Loading...
HomeMy WebLinkAbout3803 McGill Avenue Address: 3803 McGillAvenue PREPARED 10/21/13, 10:48:40 INSPECTION TICKET PAGE 1 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/21/13 ------------------------------------------------------------------------------------------------ ADDRESS 3803 MCGILL AVE SUBDIV: CONTRACTOR RANDY HOCH CONSTRUCTION PHONE (360) 452-6901 OWNER SANDERS CHARLES/CAROL D PHONE PARCEL 06-30-15-5-9-0150-0000- APPI, NUMBER: 13-00000431 RES ADDITION ------------------------------------------------------------------------------------------------ PERMIT: BPR 00 BUILDING PEIZMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BL1 01 6/07/13 JLL BLDG FOUNDATION FOOTING 6/07/13 AP June 7, 2013 8:26:37 AM pbarthol. Jason 460-2673 AM June 7, 2013 4:21:55 PM jlierly. BL2 01 6/11/13 JLL BLDG FOUNDATION STEM WALL 6/11/13 AP June 11, 2013 8:34:33 AM pbarthol. Jason 460-2673 June 11, 2013 4:01:45 PM jlierly. BAIR 01 7/24/13 JLL BLDG AIR SEAL 7/25/13 AP July 23, 2013 4:46:09 PM pbarthol. Sanders 452-9436 July 25, 2013 8:03:06 AM jlierly. BL3 01 7/24/13 JLL BLDG FRAMING 7/25/13 AP July 23, 2013 4:45:35 PM pbarthol. Sanders 452-9436 July 25, 2013 B:03:06 AM jlierly. BLI 01 7/31/13 JLL BLDG INSULATION 7/31/13 AP July 31, 2013 9:05:17 AM pbarthol. Chuck 452-9436 July 31, 2013 3:43:OS PM jlierly. BL99 01 10/21/13 BLDG FINAL October 21, 2013 10:13:43 AM pbarthol. Chuck 452-9436 --------------------- ------------------------------------------------------------------- PEIZMIT: ME 00 MECHANICAL PEIZMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RE T RESULTS/COMMENTS ------ --------- - - ---------------------------------------------------------------------- L ME99 01 10/21/13 J L MECHANICAL FINAL October 21, 2013 10:14:09 AM pbarthol. Chuck 452-9436 ------------------------ ---------------------------------------------------------------------- PEIZMIT: PL 00 PLUMBING IT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ PL2 01 7/19/13 JLL PLUMBING ROUGH-IN 7/19/13 AP July 19, 2013 8:48:17 AM pbarthol. Mark 452-8525 July 19, 2013 4:13:12 PM jlierly. PL99 01 10/21/13 PLUMBING FINAL October 21, 2013 10:14:20 AM pbarthol. Chuck 452-9436 -------------------------------------- COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES .Cf,%­M, DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 75 IM,I 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 13-00000431 Date 5/06/13 Application pin number . . . 611912 Property Address . . . . . . 3803 MCGILL AVE ASSESSOR PARCEL NUMBER: 06-30-15-5-9-0150-0000- Application type description RES ADDITION REPORT SALES TAX Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY to the City of Port Angeles -----Application-valuation 29160 (Location Code 0502) ----------- ---- Application desc 324 SQFT BEDROOM SUITE ADDITION ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ SANDERS CHARLES/CAROL D RANDY HOCH CONSTRUCTION 3803 MCGILL AVE 379 BENSON RD PORT ANGELES WA 983626751 PORT ANGELES,WA PORT ANGELES WA 98363 (360) 452-6901 Other struct info . . . . . . HARD SURFACE AREA ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Additional desc . . BEDROOM SUITE ADDITION Permit Fee . . . . 468.25 Plan Check Fee 304.36 Issue Date . . . . 5/06/13 Valuation . . . . 29160 Expiration Date . . 11/02/13 Qty Unit Charge Per Extension BASE FEE 417.75 5.00 10.1000 THOU BL-25,001-50K (10.10 PER K) 50.50 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL PERMIT Additional desc . . BATHROOM FAN/EXHAUST HOOD FAN Permit Fee . . . . 67.90 Plan Check Fee .00 Issue Date . . . . 5/06/13 Valuation . . . . 0 Expiration Date 11/02/13 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 7.25 1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . . BATHROOM / SINK Permit Fee . . . . 121.00 Plan Check Fee .00 Issue Date . . . . 5/06/13 Valuation . . . . 0 Expiration Date . . 11/02/13 Qty Unit Charge Per Extension BASE FEE 50.00 4.00 7.0000 EA PL-PLUMBING TRAP 28.00 1.00 7.0000 EA PL-WATER LINE 7.00 3.00 7.0000 EA PL-DRAIN VENT PIPING 21.00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. rDate Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections. 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Sternwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet I Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Pkirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction-R.W. PW Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number . . . . . 13-00000431 Date 5/06/13 Application pin number . . . 611912 Qty unit c�arge Per Extension REPORT SALES TAX 1.00 15.0000 EA PL-SEWER LINE 15.00 on your state excise tax form ---------------------------------------------------------------------------- Special Notes and Comments to the City of Port Angeles April 29, 2013 4:32:59 PM tamiot. (Location Code 0502) Electrical permit required for all electrical work. The Fire Department has reviewed the project application and has no comments ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 657.15 657.15 .00 .00 Plan Check Total 304.36 304.36 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 966.61 966.01 .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections. 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet I Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lightin ESA. Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction-R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit BUILDING/PLUMBING IMECHANICAL PERMIT APPLICATION- LONG FORM (To be used for projects that require plan review.) Date Received 4,Z,4-1 3 Permit# 151-431 City of Port Angeles Please print in ink. Date ApprovP4 ,:;;711.1 Attn: Building Permit Technician Approved bq-.IL. 321 E. 5" St., Port Angeles,WA 98362 VAI 360-417-4815 fax: 360-417-4711 Credit card payments are accepted Mon-Fri 8-5 prn(no Wreri-can Express) Hours: Mon through Fri 8—5 pm Cash & checks are accepted Mon-Thurs 8:30-4 prn & Fri 8:30-12:30 prn -e 13 A,,/ I.X Contact person: Q_�Nock Property owner, L)CI (-e) Phone: Property owneris mailing i3ddress: kN \C_('_'i It i tie, VC)4 cm K Ck OOA CO 1) Pbone: Contractor's busin6ss name. long/overseein.g the work) (or property owners name if he/she is d 3�a 0 4��_ tog-0 I Contractors mailing address: 2) Contractor's L&I license number: Expiration date: Project Address: 3?0�) mc_6�% O Sul-_ -PO�4 Project Type: Wesidential Li Commercial E316dustrial' Li Multi-family Project Business Name: Zoning: (for commercial, industrial, or multkfamily projects) Parcel Lot# Complete.only the portions of this permit that are relevant to your project, Pay the plan check fee(based on the valuation of the project) at the time of submittal Residentlial Projects submit: rts, etc. if applicable) Two sets of plans*(including engineering calcs, geotech repo Prescriptive Approach—Simple Form(confirming conformance to the Energy Code) Commercial Projects submit: Three sets of plans* (including engineering calcs, geotech reports, etc. if applicable) Paperwork confirming conformance.to the Energy Code For large projects, a pre-construction meeting with various City department personnel is highly recommended.To schedule a pre-construction meeting,contact the Planning Manager at(360)417-4750. (vl) Additional information may need to be submitted including: landscape plan, parking plan (including ADA spaces, ramps, etc.), utilities (existing&proposed), curbs, sidewalks, storm water.plan, etc. For Additions&New Structures also submit; Site plan(8 1/211 x 11")showing all structures(existing& proposed),setbacks,& 'new driveways *.If an architect or engineer drew the plans or calculations, include at least one"wet-stamped"set of-plans and/or calculations. T:Forms/13u!lding Division/Building/Plumbing/MechanicaI Permit Application—Long Form(Revised 2011) Page 1 of 4 FloorAreas Existina squa New sq Price per ne footag foota-cle square too Basement X $ 1't Floor 2 nd Floor 3rdFloor Garage Carport Covered Porch Deck (> 30" high)* Deck (5 30" hig�)" Shed Other Other Remodel project valuation ;2 9 op TOTAL VALUATION $ Walking surface of the deck above ground For residential building projects the minimum square foot valuation we accept is: Dwelling $85.00 per sq. ft. garagelutility/misc.structure$30.00 per sq. ft. porch/deck/carport$12.00 per sq. ft. LOT COVERAGE & SITE COVERAGE Lotcove is the amount or percent of ground area on which buildings are located. It includes: houses, garages, carports, covered patios, cantilevered portions of buildings, roof overhangs that are longer than.30-inches, uncovered docks or porches having walking surfaces higher than 30-Inches off the ground, etc. Total footprint of structures L�L4 sq. ft. + lot size 3 A,/)0o sq.ft. = Lot coverage ),, L)_�) % L Site Covera is the amount of impervious surface on a parcel, including structures, paved driveways, sidewalks, patios, and other impervious surfaces, (see Port Angeles Municipal Code 17,94.135 for exemptions) Does the project include a new driveway? o Yes V/no If yes, what will the driveway be made of? o cement a asphalt u gravel ci other (NOTE., 18 feet is the recommended minimum driveway length for residential projects) Does this project include a new parking pad? o yes W/no If yes,'what will the parking pad be made of? o cement o asphalt r3 gravel o other Total footprint of structures sq. ft. (existing& new) b). Total concrete, asphalt, &other impervious surfaces sq.ft. (existing&new) c) Add lines"a" &"b"above to get the total impervious sq.ft, (existing& new) Total impervious______..:sq.fL Jot-size sq.ft Site coverage % Page 3 of 4 PL UMBING CHA IVqES Check"No"or"Yes" (and enter quantities)for each line Item. hme- Plumbing Chan (Moved,Added, ffeelaced, orAltered) Sink (hand, mop,floor etc.) No 4yes ..-....Quantity Toilet �q o V Yes Quantity Bathtub V No Yes Quantity Shower No ;,�Yes __�_Quanbty Washing Machine V-No Yes Quantity Hot Water Heater L/-No Yes Quantity Water Line (meter to structure) V o Yes Quantity Re-plumb the structure ---VNo Yes Quantity Sewer Line 71slo Yes Quantity BacktIow Prevention Device Types: Beverage Machine �,,/N o Yes _____Quantity Landscape Watering System 0 Yes Quantity Fire Sprinkler System:5 2 inch line 0 Yes Fire Sprinkler System> 2 inch line No Yes Quantity Please list all other planned plumbing changes or additions that aren't listed above. MECHANICAL CHANGES Check"No"or"Yes" (and enter quantities)for each line item. Tvve Mechanical Chan (Moved,Added� RePI_ac­e--d, Furnace, heat pump, or or Altered) forced air unit:5 5 tons V/No —Yes Quantity Furnace, heat pump, or VNO Yes Quantity forced air unit>5 tons Ductless heat pump L,- .No Yes Quantity Wall(recessed) heater No L7Yes —Quantity Baseboard heater 0 Yes Quantity Steffes room heater 40 Yes Quantity Wood-burning stove No Yes Quantity Pellet stove 0 Yes Quantity Radiant floor heat :�FNO Yes Quantity Gas fireplace or freestanding stove ,-' No Yes Quantity Gas cooking stove -7-No Yes _____Quan.tty Propane tank set --;7--No Yes _____Quanbty Gas line Yes Quantity Boiler -3�,No Yes —Quantity Clothes Dryer — 0 Yes Quantity Ventilation fan(single duct) L.�N o Ye� Quantity Hood &duct mechanical exhaust No =Yes =Quantity Ventilation system (not part of a heating or a' conditioning system) ��VNO Yes �Quantfty Air handier Yes Quantity Evaporative cooler(non-portable) *No -Yes Quantity Please list all other planned mechanical changes or additions that ar6n T listed above. Page 4 of 4. Repair I Solar Panels I Miscellaneous: (explain the project) Project Valuation $ Remodel: (explain the project, including how the building space is currently being used and what the new, remodeled use will be) Project Valuation $ If the space will change from commercial to residential, submit: "Checklist-Converting Commercial Space into Residential Spacen Addition: (expkfinlhe proiect and complete&submit page 3) _C�+\) 4n so c(.= Maximum height of the new addition ,I Lk- feet Project Valuation $ New Structure:.(exolaln the proiect and complete&submit page 3) Maximum height of the new structure feet Project Valuation $ PL UMBING PERMIT. Will there be ANY plumbing changes(items moved, added, replaced, or altered) Check one: No_ ' Yes-Z If yes, complete&submit page 4 uPlumbing;Changes" MECHANfCAL Will there be ANY mechanical changes(items moved, added, replaced, or altered) Chn k O=e: N yek— -if yes,complete&submit page 4-"Mechanical Changes' Occupancy group #of bedrooms it Will a lawn sprinkler system be installed? Occupant load I #of full baths Will a fire sprinkler system be instailed?_ _nD — #of half baths _y�io Construction type *Homeowner: if you will be doing I overseeing the work, then the project valuation All.be determined by doubling the cost of materials, to reflect the value the repair adds to your property. Cost of materials x 2 Project Valuation$ have read and completed this application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility,todetermine what permits are required, and to obtain permits prior to working on projects. Date V­J q.- Signature K?A111-cie 0-y-_44 Print Name a_�c i,,� Pa e 2 of 4 cma in x Ln r�i N to Go in 0 Lij z LLJ 41; *3AV ;q ca Fn If > iy- to 0 to "r FIGURE I +-North 111 10' TOPOGRAPHIC/SITE MAP .......... -lk Akw 916 919 915 Kt ZIP", Btir&h Ave' 820 ........... 3802 932 B 3811 Ftl 835 805 913 815 3817 921 k* 929 AL r ko, LL Z- IDL 6(10 2 19 LA 10 Ole r—E7 3:L I t4 C.. Ph f0i �W L L r.t4-I- ni 7:2r_- L T CITY OF PORT ANGELES—Construction Plans 0 The Issuance of this perndt*, .A upon these plans,specifi- cations and other data shall not prevent the building official, from thereafter requiring the carrect!�an of errors in said plans, specifications and other data, or from preventing building operations being carried on thereunder when in Vi013tion of all codes and ordinances of�h� jurisdiction. Approval Date L__4-�By A,e 4S OIL --tp-0e - - - - - - - - - --- - - - - --- - - - - - - - - - L .�LTlCtl VENT (TYPICAL) _4 �)F 12 4AO DF 12 AO DF 12 410 DF OE I —�Q 19ROVIPE KEW CRAWL A CC 4Xi2 M)�,I CM Z2'xIO X5"THICK THFJJ EXTI'G W4LL I .� CCf4C FOOTMS 4xIO DF 12 F, 4xIO—rf 12 T- 4,do DF 2x6 D�#2 JOI--T 16 "O/C 10 -J -4 ID -4- -4-!]-4- e- +b .0 bi t lu Mr o,ra ad 7 3j, -4r. 00 .......... OL cr 7-0 ,wj 11 1 CD )LA Zwo i