBORG. WA 98324 S19 S. PEABODY ST PORT ANGELES, WA PHONE: (JliO) 417- FAX: (360) 417-0514 EMAlL: ZENOVlCOZENOVlC. Z ENOVIC & ASSOCIATES INCORPORA TEO J r f pORT ~ ,~O~<<;., ~ha~ 'IL~ ~ "l,\~ CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number Pin number Property Address ASSESSOR PARCEL NUMBER: Application description Subdivision Name Property Use Property Zoning . . . Application valuation 04-00000838 Date .865790 1533 MILWAUKEE DR 06-30-00-1-0-8450-0000_ RES MANUFACTURED HOME 10/11/04 RS9 RESDNTL SINGLE FAMILY 108876 Owner ------------------------ Contractor ANDERSON, CHARLES/GRAHAM, LISA 298 RIFE RD PORT ANGELES ------------------------ WA 98363 C&J EXCAVATING PO BOX 430 CARLSBORG (360) 683-7741 1836 SF MANUF W/ATT 648 SF TYPE V NON-RATED SINGLE FAM & CONGREGATES TOTAL % LOT COVERAGE EXISTING LOT COVERAGE LOT SIZE PROPOSED LOT COVERAGE TOTAL LOT COVERAGE NUMBER OF UNITS WA 98324 Structure Information Construction Type Occupancy Type Other struct info GARAGE --------------------------------------------------------- 7.60 1. 00 29010.00 2214.00 2214.00 1. 00 Permi t PUBLIC WORKS RES WATER SERV Additional desc Permit Fee 640.00 Plan Check Fee .00 Issue Date 10/08/04 Valuation 108876 Expiration Date 4/07/05 Qty Unit Charge Per Extension 1. 00 640.0000 EA PW W/M 1" SERV 5/8" METER 640.00 ------------------- ......- ~ \.).l Vl ----------------------------------------- 45.00 10/08/04 4/07/05 Plan Check Fee Valuation .00 108876 ~ - ~ ~ c. ~ ~ Permit Additional desc Permit Fee Issue Date Expiration Date RIGHT OF WAY ----------------------------------- Qty 1.00 Unit Charge Per 45.0000 ECH RIGHT OF WAY PERMIT Extension 45.00 ------------------------------------------------ Permit SANITARY SEWER HOOK UP Additional desc Permit Fee 95.00 Plan Check Fee .00 Issue Date 10/08/04 Valuation 108876 Expiration Date 4/07/05 Qty Unit Charge Per Extension 1. 00 95.0000 EA SAN SEWER HOOKUP 95.00 ---------------------------- "J , ----------------------------------------- Special Notes and Comments Building address sign shall not be less than 6" & not more than 12" in height. Numbers colors must contrast with wall color they are mounted on. (Ord. 14.36.050-E) When roof gutters are installed, drains will located in dry wells or piped to approved storm drain locations. ----------------------------------- Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. 6AJ FILc- Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLANNINGIFORMSII 102.15 [11/14/2003] ~~'....... \ BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. CALL 417-4815 FOR BUILDING INSPECTIONS. CALL 417-4735 FOR ELECTRICAL INSPECTIONS. , INSPECTION TYPE DATE ACCEPTED COMMENTS YES NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE/DOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: # ROUGH-IN PLUMBING UNDER FLOOR 1 SLAB ROUGH-IN WATER LINE (METER TO BLDG) GAS LINE BACK FLOW 1 WATER AIR SEAL WALLS CEILING T FRAMING JOISTS 1 GIRDERS SHEAR WALL/HOLD DOWNS WALLS 1 ROOF 1 CEILING DRYW ALL (INTERIOR BRACED PANEL ONLY) T-BAR INSULATION SLAB WALL 1 FLOOR 1 CEILING I MECHANICAL HEAT PUMP GAS LINE WOOD STOVE 1 PELLET 1 CHIMNEY HOOD 1 DUCTS PW UTILITIES I SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE 1 METER SEWER CONNECTION SANITARY STORM PLANNING DEPT. SEPARATE PERMIT #'s SEPA: PARKINGILIGHTING ESA: LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W.I PWI CONSTRUCTION - R.W. ENGINEERING 417-4807 PW 1 ENGINEERING FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 417-4815 BUILDING T:\PLANNINGIFORMS\1102.15 [I 1/14/2003] ~ ,OAT ~ 8~O~~~ na 'IL ~ ~ "l,\1C~ CITY OF PORT ANGELES DEP ARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 ---------------------------------------------------------------------------- Application Number . . . . . 04-00000838 pin number . . .865790 Page 2 Date 10/11/04 special Notes and Comments Manufactured home must be pit set so that no more than 12" of skirting is visable above grade. A residential fire sprinkler system shall be installed per NFPA 13D will be required. 2nd option is to install an out side alarm bell that is eletronicly connected to the residence's smoke detectors. The alarm bell will be painted red in color and identified as IIFire alarm" The proposal will result in the placement of a manufactured home and attached garage in the RMD zone. Setbacks are good as shown with lot coverage of 7.6%. No land use issues are noted. Electrical load calculations and elctrical permits are required. will require 29' wide all weather road improvements ---------------------------------------------------------------------------- Other Fees . . . . . . . . . MILW DRIVE ASSESSMENT SEWER SYSTEM DELV CHARGE STATE SURCHARGE PW WATER SYSTEM USE FEE 240.00 745.00 4.50 1025.00 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 780.00 780.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 2014.50 2014.50 .00 .00 Grand Total 2794.50 2794.50 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days. if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Owner (if owner is builder) Date Signature of Contractor or Authorized Agent Date T:\PLANNING\FORMS\1102.15 [11/14/2003] BmLDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. CALL 417-4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. INSPECTION TYPE DATE ACCEPTED COMMENTS YES I NO FOUNDATION: FOOTINGS WALLS FOUNDA TION DRAINAGE/DOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: # ROUGH-IN PLUMBING UNDER FLOOR 1 SLAB ROUGH-IN W 1'" TER LINE (METER TO BLDG) GAS LINE BACK FLOW 1 WATER AIR 'SEAL WALLS I CEILING FRAMING JOISTS 1 GIRDERS SHEAR WALL/HOLD DOWNS WALLS / ROOF 1 CEILING DR YW ALL (INTERIOR BRACED PANEL ONLY) T-BAR INSULATION SLAB WALL 1 FLOOR 1 CEILING I MECHANICAL HEAT PUMP GAS LINE WOOD STOVE / PELLET 1 CHIMNEY HOOD 1 DUCTS PW UTILITIES 1 SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE 1 METER SEWER CONNECTION SANITARY STORM PLANNING DEPT. SEPARATE PERMIT #'s SEPA: PARKING/LlGHTING ESA: LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W.I PWI CONSTRUCTiON - R.W. ENGINEERING 417-4807 PW 1 ENGINEERING FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 417-4815 BUILDING T:\PLANNINGIFORMSIII02.15 [11114/2003]