Loading...
HomeMy WebLinkAbout1110 Dunker Drive Address: 1110 Dunker Drive PREPARED 10/21/16, 9:01:53 INSPECTION TICKET PAGE 4 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/21/16 ------------------------------------------------------------------------------------------------ ADDRESS . : 1110 DUNKER DR SUBDIV: CONTRACTOR : ACE MICHAELS INC PHONE (360) 460-6172 OWNER ACE MICHAELS INC PHONE (360) 460-6172 PARCEL 06-30-01-8-3-0070-0000- APPL NUMBER: 16-00000774 RES NEW SFR ----------------—--------------------------------------------—-—---------------------------- REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS --------------- -- - ----- - ------ -------------'--------'--—---—-------------—---------——----—-- PL99 01 10/21/16 L PLUMBING FINAL October 21, 2016 8:36:54 AM jlierly. ------------------------lw------ COMMENTS AND NOTES -------------------------------------- PREPARED 10/21/16, 9:01:53 INSPECTION TICKET PAGE 3 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/21/16 - --—-—-------—------------------------------------------------------------------------------- ADDRESS 1110 DUNKER DR SUBDIV: CONTRACTOR ACE MICHAELS INC PHONE (360) 460-6172 OWNER ACE MICHAELS INC PHONE (360) 460-6172 PARCEL 06-30-01-8-3-0070-0000- APPL NUMBER: 16-00000774 RES NEW SFR ------------------------------------------------------------------------------------------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS -----------------------------------------— --- - -- BL1 01 7/05/16 PB BLDG FOUNDATION FOOTING 7/06/16 AP July 5, 2016 9:55:07 AM pbarthol. Mike 460-6172 July 6, 2016 11:09:28 AM pbarthol. BL2 01 7/13/16 JLL BLDG FOUNDATION STEM WALL 7/13/16 AP July 13, 2016 8:26:06 AM jlierly. - Mike 460-6172 July 13, 2016 3:51:24 PM jlierly. EFF O1 7/25/16 JLL BLDG FLOOR FRAMING - 7/25/16 AP July 25, 2016 9:26:07 AM jlierly. Mike 460-6172 July 25, 2016 3:47:03 PM jlierly. BEXS O1 8/08/16 JLL BLDG EXTERIOR SHEETING 8/08/16 AP August 8, 2016 8:52:16 AM jlierly. Mike 460-2722 August 8, 2016 4:26:41 PM jlierly. BL3 01 9/01/16 JLL BLDG FRAMING 9/01/16 AP September 1, 2016 8:26:23 AM jlierly. Mike 460-774 September 1, 2016 4:47:42 PM jlierly. BEXS 02 9/15/16 JLL BLDG EXTERIOR SHEETING 9/15/16 AP September 15, 2016 8:48:50 AM jlierly. Mike 460-6172 September 15, 2016 3:20:10 PM jlierly. PW99 01 10/19/16 RV PUBLIC WORKS FINAL 10/20/16 AP October 20, 2016 12:48:56 PM rvess. Q October 20, 2016 12:49:17 PM rvess. BL99 01 10/21/16 BLDG FINAL October 21, 2016 8:35:59 AM jlierly. Mike 460-6172 ------------------------------------------------------------------------------------------------ PERMIT: ME 00 MECBANICAL PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ ME99 01 10/21/16 LL MECHANICAL FINAL - October-21, 2016 8:36:34 AM jlierly. PERMIT: PL 00 PLUMBING PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS - ------------------------------------------------------------------------------------------------ PL2 01 8/16/16 JLL PLUMBING ROUGH-IN ' 8/16/16 AP August 16, 2016 11:09:39 AM jlierly. Mike August 16, 2016 3:57:34 PM jlierly. ----------------------------------- CONTINUED ONTO NEXT PAGE ----------------------------------- %�. CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 16-00000774 Date 8/16/16 Application pin number . . . 289646 Property Address . . . . . . 1110 DUNKER DR REPORT SALES TAX ASSESSOR PARCEL NUMBER: 06-30-01-8-3-0070-0000- Application type description RES NEW SFR on your state excise tax form Subdivision Name . . . . . . to the City of Port Angeles Property Use Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation . . . . 138650 1 11 ----------------------------------------------------------- Application desc 1882sf single story 3bed 2bath SFR Owner Contractor 1 I ------------------------ ------------------------ L ACE MICHAELS INC ACE MICHAELS INC 1329 W 10TH ST 1329 W. 10TH ST. PORT ANGELES WA 98363 PORT ANGELES WA 98363 (360) 460-6172 (360) 460-6172 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Additional desc SFR BUILDING PERMIT Permit Fee . . . . 1238.65 Plan Check Fee .00 Issue Date 7/01/16 Valuation . . . . 138650 Expiration Date 2/04/17 7 = Qty Unit Charge Per Extension BASE FEE 1020.25 39.00 5.6000 THOU BL-100,001-500K (5.60 PER K) 218.40 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL PERMIT Additional desc . . NEW SFR Permit Fee . . . . 171.20 Plan Check Fee .00 " Issue Date . . . . 8/16/16 Valuation . . . . 0 Expiration Date 2/12/17 Qty Unit Charge Per Extension f z. xF BASE FEE 50.00 1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 3.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 21.75 .00 10.6500 EA ME-VENT SYSTEM .00 1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65 .00 18.2000 EA ME-FURN/HP/FAU > 5 TON .00 5.00 14.8000 EA ME-HEATER(SUSP/WALL/FLOOR-MTD) 74.00 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . . NEW SFR Permit Fee . . . . 170.00 Plan Check Fee .00 Issue Date 8/16/16 Valuation 0 Expiration Date 2/12/17 Qty Unit Charge Per Extension BASE FEE 50.00 9.00 7.0000 EA PL-PLUMBING TRAP 63.00 Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 186 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Li hting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 i . CITY OF PORT ANGELES P� DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number . . . . . 16-00000774 Date 8/16/16 Application pin number . . . 289646 REPORT SALES TAX Qty Unit Charge Per Extension on your state excise tax form 1.00 7.0000 EA PL=WATER LINE 7.00 to the Cit of Port Angeles 4.00 7.000 EA PL DRAIN VENT 0 PIPING 28.00 Y 9 1.00 15.0000 EA PL-SEWER LINE 15.00 (Location Code 0502) ; 1.00 7.0000 EA PL-WATER HEATER 7.00 Permit . . . . . . PUBLIC WORKS RES WATER SERV Additional desc 3/4 INCH DROP IN METER Permit Fee . . . . 420.00 Plan Check Fee .00 j Issue Date . . . . 7/01/16 Valuation . . . . 138650 Expiration Date 2/04/17 Qty Unit Charge Per Extension 1.00 420.0000 EA PW WATER METER DROP IN 420.00 Permit . . . . . . SANITARY SEWER HOOK UP Additional desc . . Permit Fee . . . . 150.00 Plan Check Fee .00 Issue Date . . . . 7/01/16 Valuation . . . . 138650 Expiration Date 2/04/17 Qty Unit Charge Per Extension 1.00 150.0000 EA SAN SEWER HOOKUP 150.00 --------------------------------------------------------------------------- Special Notes and Comments May 27, 2016 3:38:52 PM pbarthol. No plan check fee paid. Fee was paid on permit 15-164, and the approved plans will be used on this project. pb July 7, 2016 9:30:13 AM msanders. Residential Sprinkler system required. Spoke to Mike Caudill via phone 7-7-2016 to confirm this requirement May 31, 2016 7:53:30 AM rbecker. If you are installing a lawn sprinkler system, you will need to install a double check valve assembly. Are you installing a fire system? If it is a closed system, you will need to install a double check valve assembly. If it is an open system, you do not need a backflow.Lawn or fire system question was not marked on the application. If you have any questions call Ron Becker at 417-4886, fax:452-4972, or E-mail: rbecker@cityofpa.us Electrical load calculations and electrical permits are required. Use existing driveway opening. 1. Establishing Construction Access. 2. Install sediment controls BMPs. 3. Stabilize exposed soils. 4. Protect slopes from erosion. 5. Protect drain. inlets. 6. Control pollutants including but not limited to spills, Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Conteactor or Authorized Agent Signature of Owner(if owner is builder). T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS- Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 ��►� CITY OF PORT ANGELES DEPARTMENT� 1► TMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 3 Application Number . . . . . 16-00000774 Date 8/16/16 Application pin number . . . 289646 - ---------------------------------------- ------------------- REPORT SALES TAX Special Notes and Comments on your state excise tax form concrete wash out, exposed aggregate processes, concrete to the City of Port Angeles grindingand saw cut waste water. 7. Maintain temporary and permanent erosion control BMPS (Location Code 0502) during project. All disturbed area's on site not covered by new improvements should meet the attached soil quality and depth standard. Consider applying for the City Green Infrastructure Rebate of up to $750.00 towards the materials to install rain garden to control roof and driveway runoff. Also rebates available for downspout disconnections.Contact Jonathan Boehme at 360 417-4811 Sanitary sewer connection inspection is required by Public Works prior to back fill of ditch. 24 hour advance notice is required. Public Works Inspection request line 417-4831 Trench safety per applicable laws. Temp erosion control and surface restoration responsibility of applicant. Contact City inspector prior to start of work @ 360 417-4831. No attachment to sanitary sewer of stormwater roof leaders, foundation drains, yard drains, or any other CSO contribution is allowed. -The contractor making the connection to an existing water meter is responsible to adjust water meter depth so that there is a minimum of 4 to 6 inches of clearance between the bottom of the meter box lid and the top of the meter at finish grade. ---------------------------------------------------------------------- Other Fees . . . . . . . . . CITY DRA g 47.32 DRA FEES PLUS INTEREST 1427.73 RES UNDERGRND SERVICE FEE 770.00 SEWER SYSTEM DELV CHARGE 2260.00 STATE SURCHARGE 4.50 PW WATER SYSTEM USE FEE 2260.00 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 2149.85 2149.85 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 6769.55 6769.55 .00 .00 Grand Total 8919:40 8919.40 .00 .00 Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permft BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 TITSI` .G, S For City Use CITY OF Permit# WASH ] N G T o N, U. S. Date Received: -/ 321 E 5th Street Date Approved Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 RAW {� 5- Email:permitsOcityo a.us BUILDING PERMIT AP LICATION Lo+ '#7 Project Address: ® Y Phone: '� Primary Contact: K .Ny"t— C � L L Email: Name , Phone � ► GTnc Property Mailing Address `��� ! 0 �_ Email Owner. w City ^ State Zip Name } Phone — Contractor Address Email Information city State Zip Contractor License# Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) -50 (10 -v Residential 1Sl Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑ Classification For the following,fill out both pages of permit application: (check New Construction EX Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes ❑ No ❑ 1 Existing? Yes ❑ No ❑ In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater cit oa.us Project Description v; S',vL Is project in a Flood Zone: Yes ❑ No� Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within 18o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date o� "- �. Print Name � UJrA{ L Signature Residential Structures Existing Proposed Construction For Office Use Area Descriptions(SQ FT) Floor area Floor area $Value new area .Basement First Floor Second Floor Covered Deck/Porch/Entry ^� Deck(over 30"or 2'd floor) of Garage O oO Carport Other(describe) Area Totals Commercial Structures v Area Descriptions(SQ FT) Existing Proposed Construction For Office Use Floor area Floor area $Value new area Existing Structure(s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size(sq ft) Lot Coverage(sq ft)foot print of %Lot Coverage(Total lot cov_lot size) Max Bldg Height all structures 18 8 Q sq ft Site Coverage(Sq Ft of all impervious) %of Site CQ, (total site cov_lot size) � a Mechanical Fixtures Indicate how inan'y of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # ortable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # 7 Furnace/Heat Pumvp/ Size: # , Ventilation System # Forced Air Unit Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Water Heater # Plumbing Vent piping # Medical gas piping #of Outlets: Water Line # Fuel gas piping #of Outlets: Sewer Line # Industrial waste pretreatment interceptor Grease Trap) Size Other(describe): T:\Forms\2015 CED Form Updates\Building&Permitting\BP\Building Permit 20150415.docx Building Soil Builders Foundation for Success Builders,developers,and landscapers are adopting practices that preserve and improve the soil on building sites. Benefits include faster planting and vibrant plant growth for quicker sales, plus better stormwater infiltration. Local governments are beginning to require these practices. Why build healthy soil? • More marketable buildings and landscapes • Better site erosion control _ w. • Reduced need for water and chemicals • Less stormwater runoff, better water quality, lower costs to comply with new regulations • Healthy landscapes=satisfied customers Soil "best management practices" (BMPs)include preserving site topsoil and vegetation where possible,reducing soil compaction,and :�- amending disturbed soils with compost to restore healthy soil functions. These BMPs will soon be required throughout western Washington. Home buyers are asking for them now. ` r son ` � 1 • 1 5 Steps to Building Soil FoumiaWn for Success Washington State's municipal stormwater permits require these soil BMPs.That requirement is taking effect locally as towns and counties around western Washington update their stormwater codes(as required by those permits). Some jurisdictions already require the soil BMPs—all will soon. The good news is,it's easy,and customers want it.New home buyers say they are happy to pay more for a healthy,easy to care for landscape—and that starts with the soil. See www.BuildingSoll.org for state and local codes,how-to tips,and more. step 1 Retain and protect native topsoil � ' r At Redmond Ridge.Quadrant Homes fences and protects existing forest as an amenity and stormwater filter.Then they grade to 12 inches below finish grade. and vegetation where practical. I Plan to fence and keep equipment off these protected areas, '• ' - to prevent compaction.Tree roots are especially sensitive,and trees are expensive to replace. 4 p t ' i; - • Loosen compacted subsoil, if needed. The next •is to place rock pads for r••• Options where there is hardpan or compaction from construction traffic: Once foundations are in and houses are •Scarify subsoil 4 inches deep before placing topsoil sided,framed and .. .•. reused soil is placed(to allow for settling to 12-inch • Rip in the first lift of topsoil,to mix with subsoil finish grade). compost • _ • prevents • Rip site soils 12 inches deep,before tilling in compost to • can proceed d 8-inch depth The goal is to have at least 12 inches of finished uncompacted soil depth,including at least an 8-inch depth of organic-amended topsoil. _,,.w y "`� This will improve both stormwater infiltration and plant growth. woo, too. compost into the existing soil. On breakCat-mounted rippers can compaction.or rip in the first lift of p - . Restore soils that are disturbed during construction. �,� � .{;. �' Construction requires land clearing,so plan to restore soil functions for _ better stormwater management and happier customers. Three options to restore disturbed soils: � •Stockpile 8�reuse good quality site topsoil,or - •Till 2-3 inches of compost into poor site soils,or •Bring in 8 inches of compost-amended topsoil(25-35%compost) At Shamrock Heights,Cam West Development Amended soils may be rdled before turf installation to reduce settling andcombines a traditional feel with innovative still retain good porosity for stormwater infiltration and plant growth. stormwater methods. Rhigh-quality supportsoils plus mulching .- Download the builder's guide at www.BuildingSoil.org. step Mulch landscape beds after planting. High Point uses Mulching prevents erosion,conserves moisture,prevents weeds, and gives plants a healthy start.Use coarse bark or wood chips— fine bark can seal the soil. compost-amended landscapes to manage stormwater. ste• At Issaquah Protect restored soils from erosion and re-compaction. Blakely Port ommunitie uses compost amended. . soils in landscapes for a . . product that sells.and attracts future customers .. ka Prevent runoff from roads or open slopes onto amended soil areas. Compost blankets are an approved erosion control BMP(see www. BuildingSoil.org).Use a compost blanket for erosion control during construction,and then just till in the compost when it's time to landscape. Once soils have been amended,keep vehicle traffic off to prevent �� re-compaction.Installing gravel pads for roads and driveways early in the project will help funnel traffic and prevent erosion violations. Loosened,amended soil is easier to plant in,and provides much �; ' � •�. better plant survival,preventing expensive call-backs. w Sellinghealthy soil valuepro's and home buyers agree on the Jim Berger,Construction Manager for Port Blakely Communities at Issaquah Highlands says,"These soil practices work better than anything we've tried-plants survive the first winter,and slopes don't need to be fixed later.Using compost blankets on slopes and compost soil amendments throughout the project not only prevents erosion right away-it gives us great vegetation establishment,even on difficult sites." Jeff Cox,ASLA,of Triad Associates confirms,"Placing amended soils or stockpiling topsoils has front-end costs,but there can be long-term savings and benefits,from healthier plant material,better growing medium,and water quality improvements." � Greg Rabourn,co-host of Yard Talk TV show adds,"Plants aren't cheap! a _ Replacing them costs time and money. Spending a little on the soil saves money on water,plant replacement,and landscape chemicals.And a healthy, , vibrant landscape is better for resale value." b 1 q Site planning consultant Howard Stenn notes,"Preserving areas of undisturbed vegetation saves on stormwater detention,landscaping,and development costs.Compost soil amendment makes for quicker planting and faster establishment.There's no doubt these practices help sell a project." Jim Thompson,a Shamrock Heights homeowner says,"It adds value w, rdustorners value a healthy, to the home now while we live in it,and for the future when we sell. I think it adds great value to the community too." easy-care landscape, starts with healthy soil. WORC PO Box 2799 + • + • Longview WA 98632 Get ahead ofnew regulations Building Soil Foundation for Success Learn more at www.BuildingSoil.org SponsoredOrganic Recycling Council,with members from the organics recycling industry and Washington state,county, and local governments. Printed on recycled paper 4. Au- A'�Ckssj�� ANdEI.£ � CITY OF Ow it baste upop P M The lssuan o this and other data shall notes specificati building o +cial from Vis.�+ correction o errors in said p cher data from preventing bu+ldin ions from being carri on thereunder wu,sd cn in unof codes and clinances of this j pROVAL / u ALL W UBJECT f0 FfE Date By 0 1 0 I sc�.le WIW Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed. In addition, based on the size of the structure,the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative Date All Climate Zones R-Value' U-Factor' Fenestration U-Factorb n/a 0.30 Skylight LI-Factor n/a 0.50 Glazed Fenestration SHGCb'e n/a n/a Ceiling 4Y 0.026 Wood Frame Wal l9 k 1 21 int 0.056 Mass Wall R-Value' 21/21h 0.056 Floor 309 0.029 Below Grade Wall`k 10/15/21 int+TB 0.042 Slab' R-Value& Depth 10, 2 ft n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2. Each dwelling unit in one and two-family dwellings and townhouses, as defined in Section 101.2 of the International Residential Code shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1. Small Dwelling Unit: 0.5 points Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are less than 750 square feet of heated floor area. ❑ 2. Medium Dwelling Unit: 1.5 points All dwelling units that are not included in#1 or#3, including additions over 750 square feet. ❑ 3. Large Dwelling Unit: 2.5 points Dwelling units exceeding 5000 square feet of conditioned floor area. Table R406.2 Summary Option Description Credit(s) la Efficient Building Envelope 1 a 0.5 ❑ 1 b Efficient Building Envelope 1 b 1.0 ❑ 1c Efficient Building Envelope 1c 2.0 ❑ 2a Air Leakage Control and Efficient Ventilation 2a 0.5 ❑ 2b Air Leakage Control and Efficient Ventilation 2b 1.0 ❑ 2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑ 3a High Efficiency HVAC 3a 0.5 31b High Efficiency HVAC 3b 1.0 ❑ 3c High Efficiency HVAC 3c 2.0 ❑ 3d High Efficiency HVAC 3d 1.0 ❑ 4 High Efficiency HVAC Distribution System 1.0 ❑ 5a Efficient Water Heating 0.5 ❑ 5b Efficient Water Heating 1.5 ❑ 6 Renewable Electric Energy 0.5 '1200 kwh 0.0 Total Credits 0.00 *Please refer to Table R406.2 for complete option descriptions http://www.energy.wsu.edu/Documents/2012%2ORes%2OEnergv.pd