Loading...
HomeMy WebLinkAbout635 Whidby Avenue Address: 635 Whidby Avenue PREPARED 2/09/16, 10:55:37 INSPECTION TICKET PAGE 4 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 2/09/16 ADDRESS 635 WHIDBY AVE SUBDIV: CONTRACTOR ANGELES HEATING INC. PHONE (360) 457-0111 OWNER JAQUINS EDWIN L PHONE PARCEL 06-30-10-5-2-1700-0000- APPL NUMBER: 16-00000184 RES MECHANICAL PERMIT --------------------------------------------------—----------------------------------------- PERMIT: ME 00 MECHANICAL PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS -----------------------------— --- ME99 01 2/09/16 J MECHANICAL FINAL February 9, 2016 10:59:17 AM jlierly. Bob price 460-2314 -------------------------------------- COMMENTS AND NOTES -------------------------------------- ��► CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 16-00000184 Date 2/08/16 Application pin number . . . 295920 Property Address . . . . . . 635 WHIDBY AVE ASSESSOR PARCEL NUMBER: 06-30-10-5-2-1700-0000- REPORT SALES TAX Application type description RES MECHANICAL PERMIT on your state excise tax form Subdivision Name . . . . . . Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY (LOC81fIvn Code 0502) Application valuation . . . . 3500 Application desc INSTALL ELECTRIC FURNACE ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ JAQUINS EDWIN L ANGELES HEATING INC. T 635 WHIDBY ST 3322 E HWY 101 60 PORT ANGELES WA 983626771 PORT ANGELES WA 98362 (360) 457-0111 ---------------------------------------------------------------------------- I Permit . . . . . . MECHANICAL PERMIT i � Additional desc INSTALL ELECTRIC FURNACE Permit Fee . . 64.80 Plan Check Fee' . .00 .-,Issue Date . . . . 2/08/16' Valuation . . . . 0 `Expiration Date 8/06/16 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80 --------------------------------------------------------------- Special Notes and Comments Per Washington State Code 51-51-315, installation of Carbon Monoxide ` C + :• > detector(s) is required if you are installing or replacing a fuel burning appliance (wood, pellet, gas)and must be in place prior to the final inspection of this permit. They are required to be " ^� place directly outside of each sleeping - .. . - c area and at least one on each floor of - the house. —� ------------------------------------------------------------------- 3 Fee summary Charged Paid Credited Due Permit Fee Total 64.80 64.80 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 64.80 64.80_ .00 .00 M Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be-true and correct.-All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting_of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-in Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: s Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type _ Date Accepted By Electrical 417-4735 Construction -R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 THE For City Use CITY OFpi xTGELES„ Permit# ( � W A S H I N G T O N, U . S. Date Received: 6 321 E 51h Street Date Approved Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permits0ci , ofna.us BUILDING PERMIT APPLICATION Project Address: C4 OP T 9 Phone: Primary Contact: Email: 6 0 es Name Phone Property Mailing Address V Email Owner .- 0 3 C4 City t /4 Q State Zip fe Nam Phone -_ ,ham ,v 36 v 0 — Contractor Address Email //� Information y 3.3 �'Z � 'bO 6 I 1( Cit o T Ai State � Zip Contractor License# n L Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) Residential Q-- Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire 11Repair 11Reroof(tear off/lay over) 11 Classification For the following,fill out both pages of permit application: (check New Construction Exterior Remodel ❑ Addition El Tenant Improvement [Iappropriate) Mechanical LI'Plumbing ❑ Other ❑ Fire Sprinkler System Proposed Irrigation System Proposed or I Proposed Bathrooms-_ Proposed Bedrooms or Existing? Yes 0 No E3 Existing? Yes 0 No [3 In addition to standard hard copy submittals please send a PDF copy-of all Stormwater plans and Engineering to www.stormwater(@cityofVa.us Project Description 49 la L u/- u )• 1 Is project in a Flood Zone: Yes ❑ N -Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date Print Name Signature Residential Structures Existing Proposed Construction For Office Use Area Descriptions(SQ FT) Floor area Floor area $Value new area Basement First Floor Second Floor Covered Deck/Porch/Entry Deck(over 30" or 2"d floor) Garage Carport Other(describe) Area Totals Commercial Structures Area Descriptions(SQ FT) Existing . Proposed Construction For Office Use Floor area Floor area $Value new area Existing Structure(s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals j l Lot/Site Coverage Calculations Lot Size(sq ft) Lot Coverage:(sq ft)footprint of %Lot Coverage(Total lot cov_lot size) Max Bldg Height all structures sq ft Site Coverage(Sq Ft of all impervious) %of Site Coverage(total site cov_lot size) _ Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets. Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) Boiler/Compressor Size: # Heating/Cooling appliance # _ repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-bur g/Gas # portable) Fireplace/Gas.s Stoy&fGas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation ,single duct # Furnace/Heat Pump/ Size: # Ye ation System # Forced Air Unit �c9D Plumbing Fixt Indicate how many of each a of fixture to be inst or relocated Plumbing Traps # Water Heater # Plumbing Vent piping # Medical gas piping #o ets: Water Line # Fuel gas piping #of Outlets: Sewer Line # Industrial waste eatment interce to ease Trap) Size Other(describe): T:\Forms\2015 CED Form Updates\Building&Permitting\BP\Building Permit 20150415.docx