Loading...
HomeMy WebLinkAbout125 W Front St - Engineering CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 O~.-73,~ Application Number Property Address ASSESSOR PARCEL NUMBER Application description Subdivision Name Property Zoning Application valuation 03-00000735 Date 125 W FRONT ST 06-30-00-5-0-5210-0000- PUBLIC WORKS UTILITES 9/11/03 o Owner Contractor COLOMPOS TTE EFFIE LAKESIDE INDUSTRIES 217 W 4TH ST POBOX 7016 PORT ANGELES WA 983622807 ISSAQUAH WA 980277016 (425) 531-3260 Structure Information STORM DRAINAGE FOR PARKING LOT I T; w fwJ;; Permit Additional desc Permit Fee Issue Date RIGHT OF WAY STORM DRAINAGE 45 00 7/28/03 FOR PARKING LOT Plan Check Fee Valuation 00 o Qty Unit Charge Per BASE FEE Extension 45 00 Fee summary Charged Paid Credited Due Permit Fee Total Plan Check Total Grand Total 45 00 00 45 00 45 00 00 45 00 00 00 00 00 00 00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T'\PLANNING\FORMS\1102.15 [412002] BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULA TE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCA nON KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION TYPE DATE ACCEPTED COMMENTS YES I NO FOUNDATION FOOTINGS WALLS FOUNDA TION DRAINAGE ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT # ROUGH-IN PLUMBING - UNDER FLOOR / SLAB ROUGH-IN WATER LINE GAS LINE BACK FLOW / WATER AIR SEAL WALLS CEILING I FRAMING JOISTS / GIRDERS SHEAR WALL WALLS / ROOF / CEILING DRYWALL T-BAR INSULATION SLAB WALL / FLOOR / CEILING MECHANICAL HEAT PUMP WOOD STOVE / PELLET / CHIMNEY HOOD / DUCTS PW UTILITIES / SITE WORK (Engineering Division) SEPARATE PERMIT #'s: W A TERLlNE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT SEPARA TE PERMIT #'s SEPA. PARKING/LIGHTING ESA. LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W / PW/ CONSTRUCTION R.W ENGINEERING 417-4807 PW / ENGINEERING FIRE 417-4653 FIRE DEPT PLANNING DEPT 4]7-4750 PLANN]NG DEPT BUILDING 417-4815 BUILDING T'\PLANNING\FORMS\I 102.15 [4/2002] c1 ,OAT ~.... $:~ ~ ...~ ~ '1,;,,,,_"" CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number Property Address ASSESSOR PARCEL NUMBER: Application description Subdivision Name Property Zoning . . . Application valuation 03-00000735 Date 9/11/03 125 W FRONT ST 06-30-00-5-0-5210-0000- PUBLIC WORKS UTILITES o Owner Contractor COLOMPOS TTE EFFIE LAKESIDE INDUSTRIES 217 W 4TH ST P. O. BOX 7016 PORT ANGELES WA 983622807 ISSAQUAH WA 980277016 (425) 531-3260 Structure Information STORM DRAINAGE FOR PARKING LOT Permit Additional desc Permit Fee Issue Date RIGHT OF WAY STORM DRAINAGE 45.00 7/28/03 FOR PARKING LOT Plan Check Fee Valuation .00 o Qty Unit Charge Per BASE FEE Extension 45.00 Fee swmnary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 45.00 45.00 .00 .00 Plan Check Total . OCt - .00 .00 .00 Grand Total 45.00 45.00 .00 .00 'f5 V( t r (j) ~ Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied With whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLANNING\FORMS\1102.15 [4/2002]