Loading...
HomeMy WebLinkAbout817 Laurel Street Address: 817 Laurel Street PREPARED 11/14/13, 13:35:10 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 11/14/13 ---------------------------------- ADDRESS 817 S LAUREL ST SUBDIV: CONTRACTOR : PHONE OWNER S GALLEGOS-OROZCO/S A WOODWARD PHONE PARCEL 06-30-00-0-2-6845-0000- APPL NUMBER: 13-00001249 RES REPAIR ----- ------ ------ PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ---- - --— ---------------------------------------------- BL3 01 11/14/13 BLDG FRAMING November 14, 2013 1:34:09 PM pbarthol. BL99 01 11/14/13 BLDG FINAL November 14, 2013 1:34:17 PM pbarthol. ----------------------- - COMMENTS AND NOTES I i CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 � w Application Number . . . . . 13-00001249 Date 11/01/13 Application pin number . . . 253419 Property Address . . . . . . 817 S LAUREL ST y, ASSESSOR PARCEL NUMBER: 06-30-00-0-2-6845-0000- REPORT SALES TAX Application type description RES REPAIR Subdivision Name . . . . . . On your state excise tax form Property Use . . . to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY Application valuation . . 600 (Location Code 0502 --------------- --------- Application desc repair water damage to wall ---------------------------------------------------------------------------- Owner Contractor ----------------=------- ------------------------ S GALLEGOS-OROZCO/S A WOODWARD OWNER 424 S EUNICE ST PORT ANGELES WA 98362 nn V' ----------------------------------`------------------------------------------ Permit . . . . BUILDING PERMIT -RESIDENTIAL Additional desc REPAIR WATER DAMAGE TO WALL Permit Fee . . . . 53.05 Plan Check Fee 34.48 Issue Date . . . . 11/01/13. valuation . . . . 600 Expiration Date 4/30/14 . Qty Unit Charge Per Extension BASE FEE 50.00 1.00 3.0500 HND BL-501-2K (3.05 PER C) 3.05 --- --- ------- Special Notes and Comments October 29, 2013 1:09:29 PM sroberds. The proposal will result in repair of water damage to existing nonconforming access structure in RS-7. No new structures or lot cov. No land use issues anticipated. -- --------- ------ Other Fees . . . . . . . STATE SURCHARGE 4.50 - --------- Fee summary Charged Paid Credited Due Permit Fee Total 53.05 53.05 .00 .00 Plan Check Total 34.48 34.48 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 92.03 92.03 .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or.not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL,TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST-PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted b MANUFACTURED HOMES: -Footing/Slab 1131ocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction-R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit THEOR� , GEL For City Use CITY OF 1� �► I U Permit# W A S H 1 N G T O N , U . S. �/ i Date Received: L � •Z- - i� 321 E 51h Street Date Approved ::*CA Port Angeles,WA 9836 P:360-417-4817 F: 360-417-4711 Email:permits@cityofpa.us BUILDING PERMIT APPLICATION Project Address: ?on -:5 Phone: Primary Contact: 4Svt7 Email: Name IPhone / Property Mailing Address 1 Email Owner �1 �- S 1 l S 1` b o o --a L. ID csL !{o Mai & City State Zip o 1n1 Nam U Phone Contractor Address Email Information City State Zip Contractor License# Exp.Date: Legal Description: Zoning: Tax Parcel # Project Value: (materials and labor) Residential ❑ Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑ Classification For the following,fill out both pages of permit application: (check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Will a fire sprinkler system be installed Irrigation System? Proposed Bathrooms Proposed Bedrooms or modified? Yes ❑ No ❑ Yes ❑ No ❑ Project Description Is project in a Flood Zone: Yes ❑ N Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within 18o days of submittal,the application will be considered abandoned and the fees will be forfeited. 5eyai'J GO,- Date Print Name Signature �-- Residential Structures For Office Use Area Description(SQ FT) Existing Proposed $$value Basement First Floor " Second Floor Covered Deck/Porch/Entry Deck(over 30"or z° floor) Garage Carport Other(describe) Area Totals Commercial Structures Proposed For Office Use Area Descriptions(SQ FT) Existing Proposed ss Value Existing Structure (s) Proposed Addition Tenant Improvement? Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage (Total lot coverage-lot size) Site Coverage (Sq Ft of all impervious) %of Site Coverage (total site coverage-lot size) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # portable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # Furnace/Heat Pump/ Size: # Ventilation System # Forced Air Unit Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Fuel gas piping #of Outlets: Water Heater # Medical gas piping #of Outlets: Water Line # Plumbing Vent piping # Sewer Line # Industrial waste pretreatment interceptor Grease Trap) Size Other(describe): T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx I'M � 41, a mow; 112 817 41, k, t, t i 4=x T _ 819 f e 111 113 O ily O FLF — cn. This eofis permit ^dt" nthe acpf!Ro r rs °''•i 6f-0 ( a, cati n an!othe date " ° �;" �t the buil i g offic al fro ter after t � corr n o err i in s.id p!as, sp cificat oras aid h r d or on preventing ( i dif erati ns L•4 }n ined cm :And when in Y v ati n all s of is j isdicti n. IL v !a C D G V r S 1 p,p roval to Y 2 Tp � QA Cot p ati L U PLO air 16 w/ - }C3x J4