HomeMy WebLinkAbout1520 Pendley Court Address:
1520 Pendley Court
PREPARED 5/25/16, 8:20:49 INSPECTION TICKET --- -- PAGE' 15
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/25/16
---—-----------—-------------------------------------------------------------------—-----
ADDRESS . : 1520 PENDLEY CT SUBDIV:
CONTRACTOR : PHONE :
OWNER PAMELA KERWIN PHONE : (360) 912-3595
PARCEL 06-30-01-8-6-0070-0000-
APPL NUMBER: 15-00000418 RES NEW SFR
------------------------------------------------------ ------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
-----------------------------------------' - -
BL1 01 6/05/15 JLL BLDG FOUNDATION FOOTING
6/05/15 AP June 5, 2015 10:23:12 AM jlierly.
Bruce
June 5, 2015 4:20:20 PM jlierly.
BL2 01 6/09/15 JLL BLDG FOUNDATION STEM WALL
6/09/15 AP June 9, 2015 9:10:46 AM jlierly.
bruce
June 9, 2015 4:50:39 PM jlierly.
BEE O1 6/26/15 PB BLDG FLOOR FRAMING
6/26/15 AP June 26, 2015 5:01:21 PM pbarthol.
June 29, 2015 8:33:51 AM pbarthol.
BLSH O1 8/05/15 JLL BLDG SHEATHING
8/06/15 AP August 5, 2015 8:48:40 AM jlierly.
Bruce 912-0079
August 6, 2015 9:09:18 AM jlierly.
BAIR O1 11/05/15 JLL BLDG AIR SEAL
11/05/15 AP November 5, 2015 9:29:54 AM jlierly.
November 5, 2015 4:29:47 PM jlierly.
BL3 01 11/05/15 JLL BLDG FRAMING
11/05/15 AP November 5, 2015 9:30:12 AM jlierly.
BRUCE 912-0079
November 5, 2015 4:29:47 PM jlierly.
BLI O1 11/19/15 JLL BLDG INSULATION
11/30/15 AP November 19, 2015 10:39:47 AM jlierly.
bruce 912-0079
November 30, 2015 12:38:57 PM jlierly.
BL99 01 5/25/16JL BLDG FINAL
May 24, 2016 12:14:59 PM jlierly.
------------------------- Bruce 912-0079
-------------------------------------------
PERMIT: ME 00 MECHANICAL PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
-------------------------——--------------------- —- -----—- --
ME99 01 5/25/16L MECHANICAL FINAL
May 24, 2016 12:15:20 PM jlierly.
PERMIT: PL 00 PLUMBING IT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
---------------------------------—---------------------------------—--
PL6 01 6/17/15 JLL PLUMBING WATER SUPPLY
6/17/15 AP June 17, 2015 9:40:01 AM jlierly.
bruce 912 0079
June 17, 2015 4:53:10 PM jlierly.
PL2 01 9/01/15 JLL PLUMBING ROUGH-IN
----------------------------------- CONTINUED ONTO NEXT PAGE ----------------------------- -----
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
� l
Application Number . . . . . 15-00000418 Date 5/08/15
Application pin number . . . 099446
Property Address . . . . . . 1520 PENDLEY CT
ASSESSOR PARCEL NUMBER: 06-30-01-8-6-0070-0000- REPORT SALES TAX
Application type description RES NEW SFR
Subdivision Name . . . on your state excise tax form
. .
Property Use . . . to the City of Port Angeles
Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY (Location Code 0502)
Application valuation . . . . 112868
-- ------------------------
Application desc
1196SF SFR W/84SF PORCH 340SF GARAGE 3BED 2BATH
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
PAMELA KERWIN OWNER
1520 PENDLEY CT
PORT ANGELES WA 98363
(360) 912-3595
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . 1620SF SFR 3BED 2BATH
Permit Fee . . . . 1093.05 Plan Check Fee .00
Issue Date . . . . 5/08/15 Valuation . . . . 112868
Expiration Date 11/04/15
Qty Unit Charge Per Extension
BASE FEE 1020.25
13.00 5.6000 THOU BL-100,001-500K (5.60 PER K) 72.80
-----------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc . . SFR MECHANICAL
Permit Fee . . . . 141.60 Plan Check Fee .00 �{
Issue Date . . . . 5/08/15 Valuation . . 0
Expiration Date 11/04/15
Qty Unit Charge Per Extension
BASE FEE 50.00
1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80
3.00 7.2500 EA ME-VENT FAN (SINGLE_ DUCT) 21.75
1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65
3.00 14.8000 EA ME-HEATER(SUSP/WALL/FLOOR-MTD) 44.40
----------------------
Permit . . . . . . PLUMBING PERMIT
Additional desc SFR PLUMBING
Permit Fee . . . . 135.00 Plan Check Fee .00
Issue Date . . . . 5/08/15 Valuation . . . . 0
Expiration Date . . 11/04/15
Qty Unit Charge Per Extension
BASE FEE 50.00
5.00 7.0000 EA PL-PLUMBING TRAP 35.00
1.00 7.0000 EA PL-WATER LINE 7.00
3.00 7.0000 EA PL-DRAIN VENT PIPING 21.00
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
ZI� t �2 c1�� 1'1'/eC'o
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Onl
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet I Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 2
Application Number . . . . . 15-00000418 Date 5/08/15
Application pin number . . . 099446 REPORT SALES TAX
Qty Unit Charge Per Extension on your state excise tax form
1.00 15.0000 EA PL-SEWER LINE
1
1.00 7.0000 EA PL-WATER HEATER 7.00 to the City of Port Angeles
-- -Notes Note--and
Special Comments
-----------------------I--------- --- (Location Code 0502)
Address numbers shall be plainly visible from the street.
Address numbers shall be a minimum of six inches high and be
of contrasting color from the background.
All homes in new subdivisions that are outside of the Fire
Department four-minute response area shall be equipped with
residential fire sprinkler systems that comply with the
International Fire Code (IFC) and National Fire Protection
Association (NFPA) .
Electrical load calculations and electrical permits are
required.
Ditches & 12" culverts will. be installed to City Stanards.
See Public Works Engineering for Standards.
20 foot easement on west property line and 10 foot on north
property line to remain clear at all times.
Infiltration trenches for downspouts and foundation drains
per plan.
Separate Right of Way Construction permit required for
driveway and culverts
Trench safety per applicable laws. Temp erosion control and
surface restoration responsibility of applicant. Contact
City inspector prior to start of work @ 360 417-4831. No
attachment to sanitary sewer of stormwater roof leaders,
foundation drains, yard drains, or any other CSO
contribution is allowed.
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch. 24 hour advance
notice is required. Public Works Inspection request line
417-4831
The contractor making the'connection to an existing water
meter is responsible to adjust water meter depth so that
there is a minimum of 4 to 6 inches of clearance between the
bottom of the meter box lid and the top of the meter at
finish grade.
Construct driveway to City Standards. Concrete with exposed
aggregate or other non-standard finishes(including. colors or
dyes)are not allowed in the City road right of way. Broom
finish only. An inspection by Public-Works Engineering is
required prior to pouring concrete. Public Works inspection
request line 417-4831.
----------------------------------------------------------------------------
Other Fees . . . . . . . . . RES UNDERGRND SERVICE FEE 770.00
SEWER SYSTEM DELV CHARGE 2260.00
STATE SURCHARGE 4.50
PW WATER SYSTEM USE FEE 2260.00
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS —
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking i£Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
.� 321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 3
Application Number . . . . . 15-00000418 Date 5/08/15
Application pin number 099446 REPORT SALES TAX
Permit Fee Total 1369.65 1369.65 .00 .00 on your state excise tax form
Plan Check Total .00 .00 .00 .00
Other Fee Total 5294.50 5294.50 .00 .00 to the City of Port Angeles
Grand Total 6664.15 6664.15 .00 00 (Location Code 0502)
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
THE
NFor City Use
�C TY
,_,
n
Permit#
W A S H 1 r _T 0 N, U. S. Date Received:
321 E 51h Street �� b D to Approved
Port Angeles,WA 9836 C o p /
P:360-417-4817 F:360-417-4711 / � / B
Email:permits(&cityofpa.us BUILDING PERM PPLICATION
Project Address: 1520 Pendley Court Port Angeles, WA 98363
Phone:360-912-0079
Prima Contact: PHA C nstruction Supervisor Email:bmcco en eninsula ha.or
Name amela Kerwin Phone 360-912-3595
Property Mailing Address 2239 W. 12th Street Email prdmarinemom2002@yahoo.com
Owner
city Port Angeles State WA zip 98363
Name Owner/Builder Phone
Contractor Address Email
Information City State zip
Contractor License# Exp.Date:
Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor)
Lu-t -7 P& (�,�� o�S cl 3v l ?6-00-70 $ 112,868.00
esidential 8 Commercial ❑ Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑
Classification For the following,fill out both pages of permit application:
(check New Construction 8 Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms
or Existing? Yes ❑ No 1] Existing? Yes ❑ No D 2 3
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
www.stormwater ci o a.us
Project Description New family residence with attached garb
Now family residence with attached garage St
Is project in a Flood Zone: Yes ❑ No8 .Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within 18o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
4120[1,5—
Date Print Name Signature
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions(SQ FT) Floor area Floor area $Value new area
Basement
First Floor 1196 $101,660.00
Second Floor
Covered Deck/Porch/Entry 84 $1,008.00
Deck(over 30"or 2" floor)
Garage 340 $10,200.00
Carport
Other(describe)
Area Totals 1620 $112,868.00
Commercial Structures
Area Descriptions(SQ FT) Existing Proposed Construction For Office Use
Floor area Floor area $Value new area
Existing Structure(s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage(sq ft)foot print of %Lot Coverage(Total lot cov_lot size) Max Bldg Height
9015 all structures sq ft 17.9
Site Coverage(Sq Ft of all impervious) %of Site Coverage(total site cov_lot size)
2194 24.3
Mechanical Fixtures
Indicate how ma.ny of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
3
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
3
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit 112k BTU 1
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Water Heater #
s
Plumbing Vent piping # Medical gas piping #of Outlets:
Water Line # Fuel gas piping #of Outlets:
Sewer Line # Industrial waste pretreatment
1
interceptor Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit4-17-13.docx
� 52 �' i ao
f a �' (
4 � 76 617 233 �Fa� 2 0827 116" 26
X.(\
3
17 O 3223 0 15 22
2. 28 2 130x1 O
� 32
i231 14 1 907
j 32 32 a
/ \ 1 30 28 71 8 23
f '
4 y�l`a 2 2 313 25 1322 5
J� 321 ' O 0
21 4 G`G 27406 61
31 0 t Qt 13T 21
26.'4
Q � 26
11,T 06
2'm
3 � 5 �a �3 3
27 3
1 910 1320
28 K. 719 9
3
0 3
z �� -9
5 -'
10
14 1 292 Q� 1 18 2
j 30 2 �q
1 j
14 z �� / 01 �1fj $ J 37 i� 411
T
Qi
14 sf , 3,
21 Q� \. 41 16 1?212
13
3 15 13r.
7 4 12
14it' 14Q2 14 5 26
I '7-6 10 �
1 ?ai8 '
8
7
1 ifs'
230 /5 9 io�a 6 11
8 1128 ��
1s g1 9
13 14 4092 416
15 ,5:
12 10 8
173
/ 622 142 � 15 ij
11 30 2301 50 �w
o �6f 315 11912 » 14 2 94�
t
14-
15 " hS 34 i 'd' 2 25 \ �
f / \
30 _ 131 1
1511 /
220 32 12 7s� 6
01 30 8
2 8 hS
f /
2 2 1
t
r, 1 72
30 / g
4
to 10
2202 20 11 2
12
S 13
rr 20 62{ 2 14
•i . .�• 62
13 11 15 /;
Prescriptive Energy Code Compliance for All Climate Zones in:Washington;.
Project InformationContact Information
Parnela�Kerwin m Peninsula Ho s nAu#hori
1520 Pendley Court ��
2603 S�Franc�s
r
Port An eles„WA 98363 .M..
,g � . Port AngelesWA98362 a ;'
This project will use the requirements of the Prescriptive Path below and incorporate the
the minimum values listed. In addition, based on the size of the structure,the appropriate
number of additional credits are checked as chosen by the permit applicant.
Authorized Representative Date
All Climate Zones
R-Value' U-Factora
Fenestration U-Factorb n/a 0.30
Skylight U-Factor n/a 0.50
Glazed fenestration SHGCb.e n/a n/a
Ceiling. 49' 0.026
Wood Frame Wall9`k,l 21 int 0.056
Mass Wall R-Value' 21/21h 0.056
Floor 309 0.029
Below Grade Wall`,k 10/15/21 int+TB 0.042
Slab R-Value& Depth 10, 2 ft n/a
"Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2.
Each dwelling unit in one and two-family dwellings and townhouses,as defined in Section 101.2 of the
International Residential Code shall comply with sufficient options from Table R406.2 so as to achieve the
following minimum number of credits:
01.Small Dwelling Unit: 0.5 points
Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration
area. Additions to existing building that are less than 750 square feet of heated floor area.
❑2. Medium Dwelling Unit: 1.5 points
All dwelling units that are not included in#1 or#3, including additions over 750 square feet.
113. Large Dwelling Unit: 2.5 points
Dwelling units exceeding 5000 square feet of conditioned floor area.
❑4. Dwelling unit other than one and two-family dwellings and townhouses: Exempt
As defined in Section 101.2 of the International Residential Code
Table R406.2 Summary
Option Description Credit(s)
1a Efficient Building Envelope 1a 0.5 ❑
lb Efficient Building Envelope 1 b 1.0 ❑
1c Efficient Building Envelope 1c 2.0 ❑
2a Air Leakage Control and Efficient Ventilation 2a 0.5 ❑
2b Air Leakage Control and Efficient Ventilation 2b 1.0 ❑
2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑
3a High Efficiency HVAC 3a 0.5 ❑
3b High Efficiency HVAC 3b 1.0 ❑
3c High Efficiency HVAC 3c 2.0 ❑
3d High Efficiency HVAC 3d 1.0 0 1.0
4 High Efficiency HVAC Distribution System 1.0 ❑
5a Efficient Water Heating 0.5 ❑
5b Efficient Water Heating 1.5 ❑
6 Renewable Electric Energy 0.5 "1200 kwh 0.0
Total Credits 1.00
*Please refer to Table R406.2 for complete option descriptions
http://www.energy.wsu.edu/Documents/Table 40612 Energy Credits 2012 WSEC.pdf
W
N
NORTH
1 •
(( nn
I �
vl
0
DS SITE PLAN
410 ,,pp 1'=201,-0'
1520 PENDLEY COURT
PORT ANGELES, W
O O PENDLEY ESTATE LOT 7
FFE HOUSE LOT SIZE 10280SF
as,s�
LOT COVERAGEi1620/10280=15,8%
;.� SITE COVERAGE►2084/10280=20,3%
I ��SQp�Pti� O
(� DS O�
I DS
4' WAL ' _
MAX SLOP %'
9'-9# R .
Iii �' FR
Ds
O (2) 30
INFILTRATION 3 •�°
TRENCHESL
2 >
Z J P UGP UGP GP UGP--
O u
� Q
H �
.tel P �
� PENDLEY COURT
S33 '1 4 15 � .
5 CC nn � 10' EMTS /
r-) l.J
I 1
-
' 1 rtI 14
I 1
l;
I
_ I I
i I ,
-1--i-L-�—k- ' I I 1 f I � � i �--�- � -�-----�-"-- 1 ' ► � I -i--=- ! �—< `G t t.�A i f
- _ -
�
�_�ii Wim, . • ; I l r ` ' i I .T` ► ='�' ;�s��_7'i ' `�--tl-'
j
I 11 ► I � � .(tel i � �__-�___ l ii � � � I {-i- I � i � I
I�I
All
ell
�'
t F I I
Aluln
_T--�_-+- �`�-- I ' I � ! } --; 1-L-�--f-T,l-Jr--�;-�_I � I ; i I ` .TT_T�-
A-T
F
Al-- I
-4-L
i
IT
lZI
C- it
it
L 11
IV, If 'I
611 is ;
I 7-f A
(99,
e � I ! �,� T�i�3���i—� i I �—�---; , t ; I i —i T T� � I ;—
199'IT' Fl—' I-,.'L 3 4,4 fi
I I
Z-1 z
ZL f I i i-- -i I i i + i I -1 -I-�--
16 1
i
J
L Vt,
I _I-
�l7 1
I ; I I L I I f I I f ! I I ! FT
iCA
—
I
_ Y u,s
i ' !
IV Q
f i i I /•—;I�i{lam, I ! I f i I ({ I i /I 1 � ,
i { I
F
If
fizio
i
I
I —t—
I I I I
l-it
{{ 7777
1 I I
! ' fill -*-
kS
it
' I
tq,
LJ
Iz-j
11
Ji
7Z--
F�r
el lre�
it
it
V17-
_F14
i6lK
tj k ;
it
it
r=�LiS j= les �� I l I , p {
—7
--r"-- T—F—
_7%
if 17
ill
17'7-, e!�—A
Ar -,V-t �ee� A Z
t r
jam_
MECAWind Version 2 . 1 . 0 . 5 per ASCE 7-05
Developed by MECA Enterprises, Inc. Copyright 2012 www.mecaencerprises.com
Date 10/16/2012 Project No. 12176
Company Name ZENOVIC & ASSOCIATES, INC. Designed By SRH
Address 301 EAST 6TH STREET, SUITE 1 Description 28x40 SFR
City PORT ANGELES Customer Name PENINSULA HOUSING AUTHORITY
State WA Proj Location CLALLAM COUNTY, WA
File Location: X:\12176 HOUSING AUTHORITY\ENGR\Structual\SFR DESIGN C.wnd
Detailed Wind Load Design (Method 2) per ASCE 7-05
Basic Wind Speed(V) = 100.00 mph Structure Type = Building
Structural Category = II Exposure Category = C
Natural Frequency = N/A Flexible Structure = No
Importance Factor = 1.00 Kd Directional Factor = 0.85
Alpha = 9.50 Zg = 900.00 ft
At = 0.11 Bt = 1.00
Am = 0.15 Bm = 0. 65
Cc = 0.20 1 = 500.00 ft
Epsilon = 0.20 Zmin = 15.00 ft
Slope of Roof = 4 : 12 Slope of Roof(Theta) = 18.43 Deg
Ht: Mean Roof Ht = 10.00 ft Type of Roof = Gabled
RHt: Ridge Ht = 12.00 ft Eht: Eave Height = 8.00 ft
OH: Roof Overhang at Eave= .00 ft Roof Area = 1316.00 ft^
2
Bldg Length Along Ridge = 52.00 ft Bldg Width Across Ridge= 24 .00 ft
Gust Factor Category I Rigid Structures - Simplified Method
Gustl: For Rigid Structures (Nat. Freq.>1 Hz) use 0.85 = 0.85
Gust Factor Category II Rigid Structures - Complete Analysis
Zm: 0.6*Ht = 15.00 ft
lzm: Cc* (33/Zm) ^0.167 = 0.23
Lzm: 1* (Zm/33) ^Epsilon = 427.06 ft
Q: (1/ (1+0. 63* ( (B+Ht) /Lzm) ^0.63) ) ^0.5 = 0. 94
Gust2: 0. 925* ( (1+1.7*lzm*3.4*Q) / (1+1.7*3.4*lzm) ) = 0.89
Gust Factor Summary
Not a Flexible Structure use the Lessor of Gustl or Gust2 = 0.85
Figure 6-5 Internal Pressure Coefficients for Buildings, GCpi
GCPi : Internal Pressure Coefficient = +/-0.18
Figure 6-6 External Pressure Coefficients
Cp - Loads on Main Wind-Force Resisting Systems(Method 2)
vie
heta
h
L
z
EL P
14 J
B
B
Kh: 2.01* (Ht/Zg) ^ (2/Alpha) = 0.85
Kht: Topographic Factor (Figure 6-4) = 1.00
Qh: .00256* (V) ^2*I*Kh*Kht*Kd = 18.47 psf
Cpww: Windward Wall Cp (Ref Fig 6-6) = 0.80
Roof Area = 1316.00 ft^2
Reduction Factor based on Roof Area = 0.80
MW-FRS-Wall Pressures for Wind Normal to 52 ft wall (Normal to Ridge)
Wall Cp Pressure Pressure
+GCpi (psf) -GCpi (psf)
--------------- ------ ----------- -----------
Leeward Wall -0.50 -11.18 -4.53
Side Walls -0.70 -14.32 -7.67
Wall Elev Kz Kzt qz Press Press Total Shear Moment
ft psf +GCpi -GCpi +/-GCpi Kip K-ft
--------------------------------------------------------------------------------
Windward 12.00 0.85 1.00 18.47 9.24 15.89 20.41 12.74 76.42
Note: 1) Total = Leeward GCPi + Windward GCPi
2) Shear and Moment are sum of forces (Leeward+Windard) acting on bldg walls.
Note that the shear & moment don't consider loads on roof or end gable.
Roof Location Cp +GCpi(psf) -GCpi(psf)
----------------------- ------- ---------- ----------
Windward - Min Cp -0.45 -10.39 -3.74
Windward - Max Cp 0.01 -3.17 3.48179'10
Leeward Perp to Ridge -0.57 -12.27 -5.62
Overhang Top (Windward) -0.45 -7.07 -7.07
Overhang Top (Leeward) -0.57 -8.95 -8.95
Overhang (Windward only) 0.80 12.56 12.56
MWFRS-Wall Pressures for Wind Normal to 24 ft wall (Along Ridge)
Wall Cp Pressure Pressure
+GCpi (psf) -GCpi (psf)
--------------- ------ ----------- -----------
Leeward Wall -0.29 -7.90 -1.25
Side Walls -0.70 -14.32 -7.67
Wall Elev Kz Kzt qz Press Press Total Shear Moment
ft psf +GCpi -GCpi +/-GCpi Kip K-ft
--------------------------------------------------------------------------------
Windward 12.00 0.85 1.00 18.47 9.24 15.89 17.14 4.94 29.62
Note: 1) Total = Leeward GCPi + Windward GCPi
2) Shear and Moment are sum of forces (Leeward+Windard) acting on bldg walls.
Note that the shear & moment don't consider loads on roof or end gable.
Roof - Dist from Windward Edge Cp Pressure Pressure
+GCpi(psf) -GCpi(psf)
--------------------------------- ------ ---------- ----------
0.0 ft to 5.0 ft -0.90 -17.46 -10.81
5.0 ft to 10.0 ft -0.90 -17.46 -10.81
10.0 ft to 20.0 ft -0.50 -11.18 -4.53
20.0 ft to 52.0 ft -0.30 -8.04 -1.39
MecaWind Pro x2 . 2 . 4 . 5 per ASCE 7-10
Developed by MECA Enterprises, Inc. Copyright www.mecaentercri-ses.com
Date 9/18/2014 Project No. JobNo
Company Name True Designed By Engineer �I J� C••
Address Address Description Description rr V(J
City City Customer Name Customer
State State Proj Location Location
File Location: C:\Users\TRACY\AppData\Roaming\MecaWind\Default.wnd
Directional Procedure Simplified Diaphragm Building (Ch 27 Part 2)
Basic Wind Speed(V) = 130.00 mph
Structural Category = III Exposure Category = C
Natural Frequency = N/A Flexible Structure = No
Importance Factor = 1.00 Kd Directional Factor = 0.85
Alpha = 9.50 Zg = 900.00 ft
At = 0.11 Bt - 1.00
Am = 0.15 Bm = 0.65
Cc = 0.20 1 = 500.00 ft
Epsilon = 0.20 Zmin = 15.00 ft
Slope of Roof = 4 : 12 Slope of Roof(Theta) = 18.43 Deg
Ht: Mean Roof Ht = 10.00 ft Type of Roof = GABLED
RHt: Ridge Ht = 12.00 ft Ent: Eave Height = 8.00 ft
OH: Roof Overhang at Eave= .00 ft Overhead Type = No Overhang
Bldg Length Along Ridge = 52.00 ft Bldg Width Across Ridge= 24.00 ft
Gust Factor Calculations
Gust Factor Category I Rigid Structures - Simplified Method
Gustl: For Rigid Structures (Nat. Freq.>1 Hz) use 0.85 = 0.85
Gust Factor Category II Rigid Structures - Complete Analysis
Zm: 0.6*Ht = 15.00 ft
1zm: Cc*(33/Zm)^0.167 = 0.23
Lzm: 1*(Zm/33)^Epsilon = 427.06 ft
Q: (1/(1+0.63*((B+Ht)/Lzm)^0.63))^0.5 = 0.94
Gust2: 0.925*((1+1.7*lzm*3.4*Q)/(1+1.7*3.4*lzm)) = 0.89
Gust Factor Summary
Not a Flexible Structure use the Lessor of Gustl or Gust2 = 0.85
Table 26.11-1 Internal Pressure Coefficients for Buildings, GCpi
GCPi Internal Pressure Coefficient = +/-0.18
Topographic Adjustment
0.33*z = 1.00
Kzt (0.33*z) : Topographic factor at elevation 0.33*z = 1.00
Vtopo: Adjust V per Para 27.5.2: V * [Kzt(0.33*z)]^0.5 = 130.00 mph
MWFRS Diaphragm Building Wind Pressures per Ch 27 Pt 2
Al_ pressures shown are based upon ASD Design, with a Load Factor of .6
MWFRS Pressures for Wind Normal to 52 ft wall (Normal to Ridge)
WALL PRESSURES PER TABLE 27.6-1
L/B: Bldg Dim in Wind Dir / Bldg Dim Normal to Wind Dir = 0.46
h: Height to top of Windward Wall = 8.00 ft
ph: Net Pressure at top of wall (windward + leeward) = 21.18 psf
p0: Net Pressure at bottom of wall (windward + leeward) = 21.18 psf
ps: Side wall pressure acting away from wall = .54 * ph = -11.44 psf
pl: Leeward wall pressure acting away from wall = .38 * ph = -8.05 psf
pwh: Windward wall press @ top acting toward wall = ph-pl = 13.13 psf
pw0: Windward wall press @ bot acting toward wall = p0-pl = 13.13 psf
ROOF PRESSURES PER. TABLE 27.6-2
h: Mean Roof Height = 10.000 ft
Lambda: Exposure Adjustment Factor = 1.000
Slope: Roof Slope = 18.43 Deg
Zone Load Casel Load Case2
psf psf
---- ---------- --=-------
1 -15.99 5.54
2 -12.90 -5.70
3 -19.86 .00
4 -17.70 .00
5 -14.52 .00
Note: A value of '0' indicates that the zone/load case is not applicable.
Notes - Normal to Ridge
Note (1) X= Along Building ridge, Y = Normal to Building Ridge, Z = Vertical
Note (2) MIN = Minimum pressures on Walls = 9.6 psf and Roof = 4.8 psf
Note (3) Area* = Area of the surface projected onto a vertical plane normal to wind.
MWFRS Pressures for Wind Normal to 24 ft wall (Along Ridge)
WALL PRESSURES PER TABLE 27.6-1
L/B: Bldg Dim in Wind Dir / Bldg Dim Normal to Wind Dir = 2.17
h: Height to top of Windward Wall = 12.00 ft
ph: Net Pressure at top of wall (windward + leeward) = 18.36 psf
p0: Net Pressure at bottom of wall (windward + leeward) = 18.36 psf
ps: Side wall pressure acting away from wall = .64 * ph = -11.75 psf
pl: Leeward wall pressure acting away from wall = .27 * ph = -4.96 psf
pwh: Windward wall press @ top acting toward wall = ph-p1 = 13.40 psf
pw0: Windward wall press @ bot acting toward wall = p0-pl = 13.40 psf
ROOF PRESSURES PER TABLE 27.6-2
h: Mean Roof Height = 10.000 ft
Lambda: Exposure Adjustment Factor = 1.000
Slope: Roof Slope = 18.43 Deg
Zone Load Casel Load Case2
psf psf
---- ---------- ----------
1 -15.99 5.54
2 -12.90 -5.70
3 -19.86 .00
4 -17.70 .00
5 -14.52 .00
Note: A value of '0' indicates that the zone/load case is not applicable.
Notes - Along Ridge
Note (1) X= Along Building ridge, Y = Normal to Building Ridge, Z = Vertical
Note (2) MIN = Minimum pressures on Walls = 9.6 psf and Roof = 4.8 psf
Note (3) Area* = Area of the surface projected onto a vertical plane normal to wind.
Total Base Reaction Summary
Description Fx FY Fz Mx My MZ
Kip Kip Kip K-ft K-ft K-ft
--------------------------------------------------------------------------------------
Normal to Ridge Walls+Roof +GCpi .0 8.2 18.0 40.4 .0 .0
Normal to Ridge Walls Only +GCpi .0 8.8 .0 35.2 .0 .0
Normal to Ridge Walls+Roof -GCpi .0 11.1 0.1 16.5 .0 .0
Normal to Ridge Walls Only -GCpi .0 8.8 .0 35.2 .0 .0
Normal to Ridge Walls+Roof MIN .0 .0 .0 .0 .0 .0
Along Ridge Walls+Roof +GCpi 4.4 .0 19.1 .0 -44.4 .0
Along Ridge Walls Only +GCpi 4.4 .0 .0 .0 -22.3 .0
Along Ridge Walls+Roof -GCpi 4.4 .0 .0 .0 -22.3 .0
Along Ridge Walls Only -GCpi 4.4 .0 .0 .0 -22.3 .0
Along Ridge Walls+Roof MIN .0 .0 .0 .0 .0 .0
Notes Applying to MWFRS Reactions:
Note (1) Per Fig 27.4-1, Note 9, Use greater of Shear calculated with or without roof.
Note (2) X= Along Building ridge, Y = Normal to Building Ridge, Z = Vertical
Note (3) MIN = Minimum pressures on Walls = 9.6 psf and Roof = 4.8 psf
Note (4) MIN area is the area of the surface onto a vertical plane normal to wind.
Note (5) Total Roof Area (incl OH Top) = 1315.51 sq. ft
Note (6) LC = Load Case (Some pressures can be zero, ref ASCE 7-10 Ch 27 Pt 2)