Loading...
HomeMy WebLinkAbout1307 Maple Street Address: 1307 Maple Street 3-.-)— E) -? C4 er ja— S �- PREPARED 8/19/15, 8:13:54 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/19/15 ------------------------------------------------------------------------------------------------ ADDRESS . : 3207 MAPLE ST SUBDIV: CONTRACTOR : PHONE OWNER EPSTEIN,ROBERT/WHARTON,E.E. PHONE PARCEL 06-30-15-5-0-1100-0000- APPL NUMBER: 14-00001529 RES ACCESSORY BUILDING ------------------------------------------------------------------------------------------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS " ------------------------------------------------------------------------------------------------ BL1 01 1/30/15 JLL BLDG FOUNDATION FOOTING 1/30/15 AP January 30, 2015 9:39:38 AM jlierly. betsy 461-0866 January 30, 2015 3:34:41 PM jlierly. BL2 01 2/04/15 JLL BLDG FOUNDATION STEM WALL 2/04/15 AP February 4, 2015 8:36:59 AM jlierly. AM vern 460-8591 February 4, 2015 12:11:19 PM jlierly. BLFD O1 2/13/15 JLL BLDG FOUNDATION DRAINAGE 2/13/15 AP February 13, 2015 10:05:55 AM pbarthol. Betsy 461-0866 February 13, 2015 4:08:39 PM jlierly. DSD O1 2/13/15 JLL BLDG DOWN SPOUT DRAINS 2/13/15 AP February 13, 2015 10:05:26 AM pbarthol. Betsy 461-0866 February 13, 2015 4:08:39 PM jlierly. - BL3 01 3/12/15 PB BLDG FRAMING 3/16/15 DA March 12, 2015 12:08:02 PM pbarthol. March 16, 2015 1:08:33 PM pbarthol. not ready BLI O1 4/27/15 JLL BLDG INSULATION 4/27/15 AP April 27, 2015 10:11:20 AM jlierly. April 27, 2015 4:05:33 PM jlierly. BL3 02 4/27/15 JLL BLDG FRAMING 4/27/15 AP April 27, 2015 10:10:35 AM jlierly. betsey 461-0866 April 27, 2015 4:05:33 PM jlierly. BL99 01 8/19/15 cth BLDG FINAL August 19, 2015 8:12:23 AM jlierly. Betsey 461-0866 --------------- PERMIT: PL 00 PLUMBING PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ PL6 01 2/13/15 JLL PLUMBING WATER SUPPLY 2/13/15 AP February 13, 2015 10:04:54 AM pbarthol. Betsy 461-0866 February 13, 2015 4:08:50 PM jlierly. PL2 01 2/17/15 PB PLUMBING ROUGH-IN 2/18/15 AP February 17, 2015 11:15:14 AM pbarthol. Betsy 461-0866 February 18, 2015 10:05:10 AM pbarthol. PL2 02 3/12/15 PB PLUMBING ROUGH-IN 3/16/15 AP March 12, 2015 12:08:14 PM pbarthol. March 16, 2015 1:08:23 PM pbarthol. ----------------------------- CONTINUED ONTO NEXT PAGE ----------------------------------- PREPARED 8/19/15, 8:13:54 INSPECTION TICKET PAGE 3 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/19/15 ------------------------------------------------------------------------------------------------ ADDRESS . : 3207 MAPLE ST SUBDIV: CONTRACTOR PHONE OWNER EPSTEIN,ROBERT/WHARTON,E.E. PHONE PARCEL 06-30-15-5-0-1100-0000- APPL NUMBER: 14-00001529 RES ACCESSORY BUILDING ---- -- -------------- REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS PL99 01 8/19/15L PLUMBING FINAL SAugust 19, 2015 8:12:51 AM jlierly. ------------------------- - ---------- COMMENTS AND NOTES 7z-or7 mlrl-- qtr PREPARED 8/31/15, 9:22:13 INSPECTION TICKET PAGE 6 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/31/15 ------------------------------------------------------------------------------------------------ ADDRESS . : 3207 MAPLE ST SUBDIV: CONTRACTOR : PHONE OWNER EPSTEIN,ROBERT/WHARTON,E.E. PHONE PARCEL 06-30-15-5-0-1100-0000- APPL NUMBER: 14-00001529 RES ACCESSORY BUILDING ------------------------------------------------------------------------------------------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT ' RESULTS/COMMENTS ------------- ------------------------------------------------------------------ BL1 01 1/30/15 JLL BLDG FOUNDATION FOOTING 1/30/15 AP January 30, 2015 9:39:38 AM jlierly. betsy 461-0866 January 30, 2015 3:34:41 PM jlierly. BL2 01 2/04/15 JLL BLDG FOUNDATION STEM WALL 2/04/15 AP February 4, 2015 8:36:59 AM jlierly. AM vern 460-8591 February 4, 2015 12:11:19 PM jlierly. BLFD O1 2/13/15 JLL BLDG FOUNDATION DRAINAGE 2/13/15 AP February 13, 2015 10:05:55 AM pbarthol. Betsy 461-0866 February 13, 2015 4:08:39 PM jlierly. DSD O1 2/13/15 JLL BLDG DOWN SPOUT DRAINS 2/13/15 AP February 13, 2015 10:05:26 AM pbarthol. Betsy 461-0866 February 13, 2015 4:06:39 PM jlierly. BL3 01 3/12/15 PB BLDG FRAMING 3/16/15 DA March 12, 2015 12:08:02 PM pbarthol. March 16, 2015 1:08:33 PM pbarthol. not ready BLI O1 4/27/15 JLL BLDG INSULATION 4/27/15 AP April 27, 2015 10:11:20 AM jlierly. April 27, 2015 4:05:33 PM jlierly. BL3 02 4/27/15 JLL BLDG FRAMING 4/27/15 AP April 27, 2015 10:10:35 AM jlierly. betsey 461-0866 April 27, 2015 4:05:33 PM jlierly. BL99 01 8/19/15 JLL BLDG FINAL 8/19/15 DA August 19, 2015 8:12:23 AM jlierly. Betsey 461-0866 August 19, 2015 4:15:51 PM jlierly. Exposed wire for extrerior light near door/ finish and call for an electrical fibnal before building/ This inspection would pass if not for electrical issue/final still pending/jll BL99 02 8/31/15 BLDG FINAL �. August 31, 2015 9:25:36 AM jlierly. betsy --------------------- --------------------- COMMENTS AND NOTES -------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 14-00001529 Date 1/13/15 Application pin number . . . 910974 Property Address . . . . . . 3207 MAPLE ST ASSESSOR PARCEL NUMBER: 06-30-15-5-0-1100-0000- REPORT SALES TAX Application type description RES ACCESSORY BUILDING Subdivision Name . . . . . . on your state excise tax form `V Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . Application valuation . . . . 15000 (Location Code 0502) ---------------------------------------------------------------------------- Application desc New Shop Storage elect/water ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ EPSTEIN,ROBERT/WHARTON,E.E. OWNER 3207 MAPLE ST PORT ANGELES WA 98362 Other struct info . . . . . HARD SURFACE AREA ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Additional desc . . SHOP/STORAGE ATTACHED Permit Fee . . . . 277.75 Plan Check Fee 180.54 Issue Date . . . . 1/13/1.5 . Valuation . . . . 15000 Expiration Date 7/12/15 Qty Unit Charge Per Extension BASE FEE 95.75 13.00 14.0000 THOU BL-2001-25K (14 PER K) 182.00 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . Permit Fee . . . . 86.00 Plan Check Fee .00 Issue Date . . . . 1/13/15 Valuation . . . . 0 Expiration Date 7/12/15 Qty Unit Charge Per Extension BASE FEE 50.00 2.00 7.0000 EA PL-PLUMBING TRAP 14.00 1.00 15.0000 EA PL-SEWER LINE 15.00 1.00 7.0000 EA PL-WATER HEATER 7.00 A , ---------------------------------------------------------------------------- Special Notes and Comments January 6, 2015 3:36:57 PM tamiot. ELECTRICAL PERMIT AND LOAD CALCULATIONS REQUIRED. January 6, 2015 10:01:14 AM sroberds. The proposal will result in a storage addition to an attached garage in the RS-7 zone for total lot coverage of 10%. No land use issues anticipated. Public Works Utility Engineering has no requirements for this plan review. Other Fees STATE SURCHARGE 4.50 ` ^ v� Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local.law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authori'z d Agent Signature Owner(i owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists 7-Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Dale Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit CITY OF PORT ANGELES ® DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number . . . . . 14-00001529 Date 1/13/15 Application pin number . . . 910974 ----------------------------g---------------------- ---------------- REPORT SALES TAX Fee summaryCharged Paid Credited Due ----------- ---------- ---------- --- on your state excise tax form Permit Fee Total 363.75 363.75 .00 .00 to the Cit of Port Angeles Plan Check Total 180.54 180.54 .00 .00 Y Other Fee Total 4.50 4.50 .00 .00 (Location Code 0502) Grand Total 548.79 548.79 .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD - PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS- Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit CITY OF ✓-�J��A %—➢l.iB,tJIT�V ilp/pLICATION ermit# W A S H 1 N G T O N , U . S . ate Received: 1 Az- 2i�. 321 E 5th Street ate Approved _ Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:peermits@cllyofiia.us BUILDING PE Project Address: Phone: (p Primary Contact: 3 2-0 Email: y, &-;-) Q Q1,4 WA4 , Wr'k-1 Name �C � Phone Property Mailing Address Email Owner :)2-c)-? S -�✓�q ' }� city`s fi P C State Zip TT�Y CSI Name J Phone 3(PC) Contractor Address Email Information city state zip Contractors License# Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) $ l5" vc) Residential Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑ Classification For the following.fill out both pages of permit application: (check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms Yes ❑ No Yes ❑ No l,$ (`J Project Description A) V-' / 0 Is project in a Flood Zone: Yes ® Nol0 Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. Residential Structures For Office Use Area Description(SQ FT) Existing Proposed S$value Basement First FIoor O� Second Floor Covered Deck/Porch/Entry e Deck(over 3o"or 2.nl floor) Y Garage Carport Other(describe) Area Totals Commercial Structures For Office Use Area Descriptions(SQ FT) Existing Proposed Ss Value Existing Structure(s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size(sq ft) Lot Coverages ) %Lot Coverage(Total lot coverage_lot size) as �o Site Coverage(Sq Ft of all impervious) %of Site Coverage(total site coverage=lot size) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # Boiler/Compressor —?� repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # portable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # Furnace/Heat Pump/ Size: # Ventilation System # Forced Air Unit Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # —2 Fuel gas piping #of Outlets: Water Heater # Medical gas piping #of Outlets: Water Line # Plumbing Vent piping # Sewer Line # Industrial waste pretreatment interceptor Grease Trap) Size Other(describe): .1 1� UTILITY t \-7.r)L-(TY POL4� ONY F PORT ANGELES-ConstWction Plans ?lie Is tanee of this permit based uj`m thel"Alans oildf W:;and other data shall n�t pre�•c7' the WATap- METE;F-. {� JW:; from thereafter requiring :ne C 'Mb o1Fwas In said plans.specil.cations 1 Cwt'W i a4@,W Ikom preventing building operations j ting aM@d oa thereunder when in viola on of a W ordina m of this jurisdiction. tv 1 10=VS BJECD'TO FIELD APPROVAL 5K Ily � t i N-W 4NOP/��rQ �2 W r era j 1 L 10 o 10 TA Sk��YES a� 3 i S rV s. _P _ 77 . -_AGe. t(N - UN N � IONEd - O V l •`� 3 _O (rf U �s-w51' 22' X I ST-I_Q GA 12 A G- UNGoND+TIoN P }" F'I�AN a �. r7 � D "GoNe,- wA�!-�. d- G-c7NG n u � u 12 Gt�t 'i• I - r-OOTIWCo wl ! I - XI�rTI�� Cook PA% l� 7i'f nD.G� fi O 2 x to Lf<IX��R Int?, �,� 1,2"„ ►2 4 Ig w��T E4- VENT 2 x 10 LEDGER BD w/1/2"LAG BOLT @ 16"oc * METAL ROOFING * #30 FELT * 5/8" PLYWD 2x10 RAFTER 12 @ 24"OC AIR BAFFLE R-38 — H2.5 CUP @ EACH RAFTER BATT 5/8" GW w/ V. B.PAINT 2x6 STUD @ 16"o.c.— w/ R21 BATT 1'2 1/2"GYPSUM BD w/ VAPOR; BARRIER PAINT * SIDING AS SELECTED Eo r BY OWNER / * TYVEK 7/16" PLYWD 2 x 6 PTS P l 1/2") 10"ANCHOR BOLT @ 6'- " OC z #4 @i 6" FROM GRADE TOP&BOTTOM 9 6 MIL POLY N 4" CONC. SLAB 2„ SAND ---–� 4" GRAVEL R 1'0 #4 @ 48"OC VERT. 2 #4 CONT.Nn sprl;