Loading...
HomeMy WebLinkAbout302 S Race St - Engineering q~ORT~ .<~ Cr~. ~ ~;;;;> CITY OF PORT ANGELES PUBLIC WORKS - UTILITIES DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 os -;;<74 Application Number Application pin number Property Address ASSESSOR PARCEL NUMBER: Application type description Subdivision Name property Use Property Zoning . _ . Application valuation 05-00000274 Date 702748 302 S RACE ST 06-30-00-7-7-0145-0000- COMM NEW CONST 5/04/05 ? 0 Z s ~fr-ce.5T PUBLIC BUILDINGS & PARKS 15000 Owner Contractor S ICo-:tL bo O-JL-J Pt. CITY OF PORT ANGELES PO BOX 1150 PORT ANGELES WA 983620217 OWNER Other struct info . TOTAL t LOT COVERAGE NUMBER OF STORIES EXISTING LOT COVERAGE LOT SIZE NUMBER OF UNITS 1. 00 1. 00 1. 00 1. 00 1. 00 Permi t . . . . . Additional desc . Permit pin number Permit Fee Issue Date Expiration Date RIGHT OF WAY 48033 50.00 5/04/05 10/31/05 Plan Check Fee valuation .00 15000 Qty Unit Charge Per Extensi~ 1.00 50.0000 ECH RIGHT OF WAY PERMIT C50. 00 ------------------------------------------------------------------ ------- Special Notes and Comments plans for concession stand & 10' high fence must be submited & approved pior to construction. 05/04/2005 01:37 PM RVESS ------------------------------ 04/20/2005 02:57 PM SROBERDS --------------------------- The proposal will result in a public skate park in the Public Buildings and Parks zone. Structures within the park will require a building permit and any fence over 6' tall will need engineering. No land use issues are apparent from the current submittal. Other Fees STATE SURCHARGE 4.50 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 50.00 50.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 54.50 54.50 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give .authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PoJicies\1102.15R {IID5] :f,"ORT~ lO~\ ,........ ~-- ~"'~ CITY OF PORT ANGELES PUBLIC WORKS - UTILITIES DNISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number Application pin number Property Address ASSESSOR PARCEL NUMBER: Application type description Subdivision Name Property Use Property Zonlng . . . Application valuation 05-00000274 Date 702748 302 S RACE ST 06-30-00-7-7-0145-0000- COMM NEW CONST 5/04/05 PUBLIC BUILDINGS & PARKS 15000 Owner Contractor CITY OF PORT ANGELES PO BOX 1150 PORT ANGELES WA 983620217 OWNER Other struct info . TOTAL % LOT COVERAGE NUMBER OF STORIES EXISTING LOT COVERAGE LOT SIZE NUMBER OF UNITS 1. 00 1. 00 1. 00 1.00 1.00 Permit . . . . . Additional desc . Permit pin number Perml t Fee Issue Date Expiratlon Date RIGHT OF WAY 48033 50.00 5/04/05 10/31/05 Plan Check Fee Valuation .00 15000 Qty unit Charge Per 1.00 50.0000 ECH RIGHT OF WAY PERMIT Extension 50.00 Special Notes and Comments Plans for concession stand & 10' high fence must be submited & approved pior to construction. 05/04/2005 01:37 PM RVESS ------------------------------ 04/20/2005 02:57 PM SROBERDS --------------------------- The proposal wll1 result in a public skate park in the Public Buildlngs and Parks zone. Structures within the park will require a building permit and any fence over 6' tall will need engineering. No land use issues are apparent from the current submittal. Other Fees STATE SURCHARGE 4.50 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 50.00 50.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 54.50 54.50 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. O~ E:J LE Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T \Pohcles\1102.15R [1/05]