Loading...
HomeMy WebLinkAbout2220 W. 18th Street Address: 2220 18 Ih Street PREPARED 8/17/16, 16:29:58 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY' DATE 8/17/16 ---------------------------------------------------------------- ------------------------------- ADDRESS . : 2220 W 18TH ST SUBDIV: CONTRACTORO PHONE OWNER 6". 'PORT OF PORT ANGELES PHONE PARCtL . 06-30-00-1-1-1900-1000- APPL NUMBER: 15-00000620 IND REMODEL --------------------------------------------- --------------------------------------------------- REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ----------------------------------------------------------------------------------------- 8/05/16 DA August 5, 2016 8:11:22 AM jlierly. Denny 490-1816 August 5, 2016 3:55:38 PM jlierly. HVAC commisioning report required before final building is crmplete except for the final report. JLL BL99 04 8/17/16 BLDG FINAL - OVERRIDE TAKEN BY 'JLIERLY DATE: 08/17/16 TIME: 16:29:17 August 17, 2016 4:34:17 PM jlierly. Denny f4 c ----------------------------------- --- COMMENTS AND NOTES --------------------- ---------------- FIGURE C408.1.4.2 COMMISSIONING COMPLIANCE CHECKLIST Project Name: Project Project Address: (v Information Certified Commissioning Professional: Certifying Body: L] Commissioning Plan was used during construction and included Items below Commissioning . A narrative description of activities and the personnel intended to accomplish each one Plan . Measurable criteria for performance (Section C408.1.2) Functions to be tested 0" Mechanical systems were included in the commissioning process(Section C408.2) Building mechanical systems have been tested to demonstrate the Installation and operation of components. systems and system-to-system interfacing relationships in accordance with approved plans and specifications Ja�' There are unresolved deficiencies with the mechanical systems.These are described in the Preliminary Commissioning Report submitted to the Owner.The following items are not in compliance with energy Code; Commissioned systems ir,,� Q46 /LO Co i,— (Sections C408.2, 0 Service Water Heating Systems were included In the commissioning process(Section C408.3) C408.3,C408.4 and Service water heating systems have been tested to demonstrate that control devices,components,equipment, C408.15) and systems are calibrated,adjusted and operate in accordance with approved plans and specifications (J There are unresolved deficiencies with the service water heating systems.These are described in the Preliminary Commissioning Report submftied to the Owner,The following items are not in compliance with energy code: Electrical Power�or Lighting Systems were Included In the commissioning process(Section C408.4) Electrical power and automatic lighting controls have been tested to demonstrate the installation and operation of components,systems,and systern-to,-syslem interfacing relationships in accordance with approved plans and specifications LJ There are unresolved deficiencies with the electrical power and/or automatic lighting controls.These are described in the Preliminary Commissioning Report submitted to the Owner.The following items are not in compliance with energy code: LI Additional systems Included in the commissioning process(Section C408.5) If additional items were Included,list them here: o There are unresolved deficiencies with systems required by G406 or G407.These are described in the Preliminary Commissioning Report submitted to the Owner.The following items are not in compliance with energy code: Metering System Functional Testing has been completed(Section C408.6) Energy source meters.energy end-use meters,the energy metering data acquisition system and required display are calibrated adjusted and operate to minimally meet code requirements. There are unresolved deficiencies with the metering system. These are described in the Preliminary Commissioning Report submitted to the Owner.The following Items are not in compliance with energy code: CE-108 2015 Washington State Energy Code FIGURE C408.1.4.2 COMMISSIONING COMPLIANCE CHECKLIST(Continuedi Supporting IJ Manuals,record documents and training have been completed or are scheduled Documents . System documentation has been provided to the owner or scheduled date: -­fo 6 C_ (Section C103.6) . Record documents have been submitted to owner or scheduAd date: C_ Training has been completed or scheduled date: Preliminary Commissioning Report submitted to Owner and Includes Items below Preliminary Commissioning Q Itemization of deficiencies found during testing that are part of the energy code and that have not been Report corrected at the time of report preparation. (Section C408.1.4.1) C1 Deferred tests that cannot be performed at the time of report preparation with anticipated date of completion. C] Status of the project's record documents,manuals,and-systems operation training with respect to requirements in Section 103.6. I hereby certify that all requirements for Commissioning have been completed in accordance with the Certification Washington State�nergy Code,including all items above. Building Owner or Owner's Representative Date PREPARED 6/29/16, 10:36:15 INSPECTION TICKET PAGE 1 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 6/29/16 ------------------------------------------------------------------------------------------------ ADDRESS . : 2220 W 18TH ST SUBDIV: CONTRACTOR PHONE OWNER PORT OF PORT ANGELES PHONE PARCEL 06-30-00-1-1-1900-1000- APPL NUMBER: 15-00000620 IND REMODEL ------------------------------------------------------------------------------------------------ PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BLFO 01 1/21/16 JLL BLDG FOUNDATION 1/21/16 AP January 20, 2016 10:13:15 AM jlierly. 260-S80-2890 January 21, 2016 3:55:05 PM jlierly. BL1 01 2/04/16 JLL BLDG FOUNDATION FOOTING 2/04/16 AP February 4, 2016 8:30:59 AM jlierly. 360-580-2890 February 4, 2016 4:12:30 PM jlierly. BL3 01 3/14/16 PB BLDG FRAMING 3/15/16 AP March 14, 2016 12:18:58 PM pbarthol. Brian 360-580-2890 BLDR 01 3/31/16 , JLL BLDG DRYWALL IBWP 3/31/16 AP March 31, 2016 12:01:21 PM jlierly. 360-580-2890 March 31, 2016 4:13:23 PM jlierly. BLFO 02 4/15/16 JLL BLDG FOUNDATION 4/18/16 AP April 15, 2016 10:03:45 AM jlierly. Slab steel inside existing structure./ill April 18, 2016 4:20:24 PM jlierly. BLTB 01 5/17/16 JLL BLDG T-BAR 5/17/16 AP May 17, 2016 9:48:38 AM jlierly. 360-580-2890 May 17, 2016 4:25:59 PM jlierly. BLTB 02 5/25/16 JLL BLDG T-BAR 5/25/16 AP May 2S, 2016 8:08:39 AM jlierly. Brian 360-580-2890 partial in labs and office space area only/jll May 2S, 2016 4:07:22 PM jlierly. BL99 01 6/29/16 BLDG FINAL June 29, 2016 9:37:09 AM jlierly. 260-580-2890 This inspection is for a TCO and not for full occupancy. Ribbon cutting ceremony social only.JLL ---------------------- --------------------------------------------------------------------- PERMIT: ME 00 MECHANICAL PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ ME5 01 3/15/16 PB MECHANICAL DUCTS 3/16/16 AP March 1S, 2016 12:29:43 PM pbarthol. Dave 477-0811 March 16, 2016 10:23:20 AM pbarthol. ME1 01 1 5/19/16 JLL MECHANICAL ROUGH-IN 5/19/16 AP May 19, 2016 8:45:30 AM jlierly. office ceiling only/ill Dean Shmidt. 460-7970 May 19, 2016 4:25:02 PM jlierly. ----------------------------------- CONTINUED ONTO NEXT PAGE ----------------------------------- PREPARED 6/29/16, 10:36:15 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 6/29/16 ---------------------------------------------------------------------------------------- ADDRESS - : 2220 W 18TH ST SUBDIV: CONTRACTOR : PHONE OWNER PORT OF PORT ANGELES PHONE PARCEL 06-30-00-1-1-1900-1000- APPL NUMBER: 15-00000620 IND REMODEL ------------------------------------------------------------------------------------------------ REQUESTED INSP DESCRIPTION ' TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ MERP 01 6/21/16 JLL MECHANICAL REFRIGERANT PRESS. 6/23/16 - AP June 17, 2016 9:06:49 AM jlierly. Tyler 42S-531-4012 A/C Line pressure test June 17, 2016 4:20:52 PM jlierly. June 23 2016 12:11:37 PM jlierly. ME99 01 6/29/16 MECHANI�AL FINAL ht June 29, 2016 9:38:36 AM jlierly. - ----------------------X-Ai----- ------------------------------------------------------------- PERMIT: PL 00 PLUMBING P IT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ PL2 01 1/12/16 JLL PLUMBING ROUGH-IN 1/12/16 AP 640-4443 January 11, 2016 4:39:35 PM jlierly. January 12, 2016 4:32:09 PM jlierly. PL2 02 1/19/16 PB PLUMBING ROUGH-IN 1/20/16 AP January 19, 2016 11:44:50 AM pbarthol. Mike 360-640-4443 January 20, 2016 10:13:07 AM pbarthol. PL2 03 3/18/16 PB PLUMBING ROUGH-IN 3/18/16 AP March 18, 2016 11:38:35 AM pbarthol. Mike 477-9773 March 18, 2016 4:54:28 Pm pbarthol. PLANS M3.2 TO GRID LINE 7 PL2 04 4/08/16 JLL PLUMBING ROUGH-IN 4/08/16 AP April 7., 2016 8:25:39 AM jlierly. 360-640-4443 April 8, 2016 4:25:44 PM jlierly. PL99 01 6/29/16 PLUMBING FINAL June 29, 2016 9:38:49 AM jlierly. -------------------------- --------- COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES 321 E 5TH STREET PORT ANGELES WA 98362 C E R T I F I C A T E 0 F 0 C C U P A N C Y TEMPORARY Issue Date . . . . . . 8/08/16 Expiration Date . . . . 9/08/16 Parcel Number . . . . . 06-30-00-1-1-1900-1000- Property Address . . . 2220 W 18TH ST PORT ANGELES WA 98363 Subdivision Name . . . Legal Description . . . LTS 119-126 & 141-150 & VAC ST S ABTG; SURVEYS V14 P11;V25 P9 9; V27 P17 ;V42 P70 ;V44 P49 Property Zoning . . . . INDUSTRIAL LIGHT Owner . . . . . . . . . PORT OF PORT ANGELES Contractor . . . . . . . Application number 15-000006 20 000 000 Description of Work IND REMODEL Construction type . . . TYPE II FIRE RESISTIVE Occupancy type . . . . FACTORY & INDUSTRIAL Flood Zone . : * , , , Special conditions . . June 2�, 2016 4 : 12 : 26 PM jlierly. Structure ok to occupay for ribbon cutting and social event only. No occupancy other then described above . Complete items listed on final inspection and recall before 30 period has expired/jll August 8 , 2016 4 : 59 : 31 PM jlierly. Complete the HVAC commissioning report and provide a signed copy per code to the buLding department/jll Approved . . . . . . . Building Official VOID UNLESS SIGNED BY BUILDING OFFICIAL PREPARED 8/05/16, 8:12:34 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/05/16 --------------------------------------------------------------- -------------------------------- ADDRESS 2220 W 18TH ST SUBDIV: CONTRACTOR : PHONE OWNER PORT OF PORT ANGELES PHONE PARCEL 06-30-00-1-1-1900-1000- APPL NUMBER: 15-00000620 IND REMODEL ------------------------------------------------------------------------------------------------ REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------- August 5, 2016 8:11:22 AM jlierly. De�iny 49-1816 -------------------------------------- COMMENTS AND NOTES -------------------------------------- -4 c,>- 12-&-oo SECTION C408 Record of progress and completion of operator SYSTEM COMMISSIONING training. C408.1 General.This section covers the commissioning C408.1.2.1 Acceptance of report.Buildings,or of the building mechanical systems in Section C403, portions thereof,shall not pass the final mechanical service water heating systems in Section C404,electrical and electrical inspections or obtain a certificate of power and lighting systems in Section C405 and energy occupancy,until such time as the code official has metering in Section C409.Prior to passing the final received a letter of transmittal from the building mechanical and electrical inspections or obtaining a owner acknowledging that the building owner has certificate of occupancy,the registered design received the Preliminary Commissioning Report. professional or approved agency shall provide evidence Completion of the Commissioning Compliance of systems commissioning and completion in accordance Checklist(Figure C408.1.2.1)is deemed to satisfy with the provisions of this section. this requirement. Copies of all documentation shall be given to the C408.1.2.2 Copy of report.The code official shall owner and made available to the code official upon be permitted to require that a copy of the request in accordance with Sections C408.1.2 and Preliminary Commissioning Report be made C408.1.3. available for review by the code official. C408.1.1 Commissioning plan.A commissioning C408.1.3 Documentation requirements.The plan shall be developed by a registered design construction documents shall specify that the professional or approved agency and shall include the documents described in this section be provided to the following items: building owner within 90 days of the date of receipt of I. A narrative description of the activities that will the certificate of occupancy. be accomplished during each phase of C408.1.3.1 Record documents.Construction commissioning,including the personnel documents shall be updated to convey a record of intended to accomplish each of the activities. the alterations to the original design.Such updates 2. Roles and responsibilities of the commissioning shall include updated mechanical,electrical and team. control drawings red-lined,or redrawn if specified, 3. A schedule of activities including systems that show all changes to size,type and locations of testing and balancing,functional testing,and components,equipment and assemblies. supporting documentation. C408.1.3.2 Manuals.An operating and maintenance 4. A listing of the specific equipment,appliances manual shall be provided and include all of the or systems to be tested and a description of the following: tests to be performed. I. Submittal data stating equipment size and 5. Functions to be tested. selected options for each piece of equipment 6. Conditions under which the test will be requiring maintenance. performed. 2. Manufacturer's operation manuals and 7. Measurable criteria for performance. maintenance manuals for each piece of C408.1.2 Preliminary commissioning report.A equipment requiring maintenance,except preliminary report of commissioning test procedures equipment not furnished as part of the project. and results shall be completed and certified by the Required routine maintenance actions shall be registered design professional or approved agency and clearly identified. provided to the building owner.The report shall be 3. Name and address of at least one service identified as"Preliminary Commissioning Report"and agency. shall identify: 4. Controls system maintenance and calibration I. Itemization of deficiencies found during testing information,including wiring diagrams, required by this section that have not been schematics,record documents,and control corrected at the time of report preparation. sequence descriptions.Desired or 2. Deferred tests that cannot be performed at the field-determined setpoints shall be time of report preparation because of climatic permanently recorded on control drawings at conditions,with anticipated date of completion. control devices or,for digital control systems, 3. Climatic conditions required for performance of in system programming instructions. the deferred tests. 4. 2012 Washington State Energy Code CE-93 CITY OF PORT ANGELES 321 E 5TH STREET PORT ANGELES WA 98362 C E R T I F I C A T E 0 F 0 C C U P A N C Y T E M P 0 R A R Y Issue Date . . . . . . 6/29/16 Expiration Date . . . . 7/29/16 Parcel Number . . . . . 06-30-00-1-1-1900-1000- Property Address . . . 2220 W 18TH ST PORT ANGELES WA 98363 Subdivision Name . . . Legal Description . . . LTS 119-126 & 141-150 & VAC ST S ABTG; SURVEYS V14 P11;V25 P9 9; V27 P17;V42 P70 ;V44 P49 Property Zoning . . . . INDUSTRIAL LIGHT Owner . . . . . . . . . PORT OF PORT ANGELES Contractor . . . . . . Application number 15-00000620 000 000 Description of Work IND REMODEL Construction type . . . TYPE II FIRE RESISTIVE Occupancy type . . . . FACTORY & INDUSTRIAL Flood Zone Special conditions June 29, 2016 4 : 12 : 26 PM jlierly. Structure ok to occupay for ribbo c tting and - socia,l:--even' t only. No occupancy other then d cri ed above . Complete' items listed on final inspecti d reca bef e 30 perli.od has expired/jll Approved . . . . . . . I/ Bui-ldinj/�riaV VOID UNLESS SIGNED BY BUILDING OFFICIAL Address: 2220 W 18 Ih Street CITY OF PORT ANGELES 321 E 5TH STREET PORT ANGELES WA 98362 C E R T I I C A T E 0 F 0 C C U P A N C Y P E R M A N E N T Issue Date . . . . . 8/08/16 Parcel Number . . .. . . 06-'30-00-1-1-1900-1000- Property Address . . . 2220 W 18TH ST PORT ANGELES WA 98363 Subdivision Name . . . Legal Description . . . LTS 119-1261 & 141-150 & VAC ST S ABTG; SURVEYS V14 P11;V25 P9 9; V27 P17 ;V42 P70 ;V44 P49 Property Zoning . . . . INDUSTRIAL LIGHT Owner . . . . . . . . . . PORT OF PORT ANGELES Contractor . . . . . . Application number 15-00000,620 000 000 Description of Work IND REMODEL Construction type . TYPE II FIRE RESISTIVE Occupancy type . . . . FACTORY & INDUSTRIAL Flood Zone Special conditions June 29, 2016 4 : 12 : 26 PM jlierly. Structure ok to occupay for ribbon cutting and social event only. No occupancy other then described above . Complete items listed on final inspection and recall before 30 period has expired/jll August 8 , 2016 4 : 59 : 31 PM jlierly. Complete the HVAC commissioning report a'n"d provide a signed 0�1 t/ copy per code to the building departnkn/t/jll August 18 , 2016 11 : 03 : 11 AM pbarth . All items completed OK to permane ly occupy JLL Approved . . . . . . . 41 4�laiKg Of VOID UNLESS SIGNED BY BUILDING OFFICIAL PREPARED 5/25/16, 8:20:49 INSPECTION TICKET PAGE 19 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/25/16 ------------------------------------------------------------------------------------------------ ADDRESS . : 2220 W 18TH ST SUBDIV: CONTRACTOR : PHONE OWNER PORT OF PORT ANGELES PHONE PARCEL 06-30-00-1-1-1900-1000- APPL NUMBER: 15-00000620 IND REMODEL ------------------------------------------------------------------------------------------------ PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BLFO 01 1/21/16 JLL BLDG FOUNDATION 1/21/16 AP January 20, 2016 10:13:15 AM jlierly. 260-580-2890 January 21, 2016 3:55:05 PM jlierly. BL1 01 2/04/16 JLL BLDG FOUNDATION FOOTING 2/04/16 AP February 4, 2016 8:30:59 AM jlierly. 360-580-2890 February 4, 2016 4:12:30 PM jlierly- BL3 01 3/14/16 PB BLDG FRAMING 3/1S/16 A? March 14, 2016 12:18:S8 PM pbarthol. Brian 360-S80-2890 BLDR 01 3/31/16 JLL BLDG DRYWALL IBWP 3/31/16 AP March 31, 2016 12:01:21 PM jlierly. 360-580-2890 March 31, 2016 4:13:23 PM jlierly. BLFO 02 4/15/16 JLL BLDG FOUNDATION 4/18/16 AP April 15, 2016 10:03:45 AM jlierly. Slab steel inside existing structure-/jll April 18, 2016 4:20:24 PM jlierly. BLTB 01 5/17/16 JLL BLDG T-BAR 5/17/16 AP May 17, 2016 9:48:38 AM jlierly. 360-580-2890 May 17, 2016 4:25:S9 Pm jlierly. BLTB 02 5/25/16 J-LL/-'\ BLDG T-BAR 11\11 ) May 25, 2016 8:08:39 AM jlierly. Brian 360-580-2890 partial in labs and office space area only/jll -------------------------------------- COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 15-00000620 Date 10/15/15 Application pin number . . . 085000 Property Address . . . . . . 2220 W 18TH ST REPORT SALES TAX ASSESSOR PARCEL NUMBER: OG-30-00-1-1-1900-1000- Application type description IND REMODEL on your state excise tax form Subdivision Name . . . . . . to the City of Port Angeles Property Use . . . . . . . . Property Zoning . . . . . . . INDUSTRIAL LIGHT , (Location Code 0502) Application valuation . . . . 4271000 ---------------------------------------------------------------------------- Application desc INTERIOR TI WORK/ADD LOADING DOCK/IND FREEZERS. . . ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ PORT OF PORT ANGELES OWNER PO BOX 1350 PORT ANGELES WA 983620251 --------------------- Structure Information 000 000 ---------------------- Construction Type . . . . . TYPE 11 FIRE RESISTIVE Occupancy Type . . . . . . FACTORY & INDUSTRIAL ----------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT - COMMERCIAL Additional desc . . BLD PERMIT COMPOSITE TI WRK Permit Fee . . . . .00 Plan Check Fee 6497.76 Issue Date . . . . 10/15/15 valuation . . . . 4271000 Expiration Date . . 4/12/16 Qty Unit Charge Per Extension BASE FEE .00 .00 3.6500 THOU BL-lM + (3.65 PER K) .00 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL PERMIT Additional desc . . MECHANICAL TI WORK Permit Fee . . . . 413.90 Plan Check Fee .00 Issue Date . . . . 10/15/15 Valuation . . . . 0 Expiration Date 4/12/16 Qty Unit Charge Per 40 Extension BASE FEE 50.00 1.00 10.6500 EA ME-AIR HAND <OR=10,000 CFM 10.65 8.00 18.1000 EA ME-AIR HAND >10,000 CFM 144.80 9.00 10.6500 EA ME-EVAP COOLER (ATTACHED) 95.85 8.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 58.00 3.00 18.2000 EA ME-FURN/HP/FAU > 5 TON 54.GO ---------------- ------------------------------------------------------------ Permit . . . . . . PLUMBING PERMIT Additional desc . . PLUMBING TI WORK Permit Fee . . . . 674.00 Plan Check Fee .00 Issue Date . . . . 10/15/15 Valuation . . . . . 0 Expiration Date 4/12/16 Qty Unit Charge Per Extension 19 C) Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes % null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. 1QLb,&_ LVAUS 4A4840 Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms!Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD — PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Sternwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) KUMBING: Under Floor/Slab Rough-In ater Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists I Girders I Under Floor Shear Wall/Hold Downs Walls I Roof I Ceiling Drywall(interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing I Slab Blocking&Hold Downs ,Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical ' 417-4735 Construction- R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number . . . . . 15-00000620 Date 10/15/15 Application pin number . . . 085000 REPORT SALES TAX Qty Unit Charge Per Extension on your state excise tax form BASE FEE 50.00 to the City of Port Angeles 80.00 7.0000 EA PL-PLUMBING TRAP 560.00 3.00 7.0000 EA PL-WATER LINE 21.00 (Location Code 0502) 2.00 7.0000 EA PL-DRAIN VENT PIPING 14.00 1.00 15.0000 EA PL-SEWER LINE 15.00 2.00 7.0000 EA PL-WATER HEATER 14.00 ---------------------------------------------------------------------------- Special Notes and Comments July 29, 2015 10:26:37 AM pbarthol. Per Dan McKeen in accordance with section 3.70.900 of the Port Angeles Municipal Code the City is waiving $22,500 in fees as memorialized in a letter to Ken O'Hollaren dated July 28, 2015. The permit fees waived are as follows Building permit fee: $17574.40 waived Building Plan Check fee:$11,423.36 of which $4925.60 was waived, totaling $22,500. pb August 7, 2015 7:49:34 AM rbecker. If you are installing a closed fire sprinkler system, you will need to install a double check valve assembly. If you are installing an open fire system, you do not need to install a backflow. If you have any questions call Ron Becker at 360-417-4886, fax:360-452-4972, or E-mail: rbecker@cityofpa.us Address numbers shall be plainly visible from the street. Address numbers shall be a minimum of six inches high and be of contrasting color from the background. A KNOX locking keybox will be required. Contact the Fire Department at 360-417-4653 for KNOX keybox ordering information and mounting location. Labeling is required for doors leading to spaces containing fire alarm control panels and fire sprinkler risers. Owner is responsible for ongoing fire sprinkler system inspection and testing per the current addition of NFPA 25. June 19, 2015 3:00:37 PM kdubuc. Freezers will require sprinkler protection. June 19, 2015 3:01:08 PM kdubuc. Permit(s) required for modifications or additions to sprinkler and or fire alarm system(s) . Electrical *load calculations and electrical permits are required. Public Works Utility Engineering has no requirements for this plan review. Backflow devices are required at point of use appliances when connected to City water service. For inspection by Public Works back flow specialist contact Ron Becker at 417-4886. Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities.private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within.180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) TForms/Building Division/B ui[ding Permit BUILDING PERMIT INSPECTION RECORD — PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage I Downspouts Piers Post Holes(Pole BIdgs.) PLUMBING: Under Floor/Slab Rough-in Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders I Under Floor Shear Wall/Hold Downs Walls I Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall I Floor I Ceiling MECHANICAL: Heat Pump/Furnace/FAU I Ducts Rough-in Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing I Slab Blocking&Hold Downs ,Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Page 3 Application Number . . . . . 15-0000OG20 Date 10/1S/15 Application pin number . . . 085000 REPORT SALES TAX ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE SURCHARGE 4.50 on your state excise tax form ---------------------------------------------------------------------------- to the City of Port Angeles Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ----- ----- (Location Code 0502) Permit Fee Total 1087.90 1087.90 .00 .00 Plan Check Total 6497.76 6497.76 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 7590.16 7590.1G .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction*authorized is not commenced within.180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:FormsiBuilding Division/Building Permit BUILDING PERMIT INSPECTION RECORD — PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backfiow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) 'PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL Heat Pump/Furnace/FAU I Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing I Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit For City Use 2 rtITYOF ,HvT A P��Ppit# W A S H I N G T 0 N, U. S. /D te Received: ';Z- 321 E 51hStreet Zte Approved ,f- E Port Angeles,WA 9836 U P:360-417-4817 F:360-417-4711 Email:VermitsPci1yofpa.us C,,veii BUILDING PERMI/�AJCATION Project Address: V11- 11"11 -----T. Tloprr WAv '18:?-62- i--A,V-A-ry M C 7-A Phone: '3�4,0. -4?,-� Y, JoS Primary Contact: Email: Name Phone T--,frr--AF 3(00. Ai�-1 . 542-7— Property Mailing Address Email Owner G State Zip I W^- � Name Phone Contractor Address Email Information city State Zip Fontractor License# Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) :r_ s 14) 2-11 1 POO' IN(,L- -VNX N&Off f-45� Residential El Co mercial Industrial Public El Permit Demolition Fire 0 Repair El Reroof(tear off/lay over) Classification For the following,fill out both pages of permit application: (check New Construction El Exterior Remodel Addition El Tenant Improvement appropriate) Mechanical X Plumbing Other Fire Sprinkler Syst m Proposed ation System Pro!osed or Proposed Bathrooms Proposed Bedrooms I Irrig 0 Tb I or Existing? Yes No 13 1 Existing? Yes [3 0 In addition to sta nd--ri h--ri --py submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater9dqofpa.us Project Description '7-510eo 9,1:� -Mt�,VV7 1Mf"vEMtW7 V-11,,q001-TMAM-L- C-4 Is project in a Flood Zone: Yes 0 No�( Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ 1 have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within 18o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date Print Name Signature NA Residential Structures Existing Proposed Construction For Office Use Area Descriptions(SQ FT) Floor area Floor area $Value new area Basement First Floor Second Floor Covered Deck/Porch/Entry Deck(over 30"or 2'd floor) Garage Carport Other(describe) Area Totals Commercial Structures Area Descriptions(SQ FT) Existing Proposed Construction For Office Use Floor area Floor area $Value new area Existing Structure (s) -JS' Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations I c�t�ize(sq ft) Lot Coverage(sq ft)foot print of %Lot Coverage (Total lot cov lot size) Max Bldg Height all structures sq ft Site Coverage(Sq Ft of all imperylous) %of Site Coverage (total site cov�lot size) 7T-�Aa tmPu*j-ir-jTT \tvl 46 5o6o Sf of- "rnoN%- a rw- 71rAL- "7 IS 0-4-A%g4�5' Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: 1wL-Tinci I \1^1-4Aw&A _ I(p v Appliance Exhaust Fan -4� # Heaier(Suspended, Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance P4lLWikA?1V4dAlAA,A lNuLap4, repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # portable) Fireplace/Gas Stove/Gas Cook Stove/Misc. 0 Fuel Gas Piping #of Outlets: 0 Ventilation Fan,single duct # 0 Furnace/Heat Pump/ AJ Size: # /7, Ventilation System # Forced Air Unit SW, 1$MI.-L 4*,,r<T V'* *3 Plumbing Fixtures Indicate how many of each type of fixtu e to be installed or relocated Plumbing Traps # Water Heater # -Z 44, Plumbing Vent piping # Medical gas piping #of Outlets: 46 ( 4.,r A-5 , �� Water Line -4— # Fuel gas piping #of Outlets: Sewer Line 04K 5�E"fz:k- # Industrial waste pretreatment interceptor(Grease Trap) Size Other(describe): 95OMP"5560 AIM - Aft ANUM - 'fm/ T:\BUILDING\APPLICATION FORMS\Current BP Application\Bi#lding Permit 4-17-13.docx =TDN'"m WIN AM`�D—. SITE PLAN NOTES. CARL&TTi ARCHITICTS PA. 40*-W 11 EAST FIR STREET SUITE A —- -----....... MOUNT VERNON WA.0827� AW PAP AND PAP ........... T 2220 W.I8TH ST. 4ES (EXISTING SHELLI .2 PO T OF PORT ANGELES C=TW FIRE COMPOSITE RECYCLING AND TECH LOST CENTER 2220 W.18TH STREET FORT ANGELES.WA HM5 MTOW r-m —=TOW �y &PORT ---------- ................. ..... MAR mm ....... 9 FWTW m ...... ....... J. ..................... 1-3 -—---------- .............. ............... .... .. PROJECT NUMbEk 15-911 MTbW WATER METER FOR--a . ................. ........... .............. ......... REVISIONS. PERMIT SET 05122/15 IIIJILDING#1 ........ (EXISTING) C-- �-'J= SHEET TITLE. SITC PLAN ............ ......——--------- S. 0 r-f MCZA S.To.§ZAK .... ........... Pic MAY 14,2015 SITE PLAN UVE SCALE r io,-o, 15-811 CRTC ELANS.ft, P, —— A-1 -0 IL "IL"S ))0 iff NG tr W 'A S H I N G T 0 N, U. S. A. City Manager's Office —M� July 28, 2015 Ken O'Hollaren Executive Director Port of Port Angeles P.O. Box 1350 Port Angeles, WA 98362 .. .......... Port of Port Angeles Composite Recycling Technology Center(CRTC) RE: Fee Wavier .......... Dear Ken, 14 This letter is intended.to.formally respond to your letter dated May 29, 2015, requesting wavier of fees mposite Recycling Technology Center(CRTC). On Thursday July'23d the City received for the Co notice from Port staff that all issues had been cleared for issuance of the building permit for the proj�ct. As you are aware the City is heavily invested in our local composites industry with over$2M in nitted and planned investments in support for this industry. Over$800,000 has been committed in corm the form of campus infrastructure and$1.3M in 18th Street.roadway improvements for access to the site. The City recognizes the importance of this project relative to the creation of new jobs with an anticipated I I I new direct employees and a ten year projection of 338 new j bs for the co u ty. mm ni In accordance with section 3.70.900 of the Port Angeles Municipal'Code,the City Managenis delegated with the authority to waive fees for economic development projects which create additional private d sectorjobs..In support of the project,I am willing to waive a portion of project fees. In review of all fees and charges associated with the project the total permit fee is$30,090.16 including Building Permit,Plan Check,Plumbing Permit, and Mechanical Pennit fees.As discussed during our June 18th meeting by way of this letter, I am confirming the waiver of$22,500 of these permit relate&fees. In order for the permit to be issued,you will need to provide payment in the -nit to be issued. amount of$7,590.16 for the pen S Dan McKeen `Z�JP` City Manager CC Nathan A. West,Director of Community and Economic Development Jennifer States, Director of Business Development, Port of Port Angeles -417-4500 Fax: 360-417-4509 1 TTY: 360-417-4645 Phone: 360 Website: www.cityofpa.us/ Email: cityrnanager@cityofpa.us 321 East Fifth Street - P.O. Box 1150 Port Angeles, WA 98362-0217 7/24/15 , 8 : 33 : 41 PAYMENTS DUE RECEIPT 16ITY-OF PORT ANGELES PROGRAM BP820L - - - -- ---------- ------- - ---------------------------------- ------------------ APPLICATION NUMBER: 15-00000620 2220 W 18TH ST FEE DESCRIPTION AMOUNT DUE --------- ----------- ---- --------------------- ------ ----------- - ---- ---- ---- PLAN CHECK FEES 11423 . 36 MECHANICAL PERMIT 413 . 90 PLUMBING PERMIT 674 . 00 BUILDING PERMIT - COMMERCIAL 17574 . 40 STATE SURCHARGE 4 . 50 TOTAL DUE 30090 . 16 Please present this receipt to the cashier with full payment . 00 vv-j�L V�3 + RICE Group , Inc. F Q�V_7k,�,A 77�� Consulting Engineers Pat Bartholick City of Port Angeles 321 E 5th Street Port Angeles, Wa. 98362 PROJECT: COMPOSITE AND RECYCLING TECHNOLOGY CENTER SUBJECT: MECHANICAL APPLICATION Mr. Bartholick, Here are the mechanical counts for the mechanical section of the application. (28) Air Handlers: (3) - 0.5 ton (9) - 0.75 ton (1) - 1.25 ton (2) - 1.0 ton C6 -7 (5) - 2.0 ton (4) - 20 ton (4) - 27.5 ton (9) Condensing Units: oc)o 00 6b (1) - 0.75 ton (1) - 1.5 ton 0 (1) - 2 ton (1) - 6 ton (1) - 8 ton (2) - 12 HP (2) - 15-HP (3) Packaged Heat Pumps, (2) - 7.5 ton (1) - 30 ton (8) Exhaust fans- All exhaust fans exhaust areas of the building. (Restrooms, data, electrical, oven areas) (3) Water lines- (1) Cold water line (1) Hot water line (1) Potable water line (1) Hot water recirculation line (1) Sewer line: (2) Plumbing Vent lines'. 20201 Cedar Valley Road, Suite 120 1 Lynnwood,WA 98036 1 Phone:425-774-3829 1 Fax:425-672-2084 CARLETTI ARCHITECTS, PS. architecture&planning LETTIER OF TRANSMHTTAL TO: Cijy of Port Angeles DATE: June 1, 2015 JOB NO.: 15-811 321 E. 5 1h Street Port Angeles, WA 98362 RE: Port of Port Angeles Composites Recycling and Technology Center (CRTC) WE ARE SENDING YOU XAttached El Under separate cover via the following items: El Shop drawings El Prints lans El Samples El Specifications El Copy of letter El Change order El Submittals El Draw Request Copies Date Revised/No. Description 2 f7V1LDlN4i FL4PIS ��e.IA,c-(vlL,,gTaiAL-rvkAL-, zij "-L" 2 9"WAt v&h- (A6 ot4s r_-_ 2 KAl",c*Jr-A&- 3 JjAotmp� 2 ttt4-1�- CAA- .5LIAAA~ d_ THESE ARE TRANSMITTED as checked below: )(For approval El Approved as submitted El Resubmit—copies for approval El For your use 0 Approved as noted El Submit—copies for distribution El As requested El Returned for corrections El Return corrected prints El For review and comment F El FORBIDS DUE El PRINTS RETURNED AFTER LOAN TO US Items referenced and required for permit resubmittal COPY TO SIGNED: Sara Tomczak Ifenclosures are not as noted,kindly notify us at once. www1carlettiarchitects.com. 116 E.Fir Street,Suite A Mount Vernon, WA 982 73 (360)424-0394 FAX (360)424-5726 ��IDCI E Seattle 0 q Portland Spokane San Diego Austin Irvine Eugene San Francisco Structural Calculations Anchorage PORT OF PORT ANGELES W 18 TI Street, Port Angelds, WA 98363 DC1 Job Number 15011 -0095 08 WA 0 29759 Prepared for: Carletti Architects 116 East Fir Street, Suite A Mount Vernon, WA 98273 818 Stewart Street,Su ite 10001 beattle,Washington,98101 Phone(206)332-1900 !S e r v I c e I n n o v a t I o n V a I u e Clallam County, Washington Wind, Snow and Seismic Zones for Clallam County Average Snow Seismic Area Wind Speed Exposure Load(S600' Design elev) Category IRC-Special ASCE 7- Wind Region 10 IBC GROUND 2012 Port Angeles 100 MPH 130 MPH C/(D**) 25 PSF D2 Diamond Point 100 MPH 130 MPH C/(D**) 25 PSF D2 Sequim 100 MPH 130 MPH C/(D**) 25 PSF D2 Beaver 110 MPH 140 MPH C 30 PSF D2 Pillar Point HOMPH 140 MPH C/(D**) 25PSF D2 Clallarn 110 MPH 140 MPH C/(D**) 25 PSF D2 Bay/Sekiu Neah Bay 120 MPH 150 MPH C/(D**) 30 PSF D1 La Push 120 MPH 150 MPH C/(D**) 25 PSF D2 Forks 110 MPH 140 MPH C 30 PSF D2 Lake 100 MPH 130 MPH C D2 Dawn/Foothills Sol) bearing pressure: 1500#p.s.f. Frost depth: 12" min. For elevations greater than 600 ft above sea level, snow load elev x 0.04. ExaTple-.--&GO_ff elevation_�=(800 x 0.04=32 psf snow load). All areas within 600 feet of the marine shoreline are exposure "D",and/or a body of water 5000 feet(95 of a mile)long,are exposure D(IBC 1609.4) "All areas within 1500 feet of the marine shoreline are exposure "D",otherwise, exposure is "C" (IRC R301.2.1.4(4)). Contact Us Copyright 0 2008-2015 Clallam County. -223 East 4th St.,Port Angeles,WA 98362 - 360-417-2000 HDOProject No. Sheet No. p n s i n E-= Project Date 6 i�,-T AmGELC-� Subject By 7-/o I)SO p4p:-A 2 ZOL-0 RI-sc F:azt t-,W-t�zcl� A.) ETTE 17ACTOkS� RI-SK CA7- C-CC>9-Y LTAft C- I WT-Nt�, f-4 X- 9,E Cf AT E� G 0 Y C Tbl�,oGkAPMT-C- FA-C-T C-.-;ra, 74. [F, Cz/�.J Roc�F 3:?,O-ra-;o:OR, --22 7. B 2-: F CAJ -31 1 C) A LL 7 1,� ki s-T V--L C/Q T FA,:-Tc> -6 PRESSUR-C Project: 15011-0095-POPA DCI Engineers Cl� 818 Stewart St.Suite 1000 Location�New Garage Door Header Seattle,WA 98101 Multi-Loaded Multi-Span Beam [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 8:19:33 AM HSS 8 x 4 x 1/4 x 24.0 FT /ASTM A500-GR.B-46 Section Adequate By:65.0% Controlling Factor:Deflection DEFLECTIONS Center LOADING DIAGRAM Live Load 1.34 IN U215 Dead Load 0.12 in Total Load 1.45 IN U198 Live Load Deflection Criteria: U120 Total Load Deflection Criteria:U120 REACTIONS 6 B Live Load 2652 lb 2652 lb Dead Load 230 lb 230 lb Total Load 2882 lb 2882 lb Bearing Length 0.47 in 0.47 in BEAM DATA Center Span Length 24 ft Unbraced Length-Top 0 ft 24 ft Unbraced Length-Bottom 24 ft STEEL PROPERTIES HSS 8 x 4 x 1/4-A500-GR.B-46 UNIFORM LOADS Cente Properties: Uniform Live Load 221 plf Steel Yield Strength: Fy 46 ksi Uniform Dead Load 0 pif Modulus of Elasticity: E= 29000 ksi Beam Self Weight 19 plf Tube Steel Section(X Axis): dx 8 in Total Uniform Load 240 plf Tube Steel Section(Y Axis): dy 4 in Tube Steel Wall Thickness: t 0.233 in Area: A= 5.24 in2 Moment of Inertia(X Axis): IX= 42.5 in4 Section Modulus(X Axis): Sx= 10.6 in3 Plastic Section Modulus(X Axis): ZX= 13.3 in3 Plastic Section Modulus(Y Axis): ZY= 8.2 in3 Design Properties per AISC 13th Edition Steel Manual: Flange Buckling Ratio: FBR= 14.17 Allowable Flange Buckling Ratio: AFBR 28.12 Allowable Flange Buckling Ratio non-compact:AFBR—NC= 35.15 Web Buckling Ratio: WBR= 31.33 Allowable Web Buckling Ratio for Eqn. F7-5: AWBR 60.76 Nominal Flexural Strength w/Safety Factor: Mn= 30529 ft-lb Controlling Equation: F7-1 Web height to thickness ratio: h/tw 31.33 lb Limiting height to thickness ratio for eqn.G2-2:h/tw-limit= 56.24 Cv Factor: Cv= 1 Controlling Equation: G2-2 Nominal Shear Strength w/safety factor: Vn= 62602 Controlling Moment: 17292 ft-lb 12.0 Ft from left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s)2 Controlling Shear: 2882 lb At left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s Comparisons with required sections: Req�d Provided Moment of Inertia(deflection): 25.76 in4 42.5 in4 Moment: 17292 ft-lb 30529 ft-lb Shear: 2882 lb 62602 lb Project: 15011-0095-POPA &~D , DCI Engineers woo* 818 Stewa rt St.S u ite 1000 Location: New Garage Door Header C Multi-Loaded Multi-Span Beam as;R:Q Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)J StruCalc Version 9.0.1.7 5/20/2015 8:19:36 AM HSS 8 x 4 x 1/4 x 24.0 FT /ASTM A500-GR.B-46 Section Adequate By:65.0% Controlling Factor: Deflection VMD DIAGRAM 3000 2882 lbs @ 0 ft 1500 Shear(Ibs) 0 -1500 -3000 20000— 17292 ft-lbs @ 12 ft 10000— ornent(ft-1b) 0 -10000- -20000— .2- -1 Deflection(in) 0 1 2— 1.454!n@12ft 24 ft Project: 15011-0095-POPA DCI Engineers SD 1 818 Stewart St.Suite 1000 Location: New Garage Door Column '4� Multi-Loaded Multi-Span Beam Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 8:26:02 Am A36 C8x1 1.5 x 12.5 FT Section Adequate By: 173.8% Controlling Factor:Moment DEFLECTIONS Center LOADING DIAGRAM Live Load 0.18 IN U825 Dead Load 0.01 in Total Load 0.19 IN U796 Live Load Deflection Criteria: U120 Total Load Deflection Criteria:U120 REACTIONS A B Live Load 1950 lb 1950 lb Dead Load 72 lb 72 lb Total Load 2022 lb 2022 lb Bearing Length 0.94 in 0.94 in BEAM DATA Center Span Length 12.5 ft Unbraced Length-Top 0 ft 12.5 ft Unbraced Length-Bottom 12.5 ft STEEL PROPERTIES C8x1 1.5-A36 UNIFORM LOADS Center Properties: Uniform Live Load 312 plf Yield Stress: Fy 36 ksi Uniform Dead Load 0 plf Modulus of Elasticity: E= 29000 ksi Beam Self Weight 12 plf Total Uniform Load 324 plf Depth: d= 8 in Web Thickness: tw 0.22 in Flange Width: bf 2.26 in Flange Thickness: tf= 0.39 in Distance to Web Toe of Fillet: k= 0.94 in Moment of Inertia About X-X Axis: Ix= 32.5 in4 Section Modulus About X-X Axis: Sx= 8.14 in3 Plastic Section Modulus About X-X Axis: ZX= 9.63 in3 Design Properties per AISC 13th Edition Steel Manual: Flange Buckling Ratio: FBR= 2.9 Allowable Flange Buckling Ratio: AFBR 10.79 Web Buckling Ratio: WBR 27.84 Allowable Web Buckling Ratio: AWBR= 106.72 Controlling Unbraced Length: Lb= 0 ft Limiting Unbraced Length- for lateral-torsional buckling: Lp= 2.59 ft Nominal Flexural Strength w/safety factor: Mn= 17299 ft-lb Controlling Equation: F2-1 Web height to thickness ratio: h/tw 27.84 Limiting height to thickness ratio for eqn. G2-2:h/tw-limit 63.58 Cv Factor: Cv= 1 Controlling Equation: G2-3 Nominal Shear Strength w/safety factor: Vn 22764 lb Controlling Moment: 6318 ft-lb 6.25 Ft from left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s)2 Controlling Shear: 2022 lb At left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s Comparisons with required sections: RecCd Provided Moment of Inertia(deflection): 4.9 in4 32.5 in4 Moment: 6318 ft-lb 17299 ft-lb Shear: 2022 lb 22764 lb Project: 15011-0095-POPA .D, DCI Engineers Location: New Garage Door Column 818 Stewart St.Suite 1000 Multi-Loaded Multi-Span Beam C n G IrA Q Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 8:26:05 AM A36 C8x1 1.5 x 12.5 FT Section Adequate By: 173.8% Controlling Factor:Moment VMQ DIAGRAM LUZZ IDS UCV U TI 3000 1500 Shear(Ibs) 0 -1500 -3000 -2022 lbs @ 12 ft 7000— .6318 ft-lbs @ 6 ft 3600— ornent(ft-lb) 0 -3500- -7000- -0.2- -0.1— Deflection(in) 0- 0.2- 0.1- 0.189!n@6.2ft 12.5 ft A Project: 15011-0095-POPA = . _C, DCI Engineers 818 Stewart St.Suite 1000 Locatiorli:Canopy Rafter Q n C.E n Q r..R r. Seattle,WA 98101 Roof Rafter [2012 International Building Code(AISC 13th Ed ASD)J StruCalc Version 9.0.1.7 5/20/2015 9:11:53 AM HSS 6 x 2 x 1/4 x 22.0 FT ASTM A500-GR.B-46 @ 24 O.C. Section Adequate By:58.6% Controlling Factor: Deflection DEFLECTIONS Center LOADING DIAGRAM Live Load 0.69 IN L/381 Dead Load 0.22 in Total Load 0.92 IN U288 Live Load Deflection Criteria: U240 Total Load Deflection Criteria: L/1 80 RAFTER REACTIONS LOADS REACTIONS Upper Live Load @ A 275 plf 550 lb Upper Dead Load @ A 88 plf 176 lb Upper Total Load @ A 363 plf 726 lb Lower Live Load @ B 275 plf 550 lb Lower Dead Load @ B 88 plf 176 lb Lower Total Load @ B 363 plf 726 lb 22 ft RAFTER SUPPORT DATA A B Bearing Length 0.47 in 0.47 in RAFTER DA Interior RAFTER LOADING Span Length 22 ft Uniform Roof Loading Rafter Pitch 0 :12 Roof Live Load: LL 25 psf Roof sheathing applied to top of joists-top of rafters fully braced, Roof Dead Load: DL= 8 psf Slope Adjusted Spans And Loads STEEL PROPERTIES Interior Span: L-adj= 22 ft HSS 6 x 2 x 1/4-A500-GR.B-46 Eave Span: L-Eave-adj 0 ft Rafter Live Load: wL-adj= 50 plf Properties: Eave Live Load: wL-Eave-adj= 50 plf Steel Yield Strength: Fy 46 ksi Rafter Dead Load: wD-adj= 16 plf Modulus of Elasticity: E= 29000 ksi Rafter Total Load: wT-adj= 66 plf Tube Steel Section(X Axis): dx 6 in Eave Total Load: wT-Eave-adj= 66 plf Tube Steel Section(Y Axis): dy 2 in Tube Steel Wall Thickness: t= 0.233 in Area: A= 3.37 in2 Moment of Inertia(X Axis): Ix= 13.1 in4 Section Modulus(X Axis): Sx= 4.37 in3 Plastic Section Modulus(X Axis): ZX= 5.84 in3 Plastic Section Modulus(Y Axis): ZY= 2.61 in3 Design Properties per AISC 13th Edition Steel Manual: Flange Buckling Ratio: FBIR= 5.58 Allowable Flange Buckling Ratio: AFBIR 28.12 Allowable Flange Buckling Ratio non-compact:AFBR—NC= 35.15 Web Buckling Ratio: WBR= 22.75 Allowable Web Buckling Ratio for Eqn. F7-5: AWBR 60.76 Nominal Flexural Strength w/Safety Factor: Mn= 13405 ft-lb Controlling Equation: 177-1 Web height to thickness ratio: h/tw 22.75 lb Limiting height to thickness ratio for eqn. G2-2:h/tw-limit 56.24 Cv Factor: Cv= 1 Controlling Equation: G2-2 Nominal Shear Strength w/safety factor: Vn= 45453 Controlling Moment: 3993 ft-lb 11.0 Ft from left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s)2 Controlling Shear: -726 lb At right support of span 2(Center Span) Created by combining all dead loads and live loads on span(s Comparisons with required sections: Reaj Provided Moment of Inertia(deflection): 8.26 in4 13.1 in4 Moment: 3993 ft-lb 13405 ft-lb Shear: -726 lb 45453 lb Project: 15011-0095-POPA D DO Engineers Location�Canopy Rafter 818 Stewart St.Suite 1000 C Seattle,WA 98101 Roof Rafter [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/2012015 9:11:56 AM HSS 6 x 2 x 1/4 x 22.0 FT ASTM A500-GR.B-46 @ 24 O.C. Section Adequate By:58.6% Controlling Factor: Deflection VMQ DIAGRAM 800 400 Shear(Ibs) 0 -400 -800 4000— 3993 ft-lbs 0 11 fl: 2000— Moment(fi-1b) 0 -2000- -4000- -0.7- -0.35— Deflection(in) 0- 0.35- 0.7— 0.694in@11ft 22ft Project: 15011-0095-POPA DCI Engineers D C1 818 Stewart St.Suite 1000 Locatiofi:Canopy Fascia a R 2. Seattle,WA 98101 Multi-Loaded Multi-Span Beam [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 8:56:48 AM HSS 6 x 2 x 1/4 x 16.0 FT /ASTM A500-GR.B-46 Section Adequate By:354.8% Controlling Factor:Deflection DEFLECTIONS Cente LOADING DIAGRAM Live Load 0.10 IN U1979 Dead Load 0.08 in Total Load 0.18 INU1091 Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U240 REACTIONS A B Live Load 200 lb 200 lb Dead Load 163 lb 163 lb Total Load 363 lb 363 lb Bearing Length 0.47 in 0.47 in BEAM DATA Center Span Length 16 ft Unbraced Length-Top 0 ft 16ft Unbraced Length-Bottom 16 ft STEEL PROPERTIES HSS 6 x 2 x 1/4-A500-GR.B-46 UNIFORM LOADS Cente Properties: Uniform Live Load 25 plf Uniform Dead Load 8 plf Steel Yield Strength: Fy 46 ksi Beam Self Weight 12 plf Modulus of Elasticity: E= 29000 ksi Total Uniform Load 45 plf Tube Steel Section(X Axis): dx= 6 in Tube Steel Section(Y Axis): dy= 2 in Tube Steel Wall Thickness: t= 0.233 in Area: A= 3.37 in2 Moment of Inertia(X Axis): lx= 13.1 in4 Section Modulus(X Axis): Sx= 4.37 in3 Plastic Section Modulus(X Axis): ZX= 5.84 in3 Plastic Section Modulus(Y Axis): ZY= 2.61 in3 Design Properties per AISC 13th Edition Steel Manual: Flange Buckling Ratio: FBR= 5.58 Allowable Flange Buckling Ratio: AFBR 28.12 Allowable Flange Buckling Ratio non-compact:AFBR NC 35.15 Web Buckling Ratio: WBR 22.75 Allowable Web Buckling Ratio for Eqn. F7-5: AWBR 60.76 Nominal Flexural Strength w/Safety Factor: Mn= 13405 ft-lb Controlling Equation: F7-1 Web height to thickness ratio: h/tw 22.75 lb Limiting height to thickness ratio for eqn. G2-2:h/tw-limit= 56.24 Cv Factor: Cv= 1 Controlling Equation: G2-2 Nominal Shear Strength w/safety factor: Vn 45453 Controlling Moment: 1451 ft-lb 8.0 Ft from left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s)2 Controlling Shear: -363 lb At right support of span 2(Center Span) Created by combining all dead loads and live loads on span(s Comparisons with required sections: Redd Provided Moment of Inertia(deflection): 2.88 in4 13.1 in4 Moment: 1451 ft-lb 13405 ft-lb Shear: -363 lb 45453 lb page Project: 15011-0095-POPA DCI Engineers Locatioh:Canopy Fascia dMOOMDO 818 Stewart St.Suite 1000 Multi-Loaded Multi-Span Beam Q n G t n Q r.'R r. Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/2012015 8:56:51 AM HSS 6 x 2 x 1/4 x 16.0 FT /ASTM A500-GR.B-46 Section Adequate By:354.8% Controlling Factor: Deflection VMD DIAGRAM 400— 363lbs@Oft 200— Shear(Ibs) 0 -200- -400—J -363 lbs @ 16 ft 2600— 1451 ft-lbs @ 8 ft 1000— Moment(ft-lb) 0- -1000- -2000- -0.2— .0.1— Deflection(in) 0- 0.1- 0.2— 0.176in@8ft 16ft A Project: 15011-0095-POPA r)"(71 DCI Engineers page mom 818 Stewart St.Suite 1000 Locatioh: Canopy Beam Multi-Loaded Multi-Span Beam Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 9:10:10 AM HSS 6 x 6 x 1/4 x 25.0 FT(2+21 +2)/ASTM A500-GR.B-46 Section Adequate By: 10.7% Controlling Factor: Deflection DEFLECTIONS Left Center Eight LOADING DIAGRAM Live Load -0.26 IN 21J184 0.82 IN U306 -0.24 IN 21J200 Dead Load -0.10 in 0.34 in -0.10 in Total Load -0.36 IN 2UI32 1.16 IN U217 -0.34 IN 2L1142 Live Load Deflection Criteria: U120 Total Load Deflection Criteria: U120 REACTIONS A B Live Load 2293 lb 1417 lb Dead Load 1077 lb 669 lb Total Load 3369 lb 2086 lb Bearing Length 0.48 in 0.47 in li TR1 BEAM DATA Left Center Eight W Span Length 2 ft 21 ft 2 ft Unbraced Length-Top 0 ft 0 ft 0 ft �-2 21 ft ft Unbraced Length-Bottom 2 ft 21 ft 2 ft STEEL PROPERTIES HSS 6 x 6 x 1/4-A500-GR.B-46 UNIFORM LOADS Left Center Right Properties: Uniform Live Load 50 plf 25 plf 50 plf Steel Yield Strength: Fy 46 ksi Uniform Dead Load 16 plf 8 plf 16 pif Modulus of Elasticity: E= 29000 ksi Beam Self Weight 19 plf 19 plf 19 plf Tube Steel Section(X Axis): dx 6 in Total Uniform Load 85 plf 52 plf 85 plf Tube Steel Section(Y Axis): dy 6 in POINT LOADS-LEFT SPAN Tube Steel Wall Thickness: t= 0.233 in Load Number One Area: A= 5.24 in2 Live Load 200 lb Moment of Inertia(X Axis): Ix= 28.6 in4 Dead Load 163 lb Section Modulus(X Axis): Sx= 9.54 in3 Location 0 ft Plastic Section Modulus(X Axis): ZX= 11.2 in3 TRAPEZOIDAL LOADS-CENTER SPAN Plastic Section Modulus(Y Axis): ZY= 11 in3 Load Number One Design Properties per AISC 13th Edition Steel Manual: Left Live Load 225 pif Flange Buckling Ratio: FBR= 22.75 Left Dead Load 72 plf Allowable Flange Buckling Ratio: AFBR 28.12 Right Live Load 37.5 plf Allowable Flange Buckling Ratio non-compact:AFBR NC= 35.15 Right Dead Load 11 plf Web Buckling Ratio: WBR 22.75 Load Start 0 ft Allowable Web Buckling Ratio for Eqn.F7-5: AWBR 60.76 Load End 21 ft Nominal Flexural Strength w/Safety Factor: Mn= 25709 ft-lb Load Length 21 ft Controlling Equation: F7-1 Controlling Moment: 12255 ft-lb 9.66 Ft from left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s)2 Controlling Shear: 28361b At left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s Comparisons with required sections: Regd Provided Moment of Inertia(deflection): 25.83 in4 28.6 in4 Moment: 12255 ft-lb 25709 ft-lb Shear: 28361b 45453 lb Project: 15011-0095-POPA DCI Engineers 818 Stewa rt St.S u ite 1000 Locatiori:Canopy Beam SE)Q Multi-Loaded Multi-Span Beam a"Toa�F d`9;4 a Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 9:10:12 AM HSS 6 x 6 x 1/4 x 25.0 FT(2+21 +2)/ASTM A500-GR.B-46 Section Adequate By: 10.7% Controlling Factor: Deflection VMD DIAGRAM 3000— 2836 lbs @ 2 ft 1500— Shear(Ibs) 0 -1500- -3000— -1887 lbs @ 23 ft 20000— 12255 ft-lbs @ 12 ft 10000— Moment(fl-1b) -10000- -20000- 122rs ft-lbs @ 12 ft -0.361 in@ ft 2 :1 Deflection(in) 0- 1 2J 1.16 in @ 12.3 ft �-2 ft A= 21 ft A A Project: 15011-0095-POPA DO Engineers ZZ Location,:Canopy Beam 2 'D"C 1 818 Stewart St.Suite 1000 Multi-Loaded Multi-Span Beam C.n a I r"r.Q A Q Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 9:00:48 AM HSS 6 x 4 x 1/4 x 23.5 FT(2+ 17.5+4)/ASTM A500-GR.B-46 Section Adequate By:26.6% Controlling Factor: Deflection DEFLECTIONS Left Center ftm LOADING DIAGRAM Live Load -0.24 IN 21J202 0.63 IN U333 -0.45 IN 21J216 Dead Load -0.08 in 0.22 in -0.15 in Total Load -0.32 IN 2L/152 0.85 IN U247 -0.59 IN 2L1162 Live Load Deflection Criteria: U120 Total Load Deflection Criteria: U120 REACTIONS A B Live Load 2188 lb 1535 lb Dead Load 964 lb 671 lb Total Load 3152 lb 2206 lb Bearing Length 0.47 in 0.47 in BEAM DATA Left Center RiglLt 6M Span Length 2 ft 17.5 ft 4 It Unbraced Length-Top 0 ft 0 ft 0 ft �-2 17.5ft Unbraced Length-Bottom 2 ft 17.5 ft 4 It A B STEEL PROPERTIES HSS 6 x 4 x 1/4-A500-GR.B-46 UNIFORM LOADS Left Center RRjghJ Properties: Uniform Live Load 50 plf 50 plf 50 plf Steel Yield Strength: Fy 46 ksi Uniform Dead Load 16 pif 16 plf 16 plf Modulus of Elasticity: E= 29000 ksi Beam Self Weight 16 plf 16 plf 16 plf Tube Steel Section(X Axis): dx 6 in Total Uniform Load 82 plf 82 plf 82 plf Tube Steel Section(Y Axis): dy 4 in POINT LOADS-LEFT SPAN Tube Steel Wall Thickness: t= 0.233 in Load Number One Area: A= 4.3 in2 Live Load 200 lb Moment of Inertia(X Axis): Ix= 20.9 in4 Dead Load 163 lb Section Modulus(X Axis): Sx 6.96 in3 Location 0 ft Plastic Section Modulus(X Axis): ZX 8.53 in3 TRAPEZOIDAL LOADS-CENTER SPAN Plastic Section Modulus(Y Axis): ZY 6.45 in3 Load Number One Design Properties per AISC 13th Edition Steel Manual: Left Live Load 225 plf Flange Buckling Ratio: FBR= 14.17 Left Dead Load 72 plf Allowable Flange Buckling Ratio: AFBR 28.12 Right Live Load 37.5 plf Allowable Flange Buckling Ratio non-compact:AFBR NC 35.15 Right Dead Load 11 plf Web Buckling Ratio: WBR 22.75 Load Start 0 ft Allowable Web Buckling Ratio for Eqn. F7-5: AWBR 60.76 Load End 17.5 ft Nominal Flexural Strength w/Safety Factor: Mn= 19580 ft-lb Load Length 17.5 ft Controlling Equation: F7-1 Web height to thickness ratio: h/tw 22.75 lb Limiting height to thickness ratio for eqn.G2-2:h/tw-limit 56.24 Cv Factor: Cv= 1 Controlling Equation: G2-2 Nominal Shear Strength w/safety factor: Vn= 45453 Controlling Moment: 9479 ft-lb 8.05 Ft from left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s)2 Controlling Shear: 26251b At left support of span 2(Center Span) Created by combining all dead loads and live loads on span(s Comparisons with required sections: Regd Provided Moment of Inertia(deflection): 16.51 in4 20.9 in4 Moment: 9479 ft-lb 19580 ft-lb Shear: 26251b 45453 lb page Project: 15011-0095-POPA slow DCI Engineers Location:'Canopy Beam 2 D- C 818 Stewart St.Suite 1000 r-nr-in r.04 z Multi-Loaded Multi-Span Beam Seattle,WA 98101 of/ [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 9:00:51 AM HSS 6 x 4 x 1/4 x 23.5 FT(2+17.5+4) ASTM A500-GR.B-46 Section Adequate By:26.6% Controlling Factor: Deflection VMQ DIAG M 3000— 2626 lbs @ 2 ft 115100— Shear(Ibs) 0 -------- -1500- -3000— -1828 lbs @ 20 ft 10000— 9479 fl-lbs @ 10 ft 5000— ornent(fl-1b) 0 -5000- -10000- 9479 ft-lbs @ 10 ft -0.9— -0.594 in @ 23.5 ft -0.45— Deflection(in) 0 0.45- 0.9- 0.851 in@ 10.6 ft 2 ft -A- 17.5 ft AIL 4fl— A B Project: 15011-0095-POPA DCI Engineers D, C� 1 818 Stewart St.Suite 1000 Locatio n:'Ca nti levered Canopy Column foot or,r',G Column Seattle,WA 98101 [2012 International Building Code(AISC 13th Ed ASD)] StruCalc Version 9.0.1.7 5/20/2015 11:21:46 AM HSS 6 x 6 x 1/4 x 14.0 FT/ASTM A500-GR.B-46 Section Adequate By: 54.7% DEFLECTIONS LOADING DIAGRAM Deflection due to lateral loads only: Defl= 0.34 IN U494 Live Load Deflection Criteria: L/1 20 VERTICAL REACTIONS Live Load: Vert-LL-Rxn= 1535 lb Dead Load: Vert-DL-Rxn= 939 lb Total Load: Vert-TL-Rxn= 2474 lb HORIZONTAL REACTIONS Total Reaction at Top of Column: TL-Rxn-Top= 964 lb Total Reaction at Bottom of Column: TL-Rxn-Boftom 5036 lb COLUMN Q Total Column Length: 14 ft Unbraced Length(X-Axis)Lx: 14 ft Unbraced Length(Y-Axis)Ly: 14 ft Column End Condtion-K(e): 1.2 COLUMN PROPERTIES 14ft HSS 6 x 6 x 1/4-Square Steel Yield Strength: Fy 46 ksi Modulus of Elasticity: E= 29 ksi Column Section: dx 6 in dy 6 in Column Wall Thickness: t 0.233 in Area: A 5.24 in Moment of Inertia(deflection): Ix= 28.6 in4 ly 28.6 in4 Section Modulus: Sx= 9.54 in3 Sy= 9.54 in3 Plastic Section Modulus: ZX= 11.2 in3 Zy= 0.27 in3 Rad.of Gyration: rX= 2.34 in ry 2.34 in Column Compression Calculations: KUr Ratio: KLx/rx 86.15' KLy/ry 86.15 Controlling Direction for Compr. CaIcs:(Y-Y Axis) AXIAL LOADING Flexural Buckling Stress: Fcr= 27.92 ksi Live Load: PIL= 1535 lb Controlling Equation F7-11 Dead Load: PID= 671 lb Nominal Compressive Strength: Pc= 88 kip Column Self Weight: CSW 268 lb Column Bending Calculations per AISC 13th Edition Steel Manual: Total Load: PT 2474 lb Controlling Load Case:Axial Total Load and Lateral Loads(D+L+Lateral) Eccentricity Moment: Mx-ex= 0 ft-lb My-ey 0 ft-lb LATERAL LOADING (Dy Face) Lateral Moment+Eccentricity: Mrx= 11279 ft-lb Mry 0 ft-lb Uniform Lateral Load: wL-Lat= 0 pif Flange Buckling Ratio: FBR= 22.75 Point Load: One Allow. Flange Buckling Ratio: AFBR= 28.12 Live Load: 6000 lb Allow.FBIR for Non-Compact: NC= 35.15 Location: 11f8 ft Web Buckling Ratio: WBRX= 22.75 WBRY 0 Allow.WBR for Eqn. F7-5: AWBIR= 60.76 NmnI.Flex. Str.w/Sfty Factor: Mcx 25.7 ft-kip Mcy 25.7 ft-kip Controlling Equation F7-1 F7-1 4k C Combined Stress Calculations: H1-1b Controls: 0.45 L Controlling Combined Stress Factor:0.45 www.hilti.us Mtfis Anchor 2.4.6 Company: DCl Engineers Page: 1 Specifier: Project: Port of Port of Tacoma Address: 818 Stewart Street Suite 1000 Sub-Project I Pos.No.: Phone I Fax: (206)332-1900 1 Date: 5/12/2015 E-Mail: ldebarathy@dci-engineers.com Specifier's comments:Canopy Embed Plate I Input data Anchor type and diameter: AWS 10111.1 GR.B 7/8 Effective embedment depth: h�f=12.000 in. Material: Proof: design method ACI 318-11 CIP Stand-off installation: eb=0-000 in.(no stand-off);t=0.500 in. Anchor plate: Ix x ly x t=12.000 in.x 12.000 in.x 0.500 in.;(Recommended plate thickness:not calculated) Profile: Square HSS(AISC); (L x W x T)=4.000 in.x 4.000 in.x 0.250 in. Base material: cracked concrete,3000,f�'=3000 psi;h=48.000 in. Reinforcement: tension:condition A,shear:condition A;anchor reinforcement:tension,shear edge reinforcement:none or<No.4 bar Geometry[in.]&Loading[lb,in.lb] ........... Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.4.6 Company: DCl Engineers Page: 2 Specifier: Project: Port of Port of Tacoma Address: 818 Stewart Street Suite 1000 Sub-Project I Pos.No.: Phone I Fax: (206)332-1900 1 Date: 5/12/2015 E-Mail: Idebarathy@dci-engineers.com 2 Load case/Resulting anchor forces Load case: Design loads 2 Anchor reactions[lb] Tension force:(+Tension,-Compression) Anchor Tension force Shear force Shear force x Shear force y X 1 14645 3000 -3000 0 2 14645 3000 -3000 0 x Col" Tension max.concrete compressive strain: 0.521%.] max.concrete compressive stress: 2272[psi] resulting tension force in(x/y)=(0.000/0.000): 29289[1b] resulting compression force in(x/y)=(-5.245/0.000):30889[lb] 01 3 Tension load Load Nua[lb] Capacity+N,[lb] Utilization PN Nua/+Nn Status Steel Strength* 14645 29299 50 OK Pullout Strength* 14645 14851 99 OK Concrete Breakout Strength**' N/A N/A N/A N/A Concrete Side-Face Blowout,direction y-** 14645 15449 95 OK anchor having the highest loading —anchor group(anchors in tension) Tension Anchor Reinforcement has been selected! 3.1 Steel Strength Nsa n Ase,N futa ACI 318-11 Eq. (D-2) �Nsteel Nua ACI 318-11 Table D.4.1.1 Variables n Ase,N[in.21 fut.[psi] 1 0.59 65000 Calculations N�a[lb] 39065 Results N�.[lb] �steel Ns�[lb] Nu.[lb] 39065 0.750 29299 14645 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan I I OLN NJ I vvvvw.hilti.us Profis Anchor 2.4.6 Company: DCl Engineers Page: 3 Specifier: Project: Port of Port of Tacoma Address: 818 Stewart Street Suite 1000 Sub-Project I Pos.No.: Phone I Fax: (206)332-1900 1 Date: 5/12/2015 E-Mail: Idebarathy@dci-engineers.com 3.2 Pullout Strength NPN �'Vc,p Np ACI 318-11 Eq.(D-13) Np =8 Ab,fc ACI 318-11 Eq.(D-14) NPN;i�Nua ACI 318-11 Table D.4.1.1 Variables N!C,P Abrg[in. Xa fC[psi] 1.000 0.88 1.000 3000 Calculations Np[lb] 21216 Results Npn[lb] Oconcrete Npn[lb] N�.[lb] 21216 0.700 14851 14645 3.3 Concrete Side-Face Blowout,direction y- N�b = 16 0 c a i �k_;' k.4f: ACI 318-11 Eq.(D-16) Nsbg =(Xgroup Nsb ACI 318-11 Eq.(D-17) �Nsbg Nua ACI 318-11 Table(D.4.1.1) OLgroup (1 +6 SCal see ACI 318-11,Part D.5.4.2 Eq.(D-1 7) Variables Cal [in.] C.2[in] kr,[in.2] [psi] s[in.] 2.500 6.000 0.88 1.000 3000 Calculations CCgroup Nsb[lb] 1.000 20599 Results N�b,[lb] �concrete Nsbg[lb] Nua,edge[lb] 20599 0.750 15449 14645 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark ofHilti AG,Schaan I MEN ;I www.hilti.us Profis Anchor 2.4.6 Company: DCl Engineers Page: 4 Specifier: Project: Port of Port of Tacoma Address: 818 Stewart Street Suite 1000 Sub-Project I Pos. No.: Phone I Fax: (206)332-1900 1 Date: 5/12/2015 E-Mail: Idebarathy@dci-engineers.com 4 Shear load Load Vu.[lb] Capacity OV,[lb] Utilization pv VuJOV� Status Steel Strength* 3000 25392 12 OK Steel failure(with lever arm)* N/A N/A N/A N/A Pryout Strength— 6000 29147 21 OK Concrete edge failure in direction N/A N/A N/A N/A anchor having the highest loading "anchor group(relevant anchors) Shear Anchor Reinforcement has been selected! 4.1 Steel Strength Vsa �n Asev futa ACI 318-11 Eq.(D-28) �Vsteel�Vua ACI 318-11 Table D.4.1.1 Variables n As.,v[in-21 t1a[Psi] 1 0.59 65000 Calculations Vsa[lb] 39065 Results V,a[lb] �steel Vsa[lb] Vua[lb] 39065 0.650 25392 3000 4.2 Pryout Strength Vcpg �k.p[(ANc)Tec,N kVed,N kVc,N ycp,N Nb ACI 318-11 Eq.(D-41) ANcO I VcP9�:Vua ACI 318-11 Table D.4.1.1 ANc see ACI 318-11, Part D.5.2.1, Fig.RD.5.2.1(b) ANI 9 h2 ef ACI 318-11 Eq.(D-5) 1 Yec,N 1 +2 e N :5 1.0 ACI 318-11 Eq. (D-8) ( 3 he,) Y�d,N 0.7+0.3 1.0 ACI 318-11 Eq.(D-10) 1.5h& Y�p,N =MAX C��,L�� 5 1.0 ACI 318-11 Eq.(D-12) ( Cac cac Nb = 16 ka 4f:h5/3 ef ACI 318-11 Eq.(D-7) Variables kcp hef[in.] ec,,N[in.] e,2,N[in.] Ca,.i.[in.] 2 12.000 0.000 0.000 2.500 Yc,N Ca.[in.] kc Xa f c[psi] 1.000 16 1.000 3000 Calculations ANc[in.2] ANcO[in.21 Yec1,N Yec2,N Yed,N Yep.N Nb[lb] 660.00 1296.00 1.000 1.000 0.742 1.000 55121 Results Vcp,[lb] Oooncrete Vcpg[lb] Vu.[lb] 41638 0.700 29147 6000 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan ELM 1111111111 www.hilti.us Profis Anchor 2.4.6 Company: DCl Engineers Page: 5 Specifier: Project: Port of Port of Tacoma Address: 818 Stewart Street Suite 1000 Sub-Project I Pos.No.: Phone I Fax: (206)332-1900 1 Date: 5/12/2015 E-Mail: Idebarathy@dci-engineers.com 5 Combined tension and shear loads PN PV Utilization PNv N Status 0.986 0.206 1.000 100 OK PNV�(PN+PV)/1.2— 1 6 Warnings - To avoid failure of the anchor plate the required thickness can be calculated in PROFIS Anchor.Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered.The anchor plate is assumed to be sufficiently stiff,in order not to be deformed when subjected to the loading! Condition A applies when supplementary reinforcement is u*sed.The 0)factor is increased for non-steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength.Refer to your local standard. Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! The design of Anchor Reinforcement is beyond the scope of PROFIS Anchor. Refer to ACI 318-11,Part D.5.2.9 for information about Anchor Reinforcement. The design of Anchor Reinforcement is beyond the scope of PROFIS Anchor.Refer to ACI 318-11,Part D.6.2.9 for information about Anchor Reinforcement. Anchor Reinforcement has been selected as a design option,calculations should be compared with PROMS Anchor calculations. Fastening meets the design criteria! C; r Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hiltl.us M:rofis Anchor 2.4.6 Company: DO Engineers Page: 6 Specifier: Project: Port of Port of Tacoma Address: 818 Stewart Street Suite 1000 Sub-Project I Pos.No.: Phone I Fax: (206)332-1900 1 Date: 5/12/2015 E-Mail: Idebarathy@dci-engineers.com 7 Installation data Anchor plate,steel:- Anchor type and diameter:AWS D 1.1 GR.B,7/8 Profile:Square HSS(AISC);4.000 x 4.000 x 0.250 in. Installation torque:-0.009 in.lb Hole diameter in the fixture:df=0.938 in. Hole diameter in the base material:-in. Plate thickness(input):0.500 in. Hole depth in the base material: 12.000 in. Recommended plate thickness:not calculated Minimum thickness of the base material: 13.875 in. Cleaning:No cleaning of the drilled hole is required ALY 6�000 6.000 77 C> 0 x CD 6.000 6.000 Coordinates Anchor in. Anchor X Y C, C+x C-Y C+y 1 0.000 -3.500 - 6.000 2.500 - 2 0.000 3.500 - 6.000 9.500 - Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilb is a registered Trademark of Hilti AG,Schaan Project No. Sheet No. 15011-0095 Project Engineer PORT OF PORT OF TACOMA LJD DC1 Subject Date E n G i n E E R 5 CANOPY EMBED COLUMN 5/20/2015 LOADS[IBC 2012 16.7.7.31 PROPERTIES Point load(Pu) 6000.0 lbs Column Material: [�W�11-1 Linear load per pole(Wu) 0.0 plf Column Size: HSS6X6X.250 v Height from grade to point load(hp) 2.25 ft Modulus of Elasticity(E) 29,000,000 psi Height from grade to top of pole(H) 14.50 ft Moment of Inertia(Ix) 28.6 inA4 U Moment at grade(M) 13500 lb-ft Section Modulus(Sx) 9.5 inA3 Bending stress(fb) 16981 psi < Bending Strength(017b) 32327 psi OK Column Section Area(Area) 5.2 inA3 Shear Stress(fv) 1145 psi Shear Strength(OFv) 16794 psi [,.W .._4] 0.02 in 0.73 in Deflection(Arna.)— 3EI 8EI EU1280 Deflection(AL1NuT)= IHV240 OK 0 LA)ads IncludeSeismic or Wind Loading?(Increases Soil Capacityby 1/3 perIBC 1806.1) El Are Deflecfions>1/2"Allowed? (Doubles Presumptive Load-Bearing Values Found in Table 18062) Allowable Soil Bearing Pressure(Q) 1500 psf (Unfactored) Allowable Soil Bearing Pressure Qu) 3000 psf (Factored) Diameter or Diagonal of Footing(dia) 1.50 ft 4 Required Depth of Embedment For Constrained Design Ref.IBC 1805.7.3.2.2): depth T4.2,G�—(m [equ. 18-3] 3.57ft ,(dia) Required Depth of Embedment For Nonconstrained Design Ref-IBC 1805.7.3.2.1): L=2.34(Pu+Wu*H) 3.120 Qu(dia) dia depth='L 1+J F+ 4.74ft [equ. 18-11 2 Project No. Sheet No. Project 15011-0095 Engineer �� Dcl PORT OF PORT ANGELES LJD 11u1jec, Bate E n G i nE E R S OPERABLE PARTITION BRACING DESIGN 5/20/2015 Site Information: Site Location: Port Angeles,WA Site Class: D Seismic Design Category: D Ss: 1.250 Fa: 1.007 Sms: 1.25 Sds: 0.833 SI: 0.5 Fv: 1.50 Sml: 0.75 1 Sill: 0.500 *Outputfrom USGS Uniform Hazard Response Spectra Analysis Program,Maximum Considered Earthquake with 5%damping assumed Variables: L wall= 30 ft Total Partition Wall Length STRUCTURE ABOVE h floor= 14 ft Height Floor to Ceiling H wall= 9 ft Partition Height WALL BRACING ? WP= 8 psf Partition Dead Load 12 > WP*H—wall= 72 plf Linear Design Load L W=Wp*L—wall*H—wall= 2160.0 lbs Total Assembly Weight WALL Analysis:* (Using ASD Load Combinations) H *Allowable Stress Design[Ref 2012 IBC and ASCE 7-10 and AISI 2007] Fp max= 1.6(Sds)(1p)(Wp)= 10.67 psf _Lj Fp rnin=0.3(Sds)(Ip)(Wp)= 2.00 psf WALL BRACING Fp— 0.4(ap)(Sds)(Wp)(1+2 5.33 psf <===Governs Seismic Design Rpl (Yh /IP) Z/h= I Component Height Ratio(z=height of component,h=height of structure) Ip= 1 Component Importance Factor[ASCE 7 Section 13.1.3] ap= I Amplification Factor[ASCE 7 Table 13.5-1] Rp= 1.5 Component Response Modification Factor [ASCE 7 Table 13.5-1 *Note: 13.4.2 Note b. The value of Rp shall not exceed 1.5 unless... Determine Seismic or Internal Pressure Governs Design- ASD Seismic Load: 0.7 Fp= 3.73 psf Governs Folded Condition ASD Minimum Internal Pressure(Pgci)= 5.00 psf Governs Unflolded Condition 40.00 plf Total Lateral Force(Fv) 0.7Fp*H—wall*L—wall 1008.0 lbs Company DCl Engineers May 1, 2015 Des ign er Luke deBarathy II'IRISA Job Number 15011-0095 Checked By. T E C H N 0 L o r. I E S Model Name Port of Port Angeles 0 R A R \ /-\�") -I-(, T Wood Design Parameters La bel Shape Lengt.., le2lftl lel Fftl le-bend top[ffl le-bend bo"I'm Kvv Kzz CV Cr v sway z s M1 16.75X18... 30 1 30 30 30 30 6, 5X 8... 3 M3 16.75X18.... 3n 1 30 30 30 30 Load Combinations Description Solve PlDelta SIR...B LC Facto r B LC Facto r B LC Facto r B LC Facto BLC Factor B LC Factor BLC Factor BILC Factor D IYes I 4, 3 D+W Yes 1 1 3 1 + Joint Reactions LC Joint Label X nbI Y nbl Z flbl MX lib-ftl MY fib-ffl MZ fib-ftl 1 N 1 0 1080 0 0 0 "0. 1-'i z J 3 N5 0 2088 0 0 0 0 ok 1 N4 0 775.2 0 0 0 0 7 1 Totals: 0 6408 0 if 9 2 N 1 0 -843.71 0 5061.29 0 ffi "g 11 2 N5 0 0 0 0 0 0 Li�2 ..�J, , 13 2 1 N4 0 0 -73.841 0 0 0 51-�i 15 2 Totals: 0 0 -2025 Z _J i 17 3 Nl 0 1080 -843.71 0 5061.29 0 19 3 1 N5 0 2088 0 0 0 0 .2 21 3 N4 0 775.2 -73.841 0 0 0 23 3 Totals: 0 6408 -2025 �a-'ti -",ja mmmv m�u 25 4 N 1 0 1080 0 0 0 0 IS 27 4 1 N5 0 2088 1005.797 0 -941.905 0 29 4 N4 0 775.2 157.663 0 0 0 0, -bum 31 4 Totals: 0 6408 1 1512 RISA-31D Version 12.0.0 [CA...\...\...\...\15011-0095 POPA-Operable Partition Wall Beam Calc.r3d] Pagel Company DCl Engineers May 1, 2015 Des ign er Luke deBarathy INIMISA Job Number 15011-0095 Checked By. T E C H N 0 L 0 G I E S Model Name Pat of Pat Angeles Member Section Deffectfons LC Member Label See x linI v finl z finl x Rotatelradl (n)L/y Ratio (n I L/z Ratio M1 1 0 0 0 0 NC NC : - , - .-,- `� A 3 3 0 -.222 0 0 1620 NC .2 2�6 5 5 0 1 0 0 0 NC NQ A- �I &M2 7 2 0 -.2 0 0 1800.658 NC 9 4 0 -.186 0 0 1933.553 NC T 1 M3 1 1 0 0 0 1 0 N C N C A 13 3 0 -.035 0 0 N C N C C, 15 5 0 0 0 0 NQ NQ 17 2 0 0 .185 0 NQ 1942.7 f4 19 4 0 0 .333 0 NQ 1079.713 5: v 'J -,2 .21.__ 2 M2 1 0 0 0 0 INIC NQ .5 5, 23 3 0 0 .161 0 N C 2242.459 25 5 0 0 0 0 NC NC 2 0 0 0 0 INIC NC 4 0 0 0 0 NC NC 31 3 M1 1 0 0 0 0 NQ NQ 2 33 3 0 -.222 .395 0 1620 910.923 A��Mn&�k T�, Wp��4&9jba 35 5 0 0 0 0 NC NQ Z-11,11..� 37 2 0 -.2 .091 0 1800.658 3952.217 42.459E 39 4 0 -.186 .1113., _0 1933.553 3194.832 41 3 M 3 1 0 0 0 0 N C N C tn","e 43 3 0 -.035 0 0 NQ NQ zg ��,,,'4 4 45 5 1 0 0 0 0 N C N Q ,4 D 00 N , 47 1 2 0 -.158 0 0 2273.684 NQ -v, Nt 49 4 0 -.158 0 0 2273.684 NQ Mb NC� 51 4 M2 1 0 0 NIC NC RISA-31D Version 12.0.0 [CA...\..A.A.A15011-0095 POPA -Operable Partition Wall Beam Calc.r3d] Page2 Company DCI Engineers May 1,2015 Designer Luke deBarathy 111RISA Job Number 15011-0095 Checked By TECH N OLOGIES Model Name Pod of Poft Angeles lf_�C P A �5 L C '��A 0,1 '1 71 -IC Member Section Deflectfons (Continued) LC Member Label Sec x linl v finl z finl x Rotate[nadl (n)L/v Ratio (n)L/z Ratio -52' 53 3 0 -.277 -.257 0 1301.168 1398.663 .6&_ fbA 55 5 0 0 0 0 NC NC P `4 3- 4: :.57 2 0 -.031 -.006 0 NC NQ . ............. 59 4 0 -.022 -.005 0 NQ NC Member Wood Code Checks LC Member ShaDe LIC Max Locl`...Shear UC Locl... Dir Fd[D...Ft'[Ds il Fb 17...FbZF..Fv'[Dsil RB CL CP Eon 1 M1 6.75X1... .123 15 .050 0 v 240.... 11 oo 2163...1398... 265 111.926 .97,a,, .15 3.9-3 W 3- 1 M3 6.75X1... .031 1.875 .097 0 V 240.... 1100 2163..,1398... 265 11-926 .976 .15 3.9-3 'A 307' � 1 "�,� d"',b-, "'� I'� fi '. 5 2 M2 6.75XII... .179 0.. ... .032 0 Z 240.... 1100 1307.. 1398... 230 11.926 .988 .15 3.9-3 5X 98- 1 5-14 7 3 1 M1 6.75X1... .318 0 .050 0 V 240-.. 1100 1307...1398... 265 11.926 .988 .15 3.9-3 4�W 05�0 61n�'. I � -­­­I - : 9- 3 M3 6.75X1... .031 1.8751 .097 0 V 240.....1100 2163.. 1398.. 265 11.926 .976 .15 3.9-3 11 4 M2 6.75X1... .314 15 .061 V 1240.... 110012163.. 1398.. 265 11.926 .976 .15 3 1307.:.'1398..2.' 11' j RISA-31D Version 12.0.0 [CA...\...\...\...\15011-0095 POPA-Operable ParUtion Wall Beam Calc.r3d] Page3 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1,and>3 story R2 and R3 'Mechanical Summary MECH-SUM 2012 Seattle Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Auo 2014 Project Info Project Address PORT OF PORT ANGELES Date 5/21/2015 W 18TH STREET For Building Dept. Use PORT ANGELES,WA 98363 Applicant Name: RICE GROUP INC. lApplicant Address: 20201 CEDAR VALLEY RD,SUITE 120,LYNN 00 lApplicant Phone: (425)774-3829 Project Description 25,000 SQUARE FOOT TENANT IMPROVEMENT FOR OFFICE SPACE,TRAINING Briefly describe mechanical ROOMS, GENERAL SHOP AREAS, LAB TYPE SPACES,AND FREEZER ROOMS. system type and features. Includes Plans Include documentation requiring compliance with commissioning provisions per Section C408. 0 Simple System Complex System 0 Total Building 0 Target Compliance Option I Performance Performance The following information is required to be incorporated with the mechanical equipment schedules on Equipment Schedules the plans. For projects without plans,fill in the required information below. Cool' g Equipment Schedule Economizer Heat Equip. Equ Capacity' OSA CFM SEER Option or Recovery ID Typiep Brand Name' Model No.' Btu/h or Econo? or EER IPLV' Exception 6 Y/N SEE EQUIPMENT SCHEDULES ON PAGE M- .-1.2, -1.3 �—I— - Head, g Equipment Schedule Heat Equip. Equip Capacity2 OSA cfm Recovery ID I Type I Brand Name' Model No.' Btu/h or Econo? Input Btuh Output Btuh EfficienCY4 Y/N SEE EQUIPMENT SCHEDULES ON PAGE M- 1.2.M-1.3 Fan Equipment Schedule Equip. Equip Brand Name' Model No.' CFM SP1 HP/BHP Flow ControI5 Location of Service SEE EQUIPMENT SCHEDULED ON PAGE M- Service Water Heating Equipment Schedule Equip. Equip Input Sub- ID Type Brand Name' Model No.' Capacity Category EF 7 Location of Service SEE EQ—UIPMENT SCHEDULE ON PAGE M- 1.2 If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP,HSPF,Combustion Efficiency,or AFUE,as Interior Lighting Summary LTG-SUM , 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014 Project Info Project Address POPA-Composite Recycling and Technology Center Date 5/21/2015 Compliance 2220 W.18th Street For Building Department Use forms do not require a Port Angeles,WA 98363 password to use. Applicant Name: K Engineers,Inc. Instructional and Applicant Addr ss: 208 Third St.,Lynden,WA 98264 calculating ce/Is are wite- Applicant Phone: (360)354-4757 Project Description 13 New Building [3 Addition 0 Alteration 0 Plans Included Lighting Compliance Path Lighting Power Density Calculations 0 Total Building Performance (If Total BuildingrPerformance then only LGT-CHKis Lighting Power Allowance 0 Building Area Method Space-By-Space Method Method Selection required to enable LPA forms Interior Lighting System Description Briefly describe lighting system type and features. Additions and Change of Space Use (C101.4.3 & C101.4.4) M Addition area or Change of Space Use area complies with all applicable provisions as stand alone project [3 Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable provisions per C1 01.4.3 Provide Building Area Method(LTG-INT-BLD)or Space-By-Space Method(LTG-INT-SPACE)Compliance Form.Document maximum allowed and proposed(including existing if applicable)lighting wattage of Addition or Change of Use space.Provide applicable lighting controls per C405.2 and commissioning of lighting controls per C405.13. Alterations, Renovations and Repairs (C101.4.3.1) 0 60%or more of luminaires in space replaced Provide Building Area Method(LTG-INT-BLD)or Space-By-Space Method(LTG-INT-SPACE)Compliance Form.Document maximum allowed wattage within the lighting retrofit space in Maximum Allowed Wattage table and proposed(including existing) lighting wattage in Proposed Wattage table.Retrofit and non-retrofit spaces shall be documented separately using multiple forms. [3 Less than 60%of luminaires in space replaced Provide a separate Space-By-Space Method(LTG-INT-SPACE)Compliance Form for this retrofit area.Document existing total wattage within the lighting retrofit space in cell provided in the Maximum Allowed Wattage table.Document proposed(including existing)lighting wattage in the Proposed Wattage table. 13 Lamp and/or ballast replacement within existing luminaires only—existing total interior building wattage not increased 0 New wiring installed to serve added fixtures and/or fixtures relocated to new circuit Provide applicable manual lighting controls(C405.2.1),occupancy sensors(C405.2.2.2),daylight zone controls(C405.2.2.3),specific application controls(C405.2.3),and commissioning of lighting controls per C405.13 13 New or moved lighting panel Provide all applicable lighting controls as noted for New Wiring,automatic time switch controls(C405.2.2.1), and commissioning of lighting controls per C405.13. [3 Space is reconfigured -luminaires unchanged or moved only Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. [3 No changes are being made to the interior lighting and space use not changed. Interior Lighting Summary - Space-By-Space LTG-INT-SPACE 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014 Project Address POPA-Composite Recycling and Technology Center Date 5/21/2015 Lighting Alterations, Renovations &Building Additions For Building Department Use 0 Less than 60% 0 60%or more 0 Stand alone 0 Addition Notes: a. Lighting fixtures ina building addition may comply as a stand alone project, ortheymaybe combined Kith the overall existing bIdg,lighting to demonstrate compliance.Refer to C 10 1.4.3. b. For retrofits and building additions,provide Space Types and gross interior areas in the Maximum Aflot4ed Lighting table.If a builidng addition vV11 comply as combined vuth the overall existing builidng,include all applicable existing Space Types and gross interior areas. c. Documentnew fixtures and all existing to remain fixtures in the Pronosed Lichtino table. N1. If less than 6: A%MiMll b I wedrovide total existing lightingiKettage 9wo, AlloKed Lighting table. Location(plan# Allowed— (3ross Interior Watts A7[5—w—ec room Space Type* Wafts per fF Area in tf (watts/ff x area) Dwg.E-3.1 Laboratory Laboratory for medical/inclustrial/research 1.81 5350 9684 Storage Storage 0.63 100 63 Mech.Rooms Electrical/mechanical 0.95 310 295 Office(Open) Office-Open plan 0.98 670 657 Reception Office-Open plan 0.98 450 441 Office Office-Enclosed 1.11 1141 1267 Corridor Corridor/transition 0.66 1264 834 Conference Rms. Conference/meeting/multi purpose 1.23 573 705 Restrooms Restroorn 0.98 652 639 Classrooms Class room/lectu re/train i ng 1.24 1414 1753 Dwg.E-3.2 Manufacturing Manufacturing:Low bay 25 ft floor-ceiling ht.) 1.19 10970 13054 Restrooms Restroorn 0.98 536 525 Break Room Lounge recreation 0.73 380 277 Office Office-Enclosed 1.11 470 522 Storage Storage 0.63 395 249 Mech.Room Electrical/mechanical 0.95 252 239 AtInUrn" itzinter1w T, [�-Ai ff 16�All6wancefrorn�G'-!N Select Table C405.5.2(2)category from drop dow7 menu. Area Allowed Wafts For atriums,indicate height.Allovied mttage for first 40 feet is 0.03 WIft. ht, Total 24927 312037 above 40 feet is 0.02 W11t. ht Proposed Lighting Wattage Location(plan# Number of Wattsl Watts room#) Fixture Description— Fixtures Fixture Proposed Dwg.E-3.1 2'x4'Fluor.Troffer,3 Lamp(Type A,AD,D) 104 89 9256 2'x4'Fluor.Troffer,2 Lamp(Type B,BA,BD) 27 59 1593 2'x2'Fluor.Troffer,3 Lamp(Type C) 2 46 92 2'x2'Fluor.Troffer,3 Lamp(Type CA,CD,E) 11 50 550 4'Fluor.Strip,2 Lamp(Type F) 6 59 354 Vx4'Fluor.Wraparound(Type G) 7 59 413 4'Fluor.Vanity Bracketed,2 Lamp(Type J) 2 59 118 4'Fluor.Under Cabinet,1 Lamp(Type K) 2 30 60 LED Recessed Downlight,1500 Lumen(Type L&LE) 25 22 550 LED Pendant Luminaire(Type P) 3 8 24 12'Fluor.Linear Direct/indirect Pendant,6 Lamp(Type R) 1 171 171 LED Track Light(Current Limiter @ 30OW) 2 300 600 Exit&Emergency Lights(Type Y,Z) 16 5 Exempt Dwg.E-3.2 2'x4'Fluor.Troffer,3 Lamp(Type A) 14 89 1246 4'Fluor.Strip,2 Lamp(Type F) 3 59 177 4'Fluor.Vanity Bracketed,2 Lamp(Type J) 2 59 118 4'Fluor.Under Cabinet,1 Lamp(Type K) 3 30 90 LED Recessed Downlight,1500 Lumen(Type L&LE) 11 22 242 8'Fluor.Industrial Strip,6 Lamp(Type M&ME) 48 171 8208 Exit&Emergency Lights(Type Y,Z) 4 5 Exempt MUJ Total Proposed Watts may not exceed Total Alloved Watts for Interior Lighting Total Proposed Wall 23862 Include existing to remain lighting fixtures and exempt lighting equipmentper notes below Notes: 1. Include ALL proposed lighting fixtures. 2. Forproposed Fixture Description,indicate fixture type,lamp type(e.g. T-8), number of lamps in Me fixture, and ballast type(if included). For track lighting,list the length of the track(in feet) in addition to the fixture, lamp,and ballast inform ation. 3. Forproposed WattslFixture, use manufacturer's listed maximum input mttage of the fixture(not simply the lamp mttage) and other criteria as specified in Section C405.5.1.For line voltage track lighting,list the greater of actual luminaire i4ettage or length of track multiplied by 50, or as applicable,the vLattage of current limiting devices of the transformer. For low voltage track lighting list the transformer rated vattage. 'VOW U5 7, nore exception number and leave wattslFixture 57anK. I 40910==M,43 MWight,5no table in the same manneras new fixtures. ldentifv as existinaPPMPLIESI ' Exterior Lighting Summary LTG-EXT , 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014 Project Info Project Address: POPA-Composite Recycling and Technologj Date 5/21/2015 2220 W.18th Street For Building Department Use Port Angeles,WA 98363 Applicant Name: K Engineers,Inc. Applicant Addr: 208 Third St.,Lynden,WA 98264 Applicant Phone: (360)354-4757 Project Description 13 New Building [3 Addition Q Alteration Plans Included Lighting Zone As specified byjurisdiction. Zone 0 zone 1 0 Zone 2 0 zone 3 0 zone 4 selection required to enable L TG-EXT MM compliance Option Lighting Power Density Calculations 0 Total Building Performance Building Grounds 13Efficacy>60 lumens/W b Controlled by motion sensor Applies to luminaires> 100 Watts OlExemption (list) Exterior Lighting Alterations[3No changes are being made to the existing exterior lighting New wiring installed to serve added fixtures and/or fixtures relocated to new circuit Provide applicable exterior lighting controls per C405.2.4 and commissioning per Tradable Maximum Allowed Lighting Wattage Base Site Allowance] 750 AllOVVeO vvarfE Area(ff),perimeter Allowed Waffs Tradable Surfaces Surface Description per fe or per If (If)or#of items x fe(or x lf) Entry Canopies Loading Dock Canopy 0.4 W/ft;2 446 178 Total Allowed Tradable Wattsi 178 Tradable Proposed Lighting Wattage (Use mfgr listed maximum input wattage for luminaire.) Number of Wattsi Watts Tradable Surface Fixture Description Fixtures Fixture Proposed Entry Canopies LED Flood Light (Type V) 1 160 160 Total proposed tradable vietts may not exceed the sum of total alloKed tradable Total Proposed Tradable Watts 160 mtts plus the base site alloKence. Any base site alloKence not needed to make tradable vLatts comply can be applied to individual non-tradable Non-Tradable Maximum Allowed Lighting Wattage Base Site Allowance Remaining: 750 Allowed Watts Area(1Y),perimeter Allowed Watts Non-Tradable Surfaces Surface Description per f?or per If (10 or#of items x fe(or x If) Bldg. Fagade (by perim) Building Perimeter 3.75 W/1f 700 2625 Non-Tradable Proposed Lighting Wattage Number of Watts) Watts Non-Tradable Surface Fixture Description Fixtures Fixture Proposed Bldg. Fagade (by perim) Fluor. Wall Sconce, 1 Lamp (Type U) 3 28 84 Bldg. Fagade (by Perim) Existing Fluor. Wall Sconce, 1 Lamp 5 28 140 Non-tradable proposed vetts may not exceed allovLed VLetts for any individual Total excess Non-Tradable watts: 0 surface unless the total excess mtts for all non-tradable surfaces are less than Site Allowance Balance: 750 the remaining site allovwnce. Exterior Lighting COMPLIES WITH SITE ALLOWANCE] Lighting, Motor, and Transformer Permit Documents Checklist LTG-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014 Project Address POPA-Composite Recycling and Technology Center I Date 5/21/2015 The following information is necessary to check a permit application for compliance with the lighting,motor,and transformer requirements in the Washington State Energy Code,Commercial Provisions. Location in ing Department ,no,na)I Code Section Compone Applicability (yes �t Compliance information required in permit documents Documents Notes LIGHTING CONTROLS (Section C405.2) Yes C4052.1.1 Manual interior Indicate on plans the manual control type&locations served: See Ltg Plans C405.2.1.2 lighting controls Indicate of plans the 50%lighting load reduction method provided or identify exception taken Indicate lighting system automatic shut-off capability-identify See Ltg Plans Automatic time lighting zone areas served on plans: Yes C405.2.2.1 switch controls and Indicate locations of override switches on plans and the areas override switching served,include area sq.ft.; Indicate locations where automatic shutoff is provided by other methods(occupancy sensor,daylight controls,etc) Yes C405.2.2.2 Occupancy sensors Indicate on plans the locations served by occupancy sensors See Ltg Plans Yes Daylight zones- Indicate vertical fenestration primary and secondary daylight See Ltg Plans C405.2.2.3 Vertical fenestration zone areas on plans,include sq.ft.; and skylights Indicate skylight daylight zone areas on plans,include sq.ft. Yes C405.2.2.3.2 Dayl i g ht zon e Indicate on plans the locations served by daylight zone controls; See Ltg Plans controls Indicate in plans the lighting load reduction(dimming)method- stepped or continuous dimming Specific application Indicate on plans the locations served by specific application NA C405.2.3 lighting controls- lighting controls General Indicate lighting control method for display and accent lighting, NA C405.2.3- Display and accent and display case lighting; Items 1&2 lighting Indicate these fixtures are controlled independently from both general area lighting and other lighting applications within the same space C405.2.3- Hotel/motel guest Provide a lighting control device at each guest room entry for all NA Item 3 rooms permanently installed fixtures in guest room; Indicated whether lighting control is manual or automatic Yes C405.2.3- Supplemental task Provide automatic shut-off vacancy controls for supplemental See Ltg Plans Item 4 lighting task lighting,including under-shelf or under-cabinet lighting Identify eligible non-visual applications and method of lighting NA C405.2.3- Lighting for non- control, Item 5 visual applications Indicate these fixtures are controlled independently from both general area lighting and other lighting applications within the same space Indicate lighting control method for lighting equipment for sale NA C405.2.3- Lighting equipment or demonstration; Item 6 for sale or Indicate these fixtures are controlled independently from both demonstration general area lighting and other lighting applications within the same space If egress lighting power density is greater than 0.05W/fl?, C405.2.3- Means of egress indicate method of automatic shut-off during unoccupied NA Item 7 lighting periods; Identify on plans the egress fixtures that function as both normal and emerclency means of egress illumination NA C405.10 Cooler and freezer Provide vacancy device or timer to turn off fixtures within 15 C405.11 lighting minutes of unoccupancy for cooler and freezer lighting fixtures with lamp efficacy less than 40 lumens per waft Yes C405.2.4 Exterior lighting Indicate on exterior lighting plans the automatic lighting control See Ltg Plans controls method and locations served Exterior building Provide motion sensor controls for building grounds fixtures NA C405.6.1 grounds lighting rated at greater than 100 watts with lamp efficacy less than 60 controls lumens,or identify exception taken Identify applicable commissioning documentation requirements See Specifications per Section C408 or eligibility for exception; Yes C408.3 Lighting system Provide written procedures for functional testing of all automatic functional testing controls and describe the expected system response, Identify in construction documents the party responsible for functional testing of automatic lighting controls INTERIOR LIGHTING POWER&EFFI ACY(Sections C405.5, C405.10, C405.11) Provide fixture schedule with fixture types,lamps,ballasts,and See Ltg Plans C405.5.1 rated wafts per fixture; C405.5.1.1 Identify spaces eligible for lighting power exemption on plans Yes C405.5.1.2 Total connected and in compliance forms; C405.5.1.3 interior lighting power Identify lighting equipment eligible for exemption in fixture C405.5.1.4 schedule and in compliance forms; Indicate that exempt lighting equipment is in addition to general area lighting and is controlled independently Lighting, Motor, and Transformer Permit Documents Checklist LTG-CHK, 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014 Project Address POPA-Composite Recycling and Technology Center FDate 5/21/2015 The following information is necessary to check a permit application for compliance with the lighting,motor,and transformer requirements in the Washington State Energy Code,Commercial Provisions. Applicability Location in Building Department (yes,no,na) Code Section Component Compliance information required in permit documents Documents Notes Yes C405.4 Exit signs Provide ext sign types and rated wafts per fixture in fixture 5 Watt schedule(maximum 5 watts per fixture) NA C405.1 0 Cooler and freezer For lighting in walk-in coolers and freezers,and refrigerated C405.11 lighting warehouse coolers and freezers,provide rated lamp efficacy(in I I lumens per waft)in fixture schedule Lighting Power Calculation-Indicate compliance path taken Complete required compliance forms—proposed wattage per NA C405.5.2 Building Area Method building area does not exceed maximum allowed wattage per building area.Identify locations of building areas on plans Complete required compliance forms—total proposed wattage Yes C405.5.2 Space-By-Space does not exceed maximum allowed wattage.Identify locations of Attached Method space types on plans,including retail display areas as applicable EXTERIOR LIGHTING POWER&EFF CACY(Section C405.6) Provide fixture schedule with fixture types,lamps,ballasts,and See Ltg.Fixture Total connected rated watts per fixture; Schedule Yes C405.6.2 exterior lighting Identify exterior applications eligible for lighting power power exemption on plans and in compliance forms, Indicate that exempt exterior lighting is controlled independently from non-exempt exterior lighting Yes Table Exterior lighting zone Indicate building exterior lighting zone as defined by the AHJ Attached C405.6.2(l) Exterior building For building grounds fixtures rated at greater than 100 wafts, NA C405.6.1 grounds lighting provide rated lamp efficacy(in lumens per waft)in fixture schedule Exterior lighting Complete required compliance form—proposed wattage for Yes C405.6.2 power calculations exterior lighting plus base site allowed does not exceed Attached maximum allowed MOTORS&TRANSFORMERS (Sections C405.8, C405.9) NA C405.8 Electric Motors For motors not part of an HVAC system,provide electric motor schedule on electrical plans with hp,rpm,and rated efficiency Yes C405.9 Transformers Provide distribution transformer schedule on electrical plans See Panel with transformer size and efficiency Schedules If"no" is selected for any question, provide explanation: CERTIFICATF rNT� -NCCUPANCY CITY OF PORT ANGELES - BUILDING DIVISION This certificate is issued pursuant to the requirements of Section I I I of the 2015 International Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances of the City regulating building construction of use for the following: Business Name: Composite Recycling Technology Center Business Address: 2220 W 18" St Business Owner: CRTC Business Owner Address: 2220 W 18"' St Automatic Fire Sprinkler: yes Use and Occupancy classification: Factory/ Industrial Type of Construction Type 11 Fire Resistive August 18, 2016 Nathan West, DCED Date Post on the premises in a conspicuous place.This certificate shall not be removed except by the Building Official