Loading...
HomeMy WebLinkAbout824 E. 8th Street Address: 824 E 811 Street PREPARED- 7/27/16, 8:59:02 INSPECTION TICKET PAGE 4 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE' 7/27/16 ------—------—-------—----------——----------------------------—--------------------------- ADDRESS 824 E 8TH ST - SUBDIV: CONTRACTOR ALPHA BUILDER CORPORATION PHONE (360) 452-3154 OWNER WILLARD H HENKES RETIRE TRUST PHONE - - PARCEL 06-30-01-6-7-0000-3010- APPL NUMBER: 16-00000037 RE-ROOF --------------------- PERMIT: BNOP 00 BUILDING PERMIT .- NO PR FEE - REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BL99 01 7/27/16 BLDG FINAL July 27, 2016 9:03:11 AM jlierly. Connie 452-3154 ------------------------ ------------ COMMENTS AND NOTES -------------------------------------- %�. CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number . . . . . 16-00000037 Date 1/11/16 Application pin number . . . 445033 Property Address . . . . . . 824 E 8TH ST ASSESSOR PARCEL NUMBER: 06-30-01-6-7-0000-3010- REPORT SALES TAX Application type description RE-ROOF Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . Application valuation . . . . 15560 (Location Code 0502) Application desc ( ^�' - TEAR OFF SHAKE INSTALL SNAP LOCK METAL OM MANSARD V ). - ---------------------------------------------------------------------------- Owner Contractor 'WILLARD H HENKES RETIRE TRUST ALPHA BUILDE$ CORPORATION 824 E 8TH ST 105 1/2 E. 1ST ST. PORT ANGELES WA 983626451 PORT ANGELES WA 98362 (360) 452-3154 --------------------------------=------------------------------------------- Permit . . . . . . BUILDING PERMIT - NO PR FEE Additional desc . . REROOF W_ Permit Fee . . . 291.75 Plan Check Fee .00 Issue Date . . . 1/11/16 Valuation . . . . 15560 Expiration Date 7/09/16 �— Qty Unit Charge Per Extension _.. BASE FEE 95.75 14.00-------14.0000 THOU BL-2001-25K (14 PER K)-------- -----196.00 ------- - ----------------------------- Other Fees STATE SURCHARGE 4.50 ---------------------------------------------------------------------------- Fee summary Charged Paid . . Credited Due .` ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 291.7.5 291.75 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 296.25 296.25 .00 .00 4 ' Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or,not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or loc law regulating construction or the performance of construction. I IVI Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 4174735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water AIR SEAL: Walls Ceiling FRAMING: Joists/Girders I Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type _ Date Accepted By Electrical 417-4735 Construction -R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 THE For City Use CITY OF tea- Permit# W A S H 1 N GT O N, U. S. Date Received: L— 6�—1 321 E 51h Street Date Approved �' Lt —i(a Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permits@cityofga.us BUILDING PERMIT APPLICATION Project Address:824 E 8th Phone:452-3154 Primary Contact:Ken Tobias Email: Alpha @olypen.corn Na11eParkridge Center Condominium phone 452-7923 (Jerry Austin) Property Mailing Address Email Owner city Port Angeles State WA zip 98362 Name Alpha Builder Corp Phone 360-452-3154 Contractor Address 402 South Lincoln Emailalpha@olypen.com Information City port Angeles state WA zip 98362 Contractor License#ALPHAABC943LW Exp.Date:6-16-16 Legal Description: Zoning: Tax Parcel# Pro ect Value: (materials and labor) $ 1 ,560.00 Residential ❑ Commercial 8 Industrial ❑ Public ❑ Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) 8 Classification For the following,fill out both pages of permit application: (check New Construction ❑ Exterior Remodel ® Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes 0 No D Existing? Yes 0 No 0 10 0 In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwater0cityo a.us Project Description SHAKE FACADES WITH SNAP-LOCK METAL ROMING RIBROOF SAKE FACADES WITH SNAP-LOCK LIETAL IMMMS Is project in a Flood Zone: Yes ❑ No8 Flood Zone Type: If in a Flood Zone,what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. 7L - 7 Date Print Name Signature