Loading...
HomeMy WebLinkAbout114 W. 14th Street Address: 114 W 14th Street PREPARED 10/05/15, 9:00:14 INSPECTION TICKET PAGE 4 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/05/15 ----------------------------------------------------------------------------------- ADDRESS --------------- ADDRESS . : 114 W 14TH ST SUBDIV: CONTRACTOR ALPHA BUILDER CORPORATION PHONE (360) 452-3154 OWNER Paul Slyh PHONE PARCEL 06-30-00-0-4-2230-0000- APPL NUMBER: 15-00001129 RES MECHANICAL PERMIT --------------------------------------------------------------------- -------------------- PERMIT: ME 00 MECHAH CAL PERMIT REQUESTED INSP DESCRIPTION . TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ----------------- ME99 01 10/05/15 MECHANICAL FINAL -- October 5, 2015 8:03:49 AM jlierly.Ic ` --—---------------------- COMMENTS AND NOTES ------------------�T _e----------------- CITY OF PORT ANGELES P� DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Application Number . . . . . 15-00001129 Date 9/08/15 Application pin number . . . 780467 Property Address . . . . . . 114 W 14TH ST ASSESSOR PARCEL NUMBER: 06-30-00-0-4-2230-0000- REPORT SALES TAX Application type description RES MECHANICAL PERMIT Subdivision Name . . . . . . On your State eXCI$e tax form Property Use . . . . . . . . to the City of PodAngeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation . . . . 3597 Application desc ductless hp ---------------------------------------------------------------------------- Owner Contractor Paul Slyh ALPHA BUILDER CORPORATION PO Box 3685 105 1/2 E. 1ST ST. SEQUIM WA 98382 PORT ANGELES WA 98362 (3 60) 452-3154 Permit . . . . . . MECHANICAL PERMIT Additional desc 1 TON Permit Fee . . . . 64.80 Plan Check Fee .00 Issue Date . . . . 9/08/15 Valuation . . . . 0 Expiration Date 3/06/16 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 -� --------------- ---------------------- ------- ------ Special Notes and Comments Per Washington State Code 51-51-315, + installation of Carbon Monoxide detector(s) is required if you are installing or replacing a fuel burning ` appliance (wood, pellet, gas)and must be in place prior to the final inspection of this permit. They are required to be place directly outside of each sleeping area and at least one on each floor of N the house. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due Permit Fee Total 64.80- 64.80 .00 .00 i Plan Check Total. .00 .00 .00 .00 J1� Grand Total . 64.80 64.80 .00 .00 V Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within.180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or to at law regulating construction or the performance of ^` construction. �� ^ P 1� \ Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS-- Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceilingi Drywall Interior Braced Panel Only) ' T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted b MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction-R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit C THE For City Use CITY 0F0R1=' NVLL` LV Permit# W A s H I N G: T o N, U . S. Date Received: 9/1AI/ 321 E 5th Street Date Approved 9) f,r Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permits@ci1yofpa.us BUILDING PERMIT APPLICATION Project Address: q 1 111-17t� Phone: Primary Contact: Email: Name q Phone PK 1 t4 n Property Maifing Address Email Owner City + State Zip G Name / Phone Contractor Address © Email Q Information City State zip Contractor License# ,3 Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) :i $ .tw Residential Commercial ❑ Industrial ❑ Public ❑ t" Permit Demolition ❑ Fire 1:1Repair ElReroof(tear off/lay over) ❑ ,Classification For the following,fill out both images of permit application: (check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical K Plumbing ❑ Other ❑ Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes ❑ No ❑ Existing? Yes ❑ No ❑ In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater ci o a.us Project Description a Is project in a Flood Zone: Yes ❑ No❑ Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. P l Date Print Name Signature