Loading...
HomeMy WebLinkAbout1116 Dunker Drive Address: 1116 Dunker Drive PREPARED 12/15/16, 13:29:10 INSPECTION TICKET PAGE 1 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY - -DATE 12/15/16 - --------------------------------------------------- ADDRESS . : 1116 DUNKER DR SUBDIV: CONTRACTOR ACE MICHAELS INC PHONE (360) 460-6172 OWNER ACE MICHAELS INC PHONE (360) 460-6172 PARCEL 06-30-01-8-3-0080-0000- APPL NUMBER: 16-00000775 RES NEW SFR ------------------------------------------------------------------------------------------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENPTAT• REQUESTED INSP DESCRIPTION .TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ---------------------------—-------------—-----------------------------—-------------—------ BL1 01 7/05/16 PB BLDG FOUNDATION FOOTING 7/06/16 AP, July 5, 2016 9:54:22 AM pbarthol. Mike 460-6172 July 6, 2016 11:09:28 AM pbarthol. BL2 01 7/13/16 JLL BLDG FOUNDATION STEM WALL 7/13/16 AP July 13, 2016 8:27:29 AM jlierly. Mike 460-6172 July 13, 2016 3:51:24 PM jlierly. BFF 01 8/12/16 JLL BLDG FLOOR FRAMING 8/12/16 AP August 12, 2016 8:21:06 AM jlierly. 460-2722 August 12, 2016 4:21:25 PM jlierly. BAIR 01 10/07/16 JLL BLDG AIR SEAL 10/07/16 AP October 6, 2016 9:59:03 AM jlierly. Mike 460-6172 October 7, 2016 4:21:59 PM jlierly. BL3 01 10/07/16 JLL BLDG FRAMING 10/07/16 AP October 6, 2016 9:59:49 AM jlierly. October 7, 2016 4:21:59 PM jlierly. PW6 01 12/12/16 RV PUBLIC WORKS DRIVEWAY 12/13/16 AP December 13, 2016 1:04:04 PM rvess. December 13, 2016 1:04:47 PM rvess. PW99 01 12/12/16 RV PUBLIC WORKS FINAL 12/13/16AP December 13, 2016 1:04:22 PM rvess. December 13, 2016 1:05:01 PM rvess. _ BL99 01 12/15/16 BLDG FINAL December 15, 2016 9:47:00 AM jlierly. Mike 460-6172 PERMIT: ME 00 MECHANICAL PERMIT ----------------------------------------------------- - - -- --- REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS -----------------------KPRMIT ------------------------------------------------------------------- ME99 01 12/1 16 JMECHANICAL FINAL December 15, 2016 9:47:23 AM jlierly. ---------------------- --------------------------------------------r---------------------- PERMIT: PL 00 PLUMBI SC INSP REQUESTED DESCRIPTION Q TYP/SQ COMPLETED RESULT RESULTS/COMMENTS PL2 01 9/22/16 JLL PLUMBING ROUGH-IN 9/23/16 AP September 22, 2016 8:31:47 AM jlierly. Mike 460-6172 September 23, 2016 8:52:15 AM jlierly. PL99 01 12/15/16 J PLUMBING FINAL December 15, 2016 9:47:35 AM jlierly. ------------------------- ----------- -------- COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES i 7►�� 'DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDMG DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 16-00000775 Date 8/16/16 Application pin number . . . 442475 Property Address . . . . . . 1116 DUNKER DR REPORT SALES TAX ASSESSOR PARCEL NUMBER: 06-30-01-8-3-0080-0000- Application type description RES NEW SFR on your state excise tax form Property Name _ . . . . . to the City of Port Angeles Pro ert Use Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY Location Code 0502) Application valuation . . . . 138650 ---------------------------------------------------------------------------- Application desc 1882sf single story 3bed 2bath SFR ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ ACE MICHAELS INC ACE MICHAELS INC 1329 W 10TH ST 1329 W. 10TH ST. PORT ANGELES WA 98363 PORT ANGELES WA 98363 (360) 460-6172 (360) 460-6172 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Additional desc . . SFR BUILDING PERMIT Permit Fee . . . . 1238.65 Plan Check Fee .00 Issue Date . . . . 7/01/16 Valuation . . . . 138650 \�--� Expiration Date 2/08/17 Qty Unit-Charge Per Extension BASE FEE 1020.25 39.00 5.6000 THOU BL-100,001-500K (5.60 PER K) 218.40 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL PERMIT - Additional desc . C31 Permit Fee . . . . 171.20 Plan Check Fee .00 Issue Date . . . . 8/16/16 Valuation . . . . 0 Expiration Date 2/12/17 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 3.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 21.75 1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65 5.00 14.8000 EA ME-HEATER(SUSP/WALL/FLOOR-MTD) 74.00 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . . Permit Fee . . . . 170.00 Plan Check Fee .00 Issue Date . . . . 8/16/16 Valuation . . . . 0 Expiration Date . . 2/12/17 Qty Unit Charge Per Extension - BASE FEE 50.00 9.00 7.0000 EA PL-PLUMBING TRAP 63.00 I 1.00 7.D0o0 EA PL-WATER LINE 7.00 4.00 7.0000 EA PL-DRAIN VENT PIPING 28.00 _9 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS- Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Light g ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction -R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 �� CITY OF PORT ANGELES i��� `D-EPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION t. rF 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number . . . . . 16-00000775 Date 8/16/16 Application pin number . . . 442475 REPORT SALES TAX Qty Unit Charge Per Extension on your state excise tax form 1.00 15.0000 EA PL-SEWER LINE 15.00 to the Cit of Port Angeles 1.00 7.0000 EA PL-WATER HEATER 7.00 Y g ----------------------- ------ ----- - -- ---- -- - - - ---------------------- (Location Code 0502) Permit PUBLIC WORKS RES WATER SERV Additional desc 3/4 INCH DROP IN METER Permit Fee . . . . 420.00 Plan Check Fee .00 Issue Date . . . . 7/01/16 Valuation . . . . 138650 Expiration Date 2/08/17 Qty Unit Charge Per Extension 1.00 420.0000 EA PW WATER METER DROP IN 420.00 ---------------------------------------------------------------------------- Permit . . . . . . SANITARY SEWER HOOK UP Additional desc . Permit Fee . . . . 150.00 Plan Check Fee .00 Issue Date . . . . 7/01/16 Valuation . . . . 138650 Expiration Date 2/08/17 Qty Unit Charge Per Extension 1.00 150.0000 EA SAN SEWER HOOKUP 150.00 ---------------------------------------------------------------------------- Special Notes and Comments May 27, 2016 3:45:47 PM pbarthol. No plan check fee paid. Fee was paid on permit 15-164, and the approved plans will be used on this project. pb July 7, 2016 9:33:35 AM msanders. Residential sprinkler system required. Spoke to Mike Caudill via phone to confirm this requirement on 7-6-2016. I �,.. May 31, 2016 7:42:48 AM rbecker. If you are installing a lawn sprinkler system, you will need to install a double check valve assembly. Are you installing a fire system? If it is a closed system, <.,. -you will need to install a double check valve assembly. If it is an open system, you do not need a backflow. Neither the fire or lawn system question was marked on the application. If you have any questions call Ron B ecker at 417-4886, fax:452-4972 or E-mail:rbecker@cityofpa.us May 31, 2016 2:29:22 PM permits. approve Electrical load calculations and electrical permits are required. Use existing driveway opening. 1. Establishing Construction Access. 2. Install sediment controls BMPs. 3. Stabilize exposed soils. 4. Protect slopes from erosion. 5. Protect drain inlets. 6. Control pollutants including but not limited to spills, Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or.the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD -- PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS- Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT_ BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 3 Application Number . . . . . 16-00000775 Date 8/16/16 Application pin number 442475 REPORT SALES TAX --------------------------------------------------------------------------- Special Notes and Comments on your state excise tax form concrete wash out, exposed aggregate processes, concrete to the Cit of Port Angeles grinding and saw cut waste water. Y g 7. Maintain temporary and permanent erosion control BMPS (Location Code 0502) during project. z . • a . All disturbed area's on site not covered by new improvements should meet the attached soil quality and depth standard. r, Consider applying for the City Green Infrastructure Rebate of up to $750.00 towards the materials to install rain garden to control roof and driveway runoff. Also rebates available for downspout disconnections.Contact Jonathan Boehme at 360 417-4811 Sanitary sewer connection inspection is required by Public Works prior to back fill of ditch. 24 hour advance notice is required. Public Works Inspection request line 417-4831 Trench safety per applicable laws. Temp erosion control and surface restoration responsibility of applicant. Contact City inspector prior to start of work @ 360 417-4831. No attachment to sanitary sewer of stormwater roof leaders, foundation drains, yard drains, or any other CSO contribution is allowed. - -- The contractor making the connection to an existing water meter is responsible to adjust water meter depth so that there is a minimum of 4 to 6 inches of clearance between the bottom of the meter box lid and the top of the meter at finish grade. ---------------------------------------------------------------------------- Other Fees . . . . . . . . . CITY DRA g 47.32 DRA FEES PLUS INTEREST 1427.73 RES UNDERGRND SERVICE FEE 770.00 SEWER SYSTEM DELV CHARGE 2260.00 STATE SURCHARGE 4.50 ., . . PW WATER SYSTEM USE FEE 2260.00 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 2149.85 2149.85 .00 .00 Plan Check Total .00 .00 .00 .00 " Other Fee Total 6769.55 6769.55 .00 .00 Grand Total 8919.40 8919.40 .00 .00 Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or,the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS- Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab IBlocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 M Building Soil Builders Foundation for Success Builders,developers,and landscapers are adopting practices that preserve and improve the soil on building sites. Benefits include faster planting and vibrant plant growth for quicker sales, plus better stormwater infiltration. Local governments are beginning to require these practices. Why build healthy soil? • More marketable buildings and landscapes • Better site erosion control • Reduced need for water and chemicals • Less stormwater runoff, better water quality, lower costs to comply with new regulations • Healthy landscapes= satisfied customers Soil "best management practices" (BMPs) include preserving site � '+ topsoil and vegetation where possible, reducing soil compaction,and _ amending disturbed soils with compost to restore healthy soil functions. , These BMPs will soon be required throughout western Washington. Home buyers are asking for them now. -' 91_0 ■■n saw z 5 il Steps • Building • Soil Foundation for Success Washington State's municipal stormwater permits require these soil BMPs.That requirement is taking effect locally as towns and counties around western Washington update their stormwater codes(as required ii by those permits). Some jurisdictions already require the soil BMPs—all will soon. The good news is, it's easy,and customers want it. New home buyers say they are happy to pay more for a healthy,easy to care for landscape—and that starts with the soil. See www.BuildingSoil.org for state and local codes, how-to tips,and more. stei • 1 Retain and protect native topsoil t and vegetation where practical. Plan to fence and keep equipment off these protected areas, a, `��` to prevent compaction.Tree roots are especially sensitive,and ��__ trees are expensive to replace. At a nr ` u �j• Redmond Ridge,Quadrant Homes fences and protects existing . ! gradestep Loosen compacted subsoil, if needed. The next •is to place rock pads for roads and Options where there is hardpan or compaction from construction traffic: Once foundationsframe •Scarify subsoil 4 inches deep before placing topsoil • "nd 14 inches of compost-amended • Rip in the first lift of topsoil,to mix with subsoil reused soil is placedallow for settling to 12-inch finish grade).The compost blend prevents erosion, • Rip site soils 12 inches deep,before tilling in compost to •work can proceed - 8-inch depth The goal is to have at least 12 inches of finished uncompacted soil X depth, including at least an 8-inch depth of organic-amended topsoil. _ ' "+ ,,,- This will improve both stormwater infiltration and plant growth. I f ^ e On many sites it is more cost effective0 fill compost into the ex isting soil. 4. Cat-mounted rippers can break up t . , Restore soils that are disturbed At Shamrock Heights,Cam West during construction. Construction requires land clearing,so plan to restore soil functions for better stormwater management and happier customers. Three options to restore disturbed soils: - •Stockpile&reuse good quality site topsoil,or '� " - •Till 2-3 inches of compost into poor site soils,or - •Bring in 8 inches of compost-amended topsoil(25-359�o compost) Development Amended soils may be rolled before turf installation to reduce settling andcombines a traditional feel with innovative Reuse still retain good porosity for stormwater infiltration and plant growth. high-quality soils plus mulching support a vibrant landscape. Download the builder's guide at www.BuildingSoil.org. step Mulch landscape beds after planting. NOW— High Point uses Mulching prevents erosion,conserves moisture,prevents weeds, and gives plants a healthy start.Use coarse bark or wood chips— fine bark can seal the soil. 9:t.. compost-amended manage stormwater. ste • xY At Issaquah Highlands,Port Blakely Communities Protect restored soils from erosion and re-compaction. uses compost •' - • ' soils in landscapes for a high-end,. product that sells.and attracts future customers .. Prevent runoff from roads or open slopes onto amended soil areas. 16 successful projects,state and local codes, how-to tips: Learn more at www.BUildingSoil.org Compost blankets are an approved erosion control BMP(see www. BuildingSoil.org).Use a compost blanket for erosion control during construction,and then just till in the compost when ft's time to ' landscape. '® Once soils have been amended,keep vehicle traffic off to prevent � � re-compaction.Installing gravel pads for roads and driveways early in the project will help funnel traffic and prevent erosion violations. Loosened,amended soil is easier to plant in,and provides much I� better plant survival,preventing expensive call-backs. Sellinghealthy soil valuepro's and home buyers agree on the Jim Berger,Construction Manager for Port Blakely Communities at Issaquah Highlands says,'?hese soil practices work better than anything we've tried—plants survive the first winter,and slopes don't need to be fixed later.Using compost blankets on slopes and compost soil amendments throughout the project not only prevents erosion right away—it gives us great vegetation establishment,even on difficult sites." Jeff Cox,ASIA,of Triad Associates confirms,"Placing amended soils or7:0K stockpiling topsoils has front-end costs,but there can be long-term savings and benefits,from healthier plant material, better growing medium,and water quality improvements." Greg Rabourn,co-host of Yard Talk TV show adds,"Plants aren't cheap! 4 Replacing them costs time and money. Spending a little on the soil saves money on water,plant replacement,and landscape chemicals.And a healthy, vibrant landscape is better for resale value." Site planning consultant Howard Stenn notes,"Preserving areas of undisturbed vegetation saves on stormwater detention,landscaping,and development costs.Compost soil amendment makes for quicker planting and faster establishment.There's no doubt these practices help sell a project." Jim Thompson,a Shamrock Heights homeowner says,"It adds value to the home now while we live in it,and for the future when we sell. Customers I think it adds great value to the community too." easy-care landscape, an• that starts with healthy soil. WORC v PO Box 2799 E • • ` + Longview WA 98632 Get ahead of • • Building Soil Foundation for Success Learn more at www.BuildingSoil.org Sponsored . . Organic organicsCouncil,with members from the recycling industry and Washington state,county, d local governments. Printed on recycled paper 4. Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information A- This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed.In addition,based on the size of the structure,the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative Date All Climate Zones R-Valuea U-Factora Fenestration U-Factorb n/a 0.30 Skylight U-Factor n/a 0.50 Glazed Fenestration SHGCb.e n/a n/a Ceiling 49 0.026 Wood Frame Wall9X' 21 int 0.056 Mass Wall R-Value' 21/2 1 h 0.056 Floor 309 0.029 Below Grade Wall°k 10/15/21 int+TB 0.042 Slab R-Value&Depth 10,2 ft n/a 'Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2. Each dwelling unit in one and two-family dwellings and townhouses,as defined in Section 101.2 of the International Residential Code shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1X1. Small Dwelling Unit: 0.5 points Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are less than 750 square feet of heated floor area. ❑ 2. Medium Dwelling Unit: 1.5 points All dwelling units that are not included in#1 or#3, including additions over 750 square feet. ❑ 3. Large Dwelling Unit: 2.5 points Dwelling units exceeding 5000 square feet of conditioned floor area. Table R406.2 Summary Option Description Credit(s) 1a Efficient Building Envelope 1a 0.5 ❑ 1 b Efficient Building Envelope 1 b 1.0 ❑ 1c Efficient Building Envelope 1c 2.0 ❑ 2a Air Leakage Control and Efficient Ventilation 2a 0.5 ❑ 2b Air Leakage Control and Efficient Ventilation 2b 1.0 ❑ 2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑ 3a High Efficiency HVAC 3a 0.5 3b High Efficiency HVAC 3b 1.0 ❑ 3c High Efficiency HVAC 3c 2.0 ❑ 3d High Efficiency HVAC 3d 1.0 ❑ 4 High Efficiency HVAC Distribution System 1.0 ❑ 5a Efficient Water Heating 0.5 ❑ 5b Efficient Water Heating 1.5 ❑ 6 Renewable Electric Energy 0.5 `1200 kwh 0.0 Total Credits 0.00 *Please refer to Table R406.2 for complete option descriptions http://www.energy.wsu.edu/Documents/2012%2ORes/2OEnergy.pdf TiFiE CITY c» ,#0" �` �, For City Use '�J Permit# 7I W A S H 1 N G T O N, U. S. Date Received: 321 E 51h Street Date Approved Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permits(@cityofpa.us BUILDING PERMIT A ICATION 4 i) Project Address: ' I /(o v Dr�v e � l ' \ Phone: Prima Contact: 1� �`1 1 Email: Name Phone C f . L K. Property Mailing Address Email Owner / 0 City ^ State Zip Name / Phone Contractor Address Email Information city State Zip Contractor License# Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) $ �o O Residential Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑ Classification For the following,fill out both pages of permit application: (check New Construction W Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes ❑ No ❑ Existing? Yes ❑ No ❑ In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater ci o ams Project Description Me- d-p Is project in a Flood Zone: Yes ❑ N Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within 118o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date '`� Print Name Signature Residential Structures Existing Proposed Construction For Office Use Area Descriptions(SQ FT) Floor area Floor area $Value new area Basement First Floor /L�5 Second Floor Covered Deck/Porch/Entry a -7 Deck(over 30"or z° floor) Garage 4. O 0 Carport / Other(describe) Area Totals I q Commercial Structures Area Descriptions(SQ FT) Existing Proposed Construction For Office Use Floor area Floor area $Value new area Existing Structure(s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size(sq ft) Lot Coverage (sq ft)foot print of %Lot Cov age(Total lot cov_lot size) Max Bldg Height 0 all structures I S j sq ft Site Coverage(Sq Ft of all impervious) %of ite Co ge(total site cov_lot size) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # I Heater(Suspended,Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # -repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # portable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # 3 Furnace/Heat Pump/ Size: # Ventilation System # Forced Air Unit VCA Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Water Heater # Plumbing Vent piping # , Medical gas piping #of Outlets: Water Line # Fuel gas piping #of Outlets: Sewer Line # Industrial waste pretreatment interceptor Grease Trap) Size Other(describe): T:\Forms\2015 CED Form Updates\Building&Permitting\BP\Building Permit 20150415.docx Residential Structures Existing Proposed Construction For Office Use Area Descriptions(SQ FT) Floor area Floor area $Value new area Basement First Floor Second Floor Covered Deck/Porch/Entry ^� Deck(over 30"or a° floor) Garage Carport V lJ Other(describe) Area Totals Commercial Structures Area Descriptions(SQ FT) Existing Proposed Construction For Office Use Floor area Floor area $Value new area Existing Structure(s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size (sq ft) Lot Coverage(sq ft)foot print of %Lot C% age(Total lot cov_lot size) Max Bldg Height (� all structures 1 g a sq ft Site Coverage(Sq Ft of all impervious) %of Site Co ge(total site cov_lot size) o� Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # ortable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # Furnace/Heat Pump/ Size: # Ventilation System # Forced Air Unit tloc -1�5e% I Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # 6 Water Heater # Plumbing Vent piping # Medical gas piping #of Outlets: Water Line # Fuel gas piping #of Outlets: Sewer Line # Industrial waste pretreatment interceptor Grease Trap) Size Other describe): T:\Forms\2015 CED Form Updates\Building&Permitting\BP\Building Permit 20150415.docx II THE CITY OF For City Use s L, 11S 1AICATION rmit# ,��y' 7 � W A S H I AN G T O N, It . S. te Received: -� 321 E 51h Street te Approved Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 � � ��_/�j Email:permits Pcityofpa.us cl i-o 4' BUILDING PERMI Project Address: I O v pr,v l ' \ Phone: t, b (I Primary Contact: mac- ��1 �1 Email: NameQPhone T1L� � L Property Mailing AddressEmail Owner ! a City n-} State Zip Name � Phone Contractor Address Email Information City state zip Contractor License# Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) $ 13 e Co,EU Residential ;�- Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑ Classification For the following fill out both pages of permit application: (check New Construction W Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes ❑ No ❑ Existing? Yes ❑ No ❑ In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwaterPciiyof12a.us Project Description ,1 AK� �l� e- k i Is project in a Flood Zone: Yes ❑ Nuff Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date Print Name Signature PREPARED 6/15/16, 14 : 18 : 43 f PAYMENT DUE CITY OF PORT ANGELES Ge c/�/� �t�Q e( t PROGRAM BP820L --------------------------------------------------------------------------- APPLICATION NUMBER: 16-00000775 1116 DUNKER DR FEE DESCRIPTION AMOUNT DUE --------------------------------------------------------------------------- CITY DRA o 47 . 32 DRA FEES PLUS INTEREST 1427 . 73 RES UNDERGRND SERVICE FEE 770 . 00 BUILDING PERMIT - RESIDENTIAL 1238 . 65 PUBLIC WORKS RES WATER SERV 420 . 00 SANITARY SEWER HOOK UP 150 . 00 SEWER SYSTEM DELV CHARGE 2260 . 00 _ STATE SURCHARGE 4 . 50 .PW WATER SYSTEM USE FEE 2260 . 00 TOTAL DUE 8578 . 20 Please present this receipt to the cashier with full payment e- C-�j �:) 172 1111, �vAl� F I CITY F FORT ANGELES-Construction Plans The I, uance of this permit I iased upon these plans I Rxcif cations and other da shall not prevent the L buildi ig official from th eafter requiring the correc ion of errors in said p ans,specifications and otner cat iti ig building operations being carried on thereunder vhen in violation of all J codes and ordinances of this'urisdiction. I ALL WORK SUBJECT TO FIELD APPROVAL I Deft 2iito BY F No �- 14�-