Loading...
HomeMy WebLinkAbout538 W. 4th Street Address: 538W4 Ih Street 3 PREPARED 10/24/13, 9:16:35 INSPECTION TICKET PAGE CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/24/13 ---------------------------------------------------------------------------------------------------- ADDRESS . : 538 W 4TH ST SUBDIV: CONTRACTOR : PHONE OWNER BAKER, DEBORAH ANN PHONE PARCEL 06-30-00-0-0-8440-0000- APPL NUMBER: 12-00001152 RES REPAIR ------------------------------------------------------------------L------------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BL99 01 10/24/13 JLL BLDG FINAL Ort.b.� 24, 2013 8:49:07 AM pbarthol. Roo Final Jasofn 457-8147 -------------------- --------- COMMENTS AND NOTES -------------------------------------- BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS– Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings z- Sternwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold D wns Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 ID—if CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 12-00001152 Date 9/12/12 Application pin number . . . 856000 Property Address . . . . . . 538 W 4TH ST ASSESSOR PARCEL NUMBER: 06-30-00-0-0-8440-0000- REPORT SALES TAX Application type description RES REPAIR on your state excise tax form Subdivision Name . . . . . . . Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY Application valuation . . . . 14484 (Location Code 0502) ---------------------------------------------------------------------------- Application desc EXTEND ROOF OVER 2ND STORY DECK & REROOF ----------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ BAKER, DEBORAH ANN OWNER 538 W 4TH ST PORT ANGELES WA 98362 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT -RESIDENTIAL Additional desc . . EXTEND ROOFOVER DECK/REROOF Permit Fee , . . . 277.75 Plan Check Fee 180.54 Issue Date . . . . 9/12/12 Valuation . . . . 14484 Expiration Date 3/11/13 Qty Unit Charge Per Extension BASE FEE 95.75 13.00 14.0000 THOU BL-2001-25K (14 PER K) 182.00 ---------------------------------------------------------------------------- Special Notes and Comments The Fire Department has reviewed the project application and has no comments September 6, 2012 10:55:00 AM sroberds. The proposal will result.in a re roof that will include a new roof over a 2nd floor deck. No additional lot coverage. September 6, 2012 10:20:05 AM banders. Electrical service mast must be extended prior to roof addition being built. Contact Trent (417-4735) or Brian (417-4708) for more details. Electrical load calculations and electrical permits are required. Public Works Utility Engineering has no requirements for this plan review. I------------------------------------------------------------------- Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 277.75 277.75 .00 .00 Plan Check Total 180.54 180.54 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 462.79 462.79 .00 .00 Separate Permits are required for electrical work,S EPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Oate Print Name Sig�are of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit THE CITY OF RT NGELES For City Use 0 M C., M P A '�"' So Permit # M 0 W A S H I N G T 0 N , U . S . -a - Z 0 1 Date Received: M 321 East 511 Street Z� rc�� Port Angeles, WA 98362 DateApproved:9 1) �2 C' — �Z r- M 0 M I/ m P: 360-417-4817 F: 360-417-4711 hcatuzo@cityofpa.us Building Permit Application Project Address: 4i,\ 32 H 7 Main Contact: Phone # Lk Property Name Phone 3�oD- -7- Owner MailingAddress Email �5 3 9 W, city State Zip '-F�,V J4 \1J Contractor Name Phone Mailing Address Email City state Zip Contractor License # Expiration: Project Value: Zoning: ax Parcel # ot# $ 44,0��� "'T U60 00 W8440 Type of Residential)o commercial . industrial 1:1 Public 0 Permit Demolition 0 Fire 1:1 Repair A Reroof(tear off/lay over) For the following,fill out both pages of permit application: New Construction 11 Remodel 11 Addition 13 Tenant Improvement El L Mechanical 0 Plumbing 0 Other A Existing Fire Sprinkler System? Maximum height of structure Proposed Bedrooms Proposed Bathrooms Yes 11 No A14 AIA Project Description (7 S26^4j icaak. & OP 5:�-00'45 ep4q-o A I have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required,and to obtain permits prior to working on projects.I understand the plan review fee is not refundable after review has occurred.I understand that I will forfeit 20%of the review fee if I cancel or withdraw the application before plan review has occurred.I understand that if the permit is not issued within 180 days of receipt,the application will be considered abandoned,and the fees forfeit. Date rint Name S" tu il r Residential Structures .Area Description(SQ FT) Existing Proposed Minimum$ For Office Use value Basement First Floor Second Floor Covered Deck/Porch/Entry Deck Garage Carport Other(describe) Area Totals Commercial Structures Area Description(SQ FT) Existing Proposed Minimum$ For Office Use value Structure(s) Addition Tenant Improvement Other(describe) Area Totals Lot/Site Coverage Calculations Footprint(SQ FT) of all Structures: Lot Size: %Lot Coverage "a nem e-o\L SQ FT Site coverage (all impervious+ (-j %Site Coverage structures) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping #of Outlets: Appliance Vent # Heater(Suspended,Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # portable) Firqplace/Gas Stove/Gas Cook Stove/Misc. Fuel.G!a�s'Riplfig '9,-crf Outlets',," # Furnac67-Heat,PunI07, S fte #-'!z j VeIitil;itibn�S In # Forced Air Unit Plumbing Fiitures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Fuel gas piping #of Outlets: Water Heater # Medical gas piping #of Outlets: Water Line # Vent piping # Sewer Line # Industrial waste pretreatment # Other(describe): interceptor I O'� 537 it i 4 5 531 31 538 36 538 532 61 421 423 423 421 531 524 Clallarn County Assessor& Treasurer - Property Details - 56238 DEBORAH ANN BAK... Page I of I Clallarn County Assessor & Treasurer Property Search Results > 56238 DEBORAH ANN BAKER for Year 2011 -2012 Account Property ID: 56238 Legal Description: LT 10 EXC S 50'BL 84 Geographic ID: 0630000084400000 Agent Code: Type: Real Tax Area: 0010-PA 121 PORT ST CNTY H2 L WMP Land Use Code 11 Open Space: N DFL N Historic Property: N Remodel Property: N Multi-Family Redevelopment: N Township: Section: Range: Location Address: 538 W FOURTH ST Mapsco: PORT ANGELES,WA 98362 Neighborhood: PA West Res MapID: 2 Neighborhood CD: 5151000 Owner Name: DEBORAH ANN BAKER Owner ID: 211528 Mailing Address: 538 W FOURTH ST %Ownership: 100.0000000000% PORT ANGELES,WA Exemptions: Taxes and Assessment Details Values Taxing Jurisdiction nt/Building Sketch Property image Land oil Value History Deed and Sales History Payout Agreement Website version:9.0.32.2200 Database last updated on:9/4/2012 3:50 2012 True Automation, Inc.All Rights AM Reserved. Privacy Notice http://websrv8.clallam.net/propertyaccess/Property.aspx?cid=O&year--201 I&prop—id=56238 9/4/2012 HARTNAGEL BUILDING SUPPLY INC. PAGE NO 1 3111 HIGHWAY 101 EAST PORT ANGELES, WA 98362 TOLL FREE 1-888-452-6252 PHONE: (360) 452-8933 AN EMPLOYEE OWNED AND OPERATED LUMBERTRADERSSTORE CE 'ObRcHA�E OR 6ikii� REP' REM �CUST�Np; ...... cl� ASHI.cHEC 'Z 203'8 TERMINAL:559 EXP.DATE:9/7/12 PA AS y SALESPERSON: 81 KEVIN WIEGEL WA `918.548�:�.,'. :_ -CASH RETAI TAX:H4 HARTNAGELS ES TIMA TE: 532300 �'�s 0 P, 4', C T UQG QERE OR QE/. RFR EXT H I PP;�:E-D`,��' 08122/12 2 10 RL FELT30 2 SQ 30#FELT (29) 10 23.27 /RL 232.70 3 19.25 EA S0412 26 SKYLINE, 16"CANYON RED 19.25 138.99 /EA 2,675.56 4 8/19'-0" 27/2'-4" 13/4'-10" 5 28/14'-0" 31/24'-0" 6 4 EA S0412 R1 6 SL VENTED RIDGE. 4 16.45 /EA 65.80 7 8 EA S0412 SW16 SL SIDEWALL. 8 13.56 /EA 108.48 8 18 EA S0412 G17 SL GABLE. 18 15.64 /EA 281.52 9 10 EA S0412 E17 EAVE TRIM. 10 12.59 /EA 125.90 10 3 EA S0412 EW16 ENDWALL. 3 14.21 /EA 42.63 11 3 EA S0412 Z17 SOLID ZEE CLOSURE. 3 5.91 /EA 17.73 12 8 EA S0412 CUSTOM L: V'0"no hem. 8 9.94 /EA 79.52 13 7 EA S0412 32"top closure for 16"panels, 7 5.94 /EA 41.58 14 PACKAGEA 19 0.75 EA S0412 1"PAINTED TRIM SCREWS. .75 52.50 /EA 39.38 20 2 EA S0412 1"FIELD SCREWS. 2 28.13 /EA 56.26 21 1 EA BOOM BOOM TRUCK DELIVERY CHARGE 1 50.00 /EA 50.00 22 BOOM TRUCK CHARGE$50.00 MINIMUM 23 AND$85.00 PER HOUR AFTER 30 MIN 24 SPECIAL JOBS AND CONDITIONS WILL 25 BE QUOTED ON AN INDIVIDUAL BASIS 26 27 8 PC PT468 4 X 6 PRIES TREATED 8' 8 15.121 /PC 120.97 28 2 EA TIM41012 4 X 10 FIR TIMBERS 12' 2 29.082 /EA 58.16 - 29 2 EA TIM41020 4 X 10 FIR TIMBERS 20' 2 48.47 /EA 96.94 30 8 EA ABU46Z ZMAX-ABU46 4x6 ADJ. POST BASE 8 28.97 /EA 231.76 31 16 EA LCE4Z ZMAX-LCE4Z LIGHT POST CAP 16 5.69 /EA 91.04 32 15 EA DF2412 2 X 4 DOUGLAS FIR 12' 15 4.401 /EA 66.02 33 42 EA DF21012 2 X 10 DOUGLAS FIR 12' 42 11.135 /EA 467.67 34 21 EA DF21014 2 X 10 DOUGLAS FIR 14' 21 12.99 /EA 272.81 35 6 EA DF21020 2 X 10 DOUGLAS FIR 20' 6 18.558 /EA 111.35 36 5 PC CDX34 3/4"-4 X 8 CDX PLY 5 31.439 /PC 157.20 37 78 PC OSB716 7/16"4 X 8 OSB 78 13.60 /PC 1,060.80 Continued... HARTNAGEL BUILDING SUPPLY INC. PAGE NO 2 3111 HIGHWAY 101 EAST PORT ANGELES, WA 98362 TOLL FREE 1-888-452-6252 PHONE: (360) 452-8933 AN EMPLOYEE OWNED AND OPERATED LUMBER TRADERS STORE ....... ...... DATE,rTImt; JOB�NO-' U 9HtcHEGKjB .2.�! .3;2::li,;'­ TERMINAL:559 ,�'SOLD� O-�" EXP.DATE:9/7/12 -s- HAN D Y M A N�','RE-P Ad R "CLYD.E--'P`7A' y KEVIN WIEGEL ...... SALESPERSON: 81 PbR TAX:H4 HARTNAGELS-CASH RETAI ESTIMA TE: 532300 HiPP fQ ',;8,K, DE'S'C "T �8UGG UNIT' S ' PRICE/ PERTXTE_NS`fON L­-"�" 'RIP _RQE� "ION. 0.10 /EA 20.00 318 200 EA 716PSCL SIMPSON 7/16PLYWOOD SHEATHNG CLP 200 3, 5/4x6 16'SPF KD PRIME FACIA 100 1704.29 /MF 170.43 39 10 PC PF540616 r4O 1 EA 999 MISC ALLOWANCE. 1 500.00 /EA 500.00 TAXABLE (7124;2.Zo> .0 NON-TAXABLE 0-00 SUBTOTAL 7242.21 TAX AMOUNT 608.35 TOTAL 7850.56, TOT WT: 8791.50 x Received By 44140 sr S 3 13 0. J-/;tl., Oo-oe,- Dc�b; &ke-- P,o Av� e-I e- --4 Z;ras Pv e?A,"b/v C/ 'y At TJO X IS aid Al Dae-X Ile Si4e OaLIK Ceder Ar x H-2-St-5+. : RECEIVED! Up SEP — 4 2012 Les E—ARME BUILDING DMSION PM PC r-l� L;)ae -2q P4 4::� ?6.peety I.;"e- F CITY OF PORT All.GELES—Construction Mans The Issuance of this permit besed upon these plans,spe.ifl- cations and other data shall not prevent the building official from thereafter requiring the correction of errors in said plans, specifications and other data, or froin preventing I k ag carried on thereunder when in building operations bei, violation of all codes and orcorances of this jurisdiction. N&I Approval Date -J I __J /stlit ): Side, W&IK El -13 — A j -�A exia" i0o, elbo. AX)o4 j- NyVo- I Axy pe-a 9 qx1, P 7 OPc.-j )07- A x Pr Axil Pr ge ------i jig L Jx GT) 37 be