Loading...
HomeMy WebLinkAbout909 Joshua Street Address: 909 Joshua Street PREPARED 6/26/14, 11:46:46 INSPECTION TICKET PAGE 2 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 6/26/14 -- --- --- --- ADDRESS . : 909 JOSHUA ST SUBDIV: CONTRACTOR FAST WATER HEATER COMPANY PHONE (425) 636-7054 OWNER RUDY MARION / JULIE J RIDGWAY PHONE (360) 477-5635 PARCEL 06-30-01-7-6-0100-0000- APPL NUMBER: 14-00000586 PLUMBING PERMIT -- -- ------ -- ---- -- - PERMIT: PL 00 PLUMBING PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ---- --- ------------- -- PL99 01 6/26 14 JLL PLUMBING FINAL June 26, 2014 11:47:50 AM pbarthol. Rudy 477-5635 -------------------------------------- COMMENTS AND NOTES -------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Application Number . . . . . 14-00000586 Date 6/05/14 Application pin number . . . 576632 Property Address . . . . . . 909 JOSHUA ST ASSESSOR PARCEL NUMBER: 06-30-01-7-6-0100-0000- REPORT SALES TAX Application type description PLUMBING PERMIT on your state excise tax form Subdivision Name . . . . . . Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation . . . . 1137 ------------ Application desc WATER HEATER REPLACEMENT ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ RUDY MAXION / JULIE J RIDGWAY FAST WATER HEATER COMPANY 909 JOSHUA ST 12601 132ND AVE NE PORT ANGELES WA 98363 KIRKLAND WA 98034 (360) 477-5635 (425) 636-7054 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBINGPERMIT Additional desc . . WATER HEATER REPLACEMENT el Permit Fee . . . . 57.00 Plan Check Fee .00 Issue Date . . . . 6/05/14 Valuation . . . . 0 Expiration Date 12/02/14 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 7.0000 EA PL-WATER HEATER ---7.00 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 57.00 57.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 57.00 57.00 .00 .00 1 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD - PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bldgs) PLUMBING: Under Floor/Slab Rough-In Water Line Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted b AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall Interior Braced Panel Ont T-Bar INSULATION: Slab Wall/Floor/Ceiling MECHANICAL: Heat Pum /Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted b MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parkin /Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE Inspection Type Date Accepted By Electrical 417-4735 Construction-R.W. PW I Engineering 417-4831 Fire 417-4653 Planning 417-4750 Building 417-4815 T:Forms/Building Division/Building Permit From: 06/11/2014 05:35 #932 P.001/002 CITY OF PORT ANGELES Owe— DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Application Number . . . . . 14-00000586 Date 6/05/14 Application pin number . . . 576632 Property Address . . . . . . 909 JOSHUA ST ASSESSOR PARCEL NUMBER: 06-30-01-7-6-0100-0000- REPORT SALES TAX Application type description PLUMBING PERMIT Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY (Location Code 0502) Application valuation . . . . 1137 --- Application desc WATER HEATER REPLACEMENT ---------------------------------------------------------------------------- Owner Contractor ----------------------'- ------------------------ RUDY MARION / JULIE J RIDGWAY FAST WATER HEATER COMPANY 909 JOSHUA ST 12601 132ND AVE NE PORT ANGELES WA 98363 KIRKLAND WA 96034 (360) 477-5635 (425) 636-7054 ---------------------------------------------- ----------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . . WATER HEATER REPLACEMENT Permit Fee . . . . 57.00 Plan Check Fee .00 Issue Date . . . . 6/05/14 Valuation . . . . 0 Expiration Date 12/02/14 Oty Unit Charge Per Extension BASE FEE 50.00 1.00 7.0000 EA PL-WATER HEATER 7.00 ------------------------------------------------------------------------ Fee summary Charged Paid Credited Due ------------^---- ---------- ---------- ---------- ---------- Permit Fee Total 57.00 57.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 57.00 57.00 .00 .00 Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements.This permit becomes null and void If work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced,or if required Inspections have not been requested within 180 days from the last inspection. I hereby certify that 1 have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. S at E Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forrns/8ui1dm9 DMsion/Building Permit TH Eal -- --- CITY OF � -RT For City Use W A S H i N -G T 0 N, U . S. Permit# �j 321 East 51b Street Date Received: /g-/ Port Angeles, WA 98362 Date Approved P: 360-417-4817 F: 360-417-4711 permits@cityofpa.us Building Permit Application Project Address: main Contact: 4 �'�.��� .: Phone# Lt =�3,� E-Mail: 5 L Property Name' a�l 1 Phone Owner Mail ng'Address � Email t7 City State Zi �''ow' - ^ 'rte- 9.3°6 , Contractor Name t ra L . ` G '� Shone, Mailing Address Email I l-11 lU C'x e2- r C-tState t a1? ."0 er"� e '•tri Contractor License# w w v�c(u�: c Expiration: t tLI Project Value: Zoning: Tax Parcel## Lot# Type of Residential Commercial ❑ Industrial ❑ Public ❑ Permit Demolition ❑ Fire 13 Repair ❑`- Reroof(tear off/lay over) ❑ Far the following,frill out both pages of permit application: New Construction ❑ Remodel ❑ Addition ❑ Tenant Improvement ❑ Mechanical XPlumbing ❑ Other Existing Fire Sprinkler System? Maximum.height of structure ProposedBedrooms f Proposed Bathrooms Yes ❑ No 13 1 Project C Description �All+t <' ti L b I have read and completed the application and know it to be true and correct.I am Authorized to apply for this permit. I understand that it is my responsibility to determine what permits are required and to obtain permits prior to working on projects. l understand that the plan review fee is not refundable after plan review has occurred. I.understand that I will forfeit the review fee if I cancel or withdraw the application before the permit is issued. I understand that if the permit is not issued within 180 days of receipt,the application will be considered abandoned and the fees forfeit. Tate Print Name Signature