Loading...
HomeMy WebLinkAbout311 W 10th Street PREPARED 1/06/17, 11:20:53 INSPECTION TICKET PAGE' — 11 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 1/06/17 ------------------------------------------------------------------------------------------------ ADDRESS . : 311 W IOTH ST SUBDIV: CONTRACTOR PAUL E PETERSON PHONE (360) 670-2320 OWNER CHURCH, CHARLES E PHONE PARCEL 06-30-00-0-2-9485-0000- APPL NUMBER: 17-00000020 RESIDENTIAL RE-ROOF ------------------------------------------------------------------------------------------------ PERMIT: BNOP 00 BUILDING PERMIT - NO PR FEE REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------ -- -- ---------------------------------------------------------------- BL99 01 1/06/17 L BLDG FINAL January 6, 2017 11:06:20 AM jlierly. Debbie 461-6392 -------------------------- ------ COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY a ECONOMIC DEVELOPMENT- BUILDING DIVISION C19F 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 17-00000020 Date 1/05/17 Application pin number . . . 624200 Property Address . . . . . . 311 W 10TH ST ASSESSOR PARCEL NUMBER: 06-30-00-0-2-9485-0000- REPORT SALES TAX Application type description RESIDENTIAL RE-ROOF on your state excise tax form Subdivision Name . . . . . . Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation . . . . 7859 ---------------------------------------------------------------------------- Application desc roof over comp ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ CHURCH, CHARLES E PAUL E PETERSON 311 W 10TH ST PO BOX 761 PORT ANGELES WA 983627604 NEAH BAY WA 98357 (360) 670-2320 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT NO PR FEE Additional desc . . ROOF OVER COMP Permit Fee . . . . 179.75 Plan Check Fee .00 Issue Date . . . . 1/05/17 Valuation . . . . 7859 Expiration Date 7/04/17 Qty Unit Charge Per Extension BASE FEE 95.75 6.00 14.0000 THOU BL-2001-25K (14 PER K) 84.00 - ---------------------------------7------------------------------------------ Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 179.75 179.75 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 184.25 184.25 .00 00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the ro isions of any state or local law regulating construction or the performance of cons ru ion. a I �A Z�'�� �9 I Vt/ Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:FormstBuilding Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS– Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspecti on Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) FLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Tooting/Slab Blocking&Hold Downs ,Skirting PLANNING DEPT. Separate Permit#s ISEPA: Parking/Lighting IESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction - R.W. PW I Engineering 417-4831 —Fire 417-4653 Planning 417-4750 —Building 417-4815 T H For City Use CITY OP NG LIES P-A- Permit# '00 1W A S H I N G T 0 N , U. S. Date Received: 321 E Slh Street Date Approved Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permits(&ciWofVa.us BUILDING PERAHT APPLICATION ProjectAddress: �A)- ;D.�94 /q/71LZ*a- ZAA 1?SZb C-;,- Phone: Primary Contact: Email: Name Phone Property Mailing Address Email Owner Cit Z/I State �p zt/� Name Phone 44 Contractor Address Email Information city State Zip Contractor License# Exp.Date: Legal Description: Zoning: Tax Parcel# ProjectValue- ate ials and labor) $ ���q Residential Commercial Industrial El Public D Permit Demolition Fire 11 Repair Reroof(tear off/lay over)CC3,-. Classification For the following,fill out both pages of permit application: 4' (check New Construction 11 Exterior Remodel 11 Addition 11 Tenant Improvement 0 appropriate) Mechanical El Plumbing El Other El or Existing? Yes 13 No--Z34Existing? Yes 0 Nd:!I� 7�posed Bathrooms I Proposed Bedrooms Fire Sprinkler System Proposed I Irrigation System Proposed or In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater0cWy-0-fPa.us Project Description 12 Is project ina Flood Zone: Yes E3 No4"lood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ 1 have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within t8o days of submittal,the application will be considered abandoned and the fees will be forfeited. Si DatZ Print Name