Loading...
HomeMy WebLinkAbout519 S. Peabody Street Address: Peabody Street PREPARED 8/09/13, 10:14:20 INSPECTION TICKET PAGE 6 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/09/13 ------------------------------------------------------------------------------------------------ ADDRESS . : 519 S PEABODY ST SUBDIV; CONTRACTOR JIM'S REFRIGERATION PHONE (360) 457-7563 OWNER CLALLAM CNTY PUB HOSP DIST 2 PHONE (360) 417-7170 PARCEL 06-30-00-0-1-9845-0000- APPL NUMBER: 13-00000901 COMM MECHANICAL PERMIT ------------------------------------------------------------------------------------------------ PERMIT: ME 00 MECHANICAL PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ ME99 01 8/09/13 MECHANICAL FINAL JL 4 August 9, 2013 8:26:25 AM pbarthol. At Ductless heat pump Bruce 460-6905 -------------------------------------- COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 13-00000901 Date 8/08/13 Application pin number . . . 341541 Property Address . . . . . . 519 S PEABODY ST ASSESSOR PARCEL NUMBER: 06-30-00-0-1-9845-0000- Application type description COMM MECHANICAL PERMIT REPORT SALES TAX Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . Property Zoning . . . . . . . . COMMERCIAL OFFICE to the City of Port Angeles -----Application-valuation----------------2400 (Location Code 0502) ----------- --------- - - - - ---- Application desc DUCTLESS HEAT PUMP ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ CLALLAM CNTY PUB HOSP DIST 2 JIM'S REFRIGERATION DBA OLYMPIC MEDICAL CENTER PO BOX 3130 939 CAROLINE ST PORT ANGELES WA 98362 PORT ANGELES WA 983623909 (360) 457-7563 (360) 417-7170 ---------------------------------------------------------------------------- Permit . . . . MECHANICAL PERMIT Additional desc DUCTLESS HEAT PUMP Permit Fee . . . . 64.80 Plan Check Fee .00 Issue Date 8/08/13 Valuation . . . . 0 Expiration Date 2/04/14 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 64.80 64.80 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 64.80 64.80 .00 .00 Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) TForms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall I Hold Downs Walls/Roof/Ceiling Drywall(interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts- Rough-In Gas Line Wood Stove/Pellet/Chimney .Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: jSHORELINE: Parking/Lighting ESA: Landscaping FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R,W. PW /Engineering 417-4831 Fire 417-4653 Pla nning 417-4750 L Building 417-4815 T:Forms/Building Division/Building Permit THE For City Use RT CITY OF .. ANGELES P� _ _L JL_ Permit# W A S H I N G T 0 N , U . S . Date Received: 321 E 51h Street Date Approved Port Angeles,WA 9836 P; 360-417-4817 F: 360-417-4711 Email: permits0cityofVa.us BUILDING PERMIT APPLICATION Project Address: Phone: Primary Contact: J [V-t 'Amail: Name Phone 6t-q"(,-- Property Mailing Xddress Email Owner C* State Zip Name Phone Adoress Email Contractor Information -City Pc'—IL--c State Zip Contractors License# Exp.Date: Legal Descriptibim, Zoning: Tax Parcel # Project Value: (materials and labor) $ 2�t4 60 C6�L__ � Residential El Commercial Industrial El Public Permit Demolition El Fire El Repair El Reroof(tear off/lay over) El Classification For the following, fill out both pages of permit application: (check New Construction 0 Exterior Remodel El Addition El Tenant Improvement El appropriate) Mechanical 0--Plumbing El Other El Fire Sprinkler System? Irrivation System roposed Bathrooms posed Bedrooms n Yes 13 No 0 Yes 1:1 No 0 Project Description G Is project in a Flood Zone: Yes El NoLk Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ 1 have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within 18o days of submittal, the application will be considered abandoned and the fees will be forfeited. > Date Print Name Sig ature Residential Structures Area Descripti.on(SQ FT) Existing Proposed ss value For Office Use Basement First Floor Second Floor Covered Deck/Porch/Entry Deck (over 30"or 2'd--door) Garage Carport Other(describe) Area Totals Commercial Structures Proposed For Office Use Area Descriptions (SQ FT) Existing Proposed ss Value Existing Structure (s) Proposed Addition Tenant Improvement? Otlier work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage (Total lot coverage+lot size) Site Coverage (Sq Ft of all impervious) %of Site Coverage (total site coverage-- lot size) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # Heater(Suspended, Floor, Recessed wall) # # Heating/Cooling appliance # Boiler/Compressor repair/alteration Evaporative Cooler(attached, not # Pellet Stove/Wood-burnina/Gas # portable) Fireplace/Gas Stove/Gas Cocok Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # Furnace�/H�eat Pump/ # Ventilation System # Forced Air Unit Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Fuel gas piping #of Outlets: Water Heater # Medical gas piping #of Outlets: Water Line # Plumbing Vent piping # Sewer Line # Industrial waste pretreatment interceptor(Grease Trap) Size Other(describe): T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx