Loading...
HomeMy WebLinkAbout1421 E. 2nd Street Address: 1421E 2nd Street I` ;� 1 C--- . '2 Sfi PREPARED 7/31/15, 9:31:37 INSPECTION TICKET PAGE 6 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 7/31/15 -—-------------------------------------—----------------------------------------------------- ADDRESS . : 1421 E 2ND ST SUBDIV: CONTRACTOR POWER TRIP ENERGY CORP PHONE : (360) 643-3080 OWNER DAVID C COWAN, TTE PHONE (360) 450-3767 PARCEL 06-30-00-5-6-0105-0000- APPL NUMBER: 15-00000694 RES SOLAR PROJECT ------------------------------------------------------------------------------------------------ PERMIT: BSOL 00 BUILDING PERMIT - SOLAR REQUESTED INSP DESCRIPTION . TYP/SQ COMPLETED RESULT RESULTS/COMMENTS -----------------—---A-—------------—-----------------------------------------------—----- BL99 01 7/31/15 BLDG FINAL July 31, 2015 9:18:26 AM jlierly. bobbie 643-3080 --------------------------N4--------- COMMENTS AND NOTES -------------------------------------- ' CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 15-00000694 Date 6/18/15 Application pin number . . . 533912 Property Address . . . . . . 1421 E 2ND ST REPORT ASSESSOR PARCEL NUMBER: 06-30-00-5-6-0105-0000- OnRoPO ate ALEexcS tax Aform Application type description RES SOLAR PROJECT Subdivision Name Property Use . . to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation . . . . 31496 ----------------------------- Application desc ROOF MOUNTED GRID TIE PV SOLAR ARRAY ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ DAVID C COWAN, TTE POWER TRIP ENERGY CORP 1421 E SECOND ST 83 DENNY AVE PORT ANGELES WA 98362 PORT TOWNSEND WA 98368 (360) 450-3767 (360) 643-3080 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT - SOLAR Additional desc . . ROOF MOUNTED SOLAR ARRAY Permit Fee . . . . 130.00 Plan Check Fee .00 Issue Date . . . . 6/18/15 Valuation . . . . 31496 Expiration Date 12/15/15 Qty Unit Charge Per Extension BASE FEE 130.00 1_ ---------------------------------------------------------------------------- Special Notes and Comments June 17, 2015 3:57:54 PM pbarthol. ` Permit is approved per contractor Irtr attesting to the project meeting the requirements of WAC 51.51.2300 Pb---------------------------------------------------------------------------- / Fee summary Charged Paid Credited Due Permit Fee Total 130.00 130.00 .00 .00 ` ! Plan Check Total .00 .00 .00 .00 j Grand Total 130.00 130.00 .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within.180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD — PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: -Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only)__ T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted b MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW /Engineering 417-4831 Fire 417-4653 Plannin 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit ' CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Application Number 15-00000694 Date 6/18/15 Application pin number 533912 Property Address . . . . 1421 E' 2ND ST ASSESSOR PARCEL NUMBER: ' 06-30-00-5-6-0105-0000- REPORT SALES TA Application type description RES SOLAR PROJECT Subdivision Name On your State eXC/Se tax form Property use . . , . : . to the City of Port Angeles s Property Zoning . . . .. RS7 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation 31496 --------------------------------------------------- Application desc ROOF MOUNTED GRID TIE PV SOLAR ARRAY ---------------------------------------------------------------------------- Owner Contractor DAVID C COWAN, TTE POWER TRIP ENERGY CORP 1421 E SECOND ST 83 DENNY AVE PORT ANGELES WA 98362 PORT TOWNSEND WA 98368 (360) 450-3767 (360) 643-3080 ---------------------------------------------------------------------------- Permit BUILDING PERMIT - SOLAR Additional desc ROOF MOUNTED SOLAR ARRAY Permit Fee 130.00 Plan Check Fee . .00 Issue Date 6/18/15 Valuation 31496 Expiration Date 12/15/15 Qty Unit Charge Per Extension BASE FEE 130.00 --------------------------------------------------- Special Notes and Comments June 17, 2015 3:57:54 PM pbarthol. Permit is approved per contractor attesting to the project meeting the requirements of WAC 51.51.2300 pb ------------------------------------------------- -------------------------- Fee summary Charged Paid Credited Due ---- ---------- --------- Permit Fee Total 130.00 130.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 130.00 130.00 00 .00 e Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements.This permit becomes null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature o ontractor or Au rued Agent Signature of Owner(if owner is builder) T:Forms/Building DMsioNBuilding Permit THSFor City Use Y, • GELSk.i C{TY OF b Permit#TAI 5 W A S H { N GT o N. U. S. Date Received: 321 E Slh Street Date Approved 1p-1,;7/S Port Angeles,WA 4836 P:360-417-4817 F:360-417-4711 Email:permitsOcityofua.us BUILDING PERMIT APPLICATION Project Address: 6f 7-1 P 5 C -2"Q 517 ; F 6p-T Tow E�---TF{p ESLrA49 GE,- Phone: Prim Contact: .Vogt-, FLCrtig� Email: �X&H,N e FCWt:R-TXi{ GWt✓=7Z4y.Later Name DAq t b �, Go WA J Phone..7 b O _ T 7-5 _b6Z17 Property Mailing Address Email Owner t�{Zi EASE vJD S 1 P4V{D660WA-�JO4re.AHL.ah-1 City r CT ELC::5 State 4vh Zip NaPow Tib+P EN t~-.l. Phonep Contractor Address Email Information. City State W,rt zip 19 bs(2 Contractors License# POW E A-T E 93 4 Q ff Exp.Date: Le�sal escrigtion;i xg1,445 Zoning: Tax Parcel#d6-3o-cv- Project Value materials and labor Gdtzt�R-� 5utb7VfS{GW E �i1 or S 56o i vs � • ( ) �wc�rlti gw izi P_R- � Residential ® Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire 11Repair ❑ Reroof(tear off/lay over) CM 50►At Classification For the following fill out both pages of permit application: (check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms Yes 0 No ILYes 0 No Project Description A60fi I`' cutaTE6 Pi-tocoV0LMic5 -5ce.AiL Is project in a Flood Zone: Yes ® NoW Flood Zone Type: If in a Flood Zone,what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. ui Date Print Name Signature Rec'd — HTE Apply'd -/ $130 Fee Application and Checklist for Roof Mounted Residential Solar Panels Project Information: Property Owner DA,i0 Caw A-J Name: P roj ect Ad d re ss: li7.i �k5`r- v-D �'T, Phone: !;Go aC,7_1? Contractor Name �o"Mep— �N Registration#pow ff f (-E Contractor Phone: 3(0p 643-30$0 PV system Roof Mvk*-JT M- C?R.i9 'ne p .7.Z,5- Mfg/model#of major equip: description14obW-E-5, 3T 1414a OiNVEKTWSXV 5u►-�P�� 7-So cvAZT Pti�'t yJJTB gul+Trt-+ rNviErereg5 Per WAC 51-51-2300, If the answer to the following questions is"yes" a building permit will be issued for simple(10-15kw output) PV systems without further engineering. Section M2302.2.1-Where solar panels are installed on roofs,the roof structure shall be deemed adequate to support the load of the rooftop if all of the following are met: Yes No 1. PV system is designed and proposed for a single family or detached accessory structure Ix ❑ 2. The photovoltaic panels and modules and supporting structure shall be constructed of ❑ noncombustible materials or fire-retardant treated wood equivalent to that required for the roof construction. The installation shall meet the requirements of the International Fire Code as amended by WA State. PV modules are listed and labeled with a fire classification in accordance with UL 1703 3. The PV system is designed for the wind speed of the local area and will be installed per the manufacturer's specifications. 4. The ground snow load does not exceed 70 pounds per square foot.The PV system is designed ❑ for the wind speed of the local area,and will be installed per the manufacturer's specifications. 5. Total dead load of modules,supports, mountings, raceways and all other appurtenances weigh 1�f ❑ no more than four pounds per square foot. Enter total dead load of system (lbs/ft ). $J7 PSfr 6. Supports for solar modules are installed to spread the dead load across as many roof-framing ❑ members as needed to ensure that no point load exceeds fifty(50)pounds. Modules are mounted no higher than 18"above the surface of the roofing to which they are affixed and do not exceed the highest point of the roof unless approved by the local jurisdiction. NOTE: If site inspection indicates a concern that the roof structure is not adequate to support the PV module(s), engineering may be required prior to final of the permit. As the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: Date: 7,0[�j Applicant Name(Please Print): -T_e'1{Nj _ FLt:Mj k1' / Fpw In?- 'rR j•,Ci2 C� Relationship to Property Owner: T:\BUILDING\APPLICATION FORMS\SOLAR PERMIT CHECKLIST.DOCX a wt A t t �X �„�., x, s�x� "« .� ��, _ � �f �• ... '�`", +Cir �_�? °+`� �� . ��,• �� ,�, "fir 6-1 ANN wo kl N • i , s 7i r ` • •g� a I •� S fl --ArR- f04-- '3:>R V ib CO w A-P ( Sr'Idr Cr I. 72 MpnCCrl•St811t IP Ni Rtin-- Monnnal Powe,(pnornt '50 W ( h .er ipared•,lass with ---- ---— - nan�miss ---. --- -i Fran:Glass Poorer Tc lerance(n) ar i-!e ecu e(AM co tang __ ... \% Panel F iclencv, ! Er.!corn ar, Ratingi I65 r - - -- - - ----- ( ------ -.. Railed er1 olwga( t l,) 4 Is'r Frame Class r Wck an u! ed h pe r n A aang) - I - --- - - ............ ................ - Rated ,.t;, rt(Irr pp) t;...; -...� i _)pPn-OptV Ita.��4^,;.) .,. _... .,, 3T GE•C nln.k,.`JP- _. rrm nr �a ii�•:rrr:.t( n P,]r;ru; o.i(I A - 1 Module!le sna in. Power'remperature Coehrr,-ients(P) I Voltage Temperature Coefficients(V,.)', -25=^,1'i-'V i rurre.^t Teroerdture JeffCen (I } S n1rV1( ^+ r r,, - I Tj Thr qI ade Tolaranc raP rdtErly rP J +lr 1 n, a00 50 v iE 1 7 n)frons z•pad �._ P i _: 11 ax.,c.a.i j __ ....._. .. _____.__ —.-----. _ _. ....._...__-__._ Snow Or)?. 2os. 50k:,W)•.ont -- ---- — - ---- d Irrmaact Resistance 1 inch(25 mm)di meter nail et 5.'_ iq)n(73 m:3s )ucuut-a 41)v(min./nom irraz.; � 111240,,26.4 V G!tPLr ,b 208,/(mm,nom ,ar i 1 u %2087229 t•' UN rar n_Fi c-Guencq(m n -593/60.0/60J-6G 5 r^ --- ,t!]u,Power 3aor n n} 0: ag ` 4;;n'anties 25-year lin:ta pj,s r.r_?rranP _-_ .5 rar I-r[ec F.ca.,�tw'a;rartf d< fort u:Put Cur,ent Cu'•=0 V ,.99 A I AC rv4,.Cort :.pui ur.ar N I;V i t i4 A UL ; - n cud.:,g wmpl+ar_e.•;tl-.Pol- i 1 rPgt,ama..t,of IEEE 1' 37 and IEEE _ i ::C Cr; r,icr Il.!enC• ^a t - � � t-£w_!`,tcLC•n:, T,.np c Fizz R;;[gr: ala !4r Br.3ncr «u' ` 2 1, 4:) i ;single phase) a Un:--z Per t,rai l--.r,.0c•20S V 2 r_h a Hole)], !1 a� itemat:ng Currenr(p,Cj Module:designation errrkla- • N Pi . ..-.__...... ._ .....__..__..._ ....._ .._..._ .. ..... ....- _-__-_._ -- ..____.._... ate__ ,,,,c_M - --.. � I ir,5rali L-0n n �•C"t�w'r^`�ttC"91i-' MM(IN) (A)-MOUNI NG HOLES '! 12'471 12X . (.261 -45 181 ----180(7 07; 0 -y ' B)-I]RAINAINAGE HOLES � (+-52'2.06' 4X 04A(19) --77 &W - ! 3221112.691 f I -41 161 ' 236 19.251 I 1. - 91-5136.02 A' -� 1559:61.39 ! � 22..87_ 1I _ -,}\t I � r 4- r c .fns x �t'��" M,n �,��3"', ..a�'t�F �'�`��� ��::.�fiS'a�'., �'i`•�•'" G* rr�'r�! ��R���w i - ,„�.,�,,, •fid'..rw• `c r•;�u�.. ''i('�I� r • • >• iA r Design-Driven Advantages #1 module aesthetics and efficiency °. RIF �X i` Reliabih-focused design,which enables 25-year wan,arity ;r Maximum value for- Roof Size.systern for rcmf,not str in;inverter Optimize performance of each module Expand Acess to solar • CorYst;lex ro:�fs • Partial shading solali systems Systern expandability Simple£x Fast installation t A x:. Factory-integrated rnicroinvertei Robust-double-locking AC connectors AC architecture allows onsite design flexibility No DCstringsizingprocess Optimize System and Installation Efficiency Fewer steps than than competing DC-ciptimizer and non-factory-integrated AC systems Factory-integrated SunPc.ver"AC Modules provide a revolutionari • Simple ccimnTissicning - tcmc rination of high efficiency,Fel=1'r'eliabiiity1,. ~.nodule-level DC-to-AC Core of Superior System ?ower conversion.Designed$J^rIC81:ly f011Se'",i:t,SUnP, P:.if,JiSiVrlrt'a • Built for use with SunPower tmisilMOLPIt"" Best-in-•la's$systern reliability antj aesthetics reSlUfr?t nl^?Ount:ng sy:si'erT--.Sur)Povver AC Modules also achieve rapid AC system means fewer parts,sirnipler desigl itT>lcrllail nand hest In dJSS SySt4tT?aesthetics..All this Ci)rY?t'S with art Pair with Sr_tnPower monitoring app For systern data industry-ieading 2-5-year AC.if ioc uh warranty. Sunpower.com • r, l r$ Pe•,�L - r D -ighest of _over 3, CI siWoii;olar Panels',Photon Module t SUN P ,,.. r Friday,January 31,2014 Snalr:l _ :,rack- SnapNrack No r m a n 775 Fiero Lane,Suite 200 San Luis Obispo,CA 93401 "Series 100 Roof Mount" Cover Letter cheel To Whom It May Concern, We have performed calculations for the 100 series roof mount PV system based on Ntructural the information provided by SnapNrack. Included with this letter are the report and calculations. We did the calculations in accordance with the 2012 IBC, ASCE 7-10, 2012 NDS, and guidelines stated in the Solar America Board for Codes and Standards. n g i n e e r Some of the components in the SnapNrack test data were used to determine the capacity and section properties of materials. We collected the test data using the Fair Oaks, 95 procedures outlined in the 2012 IBC Chapter 17. Fair Oaks,CA 95628 (916)536-9585 (916)536-0260(fax) We included the following types of load combinations and building parameters into our calculations: 1989-2013 24 years of excellence _ • ASCE 7-10 wind speeds from I10 mph to 190 for B and C exposure categories • ASCE 7-10 Seismic Design Category E • ASCE 7-10 Snow Loads up to 120 psf ground snow • Buildings with mean roof heights up to 60 foot tilt angles / roof pitches Norman Scheel,S.E. from 0 degrees to 60 degrees. LEER AP BD+C LEED AP Homes The calculations have also been completed in accordance with the 2006 IBC,2009 Fellmv—SEAOC IBC and ASCE 7-05. To use the data contained in this packet for projects that are Fellow-ASCE p h E-mail:normTnsse.com being evaluated to the older ASCE 7-05 wind speeds,refer to Appendix A for a wind speed conversion chart. Find the ASCE 7-05 (IBC 2006/2009)wind speed in Rob Coon the Chart in Appendix A, identify the corresponding ASCE 7-10(IBC 2012 wind General Manager pp � p g ( ) E-mail:rnbconnQnsse.com speed value,and proceed with using the charts contained in this packet with the Steve Smith P.E. adjusted wind speed value. Project Manager E-mail:stevesmith(arnssc.com In our opinion, the mounting system, outlined by SnapNrack Series 100 PV Mounting System Code Compliance Installation Manual, is acceptable and meets Steven Cooksey the loading requirements as staffed above. See the report and calculations included CAD supervisor E-mail:stcve(a�nsse.com with this letter for more information. Jackie Winslow If there are any further questions,please contact Norm Scheel. l J. �(;► �• � fy OfceManager tr7+ E-mail:iackie(dnsse.com Norman Scheel PE, SE LEED-AP BD+C,LEED-AP Homes +~ O Fellow S OC Fellow C.E. No.2828A� ��iSTBR� EXPIRES 4ECEMBER 2G. LO SnapNrack Series 100 Snap', rack- Project info: Dealer: Plower Trip Energy Project Name:1 Cowan Create Dater 2015-06-16715:56:05-0700 BOM#:1 33706 PV Module Data: Module Brand SunPower Length 61.39 inches Modell SPR-250-BLK-B-AC ^� Width 31.42 inches Depth 1.81 inches Environmental Requirements: Weight 33.10 pounds Topographic Condition Standard Rated power @ STC 245.00 W Standard IBC 2012 1 Rail Color. Black Snow Load 21-30 psf Item 4 checklist Racking Color Black Wind Speed 130 mph Item 4 checklist Rafter Spacing 24 inches Roof Attachment Flashed L-Foot System Style: Rail Finish Black Anodized End Clamp Type Universal Grounding Method UL 2703 Listed Micro Attachment Kits No Edge Screen Trim? No I if"Yes",4"or 8"screen? Screen Height� inches Tilt Up?l No Sub-Arrays: UL2703 Yes Premium Alloy Rai-1 No Bulk Customer No Sub-Array Sub-Array 122"Rail 162" Rail Rail Mid End Edge Roof Modules Splices Clamps Clamps Screen Attachments 1 17 20 2 10 22 24 0 56 2 TOTALS 17 20 2 10 22 24 0 56 Page 1 of 3 Cowan Solar Racking Snaphlrack Series 100 Calculator Proposed Bill of Materials Part Number Description qty 015-09822 SNAPNRACK,STANDARD RAIL SET,1221N,BLACK,6 PC 3 015-09816 SNAPNRACK,STANDARD RAIL SET,1221N,BLACK,2 PC 1 015-09818 SNAPNRACK,STANDARD RAIL SET, 1621N,BLACK,.2 PC 1 242-04015 SNAPNRACK, BONDING STANDARD RAIL SPLICE ASSEMBLY,BLACK 10 242-02055 SNAPNRACK,BONDING MID CLAMP ASSEMBLY, 1.50-`2.00IN,BLACK 22 242-02063 SNAPNRACK,BONDING UNIVERSAL END CLAMP ASSEMBLY 24 232-01023 SNAPNRACK RAIL END CAP,STANDARD,BLACK 24 242-02700 SNAPNRACK,BONDING L-FOOT KIT W/BASE AND FLASHING,CLEAR L-FOOT 56 242-02101 SNAPNRACK,GROUNDING LUG ASSEMBLY 6 Total Weight: 228.08 lbs System Total Weight: 866.00 lbs Array Area=17 modules x(31.4"x 61.4"/144 sq.inch per sf)=228 sf Pounds per Square Foot of Array=860 lbs/228 sf=3:77 psf Item 5 checklist Pounds per attachment=860 lbs/56=15 lbs.perattachment Item 6 checklist Page 2 of 3 Modules Per 7 Array Pitch(degrees) 18 Sub-Array Modules 17 Row Module 6 Building Height(ft) 15 Edge Screen(ft) 0 Rows Orientation Landsca a Attachment Spacing Attachment Spacing p inches 72 Override inches 48 Array Power(kW) 4.165 The maximum recommended rail span for this sub-array is 72 inches.The rail span for modules located in edge zones is reduced by 24 inches to 48 inches Group 1 Rail Group 2 Rail Group 3 Rail Group 4 Rail Group S Rail 122"Rail 162"Rail Row Mid Row End Row Attach- Module Rail Length Length Length Length Length Qtv Clams Clams Splices ments Sondin —Bonding 122.78 0 2 2 4 0 6 0 1 ❑❑❑Q❑ 185.17 4 0 4 4 2 10 0 1 ❑❑❑Q 185.17 4 0 4 4 2 10 0 1 ❑❑❑ 185.17 4 0 4 4 2 10 0 1 ❑C]0 0 El❑❑ 185.17 4 0 4 4 2 10 0 1 0❑Q00Q 185.17 4 0 4 4 2 10 0 1 ❑�❑❑ ❑Q Sub-Array 20 2 22 24 10 56 0 6 Totals Cowan Solar Racking Page 3 of 3 yYV.y�a Power TrIp (EnvgM Corp 83 Denny Ave Port Townsend, WA 98368 (360) 643-3080 powertripenergy.com lic # POWEF TE964JN June 17,2015 Pat Bartholick Code Compliance Officer 321 E 5th Street P.O. Box 1150 Port Angeles,WA 98362 codecompliance@cityofpa.us Dear Mr. Bartholick, Enclosed please find a building permit for work to be done at 1421 East 2°d St,Port Angeles for David Cowan. Our company(Power Trip Energy)will be installing a 9.25 kW solar array on the south&east roofs of his house. I am using the Application and Checklist for Roof Mounted Residential Solar Panels,same as the last permit. Power Trip Energy will be happy to pay for the plan check fee by credit card as soon as you request payment. If you have any additional questions please do not hesitate to call the office at 360-643-3080. Sincerely, +- � � John Fleming,PE Solar Engineer Power Trip.Energy Attachments: Application and Checklist for Roof Mounted Residential Solar Panels,site plan,&support documents 1