Loading...
HomeMy WebLinkAbout3105 Grants View Lane Address: 3105 Grants View Lane- PREPARED 9/IG/14, 12:29:47 INSPECTION TICKET PAGE 1 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 9/16/14 ------------------------------------------------------------------------------------------------ ADDRESS . : 3105 GRANTS VIEW LN SUBDIV: CONTRACTOR : PHONE : OWNER ROBERT IAN / AVRIL ELAINE SYKE PHONE : (720) 935-1924 PARCEL 06-30-15-5-1-2802-0000- APPL NUMBER: 13�00000890 RES ADDITION ------------------------------------------------------------------------------------------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDEWrIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BL6 01 2/24/14 JLL BLDG POST/COLUMN FTG 2/24/14 AP February 24, 2014 9:26:42 AM pbarthol. Ian 360-779-1612 February 24, 2014 4:24:01 PM jlierly. CLean out pier before pour. Excessive dirt and rain/jll BL99 01 9/16/14 BLDG FINAL September 16, 2014 9:35:18 AM pbarthol. Ian 360-797-1812 -------------------- ------ COMMENTS AND NOTES -------------------------------------- q p, s, 2�4 ql_ CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 13-00000890 Date 8/21/13 Application pin number . . . 323830 Property Address . . . . . . 3105 GRANTS VIEW LN ASSESSOR PARCEL NUMBER: 06-30-15-5-1-2802-0000- Application type description RES ADDITION REPORT SALES TAX Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY to the City of Port Angeles Application valuation . . . . 1344 (Location Code 0502) ---------------------------------------------------------------------------- Application desc ADD STAIRS TO EXISTING SECOND STORY DECK ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ ROBERT IAN / AVRIL ELAINE SYKE OWNER 3105 GRANTS VIEW LN PORT ANGELES WA 98362 (720) 935-1924 --------------------m-------------------------------------------------------- Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Additional desc . . STAIRS TO EXISTING 2ND STORY D Permit Fee . . . . 77.45 Plan Check Fee 50.34 Issue Date . . . . 8/21/13 Valuation . . . . 1344 Expiration Date 2/17/14 Qty Unit Charge Per Extension BASE FEE 50.00 9.00 3.0500 HND BL-501-2K (3.05 PER C) 27.45 ---------------------------------------------------------------------------- Special Notes and Comments August 19, 2013 5:08:35 PM sroberds. The proposal will result in outside stairs.from an existing deck to ground in the RS-9 zone. No land use issues anticipated. ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------------- ------------------ ..... Fee summary Charged Paid Credited Due --- ------- ------- ---- -------- Permit Fee Total 77.45 77.45 .00 .00 Plan Check Total 50.34 50.34 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 132.29 132.29 .00 .00 Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Sternwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs [Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA. Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 L Building 417-4815 T:Forms/Building Division/Building Permit THE For City Use CITY OF111-j."UR GELES. TAIN Permit# /3 — 0110 W A S H I N G T 0 N , U . S . Date Received: 321 E 5th Street Date Approved QJ!Z] JzS Port Angeles,WA 9836 P: 360-417-4817 F: 360-417-4711 Email: VermitsPcitvofpa.us BUILDING PERMIT APPLICATION ProjectAddress: Phone: ?09- 209 -3?�Sq Primary Contact: Email: &,n- !,I @ Stage-�n�.ne� Name Phone Property Mailim,Address Email 0 '0 Owner 3 w�- (!�"q 4"v-Is V/FZ-) Lmt�' 9f,41?e 9(-4 Sqpe -A*,�I- WL City State zip ?R�3r"? Name Phone �-n Address Email Contractor Information city State Fcontractors License# Exp.Date: Legal Description: Zoning: Tax Parc I # Project Value: (materials and labor) Pal" $ IV-r I Residential IN Commercial 11 Industrial 11 Public El Permit Demolition 11 Fire El Repair El Reroof(tear off/lay over) El Classification For the following, fill out both pages of permit application: (check New Construction 11 Exterior Remodel El Addition 0 Tenant Improvement appropriate) Mechanical El Plumbing El Other El Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms Yes 0 No 11 � Yes 13 No 0 Project Description -PT) S--fFp-s -r-0 Is project in a Flood Zone: Yes El NoEl Flood Zone Typ e: If in a Flood Zone, what is the value of the structure before proposed improvement? $ 1 have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within 18o days of submittal, the application will be considered abandoned and the fees will be forfeited. X, S�ygr3- �t 3 X�-)7�� Date Print Name Signature Residential Structures For Office Use Area Description (SQ FT) Existing Proposed $$value Basement First Floor Second Floor Covered Deck/Porch/Entry Deck(over 30"or 2' floor) Garage Carport Other(describe) Area Totals Commercial Structures Proposed For Office Use Area Descriptions (SQ FT) Existing Proposed ss Value Existing Structure (s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage (Total lot coverage lot size) Site Coverage (Sq Ft of all impervious) %of Site Coverage (total site coverage�lot size) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Pipino, Outlets: Appliance Exhaust Fan # Heater(Suspended,Floor, Recessed wall) # Boiler/Co mpresso r Size: # Heating/Cooling appliance # I repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wo od-b urning/Gas # portable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # F Forced Air Unit # Ventilation System # urnace/Heat Pump Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Fuel gas piping #of Outlets: Water Heater # Medical gas piping #of Outlets: Water Line # Plumbing Vent piping # Industrial waste pretreatment Sewer Line Other(describe): T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx 316 'Illy --4 Aw 10 3105 I wrlw 3 3109 109 16 31611 sting Deck (16" x 10') 2x12 2x6 f At >L4 Jq P 14- 3) 61Y 2x6 k2 4-, a4l� 15�0 21 44 PA-15<� FILL T" CITY OF PORT ANGELES—11tion PIP not The issuance of this Dermn to."d vW these p!ans,s-c cations and other dab shol;not preyed be building ok, All pressure treated lumber from thereafter the correr!*q of errors in said plans, specificatlim and other data, w fron, preventing Match existing deck handrails and balusters building operation be;ng carried on tbmnder when in violation of all codes 3nd orlm;;rices of this jurisdiction. 3105 Grants View Lane, Port Angeles Approval Date k� 8Y 7Y - 71RA P- ove'-OwdA Plan View; 3105 Grants View Lane, Port Angeles House Wall 101, Existing Deck 161 3161r VU El� City of Port Angeles 3105 Grants View Lane Dept. of Community and Economic Development Port Angeles Building Division WA 98362 321 East 5th Street Port Angeles, WA 98362 29 January 2014 Re: Application No. 13-890 Dear Sir/Madam, This is to request an extension on the above referenced building permit to install steps on my existing second story deck. The permit was issued on August 21, 2013 but I have been unable to start work due to travelling back to the East Coast several times and to Denver. I am travelling again next week, but I fully intend to get started on the project after I return on February 12. We plan to get the concrete footings in during the week after I return, weather permitting, and expect to complete the project by the end of March. Sincerely Ian Sykes