Loading...
HomeMy WebLinkAbout840 W 8th St - Engineering PUBILlC WORKS & R/W PERMIT OWNER/APPLICANT 0 Attached Notes Issued: 8/21/2000 Permit No: Work Order: 1096 o 0001000-0000 PROJECT INFO Work is: Plans Required: Start Date: Contractor: OWEST COMMUNICATIONS Performance Bond Required: Amount: Proof of Insurance: Work to Perform: PROPERTY LOCATION 840 8TH ST W Lot: Subdivision: Parcel No: Block: 275 TPA o Long Legal Value Work: $0.00 II Finish Date: 360/000-0000 II $0.00 ['J Install o Repair o Watermain o Sanitary Sewer o Storm Drain ['J Underground Tele/Elec o Misc PROJECT NOTES PLACE 30' POLE ON THE SW COR 8TH & RACE STS FEES ASSESSMEN,. 1.) R/W Excav: $0.00 15.) Other San Sewer: $0.00 2.) Sidewalk: $0.00 16.) Sew Tap Wye/Man Tap: $0.00 3.) Curb/Gutter: $0.00 17.) Sew CaplWIM Removal: $0.00 4.) Driveway: $0.00 18.) Alter Repair Sewer: $0.00 5.) Dwy Culvert: $0.00 19.) Storm Drain: $0.00 6.) Street Cut: $0.00 20.) Catch Basin per ea: $0.00 7.) Other RIW: $0.00 21.) Sewer System Dev: $0.00 8.) Fire Hydrant: $0.00 22.) Milwaukee Dr. Sew Ass: $0.00 9.) Res Water Serv: $0.00 23.) RIW Use Perm: $0.00 10.) Comm Water Serv: $0.00 24.) Admin Cost (D.R.A) $0.00 11.) Other Water Service: $0.00 25.) ORA. $0.00 12.)Water System Dev: $0.00 26.) Misc: $0.00 13.) San Sewer SFR: $0.00 TOTAL FEE: $0.00 14.) San Sewer MFR: $0.00 add unit: 0 Amount Paid: $0.00 Receipt No: Inspection Fee: $0.00 Balance Due: $0.00