Loading...
HomeMy WebLinkAbout906 Milwaukee Drive Address: 906 Milwaukee Drive 106 M /t( j",v� PREPARED 6/12/15, 9:37:59 INSPECTION TICKET PAGE 6 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 6/12/15 --------- --------- ADDRESS . : 906 MILWAUKEE DR SUBDIV: CONTRACTOR : PHONE : OWNER : RANDELL E AND RITA M BAUMAN PHONE : (360) 461-3246 PARCEL 06-30-00-9-7-0079-0000- APPL NUMBER: 15-00000500 DEMOLITION ------ —--------- ----------- PERMIT: DEMO 00 DEMOLITION REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ' ----------------------- --- ------------- --------------—------ ---------- ------------ BL99 01 6/12/15 J BLDG FINAL June 12, 2015 9:27:22 AM jlierly. ------------------------- ----------- COMMENTS AND NOTES ---- CITY OF PORT ANGELES \ DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 t-. nr Application Number . . . . . 15-00000500 Date 5/11/15 Application pin number . . . 677000 AddressProperty DR ASSESSOR PARCELNUMBER: 06630-00-9MILWAUKEE 0079-0000- REPORT SALES TAX Application type description DEMOLITION on your state excise tax form Property Name . . . . . . to the City of Port Angeles Pro ert Use Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation 1000 Application desc DEMO DETACHED GARAGE (HOME OWNER DOING WORK) ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ RANDELL E AND RITA M BAUMAN OWNER 906 MILWAUKIEE DRIVE PORT ANGELES WA 98363 (360) 461-3246 ---------------------------------------------------------------------------- Permit . . . . . . DEMOLITION Additional desc . . HOME OWNER TO DEMO GARAGE Permit Fee . . . . 50.00 Plan Check Fee .00 <v Issue Date . . . . 5/11/15 Valuation . . . . 0 Expiration Date . . 11/07/15 \ Qty Unit Charge Per Extension BASE FEE 50.00 --------- ------ ------------------- V Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ------------------ -------- ----------- ------------------- �• Fee summary Charged Paid Credited Due ------------------ ---------- ---------- Permit Fee Total 50.00 50.00 .00 .00 '^ Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 54.50 54.50 .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of cons,ruc ion. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD -- PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Only) T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted b MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction-R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit THE For Cit Use CITY OF ; �RT �NGELES v Permit# �JT�� W A S H I N G"T O N, U . S. Date Received: 321 E Slh Street Date Approved Port Angeles,WA 9836 P:360-417-4817 F:360-417-4711 Email:permitsC@cit�ofpa.us BUILDING PERMIT APPLICATION Project Address: Phone: Primary Contact: Email: Name Phone Property Mailing Address Email Owner City State Zip Name Phone Contractor Address Email Information City State Zip Contractor License# Exp.Date: Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor) Residential Commercial ❑ Industrial ❑ Public ❑ Permit Demolition Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑ Classification For the following, fill out both pages of permit application: (check New Construction ❑ ,Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑ appropriate) Mechanical ❑ Plumbing ❑ Other ❑ Fire Sprinkler System ProposedIrrigation System Proposed or Proposed Bathrooms Proposed Bedrooms or Existing? Yes E3 No D Existing? Yes E .No E3 In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to www.stormwatercityofpa.us Project Description Is project in a Flood Zone: Yes ❑ No Flood Zone Type: If in a Flood Zone, what is the value of the structure before proposed improvement? $ I have read and completed the application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not refundable after review has occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application will be considered abandoned and the fees will be forfeited. Date Print Name Signature Residential Structures Existing Proposed Construction For Office Use Area Descriptions(SQ FT) Floor area Floor area $Value new area Basement First Floor Second Floor Covered Deck/Porch/Entry Deck(over 30" or z" floor) Garage Carport Other(describe) Area Totals Commercial Structures Area Descriptions(SQ FT) Existing Proposed Construction For Office Use Floor area Floor area $Value new area Existing Structure (s) Proposed Addition Tenant Improvement? 4 Other work(describe) Site Area Totals Lot/Site Coverage Calculations Lot Size (sq ft) Lot Coverage (sq ft)foot print of %Lot Coverage (Total lot cov_lot size) Max Bldg Height all structures sq ft Site Coverage(Sq Ft of all impervious) %of Site Coverage (total site cov_lot size) Mechanical Fixtures Indicate how many of each type of fixture to be installed or relocated as part of this project. Air Handler Size: # Haz/Non-Haz Piping Outlets: Appliance Exhaust Fan # Heater(Suspended, Floor,Recessed wall) # Boiler/Compressor Size: # Heating/Cooling appliance # —] -repair/alteration Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas # ortable) Fireplace/Gas Stove/Gas Cook Stove/Misc. Fuel Gas Piping #of Outlets: Ventilation Fan,single duct # Furnace/Heat Pump/ Size: # Ventilation System # Forced Air Unit Plumbing Fixtures Indicate how many of each type of fixture to be installed or relocated Plumbing Traps # Water Heater # Plumbing Vent piping # Medical gas piping #of Outlets: Water Line # Fuel gas piping #of Outlets: Sewer Line # Industrial waste pretreatment interceptor Grease Trap) Size Other(describe): T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx