Loading...
HomeMy WebLinkAbout1119 Eckard Ave - Engineering CITY OF PORT ANGELES PUBLIC WORKS - UTILITIES DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number Applicat10n pin number Property Address ASSESSOR PARCEL NUMBER: Application type description Subd1vision Name Property Use Property Zoning . . . Application valuation 05-00000602 Date 332040 1119 ECKARD AVE T6-30-14-5-4-0560-0003- RES NEW SFR 7/25/05 RS7 RESDNTL SINGLE FAMILY 142825 Owner Contractor GLENN-TERRA, INC. 136 E. 8TH ST. # 223 PORT ANGELES WA 98362 OWNER Other struct 1nfo . TOTAL % LOT COVERAGE NUMBER OF STORIES LOT SIZE TOTAL LOT COVERAGE NUMBER OF UNITS 25.47 1. 00 9635.00 2455.00 1. 00 Permit PUBLIC WORKS RES WATER SERV Additional desc 5/8" DROP IN WATER METER Permit pin number 55327 Permit Fee 175.00 Plan Check Fee Issue Date 7/25/05 Valuation Expiration Date 1/21/06 .00 142825 Qty Unit Charge Per BASE FEE Extension 175.00 Permit . . . . . Additional desc . Permit pin number Permit Fee Issue Date Expiration Date RIGHT OF WAY 55319 50.00 7/25/05 1/21/06 Plan Check Fee Valuation .00 142825 Qty 1. 00 Unit Charge Per 50.0000 ECH RIGHT OF WAY PERMIT Extension 50.00 Permit . . . . . Additional desc . Permit pin number Permit Fee Issue Date Expiration Date SANITARY SEWER HOOK UP 55301 110.00 7/25/05 1/21/06 Plan Check Fee Valuation .00 142825 Qty 1. 00 Unit Charge Per 110.0000 EA SAN SEWER HOOKUP Extension 110.00 Special Notes and Comments Building address sign shall not be less than 6" & not more than 12" in he1ght. Numbers colors must contrast with wall color they are mounted on. (Ord. 14.36.050-E) When roof gutters are installed, drains will located in dry wells or piped to approved storm drain location. No pressurized or pumping to curbs are allowed. An inspection Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and publiC improvements. ThiS permit becomes null and void If work or construction authorized IS not commenced Within 180 days, If construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or If required inspections have not been requested Within 180 days from the last inspection I hereby certify that I have read and examined thiS application and know the same to be true and correct. All proVIsions of ws and ordinances governing thiS type of work Will be complied With whether specified herein or not. The granting of a permit does not p sume to give authOrity to Violate or cancel the provisions of any state or local law regulating construction or the performance of co structlon. -:t-{z.? oS Date Signature of Owner (If owner IS builder) Date T \Pohcles\1102 lSR [1/0SJ CITY OF PORT ANGELES PUBLIC WORKS - UTILITIES DNISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Applicat10n Number . . . . . 05-00000602 Application pin number 332040 Page Date 2 7/25/05 Special Notes and Comments by Building Department is required prior to backfill. 07/19/2005 11:15 AM SROBERDS -- The proposal w111 result in a new two story s.f. res w/attached garage in the RS-9 zone for total lot coverage of 26%. No land use issues are noted. $713 Connect Fee Electrical load calculations and permits are required. 07/14/2005 06:54 AM JHEBNER ---------------------------- Any modifications to the electrical facilities will be at the customer's expense. 07/14/2005 06:55 AM JHEBNER ---------------------------- Ditches and 12" culverts will be installed to City Stanards. See public works Engineering for Standards. 07/21/2005 02:35 PM RVESS ------------------------------ Sanitary sewer connection inspection is required by Public Works prior to back fill of ditch. Other Fees SEWER SYSTEM DELV CHARGE STATE SURCHARGE PW WATER SYSTEM USE FEE 745.00 4.50 1025.00 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 335.00 335.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 1774.50 1774.50 .00 .00 Grand Total 2109.50 2109.50 .00 .00 Separate Permits are required forelectncal work, SEPA, Shoreline, ESA, utilities, pnvate and public Improvements ThiS permit becomes null and void if work or construction authorized is not commenced within 180 days, If construction or work is suspended or abandoned for a penod of 180 days after the work as commenced, or If required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provIsions of laws and ordinances governing thiS type of work will be compiled with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the prOVIsions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authonzed Agent Date Signature of Owner (If owner IS builder) Date T IPohcleslll02 15R [l/05]