Loading...
HomeMy WebLinkAbout719 Currier Ct - Engineering o~ ~ CITY OF PORT ANGELES PUBLIC WORKS - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 PUBLIC WORKS CONSTRUCTION Issued: 11/12/96 TF Permit No: 529 & R/W PERMIT Cond: Work Order: 0 OWNER/APPLICANT------------------------PROPERTY LOCATION------------------------ LBR 719 CURRIER COURT 619 S.PEABODY Lot: AS Port Angeles,wA98362 Block: Long Legal: 360/452-1232 Sub: HIGHLAND COMMUNITIES PROJECT INFO--------------------------~--~-------------------------------------- Work is INSIDE traveled road Value Work: $0.00 Plans Required: N/A contractor: LBR CONSTRUCTION Start: Finish: Performance Bond Required: N/A Proof Insurance: Amount: Work to Perform: INSTALL * Watermain * Sanitary Sewer / / / / $0.00 * Storm Drain Underground Tele/Ele Misc NOTES------------------------------------------------------------------- PROJECT PROJECT FEES ASSESSMENT--------------------------------------------------------- R/W Excav: Sidewalk: Curb/Gutter: Driveway: Dwy Culvert: Street Cut: Other R/W: Fire Hydrant: Res Water Serv: * 5/8" * 3/4" I" Comm Water Serv: I" 1 1/2" 2" Oth Water Serv: Water Sys Dev: * Receipt No: 2539 Inspection Fee: R/W SANITARY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150.00 San Sewer SFR: * San Sewer MFR: Add unit: 0 Other San Sewer: Sew Tap Wye/Man Tap: Sew Cap/ W/M Removal: Alter/Repair Sewer: Storm Drain Tap: Catch Basin per ea: Sewer System Dev: * Milwaukee, Dr. Sew Assess: R/W Use Perm: D.R.A. : Admin Costs (D.R.A): Misc: $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $642.00 $0.00 $0.00 $0.00 $0.00 $0.00 ------------------------------ ------------------------------ $0.00 $0.00 $883.00 TOTAL FEE: AMT PAID: $0.00 WATER BAL DUE: DWY STORM DRA OTHER $1,755.00 $1,755.00 $0.00 Separate Permits are required for electrical work, utilmes, private and pUblic improvements. This permrt becomes null and void IT work or constTuction authorized is not commenced wrthin 180 days, IT construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or IT required inspections have not been requested wrthin 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permrt does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Sionature of Owner Iff owner is builder) Date Sianalure of Contractor or Authorized Acent