Loading...
HomeMy WebLinkAbout1617 E 3rd Street Address: 1617 E 3rd Street PREPARED 5/30/17, 13:23:40 INSPECTION TICKET .�_ PAGE 5 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/30/17 --' ---- ADDRESS . : 1617 E 3RD ST SUBDIV: CONTRACTOR VAUGHAN'S CONSTRUCTION PHONE (360) 477-2626 OWNER TANNER STEPHENS PHONE (206) 769-1285 PARCEL 06-30-00-6-9-0127-0000- APPL NUMBER: 17-00000663 RESIDENTIAL RE-ROOF --------------- ---------------------------------------------1--------------------- PERMIT: BNOP 00 BUILDING PERMIT - NO PR FEE REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BL99 01 5/30/17L BLDG FINAL Denver 477-2626 ------------------------- ----------- COMMENTS AND NOTES CITY OF PORT ANGELES DEPARTMENT'1P TMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- ,�. EUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 17-00000663 Date 5/23/17 Application pin number . . . 313156 Property Address . . . . . . 1617 E 3RD ST D �+ v ASSESSOR PARCEL NUMBER: 06-30-00-6-9-0127-0000- REPORT SALES TMA Application type description RESIDENTIAL RE-ROOF Subdivision Name . . . . . On your state excise tax form Property Use to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY Application valuation . . . . 4000 (Location Code 0502) ---------------------------------------------------------------------------- Application desc - TEAR OFF/INSTALL COMP ------------------------------------------------------------------- VJ Owner Contractor ------------------------ ------------------------ TANNER STEPHENS VAUGHAN'S CONSTRUCTION 540 W WASHINGTON ST 2512 E RYAN DRIVE III SEQUIM WA 98382 PORT ANGELES WA 98362 (206) 769-1285 (360) 477-2626 ----- --------------- ----- Permit . . . . . . BUILDING PERMIT - NO PR FEE Additional desc . . TEAR OFF/INSTALL COMP Permit Fee . . . . 123.75 Plan Check Fee .00 Issue Date 5/23/17 Valuation 4000 •pJ�� Expiration Date 11/19/17 Qty Unit Charge Per Extension BASE FEE 95.75 2.00 14.0000 THOU BL-2001-25K (14 PER K) 28.00 ---------------------------------------------------------------------------- Other Fees . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- i Permit Fee Total 123.75 123.75 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 128.25 128.25 .00 .00 1V I I' Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. �LkC&n Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwal I Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs w. Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: n Slab Wall/Floor/Ceiling MECHANICAL: ' Heat Pump/Furnace/FAU/Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T F- ' ' G_ IfLi For City Use COY t3 / Permit# 17-lT�� Ul A S H I N G T 0 N , U . S. Date Received: 321 E 5th Street Date Approved S 7-3, ' /7 Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permJts@citvofna.us 3 ei1 BUILDING PERMIT APPLICATION Project Address: (� �[ - Phone: 6(-a.0 -7 2-(o Primary Contact: Email: o-ec Phone Property Mailmi Address / Email Owner D+ � �11.11t/ �V.4 City Stat y�' Z' p C 1� �J�oZ Name Phone CSS] d Contractor Add r s QL Z Email Information city State Zi s P Contractor License# \ Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) OOQv—'� Residential Commercial ❑ Industrial ❑ Public ❑ ` Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) �Classification For the following,,fll out both pa es of permit application: (check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fjre Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes ❑ No ❑ Existing? Yes ❑ No ❑ In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater ci o a.us h Project Description t3yV�� - I til Is project in a Flood Zone: Yes ❑ No❑ Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that.I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date krinName kiggna(:)e(—