Loading...
HomeMy WebLinkAbout1020 Dunker DriveAddress: 1020 Dunker Drive PREPARED 12/14/11, 9:22:06 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 12/14/11 ADDRESS . : 1020 DUNKER DR SUBDIV: TENANT, NBR: NORTH PEN HOME BLDRS CONTRACTOR NORTH PENINSULA BUILDING ASSN. PHONE (360) 452-8160 OWNER NORTH PENINSULA BUILDERS ASSOC PHONE (360) 452-8160 PARCEL 06-30-01-8-3-0040-0000- APPL NUMBER: 11-00001107 RES NEW SFR --------- PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS --- — - — -------------------------- --------------------- — -- — ----- — ------ ---- BL1 01 12/07/11 JLL BLDG FOUNDATION FOOTING 12/07/11 AP December 6, 2011 4:23:52 PM pbarthol. DEREK 461-0738 December 7, 2011 3:55:13 PM jlierly. BL2 01 12/14/11 JLL BLDG FOUNDATION STEM WALL December 14, 2011 9:07:32 AM pbarthol. Derek 461-0738 -------------------------------------- COMMENTS AND NOTES -------------------------------------- PREPARED 12/07/11, 10:42:26 INSPECTION TICKET PAGE 3 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 12/07/11 ------------------------------------------------------------------------------------------------ ADDRESS . : 1020 DUNKER DR SUBDIV: TENANT, NBR: NORTH PEN HOME BLDRS CONTRACTOR NORTH PENINSULA BUILDING ASSN. PHONE (360) 452-8160 OWNER NORTH PENINSULA BUILDERS ASSOC PHONE (360) 452-8160 PARCEL 06-30-01-8-3-0040-0000- APPL NUMBER: 11-00001107 RES NEW SFR ------------------------------------------------- ------------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ---------------------------- ------ ------------------ ----------------- BL1 01 12/07/11 J BLDG FOUNDATION FOOTING December 6, 2011 4:23:52 PM pbarthol. DEREK 461-0738 -------------------------------------- COMMENTS AND NOTES ------------- --------------------- 0-fv :��COW LCL CITY OF PORT ANGELES PUBLIC WORKS & UTILITIES 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 11-00001107 Date 10/28/11 Application pin number . . . 337861 Property Address . . . . . . 1020 DUNKER DR ASSESSOR PARCEL NUMBER: 06 -30 -01 -8 -3 -0040 -0000 - Tenant nbr, name . . . . . . NORTH PEN HOME BLDRS Application type description RES NEW SFR Subdivision Name . . . . . . Property Use . . . . . . . . Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY Application valuation . . . . 135189 ---------------------------------------------------------------------------- Application desc 1,401 SF SFR, 484 SF ATT GAR, 132 SF CVRD PRCH ---------------------------------------------------------------------------- Owner Contractor ------------------- - ---- ------------------------ NORTH PENINSULA BUILDERS ASSOC NORTH PENINSULA BUILDING ASSN. P. O. BOX 748 PO BOX 748 PORT ANGELES WA 98362 PORT ANGELES WA 98362 (360) 452-8160 (360) 452-8160 --- Structure Information 000 000 1,401 SF SFR, 484 ATT GAR, 132 CV PRCH ---------------------------------------------------------------------------- Permit . . . . . . PUBLIC WORKS RES WATER SERV Additional desc . . 3/4" DROP IN METER Permit Fee . . . . 420.00 Plan Check Fee .00 Issue Date . . . . 10/28/11 Valuation . . . . 135189 Expiration Date . . 4/25/12 Qty Unit Charge Per Extension 1.00 420.0000 EA PW WATER METER DROP IN 420.00 ---------------------------------------------------------------------------- Permit . . . . . . SANITARY SEWER HOOK UP Additional desc . . Permit Fee . . . . 150.00 Plan Check Fee .00 Issue Date . . . . 10/28/11 Valuation . . . . 135189 Expiration Date . . 4/25/12 Qty Unit Charge Per Extension 1.00 150.0000 EA SAN SEWER HOOKUP 150.00 ---------------------------------------------------------------------------- Special Notes and Comments October 12, 2011 7:27:04 AM rbecker. If the fire system is a closed system, you will need to install a double check valve assembly. If it is an open fire system, you will not need to install a backflolw assembly. If you have any questions contact Ron Becker at 417-4886, E-mail: rbecker@cityofpa.us or Fax:360-452-4972 Address numbers shall be plainly visible from the street. Address numbers shall be a minimum of six inches high and be of contrasting color from the background. All homes in new subdivisions that are outside of the Fire Department four -minute response area shall be equipped with residential fire sprinkler systems that comply with the International Fire Code (IFC) and National Fire Protection REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of conC -,tion. 1� ®Z�3li SignatL re of Contractor or Authorized Agent to Date Signature of Owner (if owner is builder) Date T:\Policies\1102.15 [10/08] PERMIT INSPECTION RECORD CALL 417-4831 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER, % INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO CONSTRUCTION R.W. / PW/ ENGINEERING 417-4831 CONSTRUCTION - R.W. PW / ENGINEERING FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 417-4815 BUILDING T:\Policies\1102.15 [10/08] CITY OF PORT ANGELES PUBLIC WORKS & UTILITIES 321 EAST 5TH STREET, PORT ANGELES, WA 98362 REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of. construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\Policies\1102.15 [10/08] Page 2 Application Number . . . . . 11-00001107 Date 10/28/11 Application pin number . . . ---------------------------------------------------------------------------- 337861 Special Notes and Comments Association (NFPA). October 17, 2011 5:06:12 PM sroberds. The project will result in a new sfr in the RS -7 for total lot coverage of 22% and site coverage of 27%. No land use issues anticipated. October 12, 2011 10:12:41 AM banders. OK Sanitary sewer connection inspection is required by Public Works prior to back fill of ditch. 24 hour advance notice is required. ---------------------------------------------------------------------------- Other Fees . . . . . . . . . RES UNDERGRND SERVICE FEE 770.00 SEWER SYSTEM DELV CHARGE 2260.00 STATE SURCHARGE 4.50 PW WATER SYSTEM USE FEE 2260.00 ---------------------------------------------------------------------------- Fee summary Charged ----------------- ---------- Paid Credited ---------- ---------- ---------- Due Permit Fee Total 570.00 570.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 5294.50 5294.50 .00 .00 Grand Total 5864.50 5864.50 .00 .00 REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of. construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\Policies\1102.15 [10/08] PERMIT INSPECTION RECORD CALL 417-4831 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,} INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INA CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO CONSTRUCTION R.W. / PW/ ENGINEERING 417-4831 CONSTRUCTION - R.W. PW / ENGINEERING FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 417-4815 BUILDING T:\Policies\1102.15 [10/081 F ?ORT, y1,4CITY OF PORT ANGELES . N PUBLIC WORKS & UTILITIES 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 11-00001107 Date 3/06/13 Application pin number . . . 337861 Property Address . . . . . . 1020 DUNKER DR ASSESSOR PARCEL NUMBER: 06 -30 -01 -8 -3 -0040 -0000 - Tenant nbr, name . . . . . . NORTH PEN HOME BLDRS Application type description RES NEW SFR Subdivision Name Property Use . . . . . . . . Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY Application valuation . . . . 135189 ---------------------------------------------------------------------------- Application desc 1,401 SF SFR, 484 SF ATT GAR, 132 SF CVRD PRCH ---------------------------------------------------------------------------- Owner Contractor NORTH PENINSULA BUILDERS ASSOC NORTH PENINSULA BUILDING ASSN. P. 0. BOX 748 PO BOX 748 PORT ANGELES WA 98362 PORT ANGELES WA 98362 (360) 452-8160 (360) 452-8160 --- Structure Information 000 000 1,401 SF SFR, 484 ATT GAR, 132 ---------------------------------------------------------------------------- CV PRCH Permit . . . . . . PUBLIC WORKS RES WATER SERV Additional desc . . 3/4" DROP IN METER Permit Fee . . . . 420.00 Plan Check Fee 00 Issue Date . . . . 10/28/11 Valuation . . . . 135189 Expiration Date . . 6/11/12 Qty Unit Charge Per Extension 1.00 420.0000 EA PW WATER METER DROP IN 420.00 ---------------------------------------------------------------------------- Permit . . . . . . SANITARY SEWER HOOK UP Additional desc . . Permit Fee . . . . 150.00 Plan Check Fee .00 Issue Date . . . . 10/28/11 Valuation . . . . 135189 Expiration Date 6/11/12 Qty Unit Charge Per Extension 1.00 150.0000 EA SAN SEWER HOOKUP 150.00 ---------------------------------------------------------------------------- Special Notes and Comments October 12, 2011 7:27:04 AM rbecker. If the fire system is a closed system, you will need to install a double check valve assembly. If it is an open fire system, you will not need to install a backflolw assembly. If you have any questions contact Ron Becker at 417-4886, E-mail: rbecker@cityofpa.us or Fax:36.0-452-4972 Address numbers shall be plainly visible from the street. Address numbers shall be a minimum of six inches high and be of contrasting color from the background. All homes in new subdivisions that are outside of the Fire Department four -minute response area shall be equipped with residential fire sprinkler systems that comply with the International Fire Code (IFC) and National Fire Protection REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent T:Forms/Building Division/Public Works Permit Date Signature of Owner (if owner is builder) Date PERMIT INSPECTION RECORD r CALL 417-4831 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED, POST PERMIT INA CONSPICUOUS LOCATION.-, KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO CONSTRUCTION R.W. / PW/ ENGINEERING 417-4807 CONSTRUCTION - R.W. PW / ENGINEERING FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 4174750 PLANNING DEPT. BUILDING 45-7- 4815 BUILDING T:Forms/Building Division/Public Works Permit of PORT q1,C CITY OF PORT ANGELES 4J /wFC 4 _FN PUBLIC WORKS & UTILITIES �P 321 EAST 5TH STREET, PORT ANGELES, WA 98362 REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:Forms/Building Division/Public Works Permit Page 2 Application Number . . . . . 11-00001107 Date 3/06/13 Application pin number . . . ---------------------------------------------------------------------------- 337861 Special Notes and Comments Association (NFPA). October 17, 2011 5:06:12 PM sroberds. The project will result in a new sfr in the RS -7 for total lot coverage of 22% and site coverage of 27%. No land use issues anticipated. October 12, 2011 10:12:41 AM handers. OK Sanitary sewer connection inspection is required by Public Works prior to back fill of ditch. 24 hour advance notice is required. ---------------------------------------------------------------------------- Other Fees . . . . . . . . . CITY DRA % 77.83 DRA FEES PLUS INTEREST 1954.81 RES UNDERGRND SERVICE FEE 770.00 SEWER SYSTEM DELV CHARGE 2260.00 STATE SURCHARGE 4.50 PW WATER SYSTEM USE FEE 2260.00 ---------------------------------------------------------------------------- Fee summary Charged --------------------------- Paid Credited ------------------------------ Due Permit Fee Total 570.00 570.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 7327.14 7327.14 .00 .00 Grand Total 7897.14 7897.14 .00 .00 REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:Forms/Building Division/Public Works Permit PERMIT INSPECTION RECORD CALL 417-4831 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INA CONSPICUOUS LOCATION. w KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO CONSTRUCTION R.W. ! PW/ ENGINEERING 4174807 CONSTRUCTION - R.W. PW / ENGINEERING FIRE 417.4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 41-7- 4815 BUILDING T:Forms/Building Division/Public Works Permit ' BUILDING / PLUMBING /MECHANICAL PERMIT APPLICATION - LONG FORM (To be used for projects that require plan review.) i C Date Received Permit # 1- d City of Port Angeles Please print in ink. Date Approve Attn: Building Permit Technician Approved by 321 E. 5t1 St., Port Angeles, WA 98362 360-417-4815 fax: 360-417-4711 Credit card payments are accepted Mon -Fri 8-5 pm (no A ican Express) Hours: Mon through Fri 8 -� 5 pm Cash & checks are accepted Mon-Thurs 8:30-4 pm & Fri 8. 0-12:30 pm Contact person:r� �' Phone: 3&0 _b-70- ll � Pr perty ow er:�p\e - Winz f !0socic�ah Phone: 3&0 - IS -2- - V/iib rLW& & I1 Lot # Property owner's mailing address: 4 /�O /01 5 Al -t e l e 5 1414 Contractor's business name: 5&4,e_ NP ,+ Phone: or property owner's name if he/she is doing/overseeing the work Contractor's mailing address: Contractor's L&I license number: Expiration date: ccol_ do P8 9 CM 2—1 -2ol2-- Project Address: 10.2-0 ul ker v - Project Type: XResidential o Commercial o Industrial ® Multi -family Project Business Flame: for commercial, industrial, or multkfamilprojects) Zoning: PC� Parcel # o 6-30 0 18 3 0040 Lot # Complete. only the portions of this permit that are relevant to your project. (✓) t/ Pay the plan check fee .(based on the valuation of the project) at the time of submittal Residential Projects submit: {✓ } Two sets of plans* (including engineering calcs, geotech reports, etc. if applicable) { ✓) Prescriptive Approach - Simple Form (confirming conformance to the Energy Code) Commercial Projects submit: V) Three sets of plans* (including engineering calcs, geotech reports, etc. if applicable) (✓) Paperwork confirming conformance.to the Energy Code (✓) For large projects, a pre -construction meeting with various City department personnel is highly recommended. To schedule a pre -construction meeting, contact the Planning Manager at (360) 417-4750. (✓) Additional information may need to be submitted including: landscape plan, parking plan (including ADA spaces, ramps, etc.), utilities (existing & proposed), curbs, sidewalks, storm water.plan, etc. For Additions & New Structures also submit: (✓) Site plan (8 1/2" x 11") showing all structures (existing & proposed), setbacks, & new driveways * If an architect or engineer drew the plans or calculations, include at least one "wet -stamped" set of plans and/or calculations. T:Forms/Building Division/Building/Plumbing/Mechanical Permit Application - Long Form (Revised 2011) Page 1 of 4 00. Repair/ Solar Panels/ Miscellaneous: (explain the proiect) Project Valuation $ Remodel: (explain the proiect including how the building space is currently being used and what the new, remodeled use will be) Project Valuation I (✓) If the space will change from commercial to residential, submit "Checklist — Converting Commercial Space into Residential Space" Addition: (explain the proiect and complete & submit page 3) Maximum height of the new addition feet Project Valuation $ New Structure., (explain the project and complete & submit page 3) Maximum height of the new structure I t3 feet Project Valuation $ 3_ PLUMBING PERMIT: Check one: No . Yes MECHANICAL PERMIT. Check one: No Yes Will there be ANY plumbing changes (items moved, added, replaced, or altered) { ✓) If yes, complete & submit page 4 "Plumbing Changes" Will there be ANY mechanical changes (items moved, added, replaced, or altered) {✓) -If yes, complete & submit page 4 "Mechanical Changes" Occupancy group # of bedrooms 3 Will a lawn sprinkler system be installed? .14o Occupant load 2.90 eo55 # of full baths $ 2 - Will Will a fire sprinkler system be installed? Construction type T�"--r�-P' # of half baths *Homeowner: If you will be doing / overseeing the work, then the project valuation will. be determined by doubling the cost of materials, to reflect the value the repair adds to your property. Cost of materials x 2 = Project Valuation $ 1 have read and completed this application and know it to be true and correct l am authorized to apply for this permit and understand that it is my responsibility, to determine what permits are required, and to obtain permits prior to working on projects. n Date l Page 2 of 4 Signature Print Name lro Floor Areas Basement 15t Floor 2nd Floor 3rd Floor Garage Carport Covered Porch Deck (> 30" high)' Deck (5 30" high)*f Shed Other Other Existing square New square footage footage * Walking surface of the deck above ground Price per new square foot X = $ Vis. �o ,ol 64 30' ou _ v t 3 �. 11z. co IS— Remodel project valuation TOTAL VALUATION $ 13 S-))51-00 For residential building projects the minimum square foot valuation we accept is: Dwelling $85.00 per sq. ft. garage/utility/misc.structure $30.00 per sq. ft. porch/deck/carport $12.00 per sq. ft. LOT COVERAGE & SITE COVERAGE Lot coverage is the amount or percent of ground area on which buildings are located. It includes: houses, garages, carports, covered patios, cantilevered portions of buildings, roof overhangs that are longer than.30-inches, uncovered decks or porches having walking surfaces higher than 30 -inches off the ground, etc. Total footprint of structures 2pt-7 sq. ft. ir lot size q3 P sq.ft. = Lot coverage 22 - Site Coverage is the amount of impervious surface on a parcel, including structures, paved driveways, sidewalks, patios, and other impervious surfaces. (see Port Angeles Municipal Code 17.94.135 for exemptions) Does the project include a new driveway? ';dyes o no If yes, what will the driveway be made of? R -f cement ❑ asphalt ❑ gravel ❑ other (NOTE: 18 feet is the recommended minimum driveway length for residential projects) Does this project include a new parking pad? ❑ yes ❑ no If yes, -what will the parking pad be made of? m cement ❑ asphalt ❑ gravel ® other a) . Total footprint of structures 9- O sq. ft. (existing & new) b).. Total concrete, asphalt, & other impervious surfaces S-:! -L 0, sq. ft. (existing & new) c) Add lines "a" & "b" above to get the total impervious 216�(0-7 _ sq, ft. (existing & new) Total impervious 2 S0sq. ft. _ .lot -size �-_l_� sq. ft. = Site coverage Z7 1 Page 3 of.4 Please list all other planned plumbing changes or additions that aren't listed above. MECHANICAL CHANGES V Check "No" or "Yes" (and enter quantities) for each line Item. Type Mechanical Changes_ (Moved, Added, Replaced, Furnace, heat pump, or V/ PLUMBING CHANGES forced air units 5 tons Check "No" or "Yes" (and enter quantities) for each line item. ,_„Quantity Tvpe Plumbing Changes (Moved, Added, Replaced, forced air unit > 5 tons No Yes or Altered) 3 Sink (hand, mop, floor etc.) No Yes Quantity Toilet NoYes Yes Quantity Bathtub- No Yes 1 Quantity Shower No `Yes _Quantity Washing Machine No a/ Yes –7r%'Yes I Quantity Hot Water Heater No Yes ,_Quantity Water Line (meter to structure) No _�/_'No Yes l Quantity Re -plumb the structure No Yes Quantity Sewer Line No a/ Yes I_Quantity Backflow Prevention Device Types: ✓ Yes Quantity Beverage Machine No _7'No Yes Quantity Landscape Watering System No Yes -Yes Quantity Fire Sprinkler Systems 2 inch line No IL 1 Quantity Fire Sprinkler System > 2 inch line ✓ No Yes Quantity Please list all other planned plumbing changes or additions that aren't listed above. MECHANICAL CHANGES V Check "No" or "Yes" (and enter quantities) for each line Item. Type Mechanical Changes_ (Moved, Added, Replaced, Furnace, heat pump, or or Altered) forced air units 5 tons No -Z--yes ,_„Quantity Furnace, heat pump, or forced air unit > 5 tons No Yes Quantity Ductless heat pump No Yes Quantity Wali (recessed) heater No Yes Quantity Baseboard heater No Yes Quantity Steffes room heater No Yes Quantity Wood -burning stove No Yes Quantity Pellet stove No Yes Quantity Radiant floor heat No Yes Quantity Gas fireplace or freestanding stove No Yes Quantity Gas cooking stove No Yes Quantity Propane tank set No Yes Quantity Gas line No Yes Quantity Boiler No Yes Quantity Clothes Dryer NoYes t Quantity Ventilation fan (single duct) No Yes -W-Quantity Hood &duct mechanical exhaust No __VYes I Quantity Ventilation system (not part of a heating or air -conditioning system) No Yes –Yes Quantity Air handler No ,__Quantity Evaporative cooler (non-portable) No Yes Quantity Please list all other planned mechanical changes or additions that aren't listed above. a I Page 4 of 4 U 71 49 %119 T-7 04', jC, CD cz Of r4, V) LO 4N� \ t 75't NATIVE VEGETATION TO REMAIN UNDISTURBED 1�^ �ACKIINE ____ CLEARING LIMITS, FLAGGED IN FIELD PROPOSED DECK n I C 19' _ LOT 4 DOWNSPOUTS N 9,$40 Sff GARDEN, KEEP OUT TIGHTUNE "� µ ), DOWNSPOUT N BE INSTALLED ' .I 'OND, FOOTING O_ ADES REQUIRE i O� PROPOSED SEWER SERVICE &((jh V JNE TO HOUSE (APPROX. LSC.) i i c ', PERFORATED PVC PIPE IN BOTTOM OF . RAIN GARDEN, < iEA TO BE 390 S.F. IETERMINED IN FIELD ! `lPROSEDE D TAILS TORAIN LEFT `'''!\`� ''` , •` ',l/� G CONNECT 70 f 5' INTO PROPI A METER`LQCAMON, APPROX. LAC.' ` CAP WRE :t PR OSED CONCRETE NS�� �_ \ TALLiS-X6-X4- TEE DRIVEWAY FOR !FAIN GARDEN, 4c FIELD LOCATE 75'± f PUESCRIFTIVE APPROACH—SIMPLE FORM For the Washington State Energy Code (WSEC) 2009 Edition Climate Zone 1 CITY GOVEIM dENr . Site Information: I Building Department Use Only: Lot: Address: 020 0"Vt, IJr. city: Port X5eus State: j A Zip: 1 3 b Z Contact: `r ray 'B,t l 10i h Phone: (30A 610 111iq Phone 2J31160) q9_'2_—g1(00 FAX: Permit Notes: WSEC .Table 6-1 PRESCRIPTIVE REQUIREMENTS. FOR SINGLE-FAMILY RESIDENTIAL OR DUPLEX CLIMATE ZONE 1 (Unlimited Glazing Option Only) = option,.'' Glazing..: :.. o . _ :Area .of Floor: : ; : Glazing 'U -Factor ... -.boor...:. U- Factor Ceiling Vaulted Ce I i in 9 wall. - Above Grade'. 1-.t:: ��, Int. Below - . W Ex^terlo:r a81ow Floor Slab. ori Concrete ' Overhead - -:Vertical Grade Graefe R-49 !►I Unlimited 0.30 0.50 0:20 or R-38 R-21 R-21 R-10 R-30 / R-10 R-38 int TB U=0.029 2' adv This Project complies with the following: The project is a single-family residence or duplex. The project is a wood frame OR all of the insulation is interior or exterior of the framing. All building components meet the requirements listed above. The project will meet all other provisions of the WSEC and VIAQ. The Project will take advantage of the following exceptions to the prescriptive option. [] 602.6 Exception 2. One unlabeled or untested exterior swinging door, 24 sq.ft. or less, may be installed per unit for ornamental, security, or architectural purposes. Location of the door taking this exception: ❑ 602.6 Exception 2. If a door is mostly glass, it should meet the requirement of the vertical glazing U -factor listed above. Location of the door(s) taking exception: Type of Heat Source: C&rriyw X 14413 '54d� T:Forms/Budding Division/Prescrlptive Approach -Simple Form y4i O 1� • .� 4,0 aX r clb mow`'` `°° �~ w"►. ° ""`` �` � � '�` QL— r ° � � O^ ' t 0��� ''w",`^,.,e ttt ::'�•' 4' X � � .�, tai � > gryyp ,ts•5 '"-M., n 4j° � `°`,.., '��. .w'w� h N 'r -�rt�j - r � X 'Y f 35pSPX ^ 0. r rv� 1 i _�� .' r rr 1 N. •r ti N RAIN T. SOA n VOIYE: 5 E. ORGAN �. mnFT PACNRIG O W.ERAL scvE w RD PROM 35D IF. DF 5W6ACE AREA AT WT OF RAN oARDEN f. P R P ■T11 75't NATIVE VEGETATION TO REMAIN UNDISTURBED - 1BAn( yNF CLEARING LIMITS, FLAGGED IN FIELD II PROPOSED DECK I i I I I II I LOT 5 I I I 9.340 SFt 19 I � LOT 4 i 4**PVC TIGHTUNE FROM DOWNSPOUTS 9.340 SF* k FOOTING DRAIN TO RAIN GARDEN, KEEP I u LO FOOTING DRAIN R DOWNSPOUT TIGHTLINE SEPARATE TO POND. DOWNSPOUT I I N TIGHTUNE MUST BE INSTALLED HIGH ENOUGH TO DAYLIGHT INTO POND. FOOTING ' MAY CONNECT TO UNDERDRAIN IF GRADES REWIRE \\PROPOSED SEWER SER- I I I \ WATERLINE TO HOUSE (APPROX'. LSC.) 4' INSYNLL R PERFORATED PVC ! I UNDER0t1AIN PIPE IN BOTTOM OF \ RAIN GARDEN, SURFACE�AREA TO BE 390 S.F. \ SHAPE TOB DETERMINED IN FIELD \ I \PROPOSED RAIN GARDEN, x F < r SEE DETAILS TLEFT _ ` CONNECT TO EXISTING B'R PVC PIPE . S' _TO PROPERTY TO SOUTH. SLOPE \\\ PROPOSED METER LQCATION. I 1L INXSTTALL TEMPORARY CAP APPR0,1X\. LOC. AND P.T. 4 IPOSTOF UNMARK END FUTURE`. \SII' L\� . - .5.. \'.�4 �f :� \\ L I FORAIN GARDEN, i' LD LOCATE 7g•t r 7. ' j�j� iriL �`�/T (_ a r .L12 V— ----=– –_ �T='——= –y– i-- -- -- --- – ;' ---- -- ----- - ........–...: �.. - 777777 Shale: 1" = 10' SITE PLAN o To' xo' 3' SCALE: 1" = 10' 4 O 2 Y R Q 7F z O VI kl W Q �o I S iv3n♦ o V v� ez o Haas W W O av � � o OEn Z N O G Q Z V V) Q W Z N O to Do °� ' � 3 E � z�W W^z aoQ 11 �L 19 DOS zaa F SCALE: 1" =10' DATE: 10/4/2011 FILE: rMrl JOB NO. 1a'GY D 4 e ssroNAl cYW SHEET 1 OF 1 I4'. PK FROM UNDOMAN TO e'. I IE STdIN mAN I B RAIN GARDEN PLAN 'z Scale: NTS 75't NATIVE VEGETATION TO REMAIN UNDISTURBED - 1BAn( yNF CLEARING LIMITS, FLAGGED IN FIELD II PROPOSED DECK I i I I I II I LOT 5 I I I 9.340 SFt 19 I � LOT 4 i 4**PVC TIGHTUNE FROM DOWNSPOUTS 9.340 SF* k FOOTING DRAIN TO RAIN GARDEN, KEEP I u LO FOOTING DRAIN R DOWNSPOUT TIGHTLINE SEPARATE TO POND. DOWNSPOUT I I N TIGHTUNE MUST BE INSTALLED HIGH ENOUGH TO DAYLIGHT INTO POND. FOOTING ' MAY CONNECT TO UNDERDRAIN IF GRADES REWIRE \\PROPOSED SEWER SER- I I I \ WATERLINE TO HOUSE (APPROX'. LSC.) 4' INSYNLL R PERFORATED PVC ! I UNDER0t1AIN PIPE IN BOTTOM OF \ RAIN GARDEN, SURFACE�AREA TO BE 390 S.F. \ SHAPE TOB DETERMINED IN FIELD \ I \PROPOSED RAIN GARDEN, x F < r SEE DETAILS TLEFT _ ` CONNECT TO EXISTING B'R PVC PIPE . S' _TO PROPERTY TO SOUTH. SLOPE \\\ PROPOSED METER LQCATION. I 1L INXSTTALL TEMPORARY CAP APPR0,1X\. LOC. AND P.T. 4 IPOSTOF UNMARK END FUTURE`. \SII' L\� . - .5.. \'.�4 �f :� \\ L I FORAIN GARDEN, i' LD LOCATE 7g•t r 7. ' j�j� iriL �`�/T (_ a r .L12 V— ----=– –_ �T='——= –y– i-- -- -- --- – ;' ---- -- ----- - ........–...: �.. - 777777 Shale: 1" = 10' SITE PLAN o To' xo' 3' SCALE: 1" = 10' 4 O 2 Y R Q 7F z O VI kl W Q �o I S iv3n♦ o V v� ez o Haas W W O av � � o OEn Z N O G Q Z V V) Q W Z N O to Do °� ' � 3 E � z�W W^z aoQ 11 �L 19 DOS zaa F SCALE: 1" =10' DATE: 10/4/2011 FILE: rMrl JOB NO. 1a'GY D 4 e ssroNAl cYW SHEET 1 OF 1 P.01/O1 TRANSACTION REPORT 2011/OCT/05/WED 13:20 "FAX(TX) .77 DATE START T. RECEIVER COM.TIME PAGE TYPE/NOTE FILE ,01 OCT/05 13:19 194528197 1 0:00:231 1 1 OK SG3 6673 PREPARED 10/05/11, 11:50:29 PAYMENTS DUE RECEIPT CITYPORT --PORT ANGELES----------NO�/"�,--P�--------------------- ---------------------- -- APPLICATION NUMBER: 11-00001107 1020 DUNKER DR FEE DESCRIPTION AMOUNT DUE --------------------------------------------------------------------------- PLAN CHECK FEES 794.20 TOTAL DUE 794.20 Please present this receipt to the cashier with full payment. � L1 City of Part Angeles PoS SOnePoint Port Angeles WA 99362 Telephone: A -Z7-0411 SALES SLIP CITY PORT ANGELES Oper: PERMITS Type: OP Drawer: 1 RECEIPT Date: 10/05/11 61 Receipt no: 95490 Oper: PERMITS Type: OP Drawer! 1 Seq no: IIE459 Date: 18/05/11 01 Receipt no: 95480 Nerch ID #: 0001 Cross ref#: 104374 Description Quantity Amount 2011 1107 Card no: e******e0224 BP BUILDING PERMITS 1.00 $794.2.0 j Card type: VISA CARD Trans number: 1265251 WECH, FALEANR I Ruth code: MS96 Date: 10/05111 Time: 11:53:51 WECH, FALEANR 1020 DUG ER DR I Payment total: 4794.20 Tender detail CARDHOLDER AD(NOWL,EDGES RECEIPT OF GWDS OP CREDIT CARD 4794.20 ANDIOR SERVICES IN THE AMOUNT OF THE Total tendered 4794.20 I TOTAL SHOWN HEREON AND AGREES TO PERFORM Total payment 4794.20. THE OBLIGATIONS SET FORTH IN THE CARD - HOLDER'S A69EE W WITH THE ISM. trans date: 10l05f11 Time: 11:53:51 eam THANK YOU FOR YOUR PAYMENT Signature: FOR INQUIRIES 360-457-0411 PRESS 1 0 PREPARED 10/05/11, 11:50:29U PAYMENTS DUE RECEIPT CITY OF PORT ANGELES Nori� Pm ­ 6 1.0{,)qe. -E- Q - PROGRAM BP820L --------------------------------------------------- ----------------- APPLICATION NUMBER: 11-00001107 1020 DUNKER DR FEE DESCRIPTION AMOUNT DUE ---------------------------------------------------------------------------- PLAN CHECK FEES 794.20 TOTAL DUE 794.20 Please present this receipt to the cashier with full payment. �y CITY OF PORT ANGELES *** CUSTOMER RECEIPT *** Oper: PERMITS Type: OP Drawer: 1 Date: 10/05/11 N Receipt no: 95480 Descr2ptlion iQu0antity Amount BP 0 BUILDING PERMITS 1.00 $794.20 Trans number: 1265251 WECH, FALEANA WECH, FALEANA 1020 DUNKER DR Tender detail OP CREDIT CARD $794.20 I Total tendered $794.20 Total payment $794.20 Trans date: 10/05/11 Time: 11:53:51 *** THANK YOU FOR YOUR PAYMENT *** FOR INQUIRIES 360-457-0411 PRESS 1 WWW.CITYOFPA.US City of Port Angeles - OnePoint PoS 3,11 E 5th St Port Angeles WA 98362 Telephone: 366-457-0411 *** SALES SLIP *** Oper: PERMITS Type: OP Drawer: 1 Date: 10/05/11 01 Receipt no: 95480 Seq no: 1124502 Merch ID #: 0001 Cross ref#: 104374 Card no: ************0224 Card type: VISA CARD Auth code: 055996 Date: 10/05/11 Time: 11:53:51 Payment total: $794.20 CARDHOLDER ACKNOWLEDGES RECEIPT OF GOODS AND/OR SERVICES IN THE AMOUNT OF THE TOTAL SHOWN HEREON AND AGREES TO PERFORM THE OBLIGATIONS SET FORTH IN THE CARD- HOLDER'S AGREEMENT WITH THE ISSUER. Signature: CUSTOMER COPY ��NPBA NORTH PENINSULA BUILDING ASSOCIATION October 22, 2012 Mr. Jim Lierly City of Port Angeles PO Box 1150 Port Angeles, WA 98362 Dear Jim, P.O. Box 748 • Port Angeles, WA 98362 • (360) 452-8160 www.npbaJnfo RECEIVED OCT 242012 CITY OF PORT ANGELES BUILDING DIVISION NPBA would like to request an extension to the building permit for 1020 Dunker Drive, Port Angeles. We are working with the school district to restart the Future Builders program in Fall of 2013. Our hope is that we will be able to keep our permit active until that time as to not to incur additional fees to the program which benefits vocational programs locally. We would appreciate any assistance you could provide in helping with this valuable community program. Please let me know if you have any further questions about our plans on the site. Thank you, Tracy Gudgel .;L - Past President, NPBA oaf 2 � Jwi !..... rv06 & A- Y4x- p �a'O I Heather Catuzo From: James Lierly Sent: Monday, April 16, 2012 4:45 PM To: Heather Catuzo Subject: FW: Extension of NPBA Building Permit FYI Any of these that I get through the email process will be forwarded to you first ... jim From: faleanawech@gmail.com[mailto:faleanawechCc)gmail.com] On Behalf Of FaLeana Wech Sent: Monday, April 16, 2012 11:37 AM To: James Lierly Cc: Tracy Gudgel Subject: Extension of NPBA Building Permit Hi Jim, The North Peninsula Building Association would like to request an extension of the Building Permit for 1020 Dunker Drive in Port Angeles. The decision was made to suspend construction of the project but we would like to keep our permit active. Please let me know if you have any questions or need additional information. Thanks, FaLeana FaLeana Wech Executive Officer North Peninsula Building Association 360.452.8160 faleanagnpba. info 1 \ CITY OF PORT ANGELES p/1 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT - BUILDING DIVISION ` 4v 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 11-00001107 Date 10/28/11 Application pin number . . . 337861 Property Address . . . . . . 1020 DUNKER DR ASSESSOR PARCEL NUMBER: 06 -30 -01 -8 -3 -0040 -0000 - Tenant nbr, name . . . . . . NORTH PEN HOME BLDRS Application type description RES NEW SFR Subdivision Name . . . . . . Property Use Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY Application valuation . . . . 135189 ---------------------------------------------------------------------------- Application desc 1,401 SF SFR, 484 SF ATT GAR, 132 SF CVRD PRCH ------------------ --------------------------------------------------------- Owner Per Contractor NORTH PENINSULA BUILDERS ASSOC NORTH PENINSULA B LDING ASSN. P. O. BOX 748 THOU BL -100,001-500K (5.60 PER K) PO BOX 748 Permit . PORT ANGELES WA 98362 PORT ANGELS WA 98362 (360) 452-8160 (360) 452,,;.4160 Permit Fee --- Structure Information ---------------------------------------------------------------------------- 000 000 1,401 SF SFR, 484 ATT GAR, 132 CV PRCH Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Expiration Additional desc 1,401 SF SFR, 484 SF ATT GAR .Permit Fee . . . . 1221.85 Plan Check Fee 794.20 Issue Date . . . . 10/28/11 Valuation . . . . 135189 Expiration Date . . 4/25/12 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 REPORT SALES TAX on your state excise tax form to the City of Port Angeles (Location Code 0502) Qty Unit Charge Per Extension BASE FEE 1020.25 36.00 ---------------------------------------------------------------------------- 5.6000 THOU BL -100,001-500K (5.60 PER K) 201.60 Permit . . . . . . MECHANICAL PERMIT Additional desc . . Permit Fee . . . . 111.25 Plan Check Fee .00 Issue Date . . . . 10/28/11 Valuation . . . . 0 Expiration Date 4/25/12 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 1.00 10.6500 EA ME -AIR HAND AOR=10,000 CFM 10.65 2.00 7.2500 EA ME -VENT FAN (SINGLE DUCT) 14.50 1.00 10.6500, EA_ ME-.HOOD/DUCT-,MECH. EXHAUST_ ..,.-. 10.65 1.00 10.6500 EA ME-STOVE%FIREPLACE/MISC. APP. 10.65 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . Permit Fee . . . . 149.00 Plan Check Fee .00 Issue Date . . . . 10/28/11 Valuation . . . . 0 Expiration Date 4/25/12 Qty Unit Charge Per Extension BASE FEE 50.00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or loc law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD - PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS - Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK. BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage / Downspouts Piers Fire 417-4653 Post Holes (Pole Bldgs.) PLUMBING: FINAL Date Accepted b Under Floor / Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow / Water AIR SEAL: Walls Ceiling FRAMING: Joists / Girders / Under Floor Shear Wall / Hold Downs Walls / Roof / Ceiling Drywall Interior Braced Panel Only) T -Bar INSULATION: Slab Wall / Floor / Ceiling MECHANICAL: FINAL Date Accepted b Heat Pum / Furnace / FAU / Ducts Rou h -In Gas Line Wood Stove / Pellet / Chimney Commercial Hood / Ducts MANUFACTURED HOMES: Footing / Slab Blocking & Hold Downs Skirting PLANNING DEPT. Separate Permit #s SEPA: ESA: SHORELINE: Parkin / Lighting Landscaping FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW / Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 CITY OF PORT ANGELES �1 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 of I. Page 2 Application Number . . . . . 11-00001107 Date 10/28/11 Application pin number . . . 337861 Qty Unit Charge Per Extension 9.00 7.0000 EA PL -PLUMBING TRAP 63.00 1.00 7.0000 EA PL -WATER LINE 7.00 1.00 7.0000 EA PL -BACKFLOW PROTECTION <OR=2" 7.00 1.00 15.0000 EA PL -SEWER LINE 15.00 1.00 7.0000 EA PL -WATER HEATER 7.00 ---------------------------------------------------------------------------- Special Notes and Comments October 12, 2011 7:27:04 AM rbecker. If the fire system is a closed system, you will need to install a double check valve assembly. If it is an open fire system, you will not need to install a backflolw assembly. If you have any questions contact Ron Becker at 417-4886, E-mail: rbecker@cityofpa.us or Fax:360-452-4972 Address numbers shall be plainly visible from the street. Address numbers shall be a minimum of six inches high and be of contrasting color from the background. All homes in new subdivisions that are outside of the Fire Department four -minute response area shall be equipped with residential fire sprinkler systems that, comply with the International Fire Code (IFC) and National Fire Protection Association (NFPA). October 17, 2011 5:06:12 PM sroberds. The project will result in a new sfr in the RS -7 for total lot coverage of 22% and site coverage of 27%. No land use issues anticipated. October 12, 2011 10:12:41 AM banders. OK Sanitary sewer connection inspection is required by Public works prior to back fill of ditch. 24 hour advance notice is required. ----------------------------------------------------------------------------- Other Fees . . . . . . . . . RES UNDERGRND SERVICE FEE 770.00 SEWER SYSTEM DELV CHARGE 2260.00 STATE SURCHARGE 4.50 PW WATER SYSTEM USE FEE 2260.00 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total 1482.10 1482.10 .00 .00 Plan Check Total 794.20 794.20 .00 .00 Other Fee Total 5294.50 5294.50 .., ..00. __;. .00 Grand Total 7570.80 7570.80 .00 .00 . REPORT SALES TALC on your state excise tax form to the City of Port Angeles (Location Code 0502) Separate Permits are required forelectrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD -- PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS — Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: I U�%L d�Lr Footings Stemwall Foundation Drainage / Downspouts Piers Fire 417-4653 Post Holes (Pole Bldgs.) PLUMBING: FINAL Date Accepted b Under Floor / Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow / Water AIR SEAL: Walls Ceiling FRAMING: Joists / Girders / Under Floor Shear Wall / Hold Downs Walls / Roof / Ceiling DrVwall Interior Braced Panel Only) T -Bar INSULATION: Slab Wall / Floor / Ceiling MECHANICAL: _.._:. _. :..._. . FINAL Date Accepted b Heat Pum / Furnace / FAU / Ducts Rough -in Gas Line Wood Stove / Pellet / Chimney Commercial Hood / Ducts MANUFACTURED HOMES: Footing / Slab Blocking & Hold Downs Skirting PLANNING DEPT. Separate Permit #s SEPA: ESA: SHORELINE: Parkin / Lighting Landscaping FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW / Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 n I11a1iVIIIVLVI \FncaauIc yauycj Ia uacu iV.rcc.0 lwu0c.;u1.Iu Mall F1c�au.c�. WSEC states that. the test may be performed at any time after rough in. All penetrations in the building envelope must be sealed including those for utilities, plumbing, electrical, ventilation and combustion appliances; The code also states that when required by the buildina`ocial. theaest shall be conducted `in -the presence of :department staff: An air ff leakage test is not required.for additions less than 750 squa[e:feet; To conduct the test; 1. Close all windows, doors and fireplace and stove doors. 2. Close all dampers including: exhaust, intake, make-up air, backdraft and flue dampers. Since you will be depressurizing>the house,<dampers in<bath fans, etc. will be sucked closed during the test and` 'ill therefore not negatively affect the results. 3. Make sure plumbing traps are filled with -water, 4. Leave doors between heated areas open.. 5. Open access hatches to conditioned attics...and/or conditioned crawl spaces. 6. Seal exterior openings for continuously operating ventilation: systems and heat recovery ventilators. 7. Turn off heating -and cooling systems but do not seal supply or return registers. 8. Adjust all combustion appliances so that they do not turn on during the test. 9. Install the:blower door in an exterior dooropening and connect hoses -from the manometer to the blower door fan and the exterior pressure tap. See manufacturer's instructions for correct set-up. 10. Depressurize the house to -50 Pascals. 11. Record the flow rate (with simple manometers, the fan pressure (Pa) is converted to -- -----CFM5.0 using a flow -_table: ;Many digital manometers sold with blower doors -can - -- -- automatically perform this; conversion;; and display' CFM50 directly.) Consult your blower door and manometer manuals. You now: must convert; the flow rate (CFM50) to SLA. Use the following formula: SLA = (CFM50 X.055) / (CFA X 144) Where: SLA = Specific Leakage Area CFM50 X.055 = Blower door fan flow rat6.at 50,pascal pressure. difference, converted to a conversion factor. (SLA reference pressure) CFA x 144 = Conditioned floor area of the housing unit, converted to square inches Jo D0 I�unwk- a�-: FI 9%^ ; Box 219, L Part Angeles, WA 98362 (360) 681-0480 800 -479-1371 Ag in gypur life a little warmerl INSULATION 9ERTIFICATE THIS IS TO CERTIFY THAT, IN ACCORDANCE WITH THE CURRENT THERMAL PERFORMANCE STANDARDS (WASHINGTON STATE CODE) OR APPROVED PLANS, iNSULATION HAS BEEN INSTALLED IN THE BUILDING LOCATED AT: PROPERTY ADDRESS: 1c) r)-6 4, OWNER: BUILDER: ATTIC TYPE OF MATERIAL BLOWN -TYPE OF MATERIAL: EXTERIOR WALLS TYPE OF MATERIAL: FLOORS TYPE OF MATERIAL VAPOR BARRIERS TYPE OF MATERIAL- DUCTIPIPE WRAP TYPE OF MATERIAL SUB -CONTRACTOR DESCRIPTION OF INSULATION MANUFACTURER THICKNESS R -VALUE FIBERGLAS KNAUF FIBERGLASS KNAUF FIBERGLASS KNAUF FIBERGLASS KNAUF VISQUEEN FLOOR FIBERGLASS YES CONTRACTOR'S REG. No: AUTr-'vf%1LtU SIGNATURE C & FINSULAT16N. INC. CEILING -M ------- m --------- -WALLS NO L -d 6VEO-199-09S uoijainsuIj pue 3 I 7 ' @ �-/D Vv-,k-� Vr-, PREPARED 8/29/13, 14:24:38 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/29/13 ------------------------------------------------------------------------------------------------ ADDRESS . : 1020 DUNKER DR SUBDIV: TENANT, NBR: NORTH PEN HOME BLDRS CONTRACTOR NORTH PENINSULA BUILDING ASSN. PHONE (360) 452-8160 OWNER NORTH PENINSULA BUILDERS ASSOC PHONE (360) 452-8160 PARCEL 06-30-01-8-3-0040-0000- APPL NUMBER: 11-00001107 RES NEW SFR -------------------- PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS -------------------- --- BL1 01 12/07/11 JLL BLDG FOUNDATION FOOTING 12/07/11 AP December 6, 2011 4:23:52 PM pbarthol. DEREK 461-0738 December 7, 2011 3:55:13 PM jlierly. BL2 01 12/14/11 JLL BLDG FOUNDATION STEM WALL 12/14/11 AP December 14, 2011 9:07:32 AM pbarthol. Derek 461-0738 December 14, 2011 3:47:40 PM jlierly. BL9 01 6/14/13 JLL BLDG SHEARWALL 6/14/13 AP June 14, 2013 9:05:26 AM pbarthol. MIKE 460-6172 June 14, 2013 4:45:05 PM jlierly. BAIR O1 6/26/13 JLL BLDG AIR SEAL 6/26/13 AP June 25, 2013 4:47:10 PM pbarthol. Mike 460-6172 June 26, 2013 4:13:10 PM jlierly. BL3 01 6/26/13 JLL BLDG FRAMING 6/26/13 AP June 25, 2013 4:46:40 PM pbarthol. Mike 460-6172 June 26, 2013 4:13:10 PM jlierly. PW99 01 8/11/13 RV PUBLIC WORKS FINAL 8/12/13 AP August 12, 2013 11:36:23 AM rvess. August 12, 2013 11:36:40 AM rvess. BL99 01 8/29/13 J BLDG FINAL August 29, 2013 1:54:15 PM pbarthol. Mike 460-6172 ------------------------------------------------------------------------------------------------ PERMIT: ME 00 MECHANICAL PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED WRESULTS/COMMENTS-------------------------------------- ME99 01 8/29/13 MECHANICAL FINAL August 29, 2013 1:54:36 PM pbarthol. Mike 460-6172 ------------------------------------------------------------------------------------------------ PERMIT: PL 00 PLUMBING PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS --------- — --------------- PL2 01 6/19/13 JLL PLUMBING ROUGH -IN 6/19/13 AP June 19, 2013 8:14:57 AM pbarthol. MIke 460-6172 June 19, 2013 4:00:30 PM jlierly. PL99 01 8/29/13 J PLUMBING FINAL August 29, 2013 1• :4 PM pbarthol. --------------- —-------------------- CONTINUED TO PAGE ----------------------------------- F��IJ